Seventh Semester B.E. Degree Examination, Feb./Mar. 2022
2
:2
Quantity Surveying and Contracts Management
A
01
Time: 3 hrs. Max. Marks: 100
-S
2
Note: Answer any FIVE full questions, choosing ONE full question from each module.
2. Any revealing of identification, appeal to evaluator and /or equations written eg, 42+8 = 50, will be treated as malpractice.
A
02
Module-1
-S
1
-2
What is an estimate? Explain briefly purpose and different types of estimates (any three).
A
02
(20 Marks)
-S
Important Note : 1. On completing your answers, compulsorily draw diagonal cross lines on the remaining blank pages.
OR
4-
2 The details of two room building are shown in the Fig.Q2. Estimate quantities and cost of
A
-1
m
-S
7p
A
A
:3
-S
-S
34
A
A
-S
01
-S
A
22
A
-S
-S
20
A
SA
2-
-S
-0
A
14
-S
A
-S
A
-S
1 of 3
-S
SA
pm
18CV71
5
Module-2
:2
3 The details of septic tank are shown in Fig.Q3. Estimate the quantities of following items
and cost. (20 Marks)
2
(i) Earthwork excavation at Rs. 400/m3
:2
(ii) PCC 1 : 3 : 6 for bed at Rs. 2500/m3
(iii) BBM in CM 1 : 4 at Rs. 2200/m3
A
01
(iv) R.C.C. 1 : 2 : 4 roof slab cover at Rs. 3000/m3
-S
(v) 12mm cement plaster for sidewalls at Rs. 200/m2
A
02
-S
-2
A
02
-S
4-
A
-1
-S
U
VT
m
-S
7p
A
A
:3
-S
-S
34
A
A
Fig.Q3
:
-S
01
-S
OR
4 Prepare a detailed estimate for earthwork for a portion of road from the following data:
A
22
Dist. 0 100 200 300 400 500 600 700 800 900 1000 1100 1200
A
-S
in m
-S
20
RL of
114.50
114.75
115.25
115.20
116.10
116.85
118.00
118.25
118.10
117.80
117.75
117.90
119.50
the
A
SA
ground
2-
-S
-0
RL of
115
formation
14
-S
(20 Marks)
Module-3
5 Write detailed specification for following :
A
2 of 3
SA
pm
18CV71
5
OR
:2
6 Analyse rates from first principle for following :
(i) Cement concrete 1 : 5 : 10 in foundation.
2
(ii) Ist class brick work in super structure with CM 1:6
:2
(iii) Coursed Rubber stone masonry in CM 1:6 for super structure.
(iv) 12 mm thick internal plastering in CM 1:6 for brick walls. (20 Marks)
A
01
-S
2
Module-4
A
What is tender? Explain the departmental procedure of tendering civil works.
02
7 (20 Marks)
-S
-2 OR
8 What are the different types of contracts? Explain any four types of contracts. (20 Marks)
A
02
-S
Module-5
4-
b. Secured advance
-S
c. Liquidated damages and bonus
U
m
-S
OR
7p
10 What is valuation? Explain briefly methods of valuation of buildings. (20 Marks)
A
A
:3
*****
-S
-S
34
A
A
-S
01
-S
A
22
A
-S
-S
20
A
SA
2-
-S
-0
A
14
-S
A
-S
A
-S
3 of 3
A
-S
SA