COST
COST
steel
Cement
Paints
tiles
Bathroom fittings
Granite
Tile fitting
Brick work
Cement
Tank
Electrical work
Plumber
Wiring
Shiva Reddy
Robo sand
40mm metal
Cement 20 bags
Morum above black soil for car park
Labour for soil leveling- 4 men
Miller gang for casting
Mastry on the day for casting
CRS masonary for wall
Labour for curb stone removal
Plz note :
Material and labour for 5 inch Cement Concrete. All actuals. Tiles not covered 46150
Areas : Walk way all sides, footpath ramp, Car parking, bed under sump
Robo sand
40mm metal
Cement
Morum filling above black soil for car park
Labour for soil leveling,shifting & compacting - 4 men
Labour for casting
Mastry on the day for casting
Masonary for supporting stone walls and steps at south and north side
Labour for curb stone removal at footpath
Total
189344
1000
8000 Approx Builder provides wiring only for Gate lights
11500 Approx
46150
37000 Yet to negotiate
36500 Approx
23000
40593 GP fees already paid
26000 Approx
30000 Approx
10000 Approx
1376837
If I add tentative amount for the items in yellow from exclusions tab100000
Total 785500
for payment to RMC, TATA door, UPVC windows, tiles etc
Tentative expenses for GP approval and electricty meter. Can be paid directly
wards the cost of the building’s detailed design, soil testing and guidance provided by the builder on GP approvals
act agreement. Post GP approvals
dation and plinth beam
nd Floor Roof slab
kwork & Plastering works
nd Floor Tile, Electrical & Painting work