Project Scope Statement

This document provides details for a highway project including its location, description, needs, solutions, exclusions, project team members, constraints, assumptions, risks, milestones, budget, initial needs, required agreements and permits, and necessary research. The project aims to address needs such as the number of lanes and condition of intersections and pavement from the project limits. Key dates include 30%, 60%, and 90% design milestones. The budget ranges from $X to $Y for items including planning, preliminary engineering, construction, and right of way. Initial needs include surveys, environmental reviews, and traffic requests. Required agreements include railroad, utility, and third party funding agreements.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Project Scope Statement

This document provides details for a highway project including its location, description, needs, solutions, exclusions, project team members, constraints, assumptions, risks, milestones, budget, initial needs, required agreements and permits, and necessary research. The project aims to address needs such as the number of lanes and condition of intersections and pavement from the project limits. Key dates include 30%, 60%, and 90% design milestones. The budget ranges from $X to $Y for items including planning, preliminary engineering, construction, and right of way. Initial needs include surveys, environmental reviews, and traffic requests. Required agreements include railroad, utility, and third party funding agreements.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT SCOPE STATEMENT

Date Prepared: Prepared By:


Project Stage: Project Name:

Highway: CSJ: County: Length: miles


Project Description:

Limits: From:
To:

Describe the project location as it currently is and what needs to be fixed, including # of
lanes, sidewalks, major intersections, structures, pavement scores, etc.
Project Need:

Describe the proposed work to be performed to address the project need.


Project Solution:

Include what type of work WILL NOT be performed in this project.


Project Exclusions:

Project Team: Project Manager Name


Design Lead Name
Designer Name
Designer Name
ENV Lead Name
ROW Lead Name
Utilities Lead Name
Traffic Lead Name
Construction Lead Name
Area Engineer’s Office Name
TxDOT
District Engineer Name
Stakeholders:
TP&D Name
UTP Team Name
External
Name
Stakeholders:
Name
Name
Name
Consultant: Project Manager Name
Design Lead Name
Sub Consultants Name
TxDOTCONNECT
Project comments:

Enter District/Division Name Page 1 of 4 Last reviewed: 06/28/2022


Other:

PROJECT CONSTRAINTS, ASSUMPTIONS, and RISKS


Provide a list of items that limit a project team’s options such as schedule, resources,
Constraints:
budget, and technology.

Provide a list of considerations that are considered true, certain, or real for planning
Assumptions:
purposes. (i.e. Project will not require additional ROW)

Risks: Provide a list of unknown occurrences that may affect the project for better or worse.
(Attach Risk Register) (i.e. New structures may impact existing wetlands)

MILESTONES
(attach P6 schedule) Target Date: Actual Date:
Start Date
30% PS&E Milestone
60% PS&E Milestone
90% PS&E Milestone
95% PS&E Milestone
100% PS&E Milestone
Ready to Let Date:
Proposed Let Date:
Est. Construction Start:
Est. Construction Finish:

BUDGET
Estimate Range
Item Minimum $ Maximum $
Planning
Preliminary
Engineering
(attach Estimate
Construction Spreadsheet)
Right Of Way
Utilities
Other 1
Other 2
TOTALS

INITIAL PROJECT NEEDS


Activity Completion Date Responsible
☐ Survey
☐ SUE
☐ Pavement Design
☐ Utility/ROW Permits
☐ Environmental (APD Stagegate Checklist)
☐ FAA Obstruction Evaluation
☐ Railroad Coordination

Enter District/Division Name Page 2 of 4 Last reviewed: 06/28/2022


☐ TPP Traffic Request
☐ Bridge Inspection Reports
☐ Crash Data
☐ Pedestrian/Bicycle Facilities
☐ Public Involvement meetings
☐ Other
REQUIRED AGREEMENTS, PERMITS and CERTIFICATIONS
Ye
No Responsible
s
Railroad Agreement
Names:
☐ ☐

Utility Escrow Agreement


Names:
☐ ☐

Third Party Funding Escrow Agreement


Names:
☐ ☐

☐ ☐ FAA Certification
☐ ☐ Construction Speed Zone
☐ ☐ Environmental Certification
☐ ☐ US Coast Guard Permit
☐ ☐ US Army Corps of Engineer Permit
☐ ☐ NOI (SWP3)
☐ ☐ Signal Agreements
☐ ☐ ROW Certification
☐ ☐ ROW Encroachment Letters
☐ ☐ Utility Certification
☐ ☐ Utility Permits/Agreements
☐ ☐ Other

PROJECT RESEARCH
Activity Completion Date Responsible
☐ Existing Typical Sections
☐ Existing Drainage Plans and Studies
☐ Existing Roadway Plans
☐ Existing Structure
☐ Existing ROW Map
☐ Existing Utilities
☐ Existing Utility Permits
☐ Pavement Scores
☐ Traffic Data
☐ Crash Data
☐ Initial Stagegate Checklist
☐ Other

Enter District/Division Name Page 3 of 4 Last reviewed: 06/28/2022



Enter District/Division Name Page 4 of 4 Last reviewed: 06/28/2022