23-06-0075-01A JTI FCIE Comfort Room Rebovation Works Rev. 01 (6-30-23)

The document is a quotation from Cleanair Construction & Supply for renovation works at JT International Asia Manufacturing Corp's FCIE branch office. It provides a total amount of PHP 553,157 for the project and includes details of the scope of work such as dismantling and installing sanitary fixtures, tiles, doors and lights. The work is divided into general requirements and renovation works sections with items numbered and described. Payment terms require 100% progress billing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views3 pages

23-06-0075-01A JTI FCIE Comfort Room Rebovation Works Rev. 01 (6-30-23)

The document is a quotation from Cleanair Construction & Supply for renovation works at JT International Asia Manufacturing Corp's FCIE branch office. It provides a total amount of PHP 553,157 for the project and includes details of the scope of work such as dismantling and installing sanitary fixtures, tiles, doors and lights. The work is divided into general requirements and renovation works sections with items numbered and described. Payment terms require 100% progress billing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

CLEANAIR CONSTRUCTION & SUPPLY

B12L3 Kinston St., Carmel Heights


Governors Drive, Dasmarinas Cavite
E-mail address: [email protected]/ [email protected]
QUOTATION
[email protected] Tel no. (0922) 816-3225
Ref./Job No :023-06-0075-01A

Date : June 30, 2023

TO : JT INTERNATIONAL ASIA MANUFACTURING CORP


LIMA, MALVAR BATANGAS

ATTN : MS.IMEE PERMEJO


PROCUREMENT MGR

SUBJECT : JT INTERNATIONAL ASIA MANUFACTURING CORP


FCIE BRANCH OFFICE COMFORT ROOM AND OFFICE
RENOVATION WORKS

TOTAL AMOUNT: ON SITE (PHP) : 553,157.00

PROJECT LOCATION : PAYMENT TERMS 100% Progress Billing

CONSTRUCTION TERM : To be discussed


VALIDITY : 30 Days
NO. DESCRIPTION QTY UNIT ON SITE (PHP)

I. JT INTERNATIONAL ASIA MANUFACTURING CORP 1 LOT 462,870.00


FCIE BRANCH OFFICE COMFORT ROOM AND OFFICE
RENOVATION WORKS
(REV 01)

Work Schedule: TBD

Payment Terms and conditions:

100% Progress Billing

DIRECT COST 462,870.00


SUPERVISION / SITE EXPENSES 40,000.00
COMPANY OVERHEAD 50,287.00

SUB-TOTAL 553,157.00

12% VAT ZERO RATED

GRAND TOTAL 553,157.00

Prepared by: CLEANAIR CONSTRUCTION & SUPPLY

____________________________
Man Aguilar / Marvin Castardo MA. CELESTE MAYOL AGUILAR
OPC Engineer / Proj Mgr General Manager
REF. NO. 023-06-0075-01A CLEANAIR CONSTRUCTION & SUPPLY
DATE : 30-Jun-23 B12L3 Kinston St., Carmel Heights
Governors Drive, Dasmarinas Cavite
SUBJECT : JT INTERNATIONAL ASIA MANUFACTURING CORP E-mail address: [email protected]/ [email protected]
[email protected] Tel no. (0922) 816-3225
FCIE BRANCH OFFICE COMFORT ROOM AND OFFICE
RENOVATION WORKS

ITEM NO. DESCRIPTION QTY UNIT MATERIALS LABOR TOTAL COST


UNIT COST TOTAL COST UNIT COST TOTAL COST

I. GENERAL REQUIREMENTS

1.0 PPE's -Safety/ Workers Uniform 1 lot 8,640.00 8,640.00 - - 8,640.00


2.0 Mobilization / Demobilization 1 lot 10,800.00 10,800.00 4,320.00 4,320.00 15,120.00
3.0 PEZA Building Permits / Occupancy Permit ( Excluded-N/A ) lot - - - - -
4.0 Site Transportation / Delivery Cost 1 lot 8,640.00 8,640.00 3,456.00 3,456.00 12,096.00
5.0 Permit Processing (FCIE) 1 lot 5,400.00 5,400.00 1,890.00 1,890.00 7,290.00
6.0 Barangay Work Permit and Clearances 1 lot 5,400.00 5,400.00 - - 5,400.00
7.0 Board up Works 1 lot 8,640.00 8,640.00 3,456.00 3,456.00 12,096.00

I. GENERAL REQUIREMENTS 47,520.00 13,122.00 60,642.00

II RENOVATION WORKS - - - - -
A. COMFORT ROOM - - - - -

1.0 Dismantle and haul of Sanitary fixtures 1 lot - - 4,320.00 4,320.00 4,320.00
2.0 Chipping /Dismantling of tiles 32 sq.m 81.00 2,592.00 270.00 8,640.00 11,232.00
3.0 Dismantle of ceiling 6 pcs 56.70 340.20 189.00 1,134.00 1,474.00
4.0 Floor Preparation for Tiling works 32 sq.m 48.60 1,555.20 162.00 5,184.00 6,739.00
5.0 Installation of Tiles 32 sq.m 1,836.00 58,752.00 826.20 26,438.40 85,190.00
6.0 Ceiling Works (Gypsum in metal Stud) 6 sq,m 1,620.00 9,720.00 729.00 4,374.00 14,094.00
7.0 Water Closet 2 pcs 23,760.00 47,520.00 10,692.00 21,384.00 68,904.00
8.0 Lavatory 2 pcs 8,100.00 16,200.00 3,645.00 7,290.00 23,490.00
9.0 Bidet 2 pcs 2,160.00 4,320.00 972.00 1,944.00 6,264.00
10.0 Fixtures Accessoies 1 lot 1,944.00 1,944.00 874.80 874.80 2,819.00
11.0 Faucet for Lavatory 2 sets 3,240.00 6,480.00 1,458.00 2,916.00 9,396.00
12.0 Exhaust Fan 2 pcs 4,860.00 9,720.00 2,187.00 4,374.00 14,094.00
13.0 Painting of Ceiling 6 sq.m 1,296.00 7,776.00 583.20 3,499.20 11,275.00
14.0 New Panel Doors with Jamb 2 pcs 11,340.00 22,680.00 5,103.00 10,206.00 32,886.00
Door Painting Works 1 lot 3,780.00 3,780.00 1,701.00 1,701.00 5,481.00
Door Accessories (Door Knob, Hinges) 1 lot 5,940.00 5,940.00 2,673.00 2,673.00 8,613.00
Door Closer (Heavy Duty) 2 pcs 4,536.00 9,072.00 2,041.20 4,082.40 13,154.00
15.0 LED Downlight 6W 4 nos 486.00 1,944.00 218.70 874.80 2,819.00
16.0 Light Switch 2 nos 453.60 907.20 204.12 408.24 1,315.00
17.0 Termination works (To Re-use Wiring) 1 lot - - 3,240.00 3,240.00 3,240.00
18.0 Consumables / Miscellaneous 1 lot 10,562.13 10,562.13 4,224.85 4,224.85 14,787.00

ITEM II - A 221,804.73 119,782.69 341,586.00

SUB-TOTAL 269,324.73 132,904.69 402,228.00

TOTAL 316,844.73 146,026.69 462,870.00