Anowara Knit Composite Limited: Consultant Name

The document provides details on slab end reinforcing, scope of embedment for beams and columns, location of column splices, reinforcement around openings in concrete walls, and confinement requirements for columns at joints. It includes diagrams showing minimum bar lengths and spacing for slab edges, beams receiving slab bars, and reinforcement around openings. Confinement requirements specify minimum tie bar spacing or dimensions around columns at joints.

Uploaded by

Md Suruzzaman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
0% found this document useful (0 votes)
49 views

Anowara Knit Composite Limited: Consultant Name

The document provides details on slab end reinforcing, scope of embedment for beams and columns, location of column splices, reinforcement around openings in concrete walls, and confinement requirements for columns at joints. It includes diagrams showing minimum bar lengths and spacing for slab edges, beams receiving slab bars, and reinforcement around openings. Confinement requirements specify minimum tie bar spacing or dimensions around columns at joints.

Uploaded by

Md Suruzzaman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 1

20. SLAB END REINFORCING DETAILS 23. SCOPE OF EMBEDMENT 26.

COLUMN SPLICE LOCATION


a) FREE END OF SLAB INCAPABLE OF EMBEDDING OF STEEL BAR IN Main reinforcement Stirrups/ties
BEAM/WALL
- Beam that receives bars of slab
b) OTHERS - Main beam that receives bars of
sub-beam
slab slab
10 - Column that receives bars of
1 (a) (b) main beam or foundation beam
A
min.6 ONLY WITHIN CENTER HALF
min.6 Mark is scope of embedment
OF CLEAR COLUMN HEIGHT Joint of stirrups/ties alternately
min.6 at the main bars on adjacent
CL corners of the column as shown

FLOOR LEVEL
10 10 slab
24. OPENING IN R.C.C. WALLS
slab
10 NOT LESS THAN THREE NO. 20mm Ø BARS SHALL BE PROVIDED AROUND ALL
(b) (b) DOOR AND WINDOW OPENINGS IN R.C.C. WALLS. THE BAR SHALL BE
1
EXTENDED BEYOND THE CORNERS OF THE OPENINGS TO A DISTANCE
min.6
EQUAL TO THE DEVELOPMENT LENGTH BUT NOT LESS THAN 600.
A IS AREA FOR SPLICE OF COLUMN REINFORCEMENT. MAXIMUM 50% OF
TOTAL BAR IS SPLICED AT ONE LEVEL.
21. REINFORCEMENT DETAILS FOR SLAB OPENINGS
H = CLEAR COLUMN HEIGHT
L1

b b a
27. CONFINEMENT REQUIREMENTS OF COLUMN AT JOINTS
R.C.C. Wall (typical)
FOR EARTHQUAKE LOADING
Opening

L1
<2S0
La. Lb =
< 600

Lb n1 Opening
La min.3-20mm Ø 1/6 clear span of member OR
c lo> maximum cross sectional dimension OR
20 inch
a min. 3-20mm Ø
L1

n2
L1

8db (smallest longitudinal bar) OR


n1,n2 : The number of bars which are cut off 24d b (tie bar) OR
S0 < 1/2 (smallest member dimension)
for opening
a The number of extra bars > n1/2 12 inch
(top and bott bars) 25. END HOOK OF STIRRUPS
b The number of extra bars > n2/2 <2S0
(top and bott bars) Main bar
c The number of extra bars = 2-12mm Ø
(top and bott bars)

22. RECOMMENDED END HOOKS 28. CONFINEMENT REQUIREMENTS OF BEAM AT JOINTS


FOR EARTHQUAKE LOADING
Bar Form and Bend Angle Bend Used Location d/4
hook Extention (degree) Radius (r) Bar 8db(smallest longitudinal bar)
s< 24d b (hoop bar)
Primary db r 6 Lap splice 12 inch
reinf. 180° r = 2db to end of anchorage

4db 25
db 6 Stirrups
Tie/stirrups s < d/2
135° r = 1.25db to fastening bar
diagonal hoop
12 Fastening bar
Primary 6 Bend-up for Additonal bar
db
reinf. embedment Stirrup
90° r = 2.5db to Cross tie
12db 32 END HOOKS OF STIRRUPS ARE LOCATED ALTERNATELY AT TOP

8 Bend bar in CORNER BAR OF THE SECTION.


Slab db
45° r = 5db to slab Stirrup ties
20

CLIENT NAME & ADDRESS CONSULTANT NAME:


Combined Effluent Treatment Plant for Anowara Knit Composite Limited Engr. M.M Sanjidul Islam - -
Prof. Engr. Ruhul Amin (BUET)
Anowara Knit Composite Limited B.Sc in Civil, MIEB-M/31346
Mulayed, Dhaka - Mymensingh Hwy, Mawna Union
236/5/A, South Pirerbag, 60 Feet, General Information-2 13/02/2022 04
Mirpur, Dhaka-1216. Engr. Md. Suruz Zaman