CH Development Project Drawings
CH Development Project Drawings
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
E/01
S/01 501
402
S/02 501
S/03 502
PRECAST CONCRETE PANEL
RETAINING WALL ON BOUNDARY
EXCAVATION ADJACENT TO
D NEIGHBOURING BUILDING D
CARPARK
NEIGHBOURING BUILDING
KLIPLOK CLADDING ON
540x210 FABRICATED STEEL CONCRETE MEDIAN STRIP
STEEL FRAMED WALL STRUCTURE
PORTAL FRAME
Tander Ave
J J
I I
DRAINAGE
GRATE
DRAINAGE
GRATE
DRAINAGE
GRATE
WAREHOUSE
E/02
401
BOLLARDS TO PROTECT
DRAINAGE DRAINAGE
EXIT DOOR
OPEN GRATE GRATE
E/04
E/05
401
401
WAREHOUSE SEALED CONCRETE
SEALED CONCRETE
BLOCK WALL
SEALED CONCRETE STEEL STAIR TO RESIDENCE
STEEL FIRE BLOCK WALL BLOCK WALL
EXIT DOOR
1 2 3 4 5 6 7 8 9 10 11 DELIVERY TRUCK 12 13 14 15 16 17 18 19 20 21 22
ACCESS
Garth Rd
S/03 502
S/02 501
S/01 501
E/03
402
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
E/01
S/01 501
402
S/02 501
S/03 502
FEMALE
D M WC MALE WC M D
PRECAST CONCRETE PANEL WALL PRECAST CONCRETE PANEL MEETING
S/05 504 RETAINING WALL ROOM LIGHT FRAMED S/05 504
PLASTERBOARD WALL
L 21
20
19 GENERAL L
18
OFFICE
17
16
15 MEZZAININE LEVEL
14
13
12
[240 sqm] GREATER THAN 200 sqm
MANAGER'S 11
OFFICE 10
9
8 LIGHT FRAMED PLASTERBOARD WALL
7
6
K K
NEIGHBOURING BUILDING
KLIPLOK CLADDING ON
STEEL FRAMED WALL STRUCTURE 540x210 FABRICATED STEEL
PORTAL FRAME PRECAST CONCRETE
TILT-UP WALL
J J
E/02
401
STEEL STAIR TO RESIDENCE
E/04
E/05
401
401
SEALED CONCRETE
SEALED CONCRETE SEALED CONCRETE
STEEL FIRE BLOCK WALL
BLOCK WALL BLOCK WALL BUILT-IN
EXIT DOOR
PLANTER BOX
H H
C C
STAIRS TO LOWER
MASTER BATH
KLIPLOK CLADDING ON RETAIL FLOOR
STEEL FRAMED WALL STRUCTURE 540x210 FABRICATED STEEL BED
PORTAL FRAME BED 2
LDY
G G
VOID OVER VOID OVER TERRACE
MEALS
RETAIL RETAIL
RETAIL KITCHEN
B B
EXPRESSED JOINT FACADE PANELS EXPRESSED JOINT FACADE GLAZED CURTAIN WALL
ON FRAMED WALL PANELS ON FRAMED WALL
PRECAST CONCRETE
UC310-138
TILT-UP WALL
COLUMN
E E
A ALUMINIUM A
PRECAST CONCRETE PRECAST CONCRETE
STOREFRONT WINDOW
TILT-UP PANELS TILT-UP WALL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
S/03 502
S/02 501
S/01 501
E/03
402
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
E/01
S/01 501
402
S/02 501
S/03 502
D M M D
S/05 504 S/05 504
L L
K K
J J
I I
E/02
401
E/04
E/05
401
401
H H
C C
G G
E E
A A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
S/03 502
S/02 501
S/01 501
E/03
402
A B C D
A B C D
D C B A
+5,000
2 GROUND FLOOR
D C B A
M LI K J I H G F E
KLIPLOK ROOFING ON
STEEL ROOF FRAMING
ALUMINIUM FRAMED
WINDOWS
KLIPLOK CLADDING ON
STEEL WALL FRAMING
PRECAST CONCRETE
+8,000 RETAINING WALL
3 FIRST FLOOR
STEEL DOOR
+5,000
2 GROUND FLOOR
OVERHEAD
STEEL DOOR STEEL DOOR
WAREHOUSE DOOR
M LI K J I H G F E
22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
KLIPLOK ROOF SHEETING ON KLIPLOK ROOF SHEETING ON
KLIPLOK ROOF SHEETING ON PRECAST CONCRETE
STEEL FRAMED ROOF STRUCTURE KLIPLOK ROOF SHEETING ON
STEEL FRAMED ROOF STRUCTURE ROOF WINDOW STEEL FRAMED ROOF STRUCTURE TILT-UP WALL
220x63 STEEL PURLINS
ALUMINIUM WINDOW KLIPLOK ROOF SHEETING
ROOF WINDOW
STEEL FABRICATED
STAIR PRECAST CONCRETE
TILT-UP WALL
TANDER AVE
NGL
RL +5,000
GROUND FLOOR
8,820 4,080 6,425 7,800 6,425 6,425 6,475 5,640 5,645 5,640 18,225 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,001 5,999
RL +0
AHD
22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PRECAST CONCRETE ALUMINIUM STOREFRONT KLIPLOK ROOF SHEETING ON
KLIPLOK ROOFING KLIPLOK ROOF SHEETING ON TILTING GLAZED OPENING KLIPLOK ROOF SHEETING
TILT-UP PANEL WINDOWS AND DOUBLE DOOR STEEL FRAMED ROOF STRUCTURE
STEEL FRAMED ROOF STRUCTURE ON STEEL FRAMED
PRECAST CONCRETE ROOF WINDOW ROOF STRUCTURE
ROOF WINDOW
TILT-UP WALL
KLIPLOK
COLORBOND FASCIA PANEL PRECAST CONCRETE PANEL CLADDING
RETAINING WALL
EXPRESSED JOINT
PRECAST CONCRETE TILT-UP FACADE PANELS
+8,000 WALL AT FAR SIDE
3 FIRST FLOOR ALUMINIUM
STOREFRONT WINDOWS
AND DOUBLE DOOR
+5,000
2 GROUND FLOOR
5,999 6,001 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 18,225 5,640 5,645 5,640 6,475 6,425 6,425 7,800 6,425 4,080 8,820
±0
0 AHD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
D A
COLORBOND FLASHING
+5,000
2 GROUND FLOOR
±0
0 AHD
49,700
D A
E F G H I J K I L M
+5,000
GROUND FLOOR
±0
AHD
6,149 6,149 6,149 6,149 6,149 6,149 5,392 756 6,149
E F G H I J K I L M
1 2 3 4 5 6 7 8 9 10 11
PRECAST CONCRETE
TILT-UP WALL
OPEN WAREHOUSE
+8,000
FIRST FLOOR CONCRETE STRIP FOOTING
TANDER AVE
+5,000
GROUND FLOOR
±0
AHD
5,999 6,001 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000
1 2 3 4 5 6 7 8 9 10 11
SUSPENDED CEILING
KLIPLOK CLADDING ON
STEEL PURLINS
RESIDENCE
RETAIL
STEEL FABRICATED STAIR RETAIL RETAIL REINFORCED
CONCRETE CONCRETE SLAB
BLOCK WALL
ALUMINIUM WINDOW
RETAIL CONCRETE BEAM
RETAIL
STEEL FABRICATED STAIR STEEL DOOR BAR/CAFE
STEEL DOOR
18,225 5,640 5,645 5,640 6,475 6,425 6,425 7,800 6,425 4,080 8,820
12 13 14 15 16 17 18 19 20 21 22
ALUMINIUM WINDOW
ROOF WINDOW
STEEL FABRICATED
STAIR
8,820 4,080 6,425 7,800 6,425 6,425 6,475 5,640 5,645 5,640 18,225
22 21 20 19 18 17 16 15 14 13 12
11 10 9 8 7 6 5 4 3 2 1
KLIPLOK ROOF
TILT-UP SLAB WALL PANELS
SHEETING ON
220x63 STEEL
PURLINS
FABRICATED
STEEL TRUSS
UC310-138
STEEL COLUMN
TANDER AVE
6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,001 5,999
11 10 9 8 7 6 5 4 3 2 1