18CV71 Unlocked

This document appears to be an exam for a Quantity Surveying and Contracts Management course. It contains 5 questions, one from each module. Question 1 asks to explain the purpose and types of estimates, with examples of three types. Question 2 provides details of a two room building and asks to estimate quantities and costs of various construction items for its foundation, including earthwork excavation, bed concrete, and stonework.

Uploaded by

shaheed jafar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views3 pages

18CV71 Unlocked

This document appears to be an exam for a Quantity Surveying and Contracts Management course. It contains 5 questions, one from each module. Question 1 asks to explain the purpose and types of estimates, with examples of three types. Question 2 provides details of a two room building and asks to estimate quantities and costs of various construction items for its foundation, including earthwork excavation, bed concrete, and stonework.

Uploaded by

shaheed jafar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

pm

18CV71

5
USN

:2
Seventh Semester B.E. Degree Examination, Feb./Mar. 2022

2
:2
Quantity Surveying and Contracts Management

A
01
Time: 3 hrs. Max. Marks: 100

-S
2
Note: Answer any FIVE full questions, choosing ONE full question from each module.
2. Any revealing of identification, appeal to evaluator and /or equations written eg, 42+8 = 50, will be treated as malpractice.

A
02
Module-1

-S
1
-2
What is an estimate? Explain briefly purpose and different types of estimates (any three).

A
02
(20 Marks)

-S
Important Note : 1. On completing your answers, compulsorily draw diagonal cross lines on the remaining blank pages.

OR
4-

2 The details of two room building are shown in the Fig.Q2. Estimate quantities and cost of
A
-1

the following items of work:


-S
(i) Earthwork excavation foundation at Rs.380/m3
U

(ii) Bed concrete 1 : 4 : 8 for foundation at Rs.2600/m3


(iii) S.S.M. for foundation and basement at Rs.3600/m3
VT

m
-S

7p

A
A

:3

-S
-S

34

A
A

-S
01
-S

A
22
A

-S
-S

20

A
SA

2-

-S
-0

A
14

-S
A
-S
A
-S

Fig.Q2 (20 Marks)


A

1 of 3
-S
SA
pm
18CV71

5
Module-2

:2
3 The details of septic tank are shown in Fig.Q3. Estimate the quantities of following items
and cost. (20 Marks)

2
(i) Earthwork excavation at Rs. 400/m3

:2
(ii) PCC 1 : 3 : 6 for bed at Rs. 2500/m3
(iii) BBM in CM 1 : 4 at Rs. 2200/m3

A
01
(iv) R.C.C. 1 : 2 : 4 roof slab cover at Rs. 3000/m3

-S
(v) 12mm cement plaster for sidewalls at Rs. 200/m2

A
02

-S
-2

A
02

-S
4-

A
-1

-S
U
VT

m
-S

7p

A
A

:3

-S
-S

34

A
A

Fig.Q3
:

-S
01
-S

OR
4 Prepare a detailed estimate for earthwork for a portion of road from the following data:
A
22

Dist. 0 100 200 300 400 500 600 700 800 900 1000 1100 1200
A

-S

in m
-S

20

RL of
114.50

114.75

115.25

115.20

116.10

116.85

118.00

118.25

118.10

117.80

117.75

117.90

119.50

the
A
SA

ground
2-

-S
-0

RL of
115

formation
14

-S

Gradient Upward gradient 1 in 200 Downward gradient 1 in 400


Formation width of road is 10m. Side slope 2:1 in banking and 1½ : 1 in cutting. Calculate
also the cost of this earthwork in banking and cutting; the rates are Rs. 275/m3 and
A

Rs. 350/m3. Adopt Mid-Sectional area method.


-S

(20 Marks)

Module-3
5 Write detailed specification for following :
A

(i) Earthwork excavation for foundation


-S

(ii) Damp proof course 2.5cm (1) C.C. 1 : 1½ : 3


(iii) Burnt brick masonry for superstructure in CM 1:6
A

(iv) R.C.C. 1 : 2 : 4 for roof slab. (20 Marks)


-S

2 of 3
SA
pm
18CV71

5
OR

:2
6 Analyse rates from first principle for following :
(i) Cement concrete 1 : 5 : 10 in foundation.

2
(ii) Ist class brick work in super structure with CM 1:6

:2
(iii) Coursed Rubber stone masonry in CM 1:6 for super structure.
(iv) 12 mm thick internal plastering in CM 1:6 for brick walls. (20 Marks)

A
01

-S
2
Module-4

A
What is tender? Explain the departmental procedure of tendering civil works.

02
7 (20 Marks)

-S
-2 OR
8 What are the different types of contracts? Explain any four types of contracts. (20 Marks)

A
02

-S
Module-5
4-

9 Write a short notes on :


a. Mobilization and equipment advance
A
-1

b. Secured advance
-S
c. Liquidated damages and bonus
U

d. Dispute resolution mechanism


VT

e. Performance security. (20 Marks)


A

m
-S

OR
7p
10 What is valuation? Explain briefly methods of valuation of buildings. (20 Marks)

A
A

:3

*****
-S
-S

34

A
A

-S
01
-S

A
22
A

-S
-S

20

A
SA

2-

-S
-0

A
14

-S
A
-S
A
-S

3 of 3