M20 Pile
M20 Pile
From based on trials and experience, adopted water cementitious content ratio as 0.43
This is lower than the maximum value of 0.5prescribed for severe exposure for Plain concrete as per IS 456
0.50 > 0.43, hence O.K.
Therefore Water/Cement ratio 0.43
a. Volume of concrete = 1 cum Volume of entrapped air in concrete = 0.01cum ( As per IS 10262, 2019)
Therefore Vol. of concrete = .99 cum
b. Volume of cement = (Mass of cement / Specific gravity of cement) * (1 / 1000)
= (140/3.15)*(1/1000) = 0.044 cum.
g. Mass of coarse aggregate = Vol. of all in Agg* % of CA* Specific Gravity of 20 mm Coarse Aggregate*1000
20 mm aggregate = 0.704*34%*2.73*1000 = 653.453 = 653 kg/m3
i. Mass of Fine Aggregate = Vol. of all in agg.* % of FA * S.G of Fine Aggregate * 1000
= 0.704*45%*2.68*1000 = 849.024 = 849 kg/m3
8 Mix design Calculation :-
Hence required quantity per m3 as given below :-
S.S.D
OPC Cement = 140 kg/m3
GGBS = 230 kg/m3
Water = 159 kg/m3
10 mm = 399 kg/m3
20 mm = 653 kg/m3
Cr.Sand = 849 kg/m3
Admixture = 4.26 kg/m3
2435
Note :-
1. All the values for aggregates are for SSD conditions.
2. Adjustments to aggregate & water content shall be done based on the free moisture content in the aggregates.
3. Properties of materials may vary, conforming to specifications as per IS 4926.