Dry Type AC Hipot Tester
◆CE Certificate
◆ Hipot Tester
◆Control Box
◆ Warranty: 1 year
Technical Target
1. Impedance voltage: 4.5%-8%
2. Surface temperature rise: sine wave
3. Idle load loss consumption: 0.2%-0.35%
4. Allowable continuous operation time: 2 hours
5. Test time of the sample : 1mins at full load
6. Interrupted operation time: continuous
II. Major Technical Parameters
Input Output Output Max. External Net
Capacity
voltage voltage current dimension Weight
(KVA)
(V) (KV) (mA) (mm) (kg)
1.5 30 230x180x370 13
3 60 310x250x570 30
200
6 50 120 300x310x680 46
(400)
10 200 320x350x720 73
20 400 360x350x720 85
1
30 600 500x380x780 120
5 50 360x350x960 80
10 100 360x350x960 80
20 100 200 500x380x880 120
30 300 580x380x880 160
50 500 650x460x1010 230
IV.Introduction Of Instrument
1. Control box power switch.
2.3. AC 220V power(Control box work power supply).
4.5. Output 0~250V(As the input power to the booster).
6.Voltage adjuster(Adjust the output voltage of control box).
7.Booster secondary side instrument line(Connect the booster meter 100V.Cannot connect high
pressure tail).
8.High pressure tail(Connect the booster high pressure tail).
9.Ground protection.
10.The booster outputs the voltmeter.
2
11.High voltage leakage ammeter.
12.Control box output ammeter.
13.Control box power indicator light.
14.Timing end alarm.
15.Voltage rise indicator.
16.Test start button.
17.End of test button.
18.Timer switch.
19.timer.
20.Low voltage current ratio and excision(over current value is selected by the transfer switch.
The over current value of the relay is set at 80% of the rated value when leaving the factory, and
should be reset according to the load current when using small load. The off gear is not protected
from over current, so this gear should not be used).
21.Where K is the status value of the current ratio conversion/resecting (-SA) switch, which is ×1,
×2 and OFF respectively. The K value of the switch at the position of ×1 and ×2 is 1 and 2,
respectively, and the resecting position is OFF (generally, "OFF" is not used, because it will make
the transformer low voltage current without over current protection, resulting in equipment
damage).
3
1. High voltage output(Connect the test product through the high voltage output line).
2. Input(Connect with the output of the control box).
3. Meter 100V(Connect with the meter 100V of the control box).
4. High pressure tail(Connect the control box high pressure tail)
5. Ground protection.
4
V .Instrument Using
1. Test the wiring as shown above.
2. Turn on the power switch.
3. Set a timer.
4. Click on the start.
5. Adjust to the required voltage.
6. Turn on the timing switch.
7. Click stop after timer alarm.
8. Rotate the voltage regulator back to the initial point.
9. To discharge electricity with a discharge rod.
10. Test Closure.
VI.Matters needing attention
1.When you open the box, you need to check whether it’s in good condition or not, especially
you need to check whether the connection ports become loose or not, and the carbon brush
connects with the voltage adjustor well or not.
2.Strictly follow the procedure, please read the manual first.
3. If it has been not in use for a long time, you should check main circuit floor insulating
resistance by 2500V MΩ meter, and the data should not below 1.5MΩ
5
Control Box(≤10KVA)
If the capacity of main control box is not more than10KVA the panel of the main control box is as
figure above, If customer customize leakage current test function, We will add one mA meter into the
panel. So there will be three digital meter. HV meter LV current meter and leakage current mA meter.
Packing list
No. Item Qty
1 The dry type testing transformer 1
2 Control Box 1
3 Power cable 1
4 Test cable 1