This document summarizes the load calculation for panel MDB-1. It lists 16 feeders supplying various distribution boards and load center panels in Building T22-MDB with a total load of 1280 kW. It selects a 1600 kVA transformer to supply the average load of 1574.4 kVA and full load of 1280 kVA. It also calculates the requirements for a 480 kVAR capacitor bank and specifies circuit breakers and ratings to protect the low and high voltage sides of the system.

Uploaded by

l.suppachai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

SIG Main Power MDB Rev.01

This document summarizes the load calculation for panel MDB-1. It lists 16 feeders supplying various distribution boards and load center panels in Building T22-MDB with a total load of 1280 kW. It selects a 1600 kVA transformer to supply the average load of 1574.4 kVA and full load of 1280 kVA. It also calculates the requirements for a 480 kVAR capacitor bank and specifies circuit breakers and ratings to protect the low and high voltage sides of the system.

Uploaded by

l.suppachai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

LOAD CALCULATION

PANEL : MDB-1
SYSTEM : 3 Ph. 4W , 380/220 VAC
LOCATION : BUILDING T22-MDB
###
Load Connected Utilization Circuit Breaker
Feeder
ID No. Description Unit Phase Voltage Ib Ir Starter In IC ≥
No. kW % kW Type Pole AT AF
( ø) (V) (A) (A) (A) (kA)
F1 DB-6 BUILDING T22 DISTRIBUTION BOARD - 6 / SPARE 1 220.0 3 400 396.9 80% 176.0 317.5 MCCB 3 496.2 600 630 36
F2 DB-7 BUILDING T21 DISTRIBUTION BOARD - 7 / SPARE 1 220.0 3 400 396.9 80% 176.0 317.5 MCCB 3 496.2 600 630 36
F3 DB-1 BUILDING T24-RENO DISTRIBUTION BOARD - 1 1 220.0 3 400 396.9 80% 176.0 317.5 MCCB 3 496.2 600 630 36
F4 DB-2 BUILDING T24-RENO DISTRIBUTION BOARD - 2 1 120.0 3 400 216.5 80% 96.0 173.2 MCCB 3 270.6 300 400 36
F5 DB-5 BUILDING T24-RENO DISTRIBUTION BOARD - 5 1 120.0 3 400 216.5 80% 96.0 173.2 MCCB 3 270.6 300 400 36
F6 DB-3 BUILDING T24-RENO DISTRIBUTION BOARD - 3 1 100.0 3 400 180.4 80% 80.0 144.3 MCCB 3 225.5 250 250 36
F7 DB-4 BUILDING T24-RENO DISTRIBUTION BOARD - 4 1 100.0 3 400 180.4 80% 80.0 144.3 MCCB 3 225.5 250 250 36
F8 LCP-1 BUILDING T24-RENO LOAD CENTER PANEL-1 1 25.0 3 400 45.1 80% 20.0 36.1 MCCB 3 56.4 60 100 36
F9 LCP-2 BUILDING T24-RENO LOAD CENTER PANEL-2 1 25.0 3 400 45.1 80% 20.0 36.1 MCCB 3 56.4 60 100 36
F10 LCP-3 BUILDING T24-RENO LOAD CENTER PANEL-3 1 25.0 3 400 45.1 80% 20.0 36.1 MCCB 3 56.4 60 100 36
F11 LCP-4 BUILDING T24-RENO LOAD CENTER PANEL-4 1 25.0 3 400 45.1 80% 20.0 36.1 MCCB 3 56.4 60 100 36
F12 LCP-5 BUILDING T24-RENO LOAD CENTER PANEL-5 1 40.0 3 400 72.2 80% 32.0 57.7 MCCB 3 90.2 100 100 36
F13 LCP-6 BUILDING T24-RENO LOAD CENTER PANEL-6 1 40.0 3 400 72.2 80% 32.0 57.7 MCCB 3 90.2 100 100 36
F14 SPACE 1 - 3 400 - - - - MCCB 3 - - 100 36
F15 SPACE 1 - 3 400 - - - - - MCCB 3 - - 100 36
F16 1-CAP-1 Crushing Room Capacitor Bank , No. 1 1 - 3 400 - - - - - ACB 3 - 1,000.0 1,000 36
###
Main Total Load 1,280.0 3 400 2,309.4 80% 1,024.0 1,847.5 - ACB 3 2,309.4 2,500 2,500 50

TRANSFORMER for AVERAGE LOAD 123% 1,574.4 kVA 1000x100


SELECT TR = 1,600 kVA

TRANSFORMER for FULL LOAD 80% 1,280.0 kVA


SELECT TR = 1,600 kVA ITR = 2,309.4 A

CAPACITOR BANK = 30% TR.


= 480 kVAR SELECT 40 kVAR 12 Sets
= 480 kVAR ###
@Fuse = 1.5x[@kVAR/(1.732x0.4)]
= 86.61 A Connect 100 A
@Idisc. ≥ 1.35x[@kVAR/(1.732x0.4)]
77.94 A
Protection = Setsx1.5x[@kVAR/(1.732x0.4)]
= 1,039.26 A
ACB 1,040 AT Connect 1000 AT 1000 AF

CALCULATION LOW VOLT SIDE


Ir (LV)= (kVAx1000)/(1.732x400)
= 2,309.5 A
Icon.= 1.25xIr
= 2,886.8 A
CB MAIN≤ 2,886.8 A Connect 2500 AT 2500 AF

CALCULATION HIGH VOLT SIDE


Ir (HV)= (kVA)/(1.732x22)
= 41.99 A
Icon. ≥ 1.25xIr (HV) 2xIr (HV)
≥ 52.49 A 83.98 A Connect 100 A / Fuse Link 1000 A / W