Application Form For CTE
Application Form For CTE
PART C5
APPLICATION FOR CONSENT FOR ESTABLISHMENT
(Information to be furnished for the purpose of issue of consent for Establishment
1. Name of the Industrial Undertking & Address AMBATI MILLS
: ,Sircilla,Mustabad,Bandankal,99,BANDANKAL,505404
2. Process details :
2.4.2 If energy is generated in plant, fuel used with consumption for e.g. Coal/Fuel oil/Diesel/Natural
Gas/Wood/Others.
Name of Fuel Daily Consumption Unit
3. LOCATION :
3.10 Which of the following features exist within 20 kilometers radius of the site in respect of L & Ml and 5 Kms in
respect of SSI :
4. TOWN PLANNING :
5. WATER REQUIREMENTS :
6.2 How do you propose to discharge the waste water : Separate streams
Physical
S.No. Sour Acidi Alkal Hard B.O. C.O. Oils Total Sulp Total Total Sodi Potas Calci Mag
ce ty inity ness D. D. & Nitro hates Phos Chlo um sium um nesiu
Grea gen phate rides m
ses Phos s
phate
s
OTHER PARAMETERS
7. SOLID WASTES
7.1 Authorisation required for ( Please tick mark appropriate activity / activities) :
Collection Transport
Reception Storage
Treatment Reprocessing/Disposal
S.No. Name of Hazardo Quantity Storage Reuse/rec Disposal Existing Proposed Total
Waste us Waste generate & ycling(in After
Descripti d per day treatmen house)
on t/Pre-
treatmen
t
7.2 Non-Hazardous :
S.no Stack Name Stack Temperature( Expected Proposed Air Are any
Height(in 'C) Quantity(m3/ Pollution Standard of
mtr) hr) Control Emission
System prescribed for
or adopted by
your
Industry?
1. BOILER 30 AS PER 4 TON MULTI Yes
REQUIREM CYCLONE
D
2. GENERAT 3 NA 100 K.V.A dust Yes
OR collectors
S.no Stack Name Stack Temperature( Expected Proposed Air Are any
Height(in 'C) Quantity(m3/ Pollution Standard of
mtr) hr) Control Emission
System prescribed for
or adopted by
your
Industry?
We hereby declare that we will install and operate pollution control equipment required to meet the
standards prescribed by the Board and we will not commence production, until such pollution control
equipment is installed and ready for operation we will obtain a second No Objection Certificate from the
Board before going into production.
Place :
(Signature of Promoter or Authorized person)
Date :
(Designation)