0% found this document useful (0 votes)
334 views4 pages

SAP PM Important Topics

This document provides an introduction and overview of key concepts in SAP PM/Asset Management including organizational structures, configuration of plants and planning systems, functional locations, equipment, bills of material, permits, linear asset management, maintenance planning and scheduling, maintenance order processing, and integration with other SAP modules. It also briefly discusses SAP S/4HANA Asset Management and differences from the ECC version.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
334 views4 pages

SAP PM Important Topics

This document provides an introduction and overview of key concepts in SAP PM/Asset Management including organizational structures, configuration of plants and planning systems, functional locations, equipment, bills of material, permits, linear asset management, maintenance planning and scheduling, maintenance order processing, and integration with other SAP modules. It also briefly discusses SAP S/4HANA Asset Management and differences from the ECC version.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Introduction to SAP and SAP PM/Asset Management

Familiarization with SAP screens, Organization structure


Different landscapes in SAP.
SAP PM/Asset Management Organization Structure
Client
Company code
Enterprise set up for PM Module. - Maintenance Plant and Planning Plant
Organization Units and Maintenance Planning Systems
Planner Groups
Centralized system, Decentralized system, partially centralized system.
Configuration of above in SAP Screens.
Work Center
Capacity Utilization, Scheduling
Costing, Activity type, Labor cost
Usage, Renaming, Deletion functionalities
Functional Location
New Functional location Category
Alternative labelling
Labelling for FL.
Structure Indicator, Edit Mask, Hierarchy in FL
Reference Location, Copy Functional Location
Functional location structure list
Object Info
View profile - Tabs set up/modification.
Automatic Permits
Equipment
New Equipment Category
Installation/Dismantling at Functional Location
Equipment Hierarchy
Number ranges – Internal and External
Usage list
Object Info
Equipment structure list
View profile - Tabs modification (view profile)
Configuration for Eq to FL
Equipment PRT
User status
Auto Permits
Bills of Material (BOM)
BOM Categories, Item Categories
Types of BOM, Usage.
Material Item categories
Inactivation of BOM
Additional Functions and Objects
Class and Characteristics
Linking of class and characteristics.
Measuring Points and Measurement document (with/without Counters)
Status Management (System / User)
Permits (Automatic and manual assignment flow)
Object link
Revision
Status Management – User and System Status
PRT
Equipment PRT / Document PRT
Configuration for PRT
Attachment of PRT to Technical object
Attaching it in work order / Task list etc.
Serialization
Serialization profile creation and set up in Material master.
Creation of Equipment master with Material having serialization profile. Etc.
Manual entry of Serial number in Equipment master.
Automatic creation of Serial number through IQ01
Warranty Management
Vendor warranty, Master warranty
With Class and Characteristics
Warranty counter
Warranty Error in Work order.
Linear asset Management
Marker, LRP, Start point /End point.
Class with organizational area set up.
Characteristics for Marker
LAM in Work Order and Notification
LAM in M. Plan
LAM in Measuring point and Measurement document.
LAN in EQP and FL
Shop Paper
Shop paper set-up
Assignment to Document types
Preview of Shop paper
End to End configuration will be covered
SAP PM Business Processes
General Maintenance
Breakdown Maintenance
Corrective Maintenance
Calibration process end to end.
Preventive Maintenance
Refurbishment process.
Condition-Based Maintenance
Preventive Maintenance
Task List Types
Group. Group counter
Profile and User Fields
Component Assignment (From BOM and without BOM)
Service and PRT attachment
Maintenance Planning and Scheduling
Single cycle plan
Strategy plan
Package creation and full flow
Multiple counter plan
Cycle set creation.
Config for Multiple counter Plan
Performance based.
Offset in M. Plan
Types of Scheduling IP10 and IP30 Deadline monitoring
Program for same and how to set up.
M.Plan with counters
M. Plan Categories and Call Objects
Time based, Performance based plans.
Single Cycle, Strategy based plan (Hierarchy), Multiple Counter based plan.
Annual estimate set up.
Maintenance Order and Notification Processing
Order Types
Notification Types
Order and Notifications Integration, etc.
Sub-Topics
Task, cause, code, and code group etc.
Objects and Object Information
Catalogs and Catalog Profiles.
Action Log and Document Flow
Object list.
Construction type in Eqp and FL
What is batch job.
Transport request.
ST22 Dumps.
Processing External Services
Flow of Stock / Non-stock material in PM - PR - PO
External Services as Individual Purchase Order
External Services with External Work Centers
External Services with Service Entry Sheets
Controlling Functions in Plant Maintenance Plant Maintenance in the
Organizational Structures of Accounting
Different types of cost in PM
Order Settlement
Sender and Receiver
Settlement
Settlement types
Account assignment cat.
SAP PM with SAP Modules Integration – PP, QM, MM, FI, CO, HR, etc.
SAP PM RICEF Objects, Structure and Lists
Standard and Custom Reports
ALV Reports
SAP Query Reports
SAP Data Dictionary
Tables
Fields
SAP Projects
Implementation – ASAP Methodology
Roll out.
Support
Development
Data Migration
S/4HANA Asset Management
S4 Activate Methodology
Screen navigation
Fiori
Business Function Activation
Roles set up. / Catalog / Tiles / Groups
T codes for it and setting up.
M.Plan – changes with Respect to HANA, M. Plan Template
Deactivation of T codes ECC to HANA.
Changes in graphical representation.
LTMC, etc.

You might also like