The document is a bill of materials and cost estimate for Phase 1 of a proposed 3-storey residential building project. It includes 7 sections that estimate costs for general requirements, earthworks, concrete works, formworks/scaffoldings, steel works, masonry works, and sanitary/plumbing works. The total estimated cost is over 3.5 million pesos.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
387 views4 pages
Bill of Materials
The document is a bill of materials and cost estimate for Phase 1 of a proposed 3-storey residential building project. It includes 7 sections that estimate costs for general requirements, earthworks, concrete works, formworks/scaffoldings, steel works, masonry works, and sanitary/plumbing works. The total estimated cost is over 3.5 million pesos.