Site name & address : Rosedale Garden residential complex, Action area III, new town, Rajahat
AMC agency's name & address : M/S CONCEPTRONICS, 8b, Raja Naba Krishna street. Kol-700005
Physical condition
The Hydrant & Sprinkler System are in good working condition.
Field devices are in good working condition. The system has been checked towerwise
Status regularly, hose reels are being checked individually. Basement valves checked &
serviceded. recently we have repaired two major leakages in underground sprinkler
line.SYSTEM WORKED PERFECTLY DURING INSTANT MOCK DRILL & TRAINING.
BOTH HYDRANT & SPRINKLER LINES ARE NORMAL & FUNCTIONAL. The star
Any finding?
coupling of sprinkler jockey pump has been replaced.
Action plan to get rectified to findings WE STICK TO THE SCHEDULE MADE BY FIRE OFFICER AS MUCH AS POSSIBLE.
Timeline to complete the findings NONE.
Functional condition
Status found o.k
Any finding? already mentioned
Action plan to get rectified to findings already shared
Timeline to complete the findings already shared
There were Two different emergency leakage situation behind club house. where the
Job done leakage repaired at night, we worked very fast to restore the System , fault repaired on
emergency basis, apart from that regular jobs are on schedule.
Cleaning & servicing done All Pumps & motors & field devices checked.
Name, Sign & contact number of the person who was present during
inspection from client side.
Site name & address : Rosedale Garden residential complex, Action area III, new town, Rajahat
AMC agency's name & address : M/S CONCEPTRONICS, 8b, Raja Naba Krishna street. Kol-700005
System description : Smoke Detection & Public Address System with Voice Command
Exact location : Reception Lobby of Every Main Tower with Slave Panel of next towers.
Physical condition
All Fire Alarm Panels in all Towers are Functional.
Status The P.A system of each towers are functional,all mic controles checked o.k, replaced
defective cables, . Officially handed over the system to Fire officer.
Any finding? We have installed the modules ,MCP's & speakers as provided to us.
These are under continuous maintenance process, we are trying our best to solve as fast
Action plan to get rectified to findings
as possible.
Timeline to complete the findings We have sorted out the jobs as commited.
Functional condition
Status System is o.k, we are installing spares from the stock client proided to us.
Any finding? already mentioned
Action plan to get rectified to findings already shared
Timeline to complete the findings already shared
Cleaning & servicing done All Panels & Slave panels & field devices cleaned, serviced regularly.
Special note if any None.
Name, Sign & contact number of the person who did the
Avijit sengupta, 9674021978
inspection from AMC agency side.
Name, Sign & contact number of the person who was
present during inspection from client side.
Name, Sign & contact number of the site in
charge/Engg/FO/PM from client side.
Note : This is a service report only, not a PPM checklist/report and all. Need to follow another checklists for maintaining
documentation on PPM of respective systems.
CONCEPTRONICS Service Report-AMC
(FOR OCT 2023)
Date : 2/11/2023
Site name & address : Rosedale Garden residential complex, Action area III, new town, Rajahat
AMC agency's name & address : M/S CONCEPTRONICS, 8b, Raja Naba Krishna street. Kol-700005
System description : LPG Detection & Alarm System with network Command
Outside wall of Every LPG bank Tower with Sounder with network. Master
Exact location : panel at Main Gate security office
Physical condition
LPG Detection System is not in working condition, it has been reported to FM
Status
& Fire personnel .
Any finding? NONE
Action plan to get rectified to findings NONE
Timeline to complete the findings N/A
Functional condition
Status found dead.
Any finding? already mentioned
Action plan to get rectified to findings already shared
Timeline to complete the findings already shared
Any support required from client for rectification of AS PER THE LAST INSTRUCTION ,THE LPG SYSTEM WILL NOT BE
findings? COMMISSIONED AGAIN.
Over all status of entire system Fully dead.
Job done None.
Cleaning & servicing done None.
Special note if any None.
Name, Sign & contact number of the person who did the
Avijit sengupta, 9674021978
inspection from AMC agency side.
Name, Sign & contact number of the person who was
present during inspection from client side.
Name, Sign & contact number of the site in
charge/Engg/FO/PM from client side.
Note : This is a service report only, not a PPM checklist/report and all. Need to follow another checklists for maintaining
documentation on PPM of respective systems.
CONCEPTRONICS Service Report-AMC
(FOR OCT 2023)
Date : 2/11/2023
Site name & address : Rosedale Garden residential complex, Action area III, new town, Rajahat
AMC agency's name & address : M/S CONCEPTRONICS, 8b, Raja Naba Krishna street. Kol-700005
System description : CO Detection & Exhaust System with PLC Control
At basement with electrical control panels for Jet & Exhaust fans. PLC
Exact location : Control Master panels are adjascent to the electrical control panels.
Physical condition
We have inspected the entire CO Detection System their individual checking
Status is done properly, 2 sensors found latching, that is being reaired & re
installed, now the system is ready. Nothing new to be mentioned.
Any finding? some of the sensors calibrated as required.
Action plan to get rectified to findings NONE
Timeline to complete the findings NONE
SYSTEM NORMAL & FUNCTIONAL
Functional condition
Status Fully working condition, its been cheecked thoroughly .
Any finding? already mentioned
Action plan to get rectified to findings None
Timeline to complete the findings already shared
Any support required from client for rectification of WE OBSERVED THAT SOME VANDALISM ON SENSORS, A
findings? VIGIL IS REQUIRED THERE,OUR SERVICE WARRANTY FOR
Over all status of entire system Fully working condition(Two sensors repaired)
Physical condition
Normal.some extinguishers are TARE measured, weighing machine supplied
Status
to site & each one measured.
Any finding? None.
Action plan to get rectified to findings We maintain them regularly & refill whenever required.
Timeline to complete the findings N/A
Functional condition
Status found Good.
Any finding? already mentioned
Action plan to get rectified to findings already shared
Timeline to complete the findings already shared
TOWER - 1
TOWER - 2
TOWER - 3
ALL DEFECTIVE & ACTIVE DEVICES ARE MENTIONED IN THE ANNEXE SHEET. IN
FEW WORDS, WE DO NOT HAVE SPARES AFTER REPEATED
TOWER - 4
REQUESTS,MAINTENANCE OF SYSTEM WILL NOT BE POSSIBLE AFTER FEW DAYS
UNLESS WE GET SPARES.
TOWER - 5
TOWER - 6
TOWER - Exicutive
Action plan to get rectified to findings We have replaced the faulty devices as few materials are provided by Client.
Timeline to complete the findings Depends upon the availability of the materials.
Functional condition
Mentioned devices are dead / not responding (detailed data is in annexe sheet) All
Status
devices to be replaced soon, if provided
Any finding? ACTUAL DEVICE STATUS HAS BEEN SHARED IN ANNEXE
Action plan to get rectified to findings already shared
Timeline to complete the findings already shared
We are installing Smoke detectors & Modules & cable wherever required.
Any support required from client for rectification of findings? Keeping track of the resources. FEW SIM CARDS ARE REQUIRED FOR AUTO
DIALERS.
Over all status of entire system The system is Fully working.Alarm part is working and all P.As are functional.
Complete status analysis, Some of the cable replacement done after the cable supplied, we
Job done patched with some old cables in some places.(Repeat action)
Cleaning & servicing done All Panels & Slave panels & field devices cleaned, serviced regularly.
Special note if any These devices are inspected vividly, it is High time to get new devices.
Name, Sign & contact number of the person who did the
Avijit sengupta, 9674021978
inspection from AMC agency side.
Name, Sign & contact number of the person who was present
during inspection from client side.
Name, Sign & contact number of the site in charge/Engg/FO/PM
from client side.
Note : This is a service report only, not a PPM checklist/report and all. Need to follow another checklists for maintaining documentation
on PPM of respective systems.