Checklist For Concrete Road Works

This checklist is used to inspect concrete road work activities and ensure quality compliance. It contains checks for pre-work preparation like cleaning, formwork, and reinforcement; concrete pouring activities like mix design and vibration; post-pouring activities like surface finish, joint preparation and sealing; and curing. The inspector observes each item and notes any deviations for corrective action to meet specifications.

Uploaded by

aftabshekh624462
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views

Checklist For Concrete Road Works

This checklist is used to inspect concrete road work activities and ensure quality compliance. It contains checks for pre-work preparation like cleaning, formwork, and reinforcement; concrete pouring activities like mix design and vibration; post-pouring activities like surface finish, joint preparation and sealing; and curing. The inspector observes each item and notes any deviations for corrective action to meet specifications.

Uploaded by

aftabshekh624462
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SPCPL/IOTDDC/HILL/QMP/CIVIL/FORMAT-08

CHECKLIST FOR CONCRETE ROAD WORKS


Site
Location
Drawing Reference No.

S.No Description Observation

A General Information

1 Is approved WMS available?

2 Are all the HSE norms being covered?

B Preparatory Works Date:

1 Has the area for concreting been cleaned/ dewatered?

2 Have stability and rigidity of formwork and supports been checked?


Mention if deviation found:
3 Are dimensions as per requirement?
Check for location and alignment of conctruction joints,contraction joints and expansion
4
joints.Is it as per requirements?

5 Check for provision of dowel bars. Is it as per drawings?


Check for fixing of kerb stones, gratings on chambers at required levels. Is it as per method
6
statement?

C During Activity Date:

1 Check whether the concrete poured is as per approved mix design?


Check whether vibration is being done till concrete packs tightly against all surfaces,
2
reinforcement and embedments.

3 Is blending of Concrete poured in separate layers?

4 Check for levelling and finishing of concrete surface. Is it as per requirement?

5 Check for positions of construction joints.Is it as per requirements?

D Post Activity Date:


Mention if deviation observed:
1 Check for surface finish. Is it acceptable ?
Check for preparation of joints. Is it as per the following requirements? Mention if deviation observed:
2 a) Expansion joints should be provided at interval as stated by architect
b) Joints shall be straight
Mention actual observation:
3 Check for cutting of joints. Is it as per specified dimensions?
Mention actual observation:
4 Check for sealing of joints. Is it as per specifications?

5 Check for finishing of joints. Is it as per requirement?

6 Check if curing arrangements are sufficient and suitable?


Corrective Action Proposed, if any :

Checked by:

--------------------------------------------- ---------------------------------
Construction Manager/Engineer ( HILL / IOCL )
( SPCPL )

Shapoorji Pallonji E & C Page 1 of 1