Machine Foundation Machine Design 2 Project Motor
Machine Foundation Machine Design 2 Project Motor
plant, is one of the most critical structures within the facility. It provides
essential structural support and stability to ensure the overall safety and
space for maintenance and other activities within the facility. Furthermore,
Ipil Ormoc City, the soil type of the project site was determined. As
the location has a mixture of sandy loam and clay giving an approximate safe
bearing power of 19.5 tonnes/m2 from Table 4-4 (Morse, 1953) which is the
max value for clay, soft soil and minimum for the sandy soil. Lastly, for the
concrete mixture, the standard mixture value from Table 4-1 which is 1:3:5 will
be employed.
Machine Foundation Calculation
specifications of the chosen engine unit, together with the formulas and
Morse, will be utilized. Moreover, the calculation will be conducted for open
Prime Power
Specifications:
value of power in terms of bmhp. However, for this instance, since we don’t
have the required value, we will first utilize the given power in kW and convert
P=18.4 kW ( 0.736 kW )
1 bmhp
=25 bmhp
After getting the required bmhp, the next process is to determine the
weight of foundation by utilizing the given values in table 4-5, wherein the
Considering that the type of soil in VSU is a mixture of sandy loam and
clay, we can use the value of 19.5 tonnes/m 2 as provided in table 4-4, Safe
tonnes
Sb=19.5 or 19.5x103kg/m2
m2
Since the width at the top of the foundation is already known, we can
then proceed in determining the width at the bottom through the use of the
following formula.
s b Wm+W f
= + fb
2 bL
Flexure Formula: fb
3
Mx Wm L
fb= > M= x e > x= > I = b h
I 3 2 12
Wm 730 kg
M= x e= x 1 m=243.33 kg−m
3 3
L 2.55 m
x= = =1.275 m
2 2
3 3
bh 1.03 m(2.55 m)
I= =¿ =1.423 m4
12 12
Mx 243.33 kg−m(1.275 m)
fb= = 4
=218.022 kg /m2
I 1.423 m
b = 1.49 m
Volume of foundation
Wf 14250 kg
Vf = = =5.93m3
y 2403 kg /m3
Height of foundation
solve for the height of the foundation, the trapezoidal method will be used.
Overall Dimensions:
computation for the amount and number of cements, sand, stone, form
lumber, and steel bars that will be needed. In doing so, the mixture of 1:3:5
Diagonal=
√( 2 )
b−a 2 2
+h =
√( 1.49 m−1.03 m 2
2 )
+2.09 m2
Diagonal=0.23 m
Form Lumber = 7 m2
¯¿
Number of steel bars=total weight of steel ¿
142.5 kg
weight of each steel ¯¿ = ¿
6.247 kg/ steel ¯¿ ¿