0% found this document useful (0 votes)
468 views

22MCA344 Software Testing Module2

This document provides definitions and concepts related to software testing. It discusses the key terms of test cases, errors, faults, failures, and incidents. It also describes the software testing lifecycle and different levels of testing. Additionally, it uses Venn diagrams to illustrate the relationships between specified behaviors, implemented behaviors, and tested behaviors. The goal of testing is to ensure the region where all three sets intersect is as large as possible. Test cases can be identified using functional or structural testing methods.

Uploaded by

Ashok B P
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
468 views

22MCA344 Software Testing Module2

This document provides definitions and concepts related to software testing. It discusses the key terms of test cases, errors, faults, failures, and incidents. It also describes the software testing lifecycle and different levels of testing. Additionally, it uses Venn diagrams to illustrate the relationships between specified behaviors, implemented behaviors, and tested behaviors. The goal of testing is to ensure the region where all three sets intersect is as large as possible. Test cases can be identified using functional or structural testing methods.

Uploaded by

Ashok B P
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 311

Module-2

A perspective on Testing
Basic definitions, Test cases, Insights from a Venn diagram, Identifying test cases, Error and fault
taxonomies, Level of testing, Examples: Generalized pseudo code, The triangle problem, the Next
Date function, The commission problem, The SATM (Simple Automation Teller Machine)
problem, The currency converter, Saturn windshield wiper.
Module-2
A PERSPECTIVE ON TESTING

Why do we test? There are two main reasons: to make a judgment about quality or
acceptability, and to discover problems. We test because we know that we are fallible — this
is especially true in the domain of software and software controlled systems.

1.1 Basic Definitions

Much of testing literature is mired in confusing (and sometimes inconsistent) terminology,


probably because testing technology has evolved over decades and via scores of writers.

Test Case

Error
People make errors. A good synonym is “mistake”. When people make mistakes while coding,
we call these mistakes “bugs”. Errors tend to propagate; requirements error may be
magnified during Design, and amplified still more during coding.
Fault
A fault is the result of an error. It is more precise to say that a fault is the representation of an error,
where representation is the mode of expression, such as narrative text, dataflow diagrams, hierarchy
charts, source code, and so on. “Defect” is a good synonym for fault; so is “bug”. Faults can be elusive.
When a designer makes an error of omission, the resulting fault is that something is missing that should
be present in the representation. This suggests a useful refinement; to borrow from the Church, we
might speak of faults of commission and faults of omission. A fault of commission occurs when we
enter something into a representation that is incorrect. Faults of omission occur when we fail to enter
correct information. Of these two types, faults of omission are more difficult to detect and resolve.

Failure
A failure occurs when a fault executes. Two subtleties arise here: one is that failures only
occur in an executable representation, which is usually taken to be source code, or more
precisely, loaded object code. The second subtlety is that this definition relates failures only to
faults of commission. How can we deal with “failures” that correspond to faults of omission?
We can push this still further: what about faults that never happens to execute, or maybe don’t
execute for a long time? The Michelangelo virus is an example of such a fault. It doesn’t
execute until Michelangelo’s birthday,

Incident
When a failure occurs, it may or may not be readily apparent to the user (or customer or
tester). An incident is the symptom(s) associated with a failure that alerts the user to the
occurrence of a failure.
Test
Testing is obviously concerned with errors, faults, failures, and incidents. A test is the act of
exercising software with test cases. There are two distinct goals of a test: either to find
failures, or to demonstrate correct execution.

Test Case
A test case has an identity, and is associated with a program behavior.A test case also has a
set of inputs, a list of expected outputs.

Figure 1.1 A Testing Life Cycle

Figure 1.1 portrays a life cycle model for testing. Notice that, in the development phases, there
are three opportunities for errors to be made, resulting in faults that propagate through the
remainder of the development. One prominent tester summarizes this life cycle as follows: the
first three phases are “Putting Bugs IN”, the testing phase is Finding Bugs, and the last three
phases are “Getting Bugs OUT” [Poston 90]. The Fault Resolution step is another opportunity
for errors (and new faults). When a “fix” causes formerly correct software to misbehave, the
fix is deficient. We’ll revisit this when we discuss regression testing.

1.2 Test Cases

The essence of software testing is to determine a set of test cases for the item being tested.
Before going on, we need to clarify what information should be in a test case.
The most obvious information is inputs; inputs are really of two types: pre-conditions
(circumstances that hold prior to test case execution) and the actual inputs that were identified
by some testing method. The next most obvious part of a test case is the expected outputs;
again, there are two types: post conditions and actual outputs.
The output portion of a test case is frequently overlooked. Unfortunate, because this is often
the hard part. Suppose, for example, you were testing software that determined an optimal
route for an aircraft, given certain FAA air corridor constraints and the weather data for a
flight day. How would you know what the optimal route really is? There have been various
responses to this problem. The academic response is to postulate the existence of an oracle,
who “knows all the answers”. One industrial response to this problem is known as Reference
Testing, where the system is tested in the presence of expert users, and these experts make
judgments as to whether or not outputs of an executed set of test case inputs are
acceptable.Theact of testing entails establishing the necessary pre-conditions, providing the
test case inputs, observing the outputs, and then comparing these with the expected outputs to
determine whether r n t the test passed.
Typical Test case Information
Test Case ID
Purpose
Precondition
Inputs
Expected Outputs
Post conditions
Execution History
Date Result Version Run By

1.3 Insights from a Venn diagram

Testing is fundamentally concerned with behaviour; and behaviour is orthogonal to the


structural view common to software (and system) developers. A quick differentiation is that
the structural view focuses on “what it is”and the behavioural view considers “what it does”.
One of the continuing sources of difficulty for testers is that the base documents are usually
written by and for developers, and therefore the emphasis is on structural, rather than
behavioural, information. In this section, we develop a simple Venn diagram that clarifies
several nagging questions about testing.

Figure 1.3 Specified and Implemented Program Behaviors

Consider a Universe of program behaviours. (Notice that we are forcing attention on the
essence of testing.) Given a program and its specification, consider the set S of specified
behaviours, and the set P of programmed behaviours. Figure 1.3 shows the relationship
between our universe of discourse and the specified and programmed behaviours. Of all the
possible program behaviours, the specified ones are in the circle labelled S; and all those
behaviours actually programmed (note the slight difference between P and U, the Universe)
are in P. With this diagram, we can see more clearly the problems that confront a tester. What
if there are specified behaviours that have not been programmed? In our earlier terminology,
these are faults of omission. Similarly, what if there are programmed (implemented)
behaviours that have not been specified? These correspond to faults of commission, and to
errors which occurred after the specification was complete. The intersection of S and P (the
football shaped region) is the “correct” portion, that is behaviours that are both specified and
implemented. A very good view of testing is that it is the determination of the extent of
program behaviour that is both specified and implemented. (As a sidelight, note that
“correctness” only has meaning with respect to a specification and an implementation. It is a
relative term, not an absolute.)

Figure 1.4 Specified, Implemented,andTested Behaviours

The new circle in Fig. 1.4 is for Test Cases. Notice there is a slight discrepancy with our
Universe of Discourse, the set of program behaviours. Since test case causes a program
behaviour, the mathematicians might forgive us. Now, consider the relationships among the
sets S, P, and T. There may be specified behaviours that are not tested (regions 2 and 5),
specified behaviours that are tested (regions 1 and 4), and test cases that correspond to
unspecified behaviours (regions 3 and 7). Similarly, there may be programmed eh vior that are
not tested (regions 2 and 6), programmed behaviours that are tested (regions 1 and 3), and test
cases that correspond to programmed behaviours (regions 4 and 7). Each of these regions is
important. If there are specified behaviours for which there are no test cases, the testing is
necessarily incomplete. If there are test cases that correspond to behaviours, two possibilities
arise: either such a test case is unwarranted, or the specification is deficient. (In my experience,
good testers often postulate test cases of this latter type. This is a fine reason to have good
testers participate in specification and design reviews.) We are already at a point here we can
see some possibilities for testing as a craft: what can a tester do to make the region here these
sets all intersect (region 1) be as large as possible? Another way to get at this is to ask how the
test cases in the set T are identified. The short answer is that test cases are identified by a
testing method. This framework gives us a way to compare the effectiveness of diverse testing
methods, as we shall see in chapters 8 and 11.

1.4 Identifying Test Cases

There are two fundamental approaches to identifying test cases; these are known as functional and
structural testing. Each of these approaches has several distinct test case identification methods,
more commonly called testing methods.
1.4.1 Functional Testing

Functional testing is based on the view that any program can be considered to be a function that maps
values from its input domain to values in its output range. (Function, domain, and range are defined in
Chapter 3.) This notion is commonly used in engineering, when systems are considered to be “black
boxes”. This leads to the term Black Box Testing, in which the content (implementation) of a black
box is not known, and the function of the black box is understood completely in terms of its inputs and
outputs. In Zen and The Art of Motorcycle Maintenance , Pirsig refers to this as “romantic”
comprehension [Pirsig 73]. Many times, we operate very effectively with black box knowledge; in fact
this is central to object orientation. As an example, most people successfully operate automobiles with
only black box knowledge.

INPUT OUTPUT

Figure 1.5 An Engineer’s Black Boxcom

With the functional approach to test case identification, the only inf rmation that is used is the
specification of the software. Thereallsyllabusretwodistinctadvantageto functional test cases: they are
independent of how the software is implemented, so if the implementation changes, the test cases are
still useful, and test case deve opment c n occur in parallel with the implementation, thereby reducing
overall project development interval. On the negative side, functional test cases frequently suffer from
two problems: there can be signific nt redundancies among test cases, and this is compounded by the
possibility of gaps of untested software. Figure 1.6 shows the results of test cases identified by two
functional methods. Method A identifies a larger set of test cases than does Method B. Notice that, for
both methods, the set of test cases is completely contained within the set of specified behavior. Since

1.4.2 Structural Testing

function methods are based on the specified behavior, it is hard to imagine these methods identifying
behaviors that are not specified.

Structural testing is the other fundamental approach to test case identification. To contrast it with
Functional Testing, it is sometimes called White Box (or even Clear Box) Testing. The clear box
metaphor is probably more appropriate, because the essential difference is that the implementation (of
the Black Box) is kno n and used to identify test cases. Being able to “see inside” the black box allows
the tester to identify test cases based on how the function is actually implemented. Structural Testing
has been the subject of some fairly strong theory. To really understand structural testing, the concepts
of linear graph theory (Chapter 4) are essential. With these concepts, the tester can rigorously describe
exactly what is being tested. Because of its strong theoretical basis, structural testing lends itself to the
definition and use of test coverage metrics. Test coverage metrics provide a way to explicitly state the
extent to which a software item has been tested, and this in turn, makes testing management more
meaningful.

1.4.3 The Functional Versus Structural Debate


Given two fundamentally different approaches to test case identification, the natural question is which
is better? If you read much of the literature, you will find strong adherents to either choice. Referring to
structural testing, Robert Poston writes: “this tool has been wasting tester’s time since

the 1970s. . . [it] does not support good software testing practice and should not be in the testers tool
kit” [Poston 91]. In defense of structural testing, Edward Miller [Miller 91] writes: “Branch coverage
[a structural test coverage metric], if attained at the 85 percent or better level, tends to identify twice
the number of defects that would have been found by ’intuitive’ [functional] testing.”

1.5 Error and Fault Taxonomies

Our definitions of error and fault hinge on the distinction between process and product: process refers
to how we do something, and product is the end result of a process. The point at which testing and
Software Quality Assurance meet is that SQA typically tries to improve the product by improving the
process. In that sense, testing is clearly more product oriented. SQA is more concerned with reducing
errors endemic in the development process, while testing is more concerned with discovering faults in
a product. Both disciplines benefit from a clearer definition of types of faults. Faults can be classified
in several ways: the development phase where the corresponding error occurred, the consequences of
corresponding failures, difficulty to resolve, risk of no resolution, and so on. My favorite is based on
anomalycomccurrence: one time only, intermittent, recurring, or repeatable. Figure 1.9 contains a fault
taxono y [Beizer 84] that distinguishes faults by the severity of their consequences.

1.6. Levels of Testing

Thus far we have said nothing about one of the key concepts of te ting — levels of abstraction. Levels of testing
echo the levels of abstraction found in the Waterfall Model of the software development life cycle. While this
model has its drawbacks, it is useful for testing as a means of identifying distinct levels of testing, and for
clarifying the objectives that pertain to each level.

Table 1 Input/Output Faults Type


Instances
Input correct input not accepted
incorrect input accepted
description wrong or mis ing
allsyllabus

parameters wrong or missing


Output wrong format
wrong result
correct result at rong time (too early, too
late) www
incomplete or missing result
spurious result
spelling/grammar
cosmetic
Table 2 Logic Faults missing case(s)
duplicate case(s)
extreme condition neglected
misinterpretation
missing condition
extraneous condition(s)
test of wrong variable
incorrect loop iteration
wrong operator (e.g., < instead ≤)
Table 3 Computation Faults incorrect algorithm

missing computation
incorrect operand
incorrect operation
parenthesis error
insufficient precision (round-off, truncation)
wrong built-in function

There is a practical relationship between levels of testing and functional and structural testing. Most
practitioners agree that structural testing is most appropriate at the unit level, while functional testing
is most appropriate at the system level. While this is generallycomtrue, it is also a likely consequence
of the base information produced during the require ents spe ification, preliminary design, and detailed
design phases. The constructs defined for structural testing make the most sense at the unit level; and
similar constructs are only now becoming available for the integration
and system levels of testing. We develop such structures in Part IV to support structural testing at the

integration and system levels forallsyllabusbothtraditionalandobject-oriented software.


Table 4 Interface Faults incorrect interr pt handling
I/O timing
call to wrong procedure
call to non-existent procedure
parameter mismatch (type, num er)
incompatible types
superfluous inclusion
Table 5 Data Faults incorrect initialization
incorrect storage/access
wrong flag/index value
incorrect packing/unpacking
wrong variable used
wrong data reference
scaling or units error
incorrect data dimension
incorrect subscript
incorrect type
incorrect data scope
sensor data out of limits
off by one
inconsistent data

Page 7
1.2 The Triangle Problem

1.2.2 Discussion

The year of this writing marks the twentieth anniversary of publications using the Triangle Problem
as an example. Some of the more notable entries in this generation of testing literature are
[Gruenberger 73], [Brown 75], [Myers 79], [Pressman 82 (and the second and third editions], [Clarke
83], [Clarke 84], [Chellappa 87], and [Hetzel 88]. There are probably others, but this list should
suffice.

1.2.1 Problem Statement

The Triangle Program accepts three integers as input; these are taken to be sides of a triangle. The
output of the program is the type of triangle determined by the three sides: Equilateral, Isosceles,
Scalene, or NotATriangle. Sometimes this problem is extended to include right triangles as a fifth
type; we will use this extension in some of the exercises.

Perhaps one of the reasons for the longevity of this example is that,comangother things, it typifies

some of the incomplete definition that impairs communication among ustomers, developers, and testers.

This specification presumes allsyllabusthedevelopersknowsomedetails about triangles, in particular

the Triangle Property: the sum of any pair of sides must be strictly greater than the third side. If a, b,
and c denote the three integer sides, then the triangle property is mathematically stated as three
inequalities: a < b + c, b < a + c, and c < a + b. If ny one of these fails to be true, the integers a, b,
and c do not constitute sides of a triangle. If a three sides are equal, they constitute an equilateral
triangle; if exactly one pair of sides is equal, the form an isosceles triangle; and if no pair of sides is
equal, they constitute a scalene triangle. A good tester might further clarify the problem statement by
putting limits on the lengths of the ide . What response would we expect if we presented the program
with the sides -5, -4, -3? We wil require that all sides be at least 1, and while we are at it, we may as
well declare some upper limit, say 20,000. (Some languages, like Pascal, have an automatic limit,
called MAXINT, which is the largest binary integer representable in a certain number of bits.)
1.2.3 Traditional Implementation

The “traditional” implementation of this grandfather of all examples has a rather FORTRAN-like
style. The flowchart for this implementation appears in Figure 2.1. The flowchart box numbers
correspond to comment numbers in the (FORTRAN-like) TurboPascal program given next. (These
numbers correspond exactly to those in [Pressman 82].) I don’t really like this implementation very
much, so a more structured implementation is given in section 2.1.4. The variable match is used to
record equality among pairs of the sides. There is a classical intricacy of the FORTRAN style
connected with the variable match: notice that all three tests for the triangle property do not occur. If
two sides are equal, say a and c, it is only necessary to compare a+c with b. (Since b must be greater
than zero, a + b must be greater than c, because c equals a.) This observation clearly reduces the
amount of comparisons that must be made. The efficiency of this version is obtained at the expense of
clarity (and ease of testing!). We will find this version useful later in Part III when we discuss
infeasible program execution paths. That is the best reason for retaining this version.
Page 8
PROGRAM triangle1 (input, output);
VAR
a, b, c, match : INTEGER;
BEGIN
writeln ('Enter 3 integers which are sides of a triangle');
readln (a, b, c);
writeln ('Side A is ', a);
writeln ('Side B is ', b);
writeln ('Side C is ', c);
match := 0;
IF a = b {1 }
THEN match := match + 1; {2 }
IF a = c {3 }
THEN match := match + 2; {4 }
IF b = c {5 }
THEN match := match + 3; {6 }
IF match = 0 {7 }
THEN IF (a+b) <=c {8 }
THEN writeln ('Not a Triangle') {12.1}
ELSE IF (b+c) <=a {9 }
THEN writeln ('Not a Triangle') {12.2}
ELSE IF (a+c) <=b {10 }
THEN writeln ('Not a Triangle') {12.3}
END. ELSE writeln ('Triangle is Scalene')
allsyllabus
{11 }
ELSE IF match=1 {13 }
THEN IF (a+c) <=b {14 }
THEN writeln ('Not a Triangle') {12.4}
ELSE writeln ('Triangle is Isosceles') {15.1}
ELSE IF match=2 {16 }
THEN IF (a+c) <=b {17 }
THEN writeln ('Not a Triangle') {12.5}
ELSE writeln ('Triangle is Isosceles {15.2}
ELSE IF match=3 {18 }
THEN IF (b+c) <=a {19 }
THEN writeln ('Not a Tri ng e') {12.6}
ELSE writeln ('Triangle is Isosceles') {15.3}
ELSE writeln ('Triangle is Equil teral'); {20 }

1.2 The Triangle Problem

The year of this writing marks the twentieth anniversary of publications using the Triangle Problem as
an example. Some of the more notable entries in this generation of testing literature are [Gruenberger
73], [Brown 75], [Myers 79], [Pressman 82 (and the second and third editions], [Clarke 83], [Clarke
84], [Chellappa 87], and [Hetzel 88]. There are probably others, but this list should suffice.

1.2.1 Problem Statement

The Triangle Program accepts three integers as input; these are taken to be sides of a triangle. The
output of the program is the type of triangle determined by the three sides: Equilateral, Isosceles,
Scalene, or NotATriangle. Sometimes this problem is extended to include right triangles as a fifth
type; we will use this extension in some of the exercises.

1.2.2 Discussion
Perhaps one of the reasons for the longevity of this example is that, among other things, it typifies
some of the incomplete definition that impairs communication among customers, developers, and
testers. This specification presumes the developers know some details about triangles, in particular the
Triangle Property: the sum of any pair of sides must be strictly greater than the third side. If a, b, and c
denote the three integer sides, then the triangle property is mathematically stated as three inequalities:
a < b + c, b < a + c, and c < a + b. If any one of these fails to be true, the integers a, b, and c do not
constitute sides of a triangle. If all three sides are equal, they constitute an equilateral triangle; if
exactly one pair of sides is equal, they form an isosceles triangle; and if no pair of sides is equal, they
constitute a scalene triangle. A good tester might further clarify the problem statement by putting
limits on the lengths of the sides. What response would we expect if we presented the program with
the sides -5, -4, -3? We will require that all sides be at least 1, and while we are at it, we may as well
declare some upper limit, say 20,000. (Some languages, like Pascal, have an automatic limit, called
MAXINT, which is the largest binary integer representable in a certain number of bits.)

1.2.3 Traditional Implementation allsyllabusq

The “traditional” implementation of this grandfather of all examples has a rather FORTRAN-like
style. The flowchart for this implementation appears in Figure 2.1. The flowchart box numbers
correspond to comment numbers in the (FORTRAN-like) TurboPascal program given next. (These
numbers correspond exactly to those in [Pre man 82].)

The variable match is used to record e ality among pairs of the sides. There is a classical intricacy of
the FORTRAN style connected ith the variable match: notice that all three tests for the triangle
property do not occur. If t o sides are equal, say a and c, it is only necessary to compare a+c with b.
(Since b must be greater than zero, a + b must be greater than c, because c equals a.) This
observation clearly reduces the amount of comparisons that must be made. The efficiency of this
version is obtained at the expense of clarity (and ease of testing!).

We will find this version useful later in Part III when we discuss infeasible program execution
paths. That is the best reason for retaining this version.

PROGRAM triangle1 (input, output);


VAR
a, b, c, match : INTEGER;
BEGIN
writeln ('Enter 3 integers which are sides of a triangle');
readln (a, b, c);
writeln ('Side A is ', a);

writeln ('Side B is ', b);


writeln ('Side C is ', c);
match := 0;
IF a = b {1 }
THEN match := match + 1; {2 }
IF a = c {3 }
THEN match := match + 2; {4 }
IF b = c {5 }
THEN match := match + 3; {6 }
IF match = 0 {7 }
THEN IF (a+b) <=c {8 }
THEN writeln ('Not a Triangle') {12.1}
ELSE IF (b+c) <=a {9 }
THEN writeln ('Not a Triangle') {12.2}
ELSE IF (a+c) <=b {10 }
THEN writeln ('Not a Triangle') {12.3}
ELSE writeln ('Triangle is Scalene') {11 }
ELSE IF match=1 {13 }
THEN IF (a+c) <=b {14 }
THEN writeln ('Not a Triangle') {12.4}
ELSE writeln ('Triangle is Isosceles')
1.2.4 Structured Implementation
{15.1} allsyllabus

ELSE IF match=2 {16 }


THEN IF (a+c) <=b {17 }
THEN writeln ('Not a Triangle') {12.5}
ELSE writeln ('Triangle is Iso ce e {15.2}
ELSE IF match=3 {18 }
THEN IF (b+c) <=a {19 }
THEN writeln ('Not a Triangle') {12.6}
ELSE writeln ('Triangle is Isosceles') {15.3}
ELSE writeln ('Triangle is Equilateral'); {20 }
END.

Figure 2.2 is a dataflwwwodiagramdescription of the triangle program. We could implement it as a


main program with the four indicated procedures. Since we will use this example later for unit testing,
the four procedures have been merged into one TurboPascal program. Comment lines relate sections
of the code to the decomposition given in Figure 1.2.

PROGRAM triangle2 (input, output);


VAR
a, b, c : INTEGER;
IsATriangle : BOOLEAN;
BEGIN
{Function 1: Get Input}
writeln ('Enter 3 integers which are sides of a triangle');
readln (a,b,c);
writeln ('Side A is ',a); writeln
('Side B is ',b); writeln ('Side
C is ',c); {Function 2: Is A
Triangle?}
Page 11
IF (a < b + c) AND (b < a + c) AND (c < a + b)
THEN IsATriangle := TRUE
ELSE IsATriangle := FALSE;
{Function 3: Determine Triangle Type}
IF IsATriangle
THEN IF (a = b) AND (b = c)
THEN writeln ('Triangle is Equilateral'); ELSE
IF (a <> b) AND (a <> c) AND (b <> c)
THEN writeln ('Triangle is Scalene');
ELSE writeln ('Triangle is Isosceles')
ELSE writeln ('Not a Triangle');
{Note: Function 4, the Output Controller, has been merged into
clauses in Function 3.}
END.
1.3 The NextDate Function

The complexity in the Triangle Program is due to relationships between inputs and correct outputs.
We will use the NextDate function to illustrate a different kind f complexity — logical
relationships among the input variables themselves.

1.3.1 Problem Statement

NextDate is a function of three variables: month, day, and year It returns the date of the day after
allsyllabus
com

the input date. The month, day, and year variables have numerical values: with 1 ≤ month ≤ 12, 1 ≤
day ≤ 31, and 1812 ≤ year ≤ 2012.

1.3.2 Discussion

There are two sources of complexity in the NextDate function: the just mentioned complexity of the
input domain, and the rule that disting i he common years from leap years. Since a year is 365.2422
days long, leap years are ed for the “extra day” problem. If we declared a leap year every fourth year,
there would be a s ight error. The Gregorian Calendar (instituted by Pope Gregory in 1582) resolves
this by djusting leap years on century years. Thus a year is a leap year if
it is divisible by 4, unless it is a century year. Century years are leap years only if they are multiples of 400
[Inglis 61], www[ISO91],so 1992, 1996, and 2000 are leap years, while the year 1900 is a
common year. The NextDate function also illustrates a sidelight of software testing. Many times, we
find examples of Zipf’s La , which states that 80% of the activity occurs in 20% of the space. Notice
how much of the source code is devoted to leap year considerations.

1.3.3 Implementation

PROGRAM NextDate (INPUT, OUTPUT);


TYPE monthType = 1..12;
dayType = 1..31;
yearType = 1812..2012;
dateType = record
month : monthType;
day : dayType;
year : yearType
end; (*dateType record *)
VAR today, tomorrow :dateType;
BEGIN (*NextDate*)
writeln ('Enter today' 's date in the form MM DD YYYY');
readln (today.month, today.day, today.year);

Page 12
tomorrow := today;
WITH today DO
CASE month OF
1,3,5,7,8,10: IF day < 31 THEN tomorrow.day := day + 1
ELSE Begin
tomorrow.day := 1;
tomorrow.month := month + 1
End;
4,6,9,11 : IF day < 30 THEN tomorrow.day := day + 1
ELSE Begin
tomorrow.day := 1;
tomorrow.month := month + 1
End;
12: IF day < 31 THEN tomorrow.day := day + 1
ELSE Begin
tomorrow.day := 1;
tomorrow.month := 1;
IF year = 2012
THEN Writeln ('2012 is over')
ELSE tomorrow.year := year + 1
End;
2: IF day < 28 THEN tomorrow.day := day + 1
ELSE IF day = 28
THEN IF ((year MOD 4) =0) AND ((year MOD 400) <>0)
THEN tomorrow.day := 29 {leap year}

ELSE Begin {common year}allsyllabus tomorrow.day:3, tomorro .year:5);


tomorrow.day := 1;
tomorrow.month := 3;
End
ELSE IF day = 29
THEN Begin
tomorrow.day := 1;
tomorrow.month := 3;
End;
ELSE writeln('Cannot have Feb.', d );
End;(*CASE month*)
End; (*WITH today*)
Writeln ('Tomorrow''s date is', tomorrow month:3,

END. (*NextDate*) www

1.4 The Commission Problem

Our third example is more typical of commercial computing. It contains a mix of computation and
decision making, so it leads to interesting testing questions.

1.4.1 Problem Statement

Rifle salespersons in the Arizona Territory sold rifle locks, stocks, and barrels made by a gunsmith in
Missouri. Locks cost $45.00, stocks cost $30.00, and barrels cost $25.00. Salespersons had to sell at
least one complete rifle per month, and production limits are such that the most one salesperson could
sell in a month is 70 locks, 80 stocks, and 90 barrels. Each rifle salesperson sent a telegram to the
Missouri company with the total order for each town (s)he visits; salespersons visit at least one town
per month, but travel difficulties made ten towns the upper limit. At the end of each month, the
company computed commissions as follows: 10% on sales up to $1000, 15% on the next $800, and
20% on any sales in excess of $1800. The company had four salespersons. The telegrams from each
salesperson were sorted into piles (by person) and at the end of each month a datafile is

Page 13
prepared, containing the salesperson’s name, followed by one line for each telegram order, showing
the number of locks, stocks, and barrels in that order. At the end of the sales data lines, there is an
entry of “-1” in the position where the number of locks would be to signal the end of input for that
salesperson. The program produces a monthly sales report that gives the salesperson’s name, the total
number of locks, stocks, and barrels sold, the salesperson’s total dollar sales, and finally his/her
commission.

1.5.1 Problem Statement

1.5 The SATM System

To better discuss the issues of integration and sytem testing, we need an example with larger scope.
The automated teller machine described here is a refinement of that in [Topper 93]; it contains an
interesting variety of functionality and interactions. Although it typifies real-time systems,
practitioners in the commercial EDP domain are finding that even traditional COBOL systems have
many of the problems usually associated with real-time systems.
com

The SATM system communicates with bank customers via the fifteen s reens shown in Figure 2.4. Using a
terminal with features as sallsyllabushowninFigure1.3,SATMcustomers can select any of three transaction
types: deposits, withdrawals, and balance inq iries, and these can be done on two types
of accounts, checking and savings. When a bank customer arrives at an SATM station, screen 1 is
displayed. The bank customer accesses the SATM system with a plastic card encoded with a Personal
Account Number (PAN), which is a key to n internal customer account file, containing, among other
things, the customer’s name and account information. If the customer’s PAN matches the information
in the customer account file, the system presents screen 2 to the customer. If the customer’s PAN is
not found, screen 4 i di played, and the card is kept. At screen 2, the customer is prompted to enter
his/her Person Identification Number (PIN). If the PIN is correct (i.e., matches the information in the
customer account file), the system displays screen 5; otherwise, screen 3 is displayed. The customer
has three chances to get the PIN correct; after three failures, screen 4 is displayed, and the card is kept.

On entry to screen 5, the system adds two pieces of information to the customer’s account file: the
current date, and an increment to the number of ATM sessions. The customer selects the desired
transaction from the options shown on screen 5; then the system immediately displays screen 6, where
the customer chooses the account to which the selected transaction will be applied. If balance is
requested, the system checks the local ATM file for any unposted transactions, and reconciles these
with the beginning balance for that day from the customer account file. Screen 14 is then displayed. If
deposit is requested, the status of the Deposit Envelope slot is determined from a field in the Terminal
Control File. If no problem is known, the system displays screen 7 to get the transaction amount. If
there is a problem with the deposit envelope slot, the system displays screen 12. Once the deposit
amount has been entered, the system displays screen 13, accepts the deposit envelope, and processes
the deposit. The deposit amount is entered as an unposted amount in the local ATM file, and the count
of deposits per month is incremented. Both of these (and other information) are processed by the
Master ATM (centralized) system once per day. The system then displays screen 14. If withdrawal is
requested, the system checks the status (jammed or free) of the withdrawal chute in the Terminal
Control File. If jammed, screen 10 is displayed, otherwise, screen
Page 14
7 is displayed so the customer can enter the withdrawal amount. Once the withdrawal amount is
entered, the system checks the Terminal Status File to see if it has enough money to dispense. If it
does not, screen 9 is displayed; otherwise the withdrawal is processed. The system checks the
customer balance (as described in the Balance request transaction), and if there are insufficient funds,
screen 8 is displayed. If the account balance is sufficient, screen 11 is displayed, and the money is
dispensed. The withdrawal amount is written to the unposted local ATM file, and the count of
withdrawals per month in incremented. The balance is printed on the transaction receipt as it is for a
balance request transaction. After the cash has been removed, the system displays screen 14. When the
No button is pressed in screens 10, 12, or 14, the system presents screen 15 and returns the customer’s
ATM card. Once the card is removed from the card slot, screen 1 is displayed. When the Yes button is
pressed in screens 10, 12, or 14, the system presents screen 5 so the customer can select additional
transactions.

1.5.2 Discussion

There is a surprising amount of information “buried” in the syste description just given. For

borrowing limit? What keeps a customer from taking out more than his actual balance if he goes to
several ATM terminals? There are lots of “start up” questions: how much cash is initially in the
machine? How are new customers added to the system? These, and other “real world” refinements, are
eliminated to maintain simplicit .
instance, if you read it closely, you can infer that the terminal only contains ten dollar bills (see
com

screen 7). This textual definition is probably more precise than what is usually encountered in
practice. The example is deliberately simple (hence the name).

A plethora of questions could be resolved by ist of assumptions. For example, is there a

allsyllabus
1.6 Saturn Windshield Wiper Controller

The windshield wiper on the Saturn automobile (at least on the 1992 models) is controlled by a lever
with a dial. The lever has four positions, OFF, INT (for intermittent), LOW, and HIGH, and the dial
has three positions, numbered simply 1, 2, and 3. The dial positions indicate three intermittent speeds,
and the dial position is relevant only when the lever is at the INT position. The decision table below
shows the windshield wiper speeds (in wipes per minute) for the lever and dial positions.
Lever OFF INT INT INT LOW HIGH
Dial n/a 1 2 3 n/a n/a

Wiper 0 4 6 12 30 60

UNIT 2
BOUNDARY VALUE TESTING, EQUIVALENCE CLASS
TESTING, DECISION TABLE- BASED TESTING:

2.1 Boundary Value Analysis

For the sake of comprehensible drawings, the discussion relates to a function, F, of two variables x 1
and x2 . When the function F is implemented as a program, the input variables x 1 and x2 will have
some (possibly unstated) boundaries:
Unfortunately, the intervals [a, b] and [c, d] are referred to as the rancomgesfx 1and x2 , so right away, we

have an overloaded term. The inallsyllabustendedmeaningwillalwaybe clear from its context. Strongly

typed languages (such as Ada and Pascal) permit explicit definition of such variable ranges. In fact,
part of the historical reason for strong typing was to prevent programmers from making the kind of
errors that result in faults that are easily revealed by oundary value testing. Other languages (such
as COBOL, FORTRAN, and C) are not strong y typed, so boundary value testing is more appropriate
for programs coded in such languages. The input space (domain) of our function F is
shown in Figure 2.1. Any point within the haded rectangle is a legitimate input to the function F.
Boundary value analysis focuses on the bo nd r of the input space to identify test cases. The
rationale behind boundary value testing is th t error tend to occur near the extreme values of an input
variable. The wwwUS.Army(CECOM) made a study of its software, and found that a surprising
portion of faults turned out to be boundary value faults. Loop conditions, for example, may test for <
when they should test for ≤, and counters often are “off by one”. The desktop publishing program in
which this manuscript as typed has an interesting boundary value problem. There are two modes of
textual display: a scrolling view in which new pages are indicated by a dotted line, and a page view
which displays a full page image showing where the text is placed on the page, together with headers
and footers. If the cursor is at the last line of a page and new text is added, an anomaly occurs: in the
first mode, the new line(s) simply appear, and the dotted line (page break) is adjusted. In the page
display mode, however, the new text is lost — it doesn’t appear on either page.

Figure 2.1 Input Domain of a Function of Two Variables

Page 16
The basic idea of boundary value analysis is to use input variable values at their minimum, just above
the minimum, a nominal value, just below their maximum, and at their maximum. There is a
commercially available testing tool (named T) that generates such test cases for a properly specified
program. This tool has been successfully integrated with two popular front-end CASE tools
(Teamwork from Cadre Systems, and Software Through Pictures from Interactive Development
Environments). The T tool refers to these values as min, min+, nom, max- and max; we will use this
convention here. The next part of boundary value analysis is based on a critical assumption; it’s
known as the “single fault” assumption in reliability theory. This says that failures are only rarely the
result of the simultaneous occurrence of two (or more) faults. Thus the boundary value analysis test
cases are obtained by holding the values of all but one variable at their nominal values, and letting that
variable assume its extreme values. The boundary value analysis test cases for our function F of two
variables are:

{<x1nom, x2min>, <x1nom, x2min+ >,<x1nom, x2nom>,<x1nom, x2max-

>, <x1nom, x2max>, <x1min, x2nom >, <x1min+, x2nom >, <x1nom,

x2nom >, <x1max-, x2nom >, <x1max, x2nom > }


These are illustrated in Figure 2.2.

Figure 2.2 Boundary Value AnalysiallsyllabusTestCasesforaFunctionof Two Variables

2.1.1 Generalizing Boundary Value An i


The basic boundary value analysis technique can be generalized in two ways: by the number of

variables, and by thwwweekinds of ranges. Generalizing the number of variables is easy: if we have a
function of n variables, we hold all but one at the nominal values, and let the remaining variable
assume the min, min+, nom, max- and max values, and repeat this for each variable. Thus for a
function of n variables, boundary value analysis yields 4n + 1 test cases. Generalizing ranges depends
on the nature (or more precisely, the type) of the variables themselves. In the NextDate function, for
example, have variables for the month, the day, and the year. In a FORTRAN-like language, we
would most likely encode these, so that January would correspond to 1, February to 2, and so on. In a
language that supports user defined types (like Pascal), we could define the variable month as an
enumerated type {Jan., Feb., . . . , Dec.}. Either way, the values for min, min+, nom, max- and max
are clear from the context. When a variable has discrete, bounded values, as the variables in the
commission problem have, the min, min+, nom, max- and max are also easily determined. When there
are no explicit bounds, as in the triangle problem, we usually have to create “artificial” bounds. The
lower bound of side lengths is clearly 1 (a negative side length is silly), but what might we do for an
upper bound? By default, the largest representable integer (called MAXINT in some languages) is one
possibility, or we might impose an arbitrary upper limit such as 200 or 2000.

Page 17
Boundary value analysis doesn’t make much sense for Boolean variables; the extreme values are
TRUE and FALSE, but there is no clear choice for the remaining three. We will see in Chapter 7 that
Boolean variables lend themselves to decision table-based testing. Logical variables also present a
problem for boundary value analysis. In the ATM example, a customer’s Personal Identification
Number (PIN) is a logical variable, as is the transaction type (deposit, withdrawal, or inquiry). We
could “go through the motions” of boundary value analysis testing for such variables, but the exercise
is not very satisfying to the “tester’s intuition”.

2.1.2 Limitations of Boundary Value Analysis

Boundary value analysis works well when the program to be tested is a function of several
independent variables that represent bounded physical quantities. The key words here are independent
and physical quantities. A quick look at the boundary value analysis test cases for NextDate (in
section 5.5) shows them to be inadequate. There is very little stress on February and on leap years, for

example. The real problem here is that there are cominterestingdependencies among the month, day,
and year variables. Boundary value analysis presu es the variables to be truly independent. Even so,
boundary value analysis happens to catch end- f-month and end-of-year
faults. Boundary value analysis test cases are derived from the extrema of bounded, independent variables
that refer to physical quanti allsyllabustie,withnoconsiderationof the nature of the function, nor of the
semantic meaning of the variables. We see boundary val e analysis test cases to be rudimentary,
in the sense that they are obtained with ver ittle insight and imagination. As with so many things, you
get what you pay for.

The physical quantity criterion is equally important. When a variable refers to a physical quantity,
such as temperature, pressure, air speed, angle of attack, load, and so forth, physical boundaries can be
extremely important. (In an intere ting example of this, Sky Harbor International Airport in Phoenix
had to close on June 26, 1992 because the air temperature was 122 °F. Aircraft pilots were unable to
make certain instrument settings before take-off: the instruments could only accept a maximum air
temperature of 120 °F.) In another case, a medical analysis system uses stepper
motors to position a carousel of samples to be analyzed. It turns out that the mechanics of moving the
carousel back to the starting cell often causes the robot arm to miss the first cell. As an example of
logical (versus physical) variables, we might look at PINs or telephone numbers. It’s hard to imagine
what faults might be revealed by PINs of 0000, 0001, 5000, 9998, and 9999.

2.2 Robustness Testing

Robustness testing is a simple extension of boundary value analysis: in addition to the five boundary
value analysis values of a variable, we see what happens when the extrema are exceeded with a value
slightly greater than the maximum (max+) and a value slightly less than the minimum (min-).
Robustness test cases for our continuing example are shown in Figure 5.3.

Most of the discussion of boundary value analysis applies directly to robustness testing, especially the
generalizations and limitations. The most interesting part of robustness testing is not with the inputs,
but with the expected outputs. What happens when a physical quantity exceeds its maximum? If it is
the angle of attack of an airplane wing, the aircraft might stall. If it’s the load capacity of a public
elevator, we hope nothing special would happen. If it’s a date, like May 32, we
Page 18
would expect an error message. The main value of robustness testing is that it forces attention on
exception handling. With strongly typed languages, robustness testing may be very awkward. In
Pascal, for example, if a variable is defined to be within a certain range, values outside that range
result in run-time errors that abort normal execution. This raises an interesting question of
implementation philosophy: is it better to perform explicit range checking and use exception handling
to deal with “robust values”, or is it better to stay with strong typing? The exception handling choice
mandates robustness testing.

Figure 2.3 Robustness Test Cases for a Function of Two Variables

2.3 Worst Case Testing

Rejecting this assumption means that we are interested in what happens when more than one

Boundary value analysis, as we said earlier, makes the single fault comassuptionof reliability theory.

variable has an extreme value. In electronic circuit analysis, this is alled “worst case analysis”; we
use that idea here to generate worst case test cases. For each variable, we start with the five element

for boundary value analysis.

set that contains the min, min+, nomallsyllabus,mx-andmaxvalues.Wethen take the Cartesian product (see
Chapter 3) of these sets to generate test cases. The res lt of the two-variable version of this is shown in
Figure 2.4. Worst case te ting i c early more thoro gh in the sense that boundary value analysis test
cases are a proper subset of worst case test cases. It also represents much more effort: worst case
testing for a function of n variables gener tes 5n test cases, as opposed to 4n+1 test cases

Worst case testing follows the gener iz tion pattern we saw for boundary value analysis. It also has the
same limitations, particularly those related to independence. Probably the best application for worst
case testing is where physic l v ri bles have numerous interactions, and where failure of the function is
extremelwwwycostly.Forreally paranoid testing, we could go to robust worst case testing. This
involves the Cartesian product of the seven element sets we used in robustness testing. Figure 2.5
shows the robust orst case test cases for our two variable function.

2.4 Special Value Testing


Special value testing is probably the most widely practiced form of functional testing. It also is the
most intuitive and the least uniform. Special value testing occurs when a tester uses his/her domain
knowledge, experience with similar programs, and information about “soft spots” to devise test cases.
We might also call this “ad hoc testing” or “seat of the pants/skirt” testing. There are no guidelines,
other than to use “best engineering judgment.” As a result, special value testing is very dependent on
the abilities of the tester.

Figure 2.4 Worst Case Test Cases for a Function of Two Variables

Page 19
Figure 2.5 Robust Worst Case Test Cases for a Function of Two Variables

Despite all the apparent negatives, special value testing can be very useful. In the next section, you
will find test cases generated by the methods we just discussed for our three unit level examples (not
the ATM system). If you look carefully at these, especially for the NextDate function, you find that
none is very satisfactory. If an interested tester defined special value test cases for NextDate, we
would see several test cases involving February 28, February 29, and leap years. Even though special
value testing is highly subjective, it often results in a set of test cases which is more effective in
revealing faults than the test sets generated by the other methods we have studied— testimony to the
craft of software testing.
from all the methods for each problem is very space consuming,comswe’ll just have selected examples.
2.5 Examples

Each of the three continuing examples is a function of three variables. Printing all the test cases

2.5.1 Test Cases for the Triangle Problemallsyllabus

In the problem statement, there are no conditions on the triangle sides, other than being integers.
Obviously, the lower bounds of the ranges are a 1. We arbitrarily take 200 as an upper bound. Table 1
contains boundary value test cases and Table 2 contains worst case test cases using these ranges.

Table 1 Bound r Value Analysis Test Cases Case

a b c Expected Output

1 100 100 1 Isosceles

2 100 100 2 Isosceles

3 100 100 100 Equilateral

4 100 100 199 Isosceles

5 100 100 200 Not a Triangle

6 100 1 100 Isosceles

7 100 2 100 Isosceles

Page 20
8 100 100 100 Equilateral

9 100 199 100 Isosceles

10 100 200 100 Not a Triangle

11 1 100 100 Isosceles

12 2 100 100 Isosceles

13 100 100 100 Equilateral

14 199 100 100 Isosceles

15 200 100 100 N t a Triangle

Table 2 Worst Case Test Cases Case com

a b c Expe ted Output

1 1 1 1 Equilateral

2 1 1 2 Not a Triangle

3 1 1 100 Not a Triangle

4 1 1 199 Not a Triangle

5 1 1 200 Not a Triangle

6 1 2 1 Not a Triangle

7 1 2 2 Isosceles

8 1 2 100 Not a Triangle

9 1 2 199 Not a Triangle

10 1 2 200 Not a Triangle

11 1 100 1 Not a Triangle

12 1 100 2 Not a Triangle

13 1 100 100 Isosceles

14 1 100 199 Not a Triangle

Page 21
15 1 100 200 Not a Triangle

16 1 199 1 Not a Triangle

17 1 199 2 Not a Triangle

18 1 199 100 Not a Triangle

19 1 199 199 Isosceles

20 1 199 200 Not a Triangle

21 1 200 1 Not a Triangle


N t a Triangle
22 1 200 2

23 1 200 100
comNtaTriangle Not
24 1 200 199 a Triangle

25 1 200 200 Isosceles

26 2 1 1 Not a Triangle

27 2 1 2 Isosceles

28 2 1 100 Not a Triangle

29 2 1 199 Not a Triangle

30 2 1 200 Not a Triangle

31 2 2 1 Isosceles

32 2 2 2 Equilateral

33 2 2 100 Not a Triangle

34 2 2 199 Not a Triangle

35 2 2 200 Not a Triangle

36 2 100 1 Not a Triangle

37 2 100 2 Not a Triangle

38 2 100 100 Isosceles


Page 22
39 2 100 199 Not a Triangle

40 2 100 200 Not a Triangle

41 2 199 1 Not a Triangle

42 2 199 2 Not a Triangle

43 2 199 100 Not a Triangle

44 2 199 199 Isosceles

45 2 199 200 Scalene


N t a Triangle
46 2 200 1

47 2 200 2
comNtaTriangle Not
48 2 200 100 a Triangle

49 2 200 199 Scalene

50 2 200 200 Isosceles

51 100 1 1 Not a Triangle

52 100 1 2 Not a Triangle

53 100 1 100 Isosceles

54 100 1 199 Not a Triangle

55 100 1 200 Not a Triangle

56 100 2 1 Not a Triangle

57 100 2 2 Not a Triangle

58 100 2 100 Isosceles

59 100 2 199 Not a Triangle

60 100 2 200 Not a Triangle

61 100 100 1 Isosceles

62 100 100 2 Isosceles


Page 23
63 100 100 100 Equilateral

64 100 100 199 Isosceles

65 100 100 200 Not a Triangle

66 100 199 1 Not a Triangle

67 100 199 2 Not a Triangle

68 100 199 100 Isosceles

69 100 199 199 Isosceles


Scalene
70 100 199 200

71 100 200 1 comNtaTriangle

72 100 200 2
Not a Triangle
73 100 200 100
Not a Triangle
74 100 200 199
Scalene
75 100 200 200
Isosceles
76 199 1 1
Not a Triangle
77 199 1 2
Not a Triangle
78 199 1 100
Not a Triangle
79 199 1 199
Scalene
80 199 1 200
Not a Triangle
81 199 2 1
Not a Triangle
82 199 2 2
Not a Triangle
83 199 2 100
Not a Triangle
84 199 2 199
Isosceles
85 199 2 200
Scalene
86 199 100 1
Not a Triangle
Page 24
87 199 100 2 Not a Triangle

88 199 100 100 Isosceles

89 199 100 199 Isosceles

90 199 100 200 Scalene

91 199 199 1 Isosceles

92 199 199 2 Isosceles

93 199 199 100 Isosceles


Equilateral
94 199 199 199

95 199 199 200 comIssceles

96 199 200 1
Not a Triangle
97 199 200 2
Scalene
98 199 200 100
Scalene
99 199 200 199
Isosceles
100 199 200 200
Isosceles
101 200 1 1
Not a Triangle
102 200 1 2
Not a Triangle
103 200 1 100
Not a Triangle
104 200 1 199
Not a Triangle
105 200 1 200
Isosceles
106 200 2 1
Not a Triangle
107 200 2 2
Not a Triangle
108 200 2 100
Not a Triangle
109 200 2 199
Scalene
110 200 2 200
Isosceles
Page 25
111 200 100 1 Not a Triangle

112 200 100 2 Not a Triangle

113 200 100 100 Not a Triangle

114 200 100 199 Scalene

115 200 100 200 Isosceles

116 200 199 1 Not a Triangle

117 200 199 2 Scalene


S alene
118 200 199 100

119 200 199 199


comIssceles Is
120 200 199 200 sceles

121 200 200 1 Isosceles

122 200 200 2 Isosceles

123 200 200 100 Isosceles

124 200 200 199 Isosceles

125 200 200 200 Equilateral


2.5.2 Test Cases for the NextDate Problem

Table 3 Worst Case Test Cases Case

month day year expected output

1 1 1 1812 January 2, 1812

2 1 1 1813 January 2, 1813

3 1 1 1912 January 2, 1912

4 1 1 2011 January 2, 2011

5 1 1 2012 January 2, 2012

Page 26
6 1 2 1812 January 3, 1812

7 1 2 1813 January 3, 1813

8 1 2 1912 January 3, 1912

9 1 2 2011 January 3, 2011

10 1 2 2012 January 3, 2012

11 1 15 1812 January 16, 1812

12 1 15 1813 January 16, 1813

13 1 15 1912 January 16, 1912

14 1 15 2011 January 16, 2011

15 1 15 2012 January 16, 2012

16 1 30 1812 January 31, 1812

17 1 30 1813 January 31, 1813

18 1 30 1912 January 31, 1912

19 1 30 2011 January 31, 2011

20 1 30 2012 January 31, 2012

21 1 31 1812 February 1, 1812

22 1 31 1813 February 1, 1813

23 1 31 1912 February 1, 1912

24 1 31 2011 February 1, 2011

25 1 31 2012 February 1, 2012

26 2 1 1812 February 2, 1812

27 2 1 1813 February 2, 1813

28 2 1 1912 February 2, 1912

29 2 1 2011 February 2, 2011

Page 27
30 2 1 2012 February 2, 2012

31 2 2 1812 February 3, 1812

32 2 2 1813 February 3, 1813

33 2 2 1912 February 3, 1912

34 2 2 2011 February 3, 2011

35 2 2 2012 February 3, 2012

36 2 15 1812 February 16, 1812

37 2 15 1813 February 16, 1813

38 2 15 1912 February 16, 1912

39 2 15 2011 February 16, 2011

40 2 15 2012 February 16, 2012

41 2 30 1812 error

42 2 30 1813 error

43 2 30 1912 error

44 2 30 2011 error

45 2 30 2012 error

46 2 31 1812 error

47 2 31 1813 error

48 2 31 1912 error

49 2 31 2011 error

50 2 31 2012 error

51 6 1 1812 June 1, 1812

52 6 1 1813 June 1, 1813

53 6 1 1912 June 2, 1912

Page 28
54 6 1 2011 June 2, 2011

55 6 1 2012 June 2, 2012

56 6 2 1812 June 3, 1812

57 6 2 1813 June 3, 1813

58 6 2 1912 June 3, 1912

59 6 2 2011 June 3, 2011

60 6 2 2012 June 3, 2012

61 6 15 1812 June 16, 1812

62 6 15 1813 June 16, 1813

63 6 15 1912 June 16, 1912

64 6 15 2011 June 16, 2011

65 6 15 2012 June 16, 2012

66 6 30 1812 July 31, 1812

67 6 30 1813 July 31, 1813

68 6 30 1912 July 31, 1912

69 6 30 2011 July 31, 2011

70 6 30 2012 July 31, 2012

71 6 31 1812 error

72 6 31 1813 error

73 6 31 1912 error

74 6 31 2011 error

75 6 31 2012 error

76 11 1 1812 November 2, 1812

77 11 1 1813 November 2, 1813

Page 29
78 11 1 1912 November 2, 1912

79 11 1 2011 November 2, 2011

80 11 1 2012 November 2, 2012

81 11 2 1812 November 3, 1812

82 11 2 1813 November 3, 1813

83 11 2 1912 November 3, 1912

84 11 2 2011 November 3, 2011

85 11 2 2012 Nove ber 3, 2012


com
86 11 15 1812 N ve ber 16, 1812

87 11 15 1813 November 16, 1813

88 11 15 1912 November 16, 1912

89 11 15 2011 November 16, 2011

90 11 15 2012 November 16, 2012

91 11 30 1812 December 1, 1812

92 11 30 1813 December 1, 1813

93 11 30 1912 December 1, 1912

94 11 30 2011 December 1, 2011

95 11 30 2012 December 1, 2012

96 11 31 1812 error

97 11 31 1813 error

98 11 31 1912 error

99 11 31 2011 error

100 11 31 2012 error

101 12 1 1812 December 2, 1812

Page 30
102 12 1 1813 December 2, 1813

103 12 1 1912 December 2, 1912

104 12 1 2011 December 2, 2011

105 12 1 2012 December 2, 2012

106 12 2 1812 December 3, 1812

107 12 2 1813 December 3, 1813

108 12 2 1912 December 3, 1912


Dece ber 3, 2011
109 12 2 2011

110 12 2 2012
comDeeber 3, 2012
111 12 15 1812 December 16, 1812

112 12 15 1813 December 16, 1813

113 12 15 1912 December 16, 1912

114 12 15 2011 December 16, 2011

115 12 15 2012 December 16, 2012

116 12 30 1812 December 31, 1812

117 12 30 1813 December 31, 1813

118 12 30 1912 December 31, 1912

119 12 30 2011 December 31, 2011

120 12 30 2012 December 31, 2012

121 12 31 1812 January 1, 1813

122 12 31 1813 January 1, 1814

123 12 31 1912 January 1, 1913

124 12 31 2011 January 1, 2012

125 12 31 2012 January 1, 2013


Page 31
2.5.3 Test Cases for the Commission Problem

Rather than go through 125 boring test cases again, we’ll look at some more interesting test cases for
the commission problem. This time we’ll look at boundary values for the output range, especially near
the threshold points of $1000 and $1800. The output space of the commission is shown in Figure 5.6.
The intercepts of these threshold planes with the axes are shown. The volume below the lower plane
corresponds to sales below the $1000 threshold. The volume between the two planes is the 15%
commission range. Part of the reason for using the output range to determine test cases is that cases
from the input range are almost all in the 20% zone. We want to find input variable combinations that
stress the boundary values: $100, $1000, $1800, and $7800. These test cases were developed with a
spreadsheet, which saves a lot of calculator pecking. The minimum and maximum were easy, and the
numbers happen to work out so that the border points are easy to generate. Here’s where it gets
interesting. Test case 9 is the $1000 b rder point. If we tweak the input variables we get values just
below and just above the border ( ases 6 - 8 and 10 - 12). If we wanted to, we could pick values near
the intercepts like (22, 1, 1) and (21, 1, 1). As we continue in this way, we have a sense that we are
“exercising” interesting parts of the code. We might claim
that this is really a form of special value testing, because we usedcomourmathematical insight to

generate test cases.

warranted, the methods generate unsatisfactoryallsyllabustestcases(suchas February 31, 1912 for NextDate).

These methods have two other distinctions: normal versus robust values, and the single fault versus

2.6 Guidelines for Boundary val e Testing

With the exception of special value testing, the test methods based on the boundary values of a
function (program) are the most rudimentar of all functional testing methods. They share the
common assumption that the input v ri e re truly independent, and when this assumption is not

the multiple fault assumption. Just using these distinctions carefully will result in better testing. Each
of these methods can be applied to the output range of a program, as we did for the commission
problem.

Another useful form of output-based test cases is for systems that generate error messages. The tester
should devise test cases to check that error messages are generated when they are appropriate, and are
not falsely generated. Boundary value analysis can also be used for internal variables, such as loop
control variables, indices, and pointers. Strictly speaking, these are not input variables, but errors in
the use of these variables are quite common. Robustness testing is a good choice for testing internal
variables.

Figure 2.6 Input Space of the Commission Problem

Page 32
Table 4 Output Boundary Value Analysis Test Cases Case

locks stocks barrels sales comm Comment

1 1 1 1 100 10 output minimum

2 1 1 2 125 12.5 output minimum +

3 1 2 1 130 13 output minimum +

4 2 1 1 145 14.5 output minimum +

5 5 5 5 500 50 midpoint

6 10 10 9 975 97.5 border point -

7 10 9 10 970 97 border point -

8 9 10 10 955 95 5 border point -

9 10 10 10 1000 100 border point

10 10 10 11 1025 103.75 border point +

11 10 11 10 1030 104.5 border point +

12 11 10 10 1045 106.75 border point +

13 14 14 14 1400 160 midpoint

14 18 18 17 1775 216.25 border point -

15 18 17 18 1770 215.5 border point -

16 17 18 18 1755 213.25 border point -

17 18 18 18 1800 220 border point

18 18 18 19 1825 225 border point +

19 18 19 18 1830 226 border point +

20 19 18 18 1845 229 border point +

21 48 48 48 4800 820 midpoint

22 70 80 89 7775 1415 output maximum -

Page 33
23 70 79 90 7770 1414 output maximum -

24 69 80 90 7755 1411 output maximum -

25 70 80 90 7800 1420 output maximum

Table 5 Output Special Value Test Cases Case

locks stocks barrels sales comm Comment

1 10 11 9 1005 100.75 border point +

2 18 17 19 1795 219.25 border point -

3 18 19 17 1805 221 border point +

2.7 Equivalence Classes


We noted that the important aspect of equivalence classes is that comtheyfrma partition of a set, where

partition refers to a collectioallsyllabusnofmutuallydisjointsubetwhose union is the entire set. This

has two important implications for testing: the fact that the entire set is represented provides a form of
completeness, and the disjointness assures a form of non-redundancy. Because the subsets are
determined by an equivalence relation, the elements of a subset have something in common. The idea
of equivalence class testing is to identify test cases by using one element from each equivalence class.
If the equivalence classes are chosen wisely, this greatly reduces the potential redundancy among test
cases. In the Triangle Problem, for example, we would certainly have a test case for an equilateral
triangle, and we might pick the triple (5, 5, 5) as inputs for a test case. If we did this, we would not
expect to le rn m ch from test cases such as (6, 6, 6) and (100, 100, 100). Our intuition tells us that
these would be “treated the same” as the first test case, thus they would be redundant. When we
consider structural testing in Part III, we shall see that “treated the same” maps onto “traversing the
same execution path”.

The key (and the craft!) of equivalence class testing is the choice of the equivalence relation that
determines the classes. Very often, we make this choice by “second guessing” the likely
implementation, and thinking about the functional manipulations that must somehow be present in the
implementation. We will illustrate this with our continuing examples, but first, we need to make a
distinction between weak and strong equivalence class testing. After that, we will compare these to the
traditional form of equivalence class testing.

Suppose our program is a function of three variables, a, b, and c, and the input domain consists of sets
A, B, and C. Now, suppose we choose an “appropriate” equivalence relation, which induces the
following partition:
Page 34
Finally, we denote elements of the partitions as follows:

2.7.1 Weak Equivalence Class Testing

With the notation as given above, weak equivalence class testing is accomplished by using one
variable from each equivalence class in a test case. For the above example, we would end up with the
following weak equivalence class test cases:

This set of test cases uses one value from each equiv lence class. We identify these in a systematic
way, hence the apparent pattern. In fact, we wi a w ys have the same number of weak equivalence
class test cases as there are classes in the partition with the largest number of subsets.

2.7.2 Strong Equivalence Class Te ting


Test Case a b c

WE1 a1 b1 c1

WE2 a2 b2 2

WE3 a3 b3 3
com
WE4 a1 b4 c2

allsyllabus
Strong equivalence class testing is b sed on the Cartesian Product of the partition subsets. Continuing
with this example, the Cartesian Product A x B x C will have 3 × 4 × 2 = 24 elements, resulting in the
test cases in the table below:

Test Case a b c
SE1 a1 b1 c1

SE2 a1 b1 c2

SE3 a1 b2 c1

SE4 a1 b2 c2

SE5 a1 b3 c1

SE6 a1 b3 c2

Page 35
SE7 a1 b4 c1

SE8 a1 b4 c2

SE9 a2 b1 c1

SE10 a2 b1 c2

SE11 a2 b2 c2

SE12 a2 b2 c2

SE13 a2 b3 c1

SE14 a2 b3 1
2 com c2
SE15 a2 b4

SE16 a2 b4
allsyllabus
SE17 a3 b1 c1

SE18 a3 b1 c2

SE19 a3 b2 c1

SE20 a3 b2 c2

SE21 3 b3 c1

SE22 a3 b3 c2

SE23 a3 b4 c1

SE24 a3 b4 c2
Notice the similarity between the pattern of these test cases and the construction of a truth table in
propositional logic. The Cartesian Product guarantees that we have a notion of “completeness” in two
senses: we cover all the equivalence classes, and we have one of each possible combination of inputs.

As we shall see from our continuing examples, the key to “good” equivalence class testing is the
selection of the equivalence relation. Watch for the notion of inputs being “treated the same”. Most of
the time, equivalence class testing defines classes of the input domain. There is no reason why we
could not define equivalence relations on the output range of the program function being tested, in
fact, this is the simplest approach for the Triangle Problem.

Page 36
2.7.3 Traditional Equivalence Class Testing

The traditional view of equivalence class testing defines equivalence classes in terms of validity. For
each input variable, there are valid and invalid values; in the traditional approach, these are identified
and numbered, and then incorporated into test cases in the weak sense. As a brief example, consider
the valid ranges defined for the variables in the Commission problem:

The corresponding invalid ranges are:

Given these valid and invalid sets of inputs, the traditional equivalencometesting strategy identifies

test cases as follows:

1. For valid inputs, use one value from each valid class (as in what we have called weak equivalence
class testing. (Note that each input in these test c ses will be valid.)

2. For invalid inputs, a test case will have one invalid value and the remaining values will all be valid.
(Thus a “single failure” should cau e the test case to fail.)

If the input variables have defined r nges (as we had in the various boundary value examples), then
the test cases from traditional equiv lence class testing will always be a subset of those that would
allsyllabus
be generated by robustness testing.
There are two problems ith traditional equivalence testing. The first is that, very often, the
specification does not define
www
hat the expected output for an invalid test case should be. (We could
argue that this is a deficiency of the specification, but that doesn’t get us anywhere.) Thus testers
spend a lot of time defining expected outputs for these cases. The second problem is that strongly
typed languages eliminate the need for the consideration of invalid inputs. Traditional equivalence
testing is a product of the time when languages such as FORTRAN and COBOL were dominant,
hence this type of error was common. In fact, it was the high incidence of such errors that led to the
implementation of strongly typed languages.

2.8 Equivalence Class Test Cases for the Triangle Problem

In the problem statement, we note that there are four possible outputs: Not a Triangle, Scalene,
Isosceles, and Equilateral. We can use these to identify output (range) equivalence classes as follows.

Page 37
These classes yield a simple set of test cases:

Test Case a b c Expected Output

OE1 5 5 5 Equilateral

OE2 2 2 3 Isosceles

OE3 3 4 5 Scalene
com

OE4 4 1 2 Not a Triangle

If we base equivalence classes on the input domain, we obtain a ri her set f test cases. What are some

of the possibilities for the thre allsyllabuseintegers,a,b,andc?They can all be equal, exactly one pair

can be equal (this can happen three ways), or none can be eq al.

As a separate question, we can app y the triangle property to see if they even constitute a triangle. (For
example, the triplet <1, 4, 1> has exactly one pair of equal sides, but these sides do not form a
triangle.)

If we wanted to be still more thorough, we could separate the “less than or equal to” into the two
distinct cases, thus the set D6 would become

and similarly for D7 and D8.

We need to make one more observation. Notice that we have not taken any form of Cartesian Product.
This is because all of our equivalence classes were already defined in terms of triplets <a,

Page 38
b, c>. Had we followed the dictates of traditional equivalence testing, we would have equivalence
classes of integers greater than zero and integers less than or equal to zero. There would lead to a
boring, unsatisfactory set of test cases.

2.9 Equivalence Class Test Cases for the NextDate Function

The NextDate Function illustrates very well the craft of choosing the underlying equivalence relation.
It is also a good example on which to compare traditional, weak, and strong forms of equivalence
class testing. NextDate is a function of three variables, month, day, and year, and these have ranges
defined as follows:

Traditional Test Cases

The valid equivalence classes are

The invalid equivalence classes are

www
These classes yield the follo ing test cases, where the valid inputs are mechanically selected from
the approximate middle of the valid range:

Case ID Month Day Year Expected


Output

TE1 6 15 1912 6/16/1912

TE2 -1 15 1912 invalid input

TE3 13 15 1912 invalid input

TE4 6 -1 1912 invalid input

Page 39
TE5 6 32 1912 invalid input

TE6 6 15 1811 invalid input

TE7 6 15 2013 invalid input

If we more carefully choose the equivalence relation, the resulting equivalence classes will be more
useful. Recall we said earlier that the gist of the equivalence relation is that elements in a class are
“treated the same way”. One way to see the deficiency of the traditional approach is that the
“treatment” is at the valid/invalid level. We next reduce the granularity by focusing on more specific
treatment.
What must be done to an input date? If it is not the last day of a mcomnth,theNextDate function will
simply increment the day value. At the end of a month, the next day is 1 and the month is
incremented. At the end of a year, both the day and the month are reset to 1, and the year is

incremented. Finally, the problemallsyllabusofeapyearmakesdetermining the last day of a month

interesting. With all this in mind, we might postulate the following equivalence classes:

By choosing separate classes for 30 and 31 day months, we simplify the last day of the month
question. By taking February as a separate class, we can give more attention to leap year questions.
We also give special attention to day values: days in D 1 are (nearly) always incremented, while days
in D4 only have meaning for months in M2. Finally, we have three classes of years, the special case of
the year 1900, leap years, and common years. This isn’t a perfect set of equivalence classes, but its use
will reveal many potential errors.

Weak Equivalence Class Test Cases

These classes yield the following weak equivalence class test cases. As before, the inputs are
mechanically selected from the approximate middle of the corresponding class:

Page 40
Case ID Month Day Year Expected
Output

WE1 6 14 1900 6/15/1900

WE2 7 29 1912 7/30/1912

WE3 2 30 1913 invalid input

WE4 6 31 1900 invalid input

Notice that following a simple pattern yields test cases that are not particularly reassuring. This is
worth remembering, because any tool that attempts to automate this process will rely on some fairly
simple value selection criterion.

Strong Equivalence Class Test Cases

Using the same equivalence classes, we find the strong equivalen e lass test cases shown in the table
below. The same value selection criterion is used. We till don’t have a “perfect” set of test cases, but I
think any tester would be a lot happier with the 36 strong equivalence class test cases. To illustrate the
sensitivity to the choice of classes, notice that, among these 36 test cases, we never get a Feb . 28. If
we had chosen five day classes, where D1’ would be days 1 - 27, D1” would be 28, and the other three
would stay the same. We wou d h ve a set of 45 test cases, and among these, there would be better
coverage of Feb. 28 considerations.

Case ID Month Da Ye r Expected


Output
allsyllabus
SE1 6 14 1900 6/15/1900

SE2 6 14 1912 6/15/1912

SE3 6 14 1913 6/15/1913

SE4 6 29 1900 6/30/1900

SE5 6 29 1912 6/30/1912

SE6 6 29 1913 6/30/1913

SE7 6 30 1900 7/1/1900

SE8 6 30 1912 7/1/1912

SE9 6 30 1913 7/1/1913

Page 41
SE10 6 31 1900 ERROR

SE11 6 31 1912 ERROR

SE12 6 31 1913 ERROR

SE13 7 14 1900 7/15/1900

SE14 7 14 1912 7/15/1912

SE15 7 14 1913 7/15/1913

SE16 7 29 1900 7/30/1900

SE17 7 29 1912 7/30/1912

SE18 7 29 1913 7/30/1913

SE19 7 30 1900 7/31/1900

SE20 7 30 1912 7/31/1912

SE21 7 30 1913 /31/1913

SE22 7 31 1900 8/1/1900

SE23 7 31 1912 8/1/1912

SE24 7 31 1913 8/1/1913

SE25 2 14 1900 2/15/1900

SE26 2 14 1912 2/15/1912

SE27 2 14 1913 2/15/1913

SE28 2 29 900 ERROR

SE29 2 29 1912 3/1/1912

SE30 2 29 1913 ERROR

SE31 2 30 1900 ERROR

SE32 2 30 1912 ERROR

SE33 2 30 1913 ERROR

Page 42
SE34 2 31 1900 ERROR

SE35 2 31 1912 ERROR

SE36 2 31 1913 ERROR

We could also streamline our set of test cases by taking a closer look at the year classes. If we merge
Y1 and Y3, and call the result the set of common years, our 36 test cases would drop down to 24. This
change suppresses special attention to considerations in the year 1900, and it also adds some
complexity to the determination of which years are leap years. Balance this against how much might
be learned from the present test cases. Take a look at the test cases in which Yl is used (SE2, SE4,
SE7, ...). We don’t really learn much from these, so not much would be lost by skipping them.
The only thing really interesting about the year 1900 is test case SE28, and a related test case that was not generated by the set of equivalence classes, Feb. 28, 1900.

The Input domain of the Commission Problem is “naturally” partitioned combythe limits on locks,

2.9 Equivalence Class Test Cases for the Commission Proble

stocks, and barrels. These equivalence classes are exactly tho e that would also be identified by
traditional equivalence class testing. The first class is the valid input, the other two are invalid. The
input domain equivalence classes lead to very unsatisfactory sets of test cases. We’ll do a little better
with equivalence classes defined on the output r nge of the commission function.

Variable Input Domain Equivalence Classes


Variable Input Domain EquivallsyllabusenceClasses

Lock L1 = { lock: 1 ≤ lock ≤ 70 }

L2 = { lock: lock < 1 }

L3 = {lock: lock > 70 }

Stock S1 = { stock: 1 ≤ stock ≤ 80 }

S2 = { stock: stock < 1 }

S3 = { stock: stock > 80 }

Barrel B1 = { barrel: 1 ≤ barrel ≤ 90 }


B2 = { barrel: barrel < 1 }

B3 = { barrel: barrel > 90 }

Page 43
Weak Input Domain Equivalence Class Test Cases

These classes yield the following weak equivalence class test cases. As with the other examples, the
inputs are mechanically selected.

Test Case locks stocks barrels sales commission

WE1 35 40 45 500 50

WE2 0 0 0 ERROR ERROR

WE3 71 81 91 ERROR ERROR

Traditional Input Domain Equivalence Class Test Cases


com
The same classes yield the following traditional equivalence class test ases. As with the other
examples, the inputs are mechanically selected.
allsyllabus

Test Case locks tocks barrels ales commission

SE1 35 40 45 500 50

SE2 35 40 0 ERROR ERROR

SE3 35 40 91 ERROR ERROR

SE4 35 0 45 ERROR ERROR

SE5 35 0 0 ERROR ERROR

SE6 35 0 91 ERROR ERROR

SE7 35 81 45 ERROR ERROR

SE8 35 81 0 ERROR ERROR

SE9 35 81 91 ERROR ERROR

SE10 0 40 45 ERROR ERROR

SE11 0 40 0 ERROR ERROR

SE12 0 40 91 ERROR ERROR

SE13 0 0 45 ERROR ERROR

Page 44
SE14 0 0 0 ERROR ERROR

SE15 0 0 91 ERROR ERROR

SE16 0 81 45 ERROR ERROR

SE17 0 81 0 ERROR ERROR

SE18 0 81 81 ERROR ERROR

SE19 71 40 45 ERROR ERROR

SE20 71 40 0 ERROR ERROR

SE21 71 40 91 ERROR ERROR

SE22 71 0 45 ERROR ERROR

SE23 71 0 0 ERROR ERROR


allsyllabus

SE24 71 0 91 ERROR ERROR

SE25 71 81 45 ERROR ERROR

SE26 71 81 0 ERROR ERROR

SE27 71 81 91 ERROR ERROR

Output Range Equivalence Cl s Test Cases


Notice that, of 27 test cases, only one is a legitimate input. If we were really worried about error cases,
this might be a good set of test cases. It can hardly give us a sense of confidence about the calculation
portion of the problem, however. We can get some help by considering equivalence classes defined on
the output range. Recall that sales is a function of the number of locks, stocks and barrels sold:

Figure 5.6 helps us get a better “feel” for the input space. Elements of L1 are points with integer
coordinates in the pyramid near the origin. Elements of L2 are points in the “triangular slice” between
the pyramid and the rest of the input space. Finally, elements of L3 are all those points in the
rectangular volume that are not in L1 or in L2. All the error cases found by the strong equivalence
classes of the input domain are outside of the rectangular space shown in Figure 5.6.

Page 45
As was the case with the Triangle Problem, the fact that our input is a triplet means that we no longer
take test cases from a Cartesian Product.

2.10 Guidelines and Observations

Output Range Equivalence Class Test Cases:

Test Case locks stocks barrels sales commision

OR1 5 5 5 500 50

Or2 15 15 15 1500 175

OR3 25 25 25 2500 360

These test cases give us some sense that we are exercising important parts of the problem.

Now that we have gone through three examples, we conclude with socomeobservations about, and guidelines for equivalence class test allsyllabusing.

1. The traditional form of equivalence class testing is generally not as thorough as weak
equivalence class testing, which in turn, is not as thorough as the strong form of equivalence
class testing.

2. The only time it makes sense to use the traditional approach is when the implementation
language is not strongly typed.
3. If error conditions are a high priorit , we could extend strong equivalence class testing to
include invalid classes.

4. Equivalence class testing is appropriate when input data is defined in terms of ranges and
sets of discrete values. This is certainly the case when system malfunctions can occur for out-
of-limit variable values.

5. Equivalence class testing is strengthened by a hybrid approach with boundary value testing.
(We can “reuse” the effort made in defining the equivalence classes.)

6. Equivalence class testing is indicated when the program function is complex. In such cases,
the complexity of the function can help identify useful equivalence classes, as in the NextDate
function.

7. Strong equivalence class testing makes a presumption that the variables are independent
when the Cartesian Product is taken. If there are any dependencies, these will often generate
“error” test cases, as they did in the NextDate function. (The decision table technique in
Chapter 7 resolves this problem.)

Page 46
8. Several tries may be needed before “the right” equivalence relation is discovered, as we saw
in the NextDate example. In other cases, there is an “obvious” or “natural” equivalence
relation. When in doubt, the best bet is to try to second guess aspects of any reasonable
implementation.

2.11 Decision Table Based Testing

Of all the functional testing methods, those based on decision tables are the most rigorous, because
decision tables themselves enforce logical rigor. There are two closely related methods, Cause-Effect
graphing [Elmendorf 73], {Myers 79} and the decision tableau method [Mosley 93]. These
2.11.1 Decision Tables com

are more cumbersome to use, and are fully redundant with decision tables, s we will not discuss them
here. Both are covered in [Mosley 93].

Decision tables have been used to allsyllabusrepresentandanalyzecomplex logical relationships since the

early 1960s. They are ideal for describing situations in which a number of combinations of actions are
taken under varying sets of conditions. Some of the basic decision table terms are illustrated in Figure
2.11

There are four portions of a decision table: the part to the left of the bold vertical line is the stub
portion, to the right is the entry portion. The p rt above the bold line is the condition portion, below is
the action portion. Thus we can refer to the condition stub, the condition entries, the action stub,
and the action entries. A column in the entr portion i r le. Rules indicate which actions are

taken for the conditiwwwonalcircumstances indicated in the condition portion of the rule. In the decision
table in Figure 7.1, hen conditions c1, c2, and c3 are all true, actions a1 and a2 occur. When c1 and c2
are both true, and c3 is false, then actions a1 and a3 occur. The entry for c3 in the rule where c1 is true
and c2 is false is called a “Don’t Care” entry. The Don’t Care entry has two major interpretations: the
condition is irrelevant, or the condition does not apply. Sometimes people will enter the “n/a” symbol
for this latter interpretation.

When we have binary conditions (True/False, Yes/No, 0/1), the condition portion of a decision table is
a truth table (from propositional logic) that has been rotated 90°. This structure guarantees that we
consider every possible combination of condition values. When we use decision tables for test case
identification, this completeness property of a decision table will guarantee a form of complete testing.
Decision tables in which all the conditions are binary are called Limited Entry Decision Tables. If
conditions are allowed to have several values, the resulting tables are called Extended Entry Decision
Tables. We will see examples of both types for the NextDate problem.

Page 47
Decision tables are somewhat declarative (as opposed to imperative): there is no particular order
implied by the conditions, and selected actions do not occur in any particular order.

2.11.2 Technique

To identify test cases with decision tables, we interpret conditions as inputs, and actions as outputs.
Sometimes, conditions end up referring to equivalence classes of inputs, and actions refer to major
functional processing portions of the item being tested. The rules are then interpreted as test cases.
Because the decision table can mechanically be forced to be complete, we know we have a
comprehensive set of test cases. There are several techniques that produce decision tables that are
more useful to testers. One helpful style is to add an action to show when a rule is logically
impossible.
In the decision table in Figure 2.11.2, we see examples of Don’t Ccomareentriesand impossible rule

usage. If the integers a, b, and c do not constitute a triangle, we d n’t even care about possible

equalities, as indicated in the first rallsyllabusule.Inrules3,4,and6,iftwo pairs of integers are equal, by


transitivity, the third pair must be equal, thus the negative entry makes the rule(s) impossible.
The decision table in Figure 2.11.3 il ustrates another consideration related to technique: the choice of
conditions can greatly expand the size of a decision table. Here, we expanded the old condition (c1: a,
b, c are a triangle?) to a more detailed view of the three inequalities of the triangle property. If any one
of these fails, the three integers do not constitute sides of a triangle. We could expand this still further,
because there are two w n inequality could fail: one side could equal the sum of the other two, or it
could be strict y greater. The rule entry portion of this decision table is as in Figure 7.3, except that
each co.ndition entry is explicitly shown. This is a matter of style, not content. I think the style in
Figure 7 2 is more readable.

When conditions refer to equivalence classes, decision tables have a characteristic appearance.
Conditions in the decision table in Figure 7.4 are from the NextDate problem; they refer to the
mutually exclusive possibilities for the month variable. Since a month is in exactly one equivalence
class, we cannot ever have a rule in which two entries are true. The Don’t Care entries (—) really
mean “must be false”. Some decision table aficionados use the notation F! to make this point.

When conditions refer to equivalence classes, decision tables have a characteristic appearance.
Conditions in the decision table in Figure 7.4 are from the NextDate problem; they refer to the
mutually exclusive possibilities for the month variable. Since a month is in exactly one equivalence
class, we cannot ever have a rule in which two entries are true. The Don’t Care entries (—) really
mean “must be false”. Some decision table aficionados use the notation F! to make this point.

Page 48
Use of Don’t Care entries has a subtle effect on the way in which complete decision tables are
recognized. For limited entry decision tables, if there are n conditions, there must be 2 n rules. When
Don’t Care entries really indicate that the condition is irrelevant, we can develop a rule count as
follows. Rules in which no Don’t Care entries occur count as one rule. Each Don’t Care entry in a rule
doubles the count of that rule. The rule counts for the decision table in Figure 7.3 are shown below.
Notice that the sum of the rule counts is 64 (as it should be).

Conditions

c1: a<b+c? F T T T T T T T T T T

c2: b<a+c? - F T T T T T T T T T

c3: c<a+b? - - F T T T T T T T T

c4: a = b? - - - T T T T F F F F

c5: a = c? - - - T T F F T T F F

c6: b = c? - - - T F T F T F T F

Rule Count 32 16 8 1 1 1 1 1 1 1 1

a1: not a triangle X X X

a2: Scalene X

a3: Isosceles X X X

a4: Equilateral X

a5: Impossible X X X

If we applied this simplistic algorithm to the decision table in Figure 7.4, we get the rule counts shown
below:

conditions R1 R2 R3

Page 49
c1: month in M1 T -- --

c2: month in M2 -- T --

c3: month in M3 -- -- T

Rule Count 4 4 4

a1

com
Since we should only have eight rules, we clearly have a problem. T see where the problem lies,
we expand each of the three rules, replacing the — entries with the T and F p ssibilities.

conditions 1.1 1.2 1.3 1.4 2.1 2.2 2.3 2.4 3.1 3.2 3.3 3.4

c1: mo. in M1 T T T T T T F F T T F F

c2: mo. in M2 T T F F T T T T T F T F

c3: mo. in M3 T F T F T F T F T T T T

Rule Count 1 1 1 1 1 1 1 1 1 1 1 1

a1

Notice that we have three rules in which all entries are T: rules 1.1, 2.1, and 3.1. We also have two
rules with T, T, F entries: rules 1.2 and 2.2. Similarly, rules 1.3 and 3.2 are identical; so are rules 2.3
and 3.3. If we delete the repetitions, we end up with seven rules; the missing rule is the one in which
all conditions are false. The result of this process in shown in Figure 7.5. The impossible rules are also
shown.

The ability to recognize (and develop) complete decision tables puts us in a powerful position with
respect to redundancy and inconsistency. The decision table in Figure 7.6 is redundant — there are
three conditions and nine rules. (Rule 9 is identical to rule 4.)

Page 50
Notice that the action entries in rule 9 are identical to those in rules 1 - 4. As long as the actions in a
redundant rule are identical to the corresponding part of the decision table, there isn’t much of a
problem. If the action entries are different, as they are in Figure 2.11.7, we have a bigger problem.

If the decision table in Figure 2.11.7 were to process a transaction in which c1 is true and both c2 and
c3 are false, both rules 4 and 9 apply. We can make two observations:

1. Rules 4 and 9 are inconsistent.

2. The decision table is non-deterministic.

Rules 4 and 9 are inconsistent because the action sets are different. The whole table is non-
deterministic because there is no way to decide whether to apply rucomle4orrule 9. The bottom line
for testers is that care should be taken when Don’t Care entries are used in a de ision table.

2.11.2 Test Cases for the Triangle Problem


Using the decision table in Figure 2allsyllabus.11.3,weobtainelevenfnctional test cases: three impossible
cases, three ways to fail the triangle propert , one way to get an equilateral triangle, one way to get
a scalene triangle, and three ways to get an isosceles triangle. If we extended the decision table to
show both ways to fail an inequality, we wou d pick up three more test cases (where one side is
exactly the sum of the other two). Some judgment is required in this because of the exponential
growth of rules. In this case, we would end up with many more don’t care entries, and more
impossible rules.

Case ID a b c Expected Output

DT1 4 1 2 Not a Triangle

DT2 1 4 2 Not a Triangle

DT3 1 2 4 Not a Triangle

DT4 5 5 5 Equilateral

DT5 ? ? ? Impossible

DT6 ? ? ? Impossible

DT7 2 2 3 Isosceles

Page 51
First Try

DT8 ? ? ? Impossible

DT9 2 3 2 Isosceles

DT10 3 2 2 Isosceles

DT11 3 4 5 Scalene

2.11.3 Test Cases for the NextDate Function

The NextDate function was chosen because it illustrates the proble comofdependencies in the input
domain. This makes it a perfect example for decision table based testing, because decision tables can
highlight such dependencies. Recall that, in chapter 6, we identified equivalence classes in the input
domain of the NextDate function. One of the limitations we f und in Chapter 6 was that
indiscriminate selection of input values from the equivalence classes resulted in “strange” test cases,
such as finding the next date to Juallsyllabusne31,1812.Theproblemtem from the presumption that the
variables are independent. If they are, a Cartesian Product of the classes makes sense. When there
are logical dependencies among v riables in the input domain, these dependencies are lost (suppressed
is better) in a Cartesian Product. The decision table format lets us emphasize such dependencies using
the notion of the “impossib e ction” to denote impossible combinations of conditions. In this section,
we will make three tries at a decision table formulation of the NextDate function.

Identifying appropriate conditions and actions presents an opportunity for craftsmanship. Suppose we
start with a set of equivalence classes close to the one we used in Chapter 6.

Variable Equivalence Classes

Month M1 = { month : month has 30 days}


M2 = { month : month has 31 days}
M3 = { month : month is February}

Day D1 = {day : 1 ≤ day ≤ 28}


D2 = {day : day = 29 }
D3 = {day : day = 30 }
D4 = {day : day = 31 }

Year Y1 = {year : year is a leap year}

Page 52
Y2 = {year : year is a common year}

If we wish to highlight impossible combinations, we could make a Limited Entry Decision Table with
the following conditions and actions. (Note that the equivalence classes for the year variable collapse
into one condition.)

conditions

c1: month in M1? T

c2: month in M2? T

c3: month in M3? T

c4: day in D1?

c5: day in D2?

c6: day in D3?

c7: day in D4?

c8: year in Y1?

a1: impossible

a2: next date

This decision table wwwillhave256 rules, many of which will be impossible. If we wanted to show

why these rules were impossible, e might revise our actions to the following:

Actions

a1: Too many days in a month

a2: Cannot happen in a common year

a3: Compute the next date

Second Try

If we focus on the leap year aspect of the NextDate function, we could use the set of equivalence
classes as they were in Chapter 6. These classes have a Cartesian Product that contains 36 triples, with
several being impossible.

Page 53
To illustrate another decision table technique, this time we’ll develop an Extended Entry Decision
Table, and we’ll take a closer look at the action stub. In making an Extended Entry Decision Table, we
must ensure that the equivalence classes form a true partition of the input domain. (Recall from
Chapter 3 that a partition is a set of disjoint subsets whose union is the entire set.) If there were any
“overlap” among the rule entries, we would have a redundant case in which more than one rule could
be satisfied. Here, Y2 is the set of years between 1812 and 2012 evenly divisible by four excluding the
year 1900.

Variable Equivalence Classes

Month M1 = { month: month has 30 days}


M2 = { month: month has 31 days}
M3 = { month: month is February}

Day D1 = {day: 1 ≤ day ≤ 28}


D2 = {day: day = 29 }
D3 = {day: day = 30 }
D4 = {day: day = 31 }

allsyllabus
Year Y1 = {year: year = 1900}
Y2 = {year: 1812 ≤ year ≤ 2012 AND (year ≠ 1900) AND (year = 0 mod 4)}
Y3 = {year: (1812 ≤ year ≤ 2012 AND year ≠ 0 mod 4)}

In a sense, we could argue that we have a “gray box” technique, because we take a closer look at the
NextDate function. In order to prod ce the next date of a given date, there are only five possible
manipulations: incrementing and resetting the day and month, and incrementing the year, (we won’t
let time go backwards by resetting the year).

Conditions 1 2 3 4 5 6 7 8

c1 month in M1 M1 M1 M1 M2 M2 M2 M2

c2: day in D1 D2 D3 D4 D1 D2 D3 D4

c3: year in - - - - - - - -

Rule Count 3 3 3 3 3 3 3 3

actions

a1: impossible X

a2: increment day X X X X X

Page 54
a3: reset day X X

a4: increment month X ?

a5: reset month ?

a6: increment year ?

conditions 9 10 11 12 13 14 15 16

c1: month in M3 M3 M3 M3 M3 M3 M3 M3

c2: day in D1 D1 D1 D2 D2 D2 D3 D3

c3: year in Y1 Y2 Y3 Y1 Y2 Y3 - -

Rule Count 1 1 1 1 1 1 3 3

actions

a1: impossible X X X X

a2: increment day X

a3: reset day X X X

a4: increment month X X X

a5: reset month

a6: increment year

This decision table has 36 rules, and corresponds to the Cartesian Product of the equivalence classes.
We still have the problem with logically impossible rules, but this formulation helps us identify the
expected outputs of a test case. If you develop this table, you will find some cumbersome problems
with December (in rule 8). We fix these next.

Third Try

We can clear up the end of year considerations with a third set of equivalence classes. This time, we
are very specific about days and months, and we revert to the simpler leap-year or common year
condition of the first try, so the year 1900 gets no special attention. (We could do a fourth try, showing
year equivalence classes as in the second try, but by now, you get the point.)

Revised NextDate Domain Equivalence Classes

Page 55
Month M1 = { month: month has 30 days}
M2 = { month: month has 31 days except Dec.}
M3 = { month: month is December}
M4 = {month: month is February}

Day D1 = {day: 1 ≤ day ≤ 27}


D2 = {day: day = 28 }
D3 = {day: day = 29 }
D4 = {day: day = 30 }
D5 = {day: day = 31 }

Year Y1 = {year: year is a leap year}


Y2 = {year: year is a common year}

The Cartesian product of these con allsyllabustains40elements.Thefulldeci ion table is given in Figure 7.8;

it has 22 rules, compared to the 36 of the second try. Recall from Chapter 1 the question of whether

a large set of test cases is necessarily better than a smaller set. Here we have a 22 rule decision table
that gives a clearer picture of the NextDate function th n does the 36 rule decision table. The first five
rules deal with 30 day months; notice that the e p year considerations are irrelevant. The next two sets
of rules (6 - 10 and 11 - 15) deal with 31 day months, where the first five deal with months other than
December, and the second five deal with December. There are no impossible rules in this portion of
the decision table, tho gh there is some redundancy that an efficient tester might question. Eight of the
ten rules simply increment the day. Would we really require eight separate test cases for this
subfunction? Probably not, but note the insights we can get from the decision table. Finally, the last
seven rules focus on February and leap year.

The decision table in Figure 2.11.8 is the basis for the source code for the NextDate function in
Chapter 2. As an aside, this example shows how good testing can improve programming. All of the
decision table analysis could have been done during the detailed design of the NextDate function.

Corresponding Test Cases:

Case ID Month Day Year Expected Output

1 April 15 1993 April 16, 1993

2 April 28 1993 April 29, 1993

Page 56
3 April 29 1993 April 30, 1993

4 April 30 1993 May 1, 1993

5 April 31 1993 Impossible

6 Jan. 15 1993 Jan. 16, 1993

7 Jan. 28 1993 Jan. 29, 1993

8 Jan. 29 1993 Jan. 30, 1993

9 Jan. 30 1993 Jan. 31, 1993

10 Jan. 31 1993 Feb. 1, 1993

11 Dec. 15 1993 Dec. 16, 1993

12 Dec. 28 1993 Dec. 29, 1993


allsyllabus

13 Dec. 29 1993 Dec. 30, 1993

14 Dec. 30 1993 Dec. 31, 1993

15 Dec. 31 1993 Jan. 1, 1994

16 Feb. 15 1993 Feb. 16, 1993

17 Feb. 28 1992 Fe . 29, 1992

18 Feb. 28 1993 Mar. 1, 1993

19 Feb. 29 1992 Mar. 1, 1992

20 Feb. 29 1993 Impossible

21 Feb. 30 1993 Impossible

22 Feb. 31 1993 Impossible

2.11.3 Test Cases for the Commission Problem

As we will see in this section, the Commission Problem is not well-served by a decision table analysis.
Not surprising, because there is very little decisional logic in the problem. What we can do is see how
decision tables can help to improve an under-specified problem (the Commission Problem is a good
example of this all too common situation). To get started, recall that the Commission Problem is a
portion of the larger Lock, Stock, and Barrel example, in which telegrams

Page 57
representing orders are sent to a central point. The functional view of the entire problem is that the
salesperson’s commission is a function of the telegrams:

F(telegrams) = commission

This decomposes naturally into three subfunctions:

F1(telegrams) = (locks, stocks, barrels)

F2(locks, stocks, barrels) = sales

F3(sales) = commission

The Commission Problem is just the composition of F2 and F3. As we saw in Chapter 6, the input
domain is partitioned by the limits on locks, stocks, and barrels.

Variable Equivalence Classes for F2

allsyllabus
Lock L1 = {lock: lock < 1}
L2 = {lock: 1 ≤ lock ≤ 70 }
L3 = {lock: lock > 70 }

Stock S1 = {stock: stock < 1 }


S2 = {stock: 1 ≤ stock ≤ 80 }
S3 = {stock: stock > 80 }

Barrel B1 = {barrel: barrel < 1 }


B2 = {b rrel: 1 ≤ barrel ≤ 90 }
B3 = {barrel: barrel > 90 }

These equivalence classes lead directly to a possible set of conditions for a decision table:

c1: lock <1

c2: 1 ≤ lock ≤ 70

c3: lock > 70 c4:

stock < 1

c5: 1 ≤ stock ≤ 80

c6: stock > 80 c7:

barrel < 1

c8: 1 ≤ barrel ≤ 90

, Page 58
c9: barrel > 90

So far, so good. Now, what actions shall we postulate? The original problem statement only addresses
the cases where c2, c5, and c8 are all true. There is no information for what should happen if any of
the remaining conditions are true. This is an error of omission at specification time. A tester might use
decision tables as the skeleton of an interview to determine, from the user/customer, just what actions
should be taken in these circumstances. (The specifier could also have done this!) We might end up
with actions such as the following:

a1: Error: must sell at least one rifle lock.

a2: Error: cannot sell more than 70 rifle locks.

a3: Error: must sell at least one rifle stock.

a4: Error: cannot sell more than 80 rifle stocks.

a5: Error: must sell at least one rifle barrel.

a6: Error: cannot sell more than 90 rifle barrels.

An analysis such as this raises folloallsyllabusw-upquestions.Forexample, what if a negative number were

entered as the value of one of the variables? Would that indicate returned items? If so, the company
would likely wish to reduce the sa esperson’s commission. Now, what if such a reduction moved the
commission to a less favorable level, such as from the 20% level to the 10% level? We get into similar
questions when the sales limits are exceeded. How should excess sales be treated? Are they simply
carried over to the next month? The company might prefer this, because it would likely
reduce the commission level; obvio , the alesperson would prefer excess sales to contribute to
the higher commission levels. This discussion ties back to the Chapter 1 discussion on specified,
programmed, and tested behavio.rsThe examples in which limits are violated are good examples of
test cases that are “outside” the sets of specified and programmed behaviors. (We might have added a
fourth circle, that refers to hat the customer really wants.)

We can do a little more for the F3 subfunction. Since there are three commission levels, there will
clearly be three equivalence classes.

Variable Equivalence Classes for F3

Sales L1 = {sales: sales < 1000 }


L2 = {sales: 1000 ≤ sales ≤ 1800 }
L3 = {sales: sales > 1800 }

These equivalence classes lead to the simple decision table in Figure 7.9:

Page 59
Our last step is to identify actual test cases for the Commission Problem. Note that we cannot simply
provide values of sales that would give us test cases for the subfunction F3. Now you will see how
arithmetically contrived this problem really is.

Test Cases for the Commission Problem:

Test Case locks stocks barrels sales commission

DT1 5 5 5 500 50

DT2 15 15 15 1500 175

DT3 25 25 25 2500 360

2.12 Guidelines and Observations

As with the other testing techniques, decision table based testing w rks well for some applications
(like NextDate) and is not worth the trouble for others (like the Co mission Problem). Not
com

surprisingly, the situations in whichallsyllabusitworkwellarethosewhere there is a lot of decision making


(like the Triangle Problem), and those in which there are important logical relationships among
input variables (like the NextDate f nction).

1. The decision table technique is indicated for pplic tions characterized by any of the following:

prominent If-Then-Else logic

logical relationships among inp t v ri e

calculations involving subsets of the input variables

cause and effect relationships between inputs and outputs

high cyclomatic (McCabe) complexity (see Chapter 9)

2. Decision tables don’t scale up very well (a limited entry table with n conditions has 2 n rules). There
are several ways to deal with this: use extended entry decision tables, algebraically simplify tables,
“factor” large tables into smaller ones, and look for repeating patterns of condition entries. For more on
these techniques, see [Topper 93].

3. As with other techniques, iteration helps. The first set of conditions and actions you identify may be
unsatisfactory. Use it as a stepping stone, and gradually improve on it until you are satisfied with a
decision table.
Page 60
EXERCISES

1. Develop a formula for the number of robustness test cases for a function of n variables.

2. Develop a formula for the number of robust worst case test cases for a function of n
variables.

3. Make a Venn diagram showing the relationships among test cases form boundary value
analysis, robustness testing, worst case testing, and robust worst case testing.

4. What happens if we try to do output range robustness testing? Use the commission problem
as an example.

Page 61
UNIT 3

PATH TESTING, DATA FLOW TESTING

3.1 Path Testing

The distinguishing characteristic of structural testing methods is that they are all based on the source
code of the program being tested, and not on the definition. Because of this absolute basis, structural
testing methods are very amenable to rigorous definitions, mathematical analysis, and precise
measurement. In this chapter, we will examine the two most common forms of path testing. The
technology behind these has been available since the mid-1970s, and the originators of these methods
now have companies that market very successful tools thatcomipleentthe techniques. Both techniques
start with the program graph;

Definition

graph in which nodes are either entire t tements or fragments of a statement, and edges represent flow of control.
If i and j are nodes in the program graph, there is an edge from node i to node j iff the statement (fragment)
corresponding to node j c n be executed immediately after the statement (fragment) corresponding to node i.

Given a program written in an impeallsyllabusrtiveprogramminglanguage, its program graph is a directed

Constructing a program graph from given program is an easy process. It’s illustrated here with the
Pascal implementation of the Triang e program from Chapter 2. Line numbers refer to statements and
statement fragments. There is n element of judgment here: sometimes it is convenient to keep a
fragment (like a BEGIN) as a separate node, as at line 4. Other times is seems better to include this
with another portion of a statement: the BEGIN at line 13 could really be merged with the THEN on
line 12. We ill see that this latitude collapses onto a unique DD-Path graph, so the differences
introduced by differing judgments are moot. (A mathematician would make the point that, for a given
program, there might be several distinct program graphs, all of which reduce to a unique DD-Path
graph.) We also need to decide whether to associate nodes with non-executable statements such as
variable and type declarations: here we do not.

A program graph of this program is given in Figure 3.1. Nodes 4 through 7 are a sequence, nodes 8
through 11 are an IF-THEN-ELSE construct (that terminates on an IF clause), and nodes 14 through
16 are an IF-THEN construct. Nodes 4 and 22 are the program source and sink nodes, corresponding
to the single entry, single exit criteria.. There are no loops, so this is a directed acyclic graph. The
importance of the program graph is that program executions correspond to paths from the source to the
sink nodes. Since test cases force the execution of some such program path, we now have a very
explicit description of the relationship between a test case and the part of the program it exercises. We
also have an elegant, theoretically respectable way to deal with the potentially large number of
execution paths in a program. Figure 3.2 is a graph of a simple program;
Page 62
it is typical of the kind of example used to show the impossibility of completely testing even simple
programs [Schach 93].

In this program, there are 5 paths from node B to node F in the interior of the loop. If the loop may
have up to 18 repetitions, there are some 4.77 trillion distinct program execution paths.

1. program triangle (input, output) ;


2. VAR a, b, c : integer;
3. IsATriangle : boolean;
4. BEGIN
5. writeln('Enter three integers which are sides of a triangle:');
6. readln (a,b,c);
7. writeln('Side A is ',a, 'Side B is ',b, 'side C is ',c);
8. IF (a < b + c) AND (b < a + c) AND (c < a + b)
9. THEN IsATriangle :=TRUE
10. ELSE IsATriangle := FALSE ;
11. IF IsATriangle
12. THEN
13. BEGIN
14. IF (a = b) XOR (a = c) XOR (b = c) AND NOT((a=b) AND (a=c)) 15.
THEN Writeln ('Triangle is Isosceles') ;
16. IF (a = b) AND (b = c)

17. THEN Writeln ('Triangle is Equilallsyllabusteral'); 18. IF (a <> b) AND (a


<> c) AND (b <> c)
19. THEN Writeln ('Triangle is Scalene') ;
20. END
21. ELSE WRITELN('Not a Triangle') ;
22. END.

Figure 3.1 Program Graph of the Pascal Triangle Program

Figure 3.2 Trillions of Paths

3.2 DD-Paths

The best known form of structural testing is based on a construct known as a decision-to-decision path
(DD-Path) [Miller 77]. The name refers to a sequence of statements that, in Miller’s words, begins
with the “outway” of a decision statement and ends with the “inway” of the next decision

Page 63
statement. There are no internal branches in such a sequence, so the corresponding code is like a row
of dominoes lined up so that when the first falls, all the rest in the sequence fall. Miller’s original
definition works well for second generation languages like FORTRAN II, because decision making
statements (such as arithmetic IFs and DO loops) use statement labels to refer to target statements.
With block structured languages (Pascal, Ada, C), the notion of statement fragments resolves the
difficulty of applying Miller’s original definition—otherwise, we end up with program graphs in
which some statements are members of more than one DD-Path.

We will define DD-Paths in terms of paths of nodes in a directed graph. We might call these paths
chains, where a chain is a path in which the initial and terminal nodes are distinct, and every interior
node has indegree = 1 and outdegree = 1. Notice that the initial node is 2-connected to every other
node in the chain, and there are no instances of 1- or 3-connected nodes, as shown in Figure 3.3. The
length (number of edges) of the chain in Figure 3.3 is 6. We can have a degenerate case of a chain that
is of length 0, that is, a chain consisting of exactly one node and n edges.

Definition

A DD-Path is a chain in a program graph such that com


allsyllabus
Case 1: it consists of a single node with indeg = 0,

Case 2: it consists of a single node with outdeg = 0,

Case 3: it consists of a single node with indeg ≥ 2 or outdeg ≥ 2,

Case 4: it consists of a single node with indeg = 1 and outdeg = 1,

Case 5: it is a maximal chain of ength ≥ 1.

Cases 1 and 2 establish the unique so rce and sink nodes of the program graph of a structured
program as initial and final DD-Paths. Case 3 deals with complex nodes; it assures that no node is
contained in more than one DD-Path. Case 4 is needed for “short branches”; it also preserves the one
fragment, one DD-Path principle. Case 5 is the “normal case”, in which a DD-Path is a single entry,
single exit sequence of nodes (a chain). The “maximal” part of the case 5 definition is used to
determine the final node of a normal (non-trivial) chain.

Table 1 Types of DD-Paths in Figure 9.1 Program Graph Nodes

DD-Path Name Case of Definition

4 first 1

5-8 A 5

9 B 4

Page 64
10 C 4

11 D 3

12 - 14 E 5

15 F 4

16 G 3

17 H 4

18 I 3

19 J 4

20 K 3

21 L 4

22 last 2

allsyllabus
This is a complex definition, so we’ll apply it to the program graph in Figure 9.1. Node 4 is a Case
1 DD-Path, we’ll call it “first”; similarly, node 22 is Case 2 DD-Path, and we’ll call it “last”.
Nodes 5 through 8 are a Case 5 DD-Path. We know that node 8 is the last node in this DD-Path
because it is the last node that preserves the 2-connectedness property of the chain. If we went beyond
node 8 to include nodes 9 and 10, the e would both be 2-connected to the rest of the chain, but they are
only 1-connected to e ch other. If we stopped at node 7, we would violate the “maximal” criterion.
Node 11 is C se 3 DD-Path, which forces nodes 9 and 10 to be individual DD-Paths by case 4. Nodes
12 through 14 are a case 5 DD-Path by the same reasoning as for nodes 5 - 8. Nodes 14 through 20
correspond to a sequence of IF-THEN statements. Nodes 16 and 18 are both Case 3 DD-Paths, and
this forces nodes 15, 17, and 19 to be Case 4 DD-Paths. Node 20 is a Case 3 DD-Path, and node 21 is
a Case 4 DD-Path. All of this is summarized in Table 1, where the DD-Path names correspond to the
DD-Path graph in Figure 3.4. Part of the confusion with this example is that the triangle problem is
logic intensive and computationally sparse. This combination yields many short DD-Paths. If the
THEN and ELSE clauses contained BEGIN

. . END blocks of computational statements, we would have longer DD-Paths, as we do in the


commission problem.

We can now define the DD-Path graph of a program.

Page 65
are in several DD-
Paths.

3.3 Test Coverage Metrics

Figure 3.4 DD-Path Graph for the Triangle Program

Definition

Given a program written in an imperative language, its DD-Path graph is the directed graph in which
nodes are DD-Paths of its program graph, and edges recompresentntrol flow between successor DD-
Paths. In effect, the DD-Path graph is a form of condensati n graph (see Chapter 4); in this
condensation, 2-connected components are collapsed into individual nodes that correspond to Case 5
DD-Paths. The single node DD-Paths (corresponding to Cases 1 - 4) are required to preserve
the convention that a statement (or statement fragment) is in exactly one DD-Path. Without this
convention, we end up with rather allsyllabusclumsyDD-Pathgraphs,inwhich some statement (fragments)
Testers shouldn’t be intimidated by thi process — there are high quality commercial tools that
generate the DD-Path graph of a given program. The vendors make sure that their products work for a
wide variety of programming languages. In practice, it’s reasonable to make DD-Path graphs for
programs up to about 100 source line . Be ond that, most testers look for a tool.

The raison d’être of DD-Paths is that they enable very precise descriptions of test coverage. Recall
(from Chapter 8) that one of the fundamental limitations of functional testing is that it is impossible to
know either the extent of redundancy or the possibility of gaps corresponding to the way a set of
functional test cases exercises a program. Back in Chapter 1, we had a Venn diagram showing
relationships among specified, programmed, and tested behaviors. Test coverage metrics are a device
to measure the extent to which a set of test cases covers (or exercises) a program.

There are several widely accepted test coverage metrics; most of those in Table 2 are due to the early
work of E. F. Miller [Miller 77]. Having an organized view of the extent to which a program is tested
makes it possible to sensibly manage the testing process. Most quality organizations now expect the
C1 metric (DD-Path coverage) as the minimum acceptable level of test coverage. The statement
coverage metric (C0) is still widely accepted: it is mandated by ANSI Standard 187B, and has been
used successfully throughout IBM since the mid-1970s.

Table 2 Structural Test Coverage Metrics Metric

Page 66
Description of Coverage

C0 Every statement

C1 Every DD-Path (predicate outcome)

C 1p Every predicate to each outcome

C2 C1 coverage + loop coverage

Cd C1 coverage + every dependent pair of DD-Paths

CMCC Multiple condition coverage

C ik Every program path that contains up to k repetitions of a loop (usually k =


2)
com
Cstat “Statistically significant” fra ti n f paths

C∞ All possible exe ution paths

3.3.1 Metric Based Testing

These coverage metrics form a latticallsyllabuse(seeChapter10)inwhichsome are equivalent, and some are
implied by others. The importance of the lattice is that there are always fault types that can be revealed
at one level, and can escape detection by inferior levels of testing. E. F. Miller observes that when
DD-Path coverage is attained by a set of test cases, roughly 85% of all faults are revealed [Miller 91].

The test coverage metrics in Table 2 tel us what to test, but not how to test it. In this section, we take a
closer look at techniques that exercise source code in terms of the metrics in Table 2. We must keep an
important distinction in mind: Miller’s test coverage metrics are based on program graphs in which
nodes are full statements, whereas our formulation allows statement fragments to be nodes. For the
remainder of this section, the statement fragment formulation is “in effect”.

Statement and Predicate Testing


Because our formulation allows statement fragments to be individual nodes, the statement and
predicate levels (C0 and C1) to collapse into one consideration. In our triangle example (see Figure
3.1), nodes 8, 9, and 10 are a complete Pascal IF-THEN-ELSE statement. If we required nodes to
correspond to full statements, we could execute just one of the decision alternatives and satisfy the
statement coverage criterion. Because we allow statement fragments, it is “natural” to divide such a
statement into three nodes. Doing so results in predicate outcome coverage. Whether or not our
convention is followed, these coverage metrics require that we find a set of test cases such that, when
executed, every node of the program graph is traversed at least once.

Page 67
DD-Path Testing

When every DD-Path is traversed (the C 1 metric), we know that each predicate outcome has been
executed; this amounts to traversing every edge in the DD-Path graph (or program graph), as opposed
to just every node. For IF-THEN and IF-THEN-ELSE statements, this means that both the true and the
false branches are covered (C1p coverage). For CASE statements, each clause is covered. Beyond this,
it is useful to ask what else we might do to test a DD-Path. Longer DD-Paths generally represent
complex computations, which we can rightly consider as individual functions. For such DD-Paths, it
may be appropriate to apply a number of functional tests, especially those for boundary and special
values.

Dependent Pairs of DD-Paths

one DD-Path and is referenced in another DD-Path. The importan e f these dependencies is that
The C metric foreshadows the dataflow testing. The most common dependency among pairs of DD-

Padths is the define/reference relationship, in which a variable comisdefined(receives a value) in


they are closely related to the problem of infeasible paths. We have g d examples of dependent
pairs of DD-Paths: in Figure 9.4, B and D are such a pair, so are DD-Paths C and L. Simple DD-Path

coverage might not exercise t allsyllabushesedependencies,thusadeeper class of faults would not be


revealed.
Multiple Condition Coverage

Look closely at the compound condition in DD-Paths A and E. Rather than simply traversing such
predicates to their TRUE and FALSE outcome , we should investigate the different ways that each
outcome can occur. One possibility i to m ke a truth table; a compound condition of three simple
conditions would have eight rows, yie ding eight test cases. Another possibility is to reprogram
compound predicates into nested simple IF-THEN-ELSE logic, which will result in more DD-Paths to
cover. We see an interesting trade-off: statement complexity versus path complexity. Multiple
condition coverage assures that this complexity isn’t swept under the DD-Path coverage rug.

Loop Coverage

The condensation graphs provide us with an elegant resolution to the problems of testing loops. Loop
testing has been studied extensively, and with good reason — loops are a highly fault prone portion of
source code. To start, there is an amusing taxonomy of loops in [Beizer 83]: concatenated, nested, and
horrible, shown in Figure 3.5.

Figure 3.5 Concatenated, Nested, and Knotted Loops


Page 68
Concatenated loops are simply a sequence of disjoint loops, while nested loops are such that one is
contained inside another. Horrible loops cannot occur when the structured programming precepts are
followed. When it is possible to branch into (or out from) the middle of a loop, and these branches are
internal to other loops, the result is Beizer’s horrible loop. (Other sources define this as a knot—how
appropriate.) The simple view of loop testing is that every loop involves a decision, and we need to
test both outcomes of the decision: one is to traverse the loop, and the other is to exit (or not enter) the
loop. This is carefully proved in [Huang 79]. We can also take a modified boundary value approach,
where the loop index is given its minimum, nominal, and maximum values (see Chapter 5). We can
push this further, to full boundary value testing and even robustness testing. If the body of a simple
loop is a DD-Path that performs a complex calculation, this should also be tested, as discussed above.
Once a loop has been tested, the tester condenses it into a single node. If loops are nested, this process
is repeated starting with the innermost loop and working outward. This results in the same multiplicity
of test cases we found with boundary value analysis, which makes sense, because each loop index
variable acts like an input variable. If loops are
knotted, it will be necessary to carefully analyze them in terms of the dataflow ethods discussed in
Chapter 10. As a preview, consider the infinite loop that could occur if ne l op tampers with the
value of the other loop’s index.

3.3.2. Test Coverage Analyzers com

Coverage analyzers are a class of teallsyllabusttoothtofferautomatedsupport for this approach to testing

management. With a coverage analyzer, the tester runs a set of test cases on a program that has been
“instrumented” by the coverage analyzer. The n yzer then uses information produced by the
instrumentation code to generate a coverage report. In the common case of DD-Path coverage, for
example, the instrumentation identifies and labels all DD-Paths in an original program. When the
instrumented program is executed with te t c e , the n zer tabulates the DD-Paths traversed by each test
case. In this way, the tester c n experiment with different sets of test cases to determine the coverage
of each set.

3.4 Basis Path Testing

The mathematical notion of a “basis” has attractive possibilities for structural testing. Certain sets can
have a basis, and hen they do, the basis has very important properties with respect to the entire set.
Mathematicians usually define a basis in terms of a structure called a “vector space”, which is a set of
elements (called vectors) and which has operations that correspond to multiplication and addition
defined for the vectors. If a half dozen other criteria apply, the structure is said to be a vector space,
and all vector spaces have a basis (in fact they may have several bases). The basis of a vector space is
a set of vectors such that the vectors are independent of each other and they “span” the entire vector
space in the sense that any other vector in the space can be expressed in terms of the basis vectors.
Thus a set of basis vectors somehow represents “the essence” of the full vector space: everything else
in the space can be expressed in terms of the basis, and if one basis element is deleted, this spanning
property is lost. The potential for testing is that, if we can view a program as a vector space, then the
basis for such a space would be a very interesting set of elements to test. If the basis is “OK”, we could
hope that everything that can be expressed in terms of the basis is

Page 69
also “OK”. In this section, we examine the early work of Thomas McCabe, who recognized this
possibility in the mid-1970s.

3.4.1 McCabe’s Basis Path Method

Figure 3.6 is taken from [McCabe 82]; it is a directed graph which we might take to be the program
graph (or the DD-Path graph) of some program. For the convenience of readers who have encountered
this example elsewhere ([McCabe 87], [Perry 87]) , the original notation for nodes and edges is
repeated here. (Notice that this is not a graph derived from a structured program: nodes B and C are a
loop with two exits, and the edge from B to E is a branch into the IF-THEN statement in nodes D, E,
and F. The program does have a single entry (A) and a single exit (G).) McCabe based his view of
testing on a major result from graph theory, which states that the cyclomatic number (see Chapter 4)
of a strongly connected graph is the number of linearly independent circuits in the graph. (A circuit is
similar to a chain: no internal loops or decisions, but the initial node is the terminal node. A circuit is a
set of 3-connected nodes.) We can always create a strongly connected graph by adding an edge from
the (every) sink node to the (every) source node. (Notice that, if the single entry, single exit precept is
violated, we greatly increase the cyclo atic number, because we

everyone agrees that e is the number of edges, n is the n mber of nodes, and p is the number of connected
regions. The confusion app rently comes from the transformation of an arbitrary directed graph (such as the
one in Figure 9.6) to a strongly connected directed graph obtained by adding one edge from the sink to the
source node (as in Figure 3.7). Adding an edge clearly affects value computed by the formula, but it shouldn’t
affect the number of circuits. Here’s a way to resolve the apparent inconsistency: The number of linearl
independent paths from the source node to the sink node in Figure 3.6 is
need to add edges from each sink node to each source node.) Figure 9.7 sh ws the result of doing
this; it also contains edge labels that are used in the discussion that foll ws.

com
There is some confusion in the literature about the correct formula for cyclomatic complexity. Some
sources give the formula as V(G) = e - n + p, while other e the formula V(G) = e - n + 2p;

allsyllabus
and the number of linearly independent circuits in the graph in Figure 3.7 is
Figure 3.6 McCabe’s Control Graph

Page 70
Figure 3.7 McCabe’s Derived Strongly Connected Graph

The cyclomatic complexity of the strongly connected graph in Figure 3.7 is 5, thus there are five
linearly independent circuits. If we now delete the added edge form node G to node A, these five
circuits become five linearly independent paths from node A to node G. In small graphs, we can
visually identify independent paths. Here we identify paths as sequences of nodes:

p1: A, B, C, G

p2: A, B, C, B, C, G

p3: A, B, E, F, G p4:

A, D, E, F, G p5: A,

D, F, G

We can force this beginning to look allsyllabusikeavectorspaceydefining notions of addition and

scalar multiplication: path addition is simply one path followed by another path, and multiplication

corresponds to repetitions of a path. With this formulation, McCabe arrives at a vector space of
program paths. His illustration of the basis part of this framework is that the path A, B, C, B, E, F, G is
the basis sum p2 + p3 - p1, and the p th A, B, C, B, C, B, C, G is the linear combination 2p2 - p1. It is
easier to see this addition with an incidence matrix (see Chapter 4) in which rows correspond to paths,
and columns correspond to edges, as in Table 3. The entries in this table are obtained by following a
path and noting which edges are traversed. Path p1, for example, traverses edges 1, 4, and 9; while
path p2 traverses the following edge sequence: 1, 4, 3, 4, 9. Since edge 4 is traversed twice by path p2,
that is the entry for the edge 4 column.

Table 3 Path/Edge Traversal path \ edges travesed

1 2 3 4 5 6 7 8 9 10

p1: A, B, C, G 1 0 0 1 0 0 0 0 1 0

p2: A, B, C, B, C, G 1 0 1 2 0 0 0 0 1 0

p3: A, B, E, F, G 1 0 0 0 1 0 0 1 0 1

p4: A, D, E, F, G 0 1 0 0 0 1 0 1 0 1

p5: A, D, F, G 0 1 0 0 0 0 1 0 0 1

Page 71
ex1: A, B, C, B, E, F, G 1 0 1 1 1 0 0 1 0 1

ex2: A, B, C, B, C, B, C, G 1 0 2 3 0 0 0 0 1 0

We can check the independence of paths p1 - p5 by examining the first five rows of this incidence
matrix. The bold entries show edges that appear in exactly one path, so paths p2 - p5 must be
independent. Path p1 is independent of all of these, because any attempt to express p1 in terms of the
others introduces unwanted edges. None can be deleted, and these five paths span the set of all paths
from node A to node G. At this point, you should check the linear combinations of the two example
paths. The addition and multiplication are performed on the column entries.

McCabe next develops an algorithmic procedure (called the “baseline method”) to determine a set of
basis paths. The method begins with the selection of a “baseline” path, which should correspond to
some “normal case” program execution. This can be somewcomhatarbitrary; McCabe advises
choosing a path with as many decision nodes as possible. Next the baseline path is retraced, and in
turn each decision is “flipped”, that is when a node of outdegree ≥2 is rea hed, a different edge must
be taken. Here we follow McCabe’s example, in which he first postulates the path through
nodes A, B, C, B, E, F, G as the baseli allsyllabusne.(Thiswasexpressedinterms of paths p1 - p5 earlier.)
The first decision node (outdegree ≥2) in this path is node A, so for the next basis path, we traverse edge
2 instead of edge 1. We get the path A, D, E, F, G, where we retrace nodes E, F, G in path 1 to be as
minimally different as possible. For the next path, we can follow the second path, and take the other
decision outcome of node D, which give us the p th A, D, F, G. Now only decision nodes B and C
have not been flipped; doing so yields the last two basis paths, A, B, E, F, G and A, B, C, G. Notice
that this set of basis paths is distinct from the one in Table 3: this is not problematic, because there is
no requirement that a basis be uniq e.

3.4.2 Observations on McCabe’s B sis Path Method


If you had trouble fwwwolloingsome of the discussion on basis paths and sums and products of these,
you may have felt a haunting skepticism, something along the lines of “Here’s another academic
oversimplification of a real- orld problem”. Rightly so, because there are two major soft spots in the
McCabe view: one is that testing the set of basis paths is sufficient (it’s not), and the other has to do
with the yoga-like contortions we went through to make program paths look like a vector space.
McCabe’s example that the path A, B, C, B, C, B, C, G is the linear combination 2p2 - p1 is very
unsatisfactory. What does the 2p2 part mean? Execute path p2 twice? (Yes, according to the math.)
Even worse, what does the - p1 part mean? Execute path p1 backwards? Undo the most recent
execution of p1? Don’t do p1 next time? Mathematical sophistries like this are a real turn-off to
practitioners looking for solutions to their very real problems. To get a better understanding of these
problems, we’ll go back to the triangle program example.

Start with the DD-Path graph of the triangle program in Figure 9.4. We begin with a baseline path that
corresponds to a scalene triangle, say with sides 3, 4, 5. This test case will traverse the path p1. Now if
we flip the decision at node A, we get path p2. Continuing the procedure, we flip the decision at node
D, which yields the path p3. Now we continue to flip decision nodes in the baseline

Page 72
path p1; the next node with outdegree = 2 is node E. When we flip node E, we get the path p4. Next
we flip node G to get p5. Finally, (we know we’re done, because there are only 6 basis paths) we flip
node I to get p6. This procedure yields the following basis paths:

p1: A-B-D-E-G-I-J-K-Last
p2: A-C-D-E-G-I-J-K-Last

p3: A-B-D-L-Last

p4: A-B-D-E-F-G-I-J-K-Last
p5: A-B-D-E-F-G-H-I-J-K-Last

p6: A-B-D-E-F-G-H-I-K-Last

Time for a reality check: if you follow paths p2, p3, p4, p5, and p6, y u find that they are all
infeasible. Path p2 is infeasible, because passing through node C means the sides are not a triangle, so
none of the sequel decisions can allsyllabusbetaken.Similarly,inp3,pa sing through node B means the
sides do form a triangle, so node L cannot be traversed. The others are all infeasible because they
involve cases where a triangle is of two types (e.g., isosceles and equilateral). The problem here is that
there are several inherent dependencies in the tri ngle problem. One is that if three integers constitute
sides of a triangle, they must be one of the three possibilities: equilateral, isosceles, or scalene. A
second dependency is that the three possibilities are mutually exclusive: if one is true, the other two
must be false.

Recall that dependencies in the inp t d ta domain caused difficulties for boundary value testing, and
that we resolved these by going to decision table based functional testing, where we addressed data
dependencies in the decision table. Here we are dealing with code level dependencies, and these are
absolutely incompatible with the latent assumption that basis paths are independent. McCabe’s
procedure successfully identifies basis paths that are topologically independent, but when these
contradict semantic dependencies, topologically possible paths are seen to be logically infeasible. One
solution to this problem is to always require that flipping a decision results in a semantically feasible
path. Another is to reason about logical dependencies. If we think about this problem we can identify
several rules:

If node B is traversed, then we must traverse nodes D and E.

If node C is traversed, then we must traverse nodes D and L.

If node E is traversed, then we must traverse one of nodes F, H, and J.

If node F is traversed, then we cannot traverse nodes H and J.

If node H is traversed, then we cannot traverse nodes F and J.

If node J is traversed, then we cannot traverse nodes F and I.

Page 73
Taken together, these rules, in conjunction with McCabe’s baseline method, will yield the following
feasible basis path set:

3.4.3 Essential Complexity

fp1: A-C-D-L-Last (Not a triangle)

fp2: A-B-D-E-F-G-I-K-Last (Isosceles)

fp3: A-B-D-E-G-H-I-K-Last (Equilateral)

fp4: A-B-D-E-G-I-J-K-Last (Scalene)

Figure 3.8 Structured Programming Constructs com

The triangle problem is atypical in that there are no loops. The progra has only 18 topologically
possible paths, and of these, only the four basis paths listed above are feasible. Thus for this special
case, we arrive at the same test casesallsyllabusaswedidwithspecialvalue testing and output range testing.
For a more positive observation, basis path coverage guarantees DD-Path coverage: the process of
flipping decisions guarantees that ever decision outcome is traversed, which is the same as DD-Path
coverage. We see this by example from the incidence matrix description of basis paths, and in our
triangle program feasible basis paths. We cou d push this a step further and observe that the set of DD-
Paths acts like a basis, because any program path can be expressed as a linear combination of DD-
Paths.

Part of McCabe’s wwwworkoncyclomatic complexity does more to improve programming than


testing. In this section we take a quick look at this elegant blend of graph theory, structured
programming, and the implications these have for testing. This whole package centers on the notion of
essential complexity [McCabe 82], hich is just the cyclomatic complexity of yet another form of
condensation graph. Recall that condensation graphs are a way of simplifying an existing graph; so far
our simplifications have been based on removing either strong components or DD-Paths. Here, we
condense around the structured programming constructs, which are repeated as Figure 3.8.

The basic idea is to look for the graph of one of the structured programming constructs, collapse it into
a single node, and repeat until no more structured programming constructs can be found. This process
is followed in Figure 9.9, which starts with the DD-Path graph of the Pascal triangle program. The IF-
THEN-ELSE construct involving nodes A, B, C, and D is condensed into node a, and then the three
IF-THEN constructs are condensed onto nodes b, c, and d. The remaining IF-THEN-ELSE (which
corresponds to the IF IsATriangle statement) is condensed into node e, resulting in a condensed graph
with cyclomatic complexity V(G) = 1. In general, when a program is

Page 74
well structured (i.e., is composed solely of the structured programming constructs), it can always be
reduced to a graph with one path.

The graph in Figure 3.6 cannot be reduced in this way (try it!). The loop with nodes B and C cannot be
condensed because of edge from B to E. Similarly, nodes D, E, and F look like an IF-THEN construct,
but the edge from B to E violates the structure. McCabe went on to find elemental “unstructures” that
violate the precepts of structured programming [McCabe 76]. These are shown in Figure 3.10.

com
Figure 3.9 Condensing with Respect to the Structured Programming C nstru ts

Each of these “unstructures” contains three distinct paths, as opposed to the tw paths present in the
allsyllabus

corresponding structured programming constructs, so one conclu ion is that such violations increase
cyclomatic complexity. The piece d’ resistance of McCabe’s analysis is that these unstructures
cannot occur by themselves: if there is one in a program, there must be at least one more, so a program
cannot be just slightly unstructured. Since these increase cyclomatic complexity, the minimum number
of test cases is thereby incre sed. In the next chapter, we will see that the unstructures have interesting
implications for dataflow testing.

The bottom line for testers is this: progr m with high cyclomatic complexity require more testing. Of
the organizations that use the cyclomatic complexity metric, most set some guideline for maximum
acceptable complexity; V(G) = 10 is a common choice. What happens if a unit has a higher

complexity? wwwTopossibilities: either simplify the unit or plan to do more testing. If the unit is well
structured, its essential complexity is 1, so it can be simplified easily. If the unit has an essential
complexity that exceeds the guidelines, often the best choice is to eliminate the unstructures.

Figure 9.10 Violations of Structured Programming

3.5 Guidelines and Observations

In our study of functional testing, we observed that gaps and redundancies can both exist, and at the
same time, cannot be recognized. The problem was that functional testing removes us “too far”

Page 75
from the code. The path testing approaches to structural testing represent the case where the pendulum
has swung too far the other way: moving from code to directed graph representations and program
path formulations obscures important information that is present in the code, in particular the
distinction between feasible and infeasible paths. In the next chapter, we look at dataflow based
testing. These techniques move closer to the code, so the pendulum will swing back from the path
analysis extreme.

McCabe was partly right when he observed: “It is important to understand that these are purely criteria
that measure the quality of testing, and not a procedure to identify test cases” [McCabe 82]. He was
referring to the DD-Path coverage metric (which is equivalent to the predicate outcome metric) and the
cyclomatic complexity metric that requires at least the cyclomatic number of distinct program paths
must be traversed. Basis path testing therefore gives us a lower bound on how much testing is
necessary.
Path based testing also provides us with a set of metrics that actcomasrosschecks on functional testing.
We can use these metrics to resolve the gaps and redundancies questi n. When we find that the same
program path is traversed by several functional test cases, we suspe t that this redundancy
is not revealing new faults. When we fail to attain DD-Path coverage, we kn w that there are gaps in the
functional test cases. As an exallsyllabusmple,supposewehaveaprogram that c ntains extensive error
handling, and we test it with boundary value test cases (rain, mi n+, nom, max-, and max). Because
these are all permissible values, DD-P th corresponding to the error handling code will not be
traversed. If we add test cases derived from robustness testing or traditional equivalence class testing,
the DD-Path coverage will improve. Beyond this rather obvious use of coverage metrics, there is an
opportunity for real testing craftsmanship. The coverage metrics in Table 2 can operate in two ways:
as a blanket mandated standard (e.g., all units shall be tested to attain full DD-Path coverage) or as a
mechanism to se ective te t portions of code more rigorously than others. We might choose multiple
condition coverage for modules with complex logic, while those with extensive iteration might be
tested in terms of the loop coverage techniques. This is probably the best view of structural testing:
use the properties of the source code to identify appropriate coverage metrics, and then use these as a
cross check on functional test cases. When the desired coverage is not attained, follow interesting
paths to identify additional (special value) test cases.

This is a good place to revisit the Venn diagram view of testing that we used in Chapter 1. Figure 9.11
shows the relationship between specified behaviors (set S), programmed behaviors (set P), and
topologically feasible paths in a program (set T). As usual, region I is the most desirable — it contains
specified behaviors that are implemented by feasible paths. By definition, every feasible path is
topologically possible, so the shaded portion (regions 2 and 6) of the set P must be empty. Region 3
contains feasible paths that correspond to unspecified behaviors. Such extra functionality needs to be
examined: if useful, the specification should be changed, otherwise these feasible paths should be
removed. Regions 4 and 7 contain the infeasible paths; of these, region 4 is problematic. Region 4
refers to specified behaviors that have almost been implemented: topologically possible yet infeasible
program paths. This region very likely corresponds to coding errors, where changes are needed to
make the paths feasible. Region 5 still corresponds to specified behaviors that have not been
implemented. Path based testing will never recognize this region. Finally, region 7 is a curiosity:
unspecified, infeasible, yet topologically possible paths. Strictly speaking, there is no
Page 76
problem here, because infeasible paths cannot execute. If the corresponding code is incorrectly
changed by a maintenance action (maybe by a programmer who doesn’t fully understand the code),
these could become feasible paths, as in region 3.

Figure 3.11 Feasible and Topologically Possible Paths

EXERCISES

1. Find the cyclomatic complexity of the graph in Figure 9.2.

2. Identify a set of basis paths for the graph in Figure 9.2.


com
3. Discuss McCabe’s concept of “flipping” for nodes with outdegree ≥ 3.

4. Suppose we take Figure 9.2 as the DD-Path graph of some progra . Develop sets of paths (which
would be test cases) for the C0, C1, and C2 metrics.
allsyllabus
5. Develop multiple condition cover ge test cases for the Pa cal triangle program. Pay attention to
the dependency between statement fragments 14 and 16 with the expression (a = b) AND (c = d).
Rewrite the program segment 14 - 21 ch that the compo nd conditions are replaced by nested IF-
THEN-ELSE statements. Compare the cyclomatic complexity of your program with that of the
existing version.

6. For a set V to be a vector space, two operations (addition and scalar multiplication) must be defined
for elements in the set. In addition, the following criteria must hold for all vectors x, y, and z � V, and
for all scalars k, 1, 0, nd 1:

i. if x, y � V, the vector x + y � V.

ii. x + y = y + x.

iii. (x + y) + z = x + (y + z).

iv. there is a vector 0 � V such that x + 0 = x.

v. for any x � V, there is a vector -x such that x + (-x) 0.

vi. for any X � V, the vector kx � V.

vii. k(x + y) kx + ky.

viii. (k + l)x kx + lx.

ix. k(lx) = (kl)x.

x. lx = x.

How many of these ten criteria hold for the “vector space” of paths in a program?

Page 77
3.6 Data Flow Testing

Data flow testing is an unfortunate term, because most software developers immediately think about
some connection with dataflow diagrams. Data flow testing refers to forms of structural testing that
focus on the points at which variables receive values and the points at which these values are used (or
referenced). We will see that data flow testing serves as a “reality check” on path testing; indeed,
many of the data flow testing proponents (and researchers) see this approach as a form of path testing.
We will look at two mainline forms of data flow testing: one provides a set of basic definitions and a
unifying structure of test coverage metrics, while the second is based on a concept called a “program
slice”. Both of these formalize intuitive behaviors (and analyses) of testers, and although they both
start with a program graph, both move back in the direction of functional testing.

Most programs deliver functionality in terms of data. Variables that represent data somehow receive
values, and these values are used to compute values for other variables. Since the early 1960s,

programmers have analyzed source code in terms of the points com(stateents) at which variables
receive values and points at which these values are used. Many times, their analyses were based on
concordances that list statement numbers in which variable na es ccur. Concordances were
popular features of second generation language compilers (they are still popular with COBOL

programmers). Early “data flow” anallsyllabusalysesoftencenteredonaet of faults that are now known
as define/reference anomalies:
• a variable that is defined but never used (referenced)

• a variable that is used but never defined

• a variable that is defined twice before it i used

Each of these anomalies can be recognized from the concordance of a program. Since the concordance
information is compi er generated, these anomalies can be discovered by what is known as “static
analysis”: finding faults in source code without executing it.

3.6.1 Define/Use Testing

Much of the formalization of define/use testing was done in the early 1980s [Rapps 85]; the
definitions in this section are compatible with those in [Clarke 89], an article which summarizes most
of define/use testing theory. This body of research is very compatible with the formulation we
developed in chapters 4 and 9. It presumes a program graph in which nodes are statement fragments (a
fragment may be an entire statement), and programs that follow the structured programming precepts.

The following definitions refer to a program P that has a program graph G(P), and a set of program
variables V. The program graph G(P) is constructed as in Chapter 4, with statement fragments as
nodes, and edges that represent node sequences. G(P) has a single entry node, and a single exit node.
We also disallow edges from a node to itself. Paths, subpaths, and cycles are as they were in Chapter
4.

Page 78
Definition

Node n G(P) is a defining node of the variable v V, written as DEF(v,n), iff the value of the variable v
is defined at the statement fragment corresponding to node n. Input statements, assignment statements,
loop control statements, and procedure calls are all examples of statements that are defining nodes.
When the code corresponding to such statements executes, the contents of the memory location(s)
associated with the variables are changed.

Definition

Node n G(P) is a usage node of the variable v V, written as USE(v, n), iff the value of the
variable v is used at the statement fragment corresponding to node n. Output statements, assignment
statements, conditional statements, loop control statements, and procedure calls are all examples of
statements that are usage nodes. When the code corresponding to such statements executes, the

contents of the memory location(s) associated with the variables rem comainunchanged.
Definition

A usage node USE(v, n) is a predicate use (denoted as P-use) iff the state ent n is a predicate
statement; otherwise USE(v, n) is a computation use , (denoted C-use). The nodes corresponding to
predicate uses always have an outdegree ≥ 2, and nodes corresponding to computation uses always
have outdegree ≤ 1.

Definition

A definition-use (sub)path with respect to a variable v (denoted du-path) is a (sub)path in


PATHS(P) such that, for some v V, there re define nd sage nodes DEF(v, m) and USE(v, n)
such that m and n are the initial and fin l node of the ( )p th.

Definition allsyllabus

A definition-clear (sub)path ith respect to a variable v


www
(denoted dc-path) is a definition-use
(sub)path in PATHS(P) ith initial and final nodes DEF (v, m) and USE (v, n) such that no other node
in the (sub)path is a defining node of v. Testers should notice how these definitions capture the
essence of computing with stored data values. Du-paths and dc-paths describe the flow of data across
source statements from points at which the values are defined to points at which the values are used.
Du-paths that are not definition-clear are potential trouble spots.

3.6.2 Example

We will use the Commission Problem and its program graph to illustrate these definitions. The
numbered source code is given next, followed by a program graph constructed according to the
procedures we discussed in Chapter 4. This program computes the commission on the sales of four
salespersons, hence the outer For-loop that repeats four times. During each repetition, a salesperson’s
name is read from the input device, and the input from that person is read to compute

Page 79
the total numbers of locks, stocks, and barrels sold by the person. The While-loop is a classical
sentinel controlled loop in which a value of -1 for locks signifies the end of that person’s data. The
totals are accumulated as the data lines are read in the While-loop. After printing this preliminary
information, the sales value is computed, using the constant item prices defined at the beginning of the
program. The sales value is then used to compute the commission in the conditional portion of the
program.
1 program lock-stock_and_barrel
2 const
3 lock_price = 45.0;
4 stock_price = 30.0;
5 barrel_price 25.0;
6 type
7 STRING_30 = string[30]; {Salesman's Name}
8 var
9 locks, stocks, barrels, num_locks, num_stocks,
10 num_barrels, salesman_index, order_index : INTEGER;
11 sales, commission : REAL;
12 salesman : STRING_30;
13
14 BEGIN {program lock_stock_and_barrel}
15 FOR salesman_index := 1 TO 4 DOallsyllabus
16 BEGIN
17 READLN(salesman);
18 WRITELN ('Salesman is ', salesman);
19 num_locks := 0;
20 num_stocks := 0;
21 num_barrels := 0;
22 READ(locks);
23 WHILE locks <> -1 DO
24 BEGIN
25 READLN (stocks, barrels);
26 num_locks := num_locks + ocks;
27 num_stocks := num_stocks + stocks;
28 num_barrels := num barrels + barrels;
29 READ(locks);
30 END; (WHILE locks)
31 READLN;
32 WRITELN('Sales for ',salesman);
33 WRITELN('Locks sold: ', num_locks);
34 WRITELN('Stocks sold: ', num_stocks);
35 WRITELN('Barrels sold: ', num_barrels);
36 sales := lock_price*num_locks + stock_price*num_stocks +
barrel_price*num_barrels;
37 WRITELN('Total sales: ', sales:8:2);
38 WRITELN;
39 IF (sales > 1800.0) THEN
40 BEGIN
41 commission := 0.10 * 1000.0;
42 commission := commission + 0.15 * 800.0;
43 commission := commission + 0.20 * (sales-1800.0);
44 END;
45 ELSE IF (sales > 1000.0) THEN
46 BEGIN
47 commission := 0.10 * 1000.0;
48 commission := commission + 0.15*(sales - 1000.0);
49 END
Page 80
50 ELSE commission := 0.10 * sales;

p1 = <22, 23>

p2 = <22, 23, 24, 25, 26>

p3 = <29, 30, 23>

p4 = <29, 30, 23, 24, 25, 26>

51 WRITELN('Commission is $',commission:6:2);
52 END; (FOR salesman)
53 END. {program lock_stock_and-barrel}

The DD-Paths in this program are given in Table 1, and the DD-Path graph is shown in Figure 10.2.
Tables 2 and 3 list the define and usage nodes for five variables in the commission problem. We use
this information in conjunction with the program graph in Figure 10.1 to identify various definition-
use and definition-clear paths. It’s a judgment call whether or not non-executable statements such as
constant (CONST) and variable (VAR) declaration statements should be considered as defining nodes.
Technically, these only define memory space (the CONST declaration creates a compiler-produced
initial value). Such nodes aren’t very interesting when we follow what happens along their du-paths,
but if there is something wrong, it’s usually helpful to include them. Take your pick. We will refer to
the various paths as sequences of node numbers. First, let’s look at the du-paths for the variable stocks.
We have DEF(stocks, 25) and USE(stocks, 27), so the path <25, 27> is a du-path wrt (with respect to)
stocks. Since there are no other defining ncomodesforstocks, this path is also definition-clear.
Two defining and two usage nodes make the locks variable more interesting: we have DEF(locks,

22), DEF(locks, 29), USE(locks, 23allsyllabus),ndUSE(locks,26).Theeyield f ur du-paths:

Figure 3.1 Program Graph of the Commission Program

Table 1 DD-Paths in Figure 10.1 DD-Path

Nodes

1 14

2 15-22

3 23

4 24-30

Page 81
p1’ = <22, 23, 31>

p3’ = <29, 30, 23, 31>

5 31-39

6 40-44

7 45

8 46-49

9 50

10 51,52

11 53

Du-paths p1 and p2 refer to the priming value of locks which iscomreadatnode 22: locks has a
predicate use in the While statement (node 23), and if the conditi n is true (as in path p2), a
computation use at statement 26. The other two du-paths start near the end of the While loop and
occur when the loop repeats. If we “extended” paths p1 and p3 to in lude node 31,

then the paths p1’, p2, p3’, and p4 formallsyllabusverycompetesetoftest cases for the While-loop: bypass
the loop, begin the loop, repeat the loop, and exit the loop. All of these du-paths are definition-clear.

Figure 3.2 DD-Path Graph of the Commission Program

Table 2 Define/Use Information for locks, stocks, and num_locks Variable

Defined at Used at Comment

locks 9 (to compiler)

locks 22 READ

Page 82
locks 23 predicate use

locks 26 computation use

locks 29 READ

stocks 9 (to compiler)

stocks 25 READ

stocks 27 computation use

num_locks 9 (to compiler)

num_locks 19 assignment

num_locks 26 assignment

num_locks 26 commputation use


allsyllabus

num_locks 33 WRITE

num_locks 36 computation use

Table 3 Define/Use Information for Sale and Commission Variable

Defined at Used at Comment

sales 11 (to compiler)

sales 36 assignment

sales 37 WRITE

sales 39 predicate use

sales 43 computation use

sales 45 predicate use

sales 48 computation use

sales 50 computation use

commission 11 (to compiler)

commission 41 assignment

Page 83
commission 42 assignment

commission 42 computation use

commission 43 assignment

commission 43 computation use

commission 47 assignment

commission 48 assignment

commission 48 computation use

commission 50 assignment
com

commission 51 WRITE

The du-paths for num_locks will lead us to typical test cases for co putations. With two defining

nodes (DEF(num_locks, 19) and DallsyllabusEF(numlocks,26))andthree usage nodes (USE(num_locks,


26), USE(num_locks, 33), USE(num locks, 36)), we might expect six du-paths. Let’s take a closer
look.

Path p5 = <19, 20, 21, 22, 23, 24, 25, 26> is a du-path in which the initial value (0) has a computation
use. This path is definition-clear. The next path is problematic:

p6 = <19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33>

We have ignored the possible repetition of the Whi e-loop. We could highlight this by noting that the
subpath <26, 27, 28, 29, 30, 22, 23, 24, 25> might be traversed several times. Ignoring this for now,
we still have a du-path that fails to be definition-clear. If there is a problem with the value of
num_locks at node 33 (the WRITE statement), we should look at the intervening DEF(num_locks, 26)
node.

The next path contains p6; we can show this by using a path name in place of its corresponding node
sequence:

p7 = <19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36>

p7 = < p6, 34, 35, 36>

Du-path p7 is not definition-clear because it includes node 26.

Subpaths that begin with node 26 (an assignment statement) are interesting. The first, <26, 26>, seems
degenerate. If we “expanded” it into machine code, we would be able to separate the define and usage
portions. We will disallow these as du-paths. Technically, the usage on the right-hand

Page 84
side of
the
assign
p8 = <26, 27, 28, 29, 30, 31, 32, 33>

p9 = <26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36>

Bot
h
Since
there is
only
one
p10 = <36, 37>

p11 = <36, 37, 38, 39>

p12 = <36, 37, 38, 39, 40, 41, 42, 43>

Notice that p12 is a definition-clear path with three usage nodes; it alscomontains paths p10 and p11. If we were testing with p12, we kn allsyllabusowwewouldalsohavecovered the other two paths. We will revisit this toward the end of the chapter.

The IF, ELSE IF logic in statement 39 through 50 highlights an ambiguity in the original research.
There are two choices for du-paths that begin with p th p11: the static choice is the path <36, 37, 38,
39, 40, 41, 42, 43>, the dynamic choice is the path <36, 37, 38, 39, 45>. Here we will use the dynamic
view, so the remaining du-paths for ales are

p13 = <36, 37, 38, 39, 45, 46, 47, 48>


p14 = <36, 37, 38, 39, 45, 50>
Note that the dynamicwwwvieisvery compatible with the kind of thinking we used for DD-Paths. If
you have followed this discussion carefully, you are probably dreading the stuff on du-paths wrt
commission. You’re right -- it’s time for a change of pace. In statements 39 through 51, the calculation
of commission is controlled by ranges of the variable sales. Statements 41 to 43 build up the value of
commission by using the memory location to hold intermediate values. This is a common
programming practice, and it is desirable because it shows how the final value is computed. (We could
replace these lines with the statement “ commission := 220 + 0.20* (sales -1800)”, where 220 is the value of
0.10*1000 + 0.15*800, but this would be hard for a maintainer to understand.) The “built-up” version uses
intermediate values, and these will appear as define and usage nodes in the du-path analysis. Since we
decided to disallow du-paths from assignment statements like 41 and 42, we’ll just consider du-paths
that begin with the three “real” defining nodes: DEF(commission, 43), DEF(commission, 48), and
DEF(commission, 50). There is only one usage node, USE(commission, 51).
Page 85
We have another ambiguity. The static view results in one du-path:

3.6.3 Du-path Test Coverage Metrics

<43, 44, 45, 48, 50, 51>

This path contains the three definitions of commission, so it is not definition-clear. The dynamic
view results in three paths:

p15 = <43, 51>

p16 = <48, 51>

p17 = <50, 51>

Again, the dynamic view is preferable; it also results in definition-clear paths. (A sharp tester might
ask how we would ever execute the “path” <43, 44, 45, 48, 50, 51>. We cannot.) The full set of du-
paths in the problem is given in Table 4 (they are renumbered).

The whole point of analyzing a program as in the previous section iscomtdefineaset of test coverage

metrics known as the Rapps-Weyuker data flow metrics [Rapps 85] The first three of these are equivalent

to three of E. F. Miller’s allsyllabusmetricsinChapter9:All-Path , All-Edges, and All-Nodes. The others


presume that define and usage nodes have been identified for all program variables, and that
du-paths have been identified with respect to each varia le. In the following definitions, T is a set of
(sub)paths in the program graph G(P) of a program P, with the set V of variables.

Definition

The set T satisfies the All-Defs criterion for the program P iff for every variable v � V, T contains
definition clear (sub)paths from ever defining node of v to a use of v.

Definition
The set T satisfies the All-Uses criterion for the program P iff for every variable v � V, T contains
definition-clear (sub)paths from every defining node of v to every use of v, and to the successor
node of each USE(v,n).
Definition

The set T satisfies the All-P-Uses /Some C-Uses criterion for the program P iff for every variable v
� V, T contains definition-clear (sub)paths from every defining node of v to every predicate use of a
v, and if a definition of v has no P-uses, there is definition-clear path to at least one computation
use.
Table 4 Du-Paths in Figure 10.1 Du-Path

Variable Def Node Use Node

1 locks 22 23

Page 86
2 locks 22 26

3 locks 29 23

4 locks 29 26

5 stocks 25 27

6 barrels 25 28

7 num_locks 19 26

8 num_locks 19 33

9 num_locks 19 36

10 num_locks 26 33

11 num_locks 26 36
allsyllabus

12 num_stocks 20 27

13 num_stocks 20 34

14 num_stocks 20 36

15 num_stocks 27 34

16 num_stock 27 36

17 num barrels 21 28

18 num_stocks 21 35

19 num_stocks 21 36

20 num_stocks 28 35

21 num_stocks 28 36

22 sales 36 37

23 sales 36 39

24 sales 36 43

25 sales 36 45
Page 87
26 sales 36 48

27 sales 36 50

28 commission 41 42

29 commission 42 43

30 commission 43 51

31 commission 47 48

32 commission 48 51

33 commission 50 51

Definition

The set T satisfies the All-C-Uses /Some P-U e criterion for the pr gram P iff for every variable v
com

� V, T contains definition-clear (su )p th from ever defining node of v to every computation use
of v, and if a definition of v has no C- e , there i definition-clear path to at least one predicate
use.

Definition

The set T satisfies the All-DU-path criterion for the program P iff for every variable v � V, T
cycle free. allsyllabus

contains definition-clear (sub)paths from every defining node of v to every use of v, and to the
successor node of each USE(v,n), nd that these paths are either single loop traversals, or they are

These test coverage metrics have several set-theory based relationships, which are referred to as
“subsumption” in [Rapps 85]. When one test coverage metric subsumes another, a set of test cases that
attains coverage in terms of the first metric necessarily attains coverage with respect to the subsumed
metric. These relationships are shown in Figure 3.3.

We now have a more refined view of structural testing possibilities between the extremes of the
(typically unattainable) All-Paths metric, and the generally accepted minimum, All-Edges.

Figure 3.3 Rapps/Weyuker Hierarchy of Data Flow Coverage Metrics

Page 88
Since several du-paths are present in a full program execution path (traversed by a test case), the
higher forms of coverage metrics don’t always imply significantly higher numbers of test cases. In our
continuing example, the three decision table functional test cases cover all the DD-Paths (see Table 5)
and most of the du-paths (see Table 6). The missing du-paths (8, 9, 14, 18, 19) are all traversed by a
test case in which nothing is sold (i.e., the first value of locks is -1).

3.7 Slice-Based Testing

Program slices have surfaced and submerged in software engineering literature since the early 1980s. They
were originally proposed in [Weiser 85], used as an approach to software maintenance in [Gallagher 91], and
most recently used to quantify functional cohesion in [Bieman 94]. Part of this versatility is due to the natural,
intuitively clear intent of the program slice concept. Informally, a program slice is a set of program statements
that contribute to, or affect a value for a variable at
some point in the program. This notion of slice corresponds to other disciplines as well. We might
com

study history in terms of slices: US history, European history, Russian history, Far East history,
Roman history, and so on. The way such historical slices interact turns ut t be very analogous to
the way program slices interact.
allsyllabus

Table 5 DD-Path Coverage of Decision Table Functional Test Cases Case

locks stocks barrels sales commission DD-Paths

1 5 5 5 500 50 1-5, 7, 9, 10, 11

2 15 15 15 1500 175 1-5, 7, 8, 10, 11

3 25 25 25 2500 360 1-5, 9, 10, 11

Table 6 Du-Path Coverage of Decision Tab e Functional Test Cases Du-Path

Case 1 Case 2 Case 3

1 X X X

2 X X X

3 X X X

4 X X X

5 X X X

6 X X X

7 X X X

Page 89
8

10 X X X

11 X X X

12 X X X

13 X X X

14

15 X X X

16 X X X

17 X X X

18

19

20 X X X

21 X X X

22 X X X

23 X X X

24 X

25 X X

26 X

27 X

28 X

29 X

30 X

31 X

Page 90
Definition

32 X

33 X

We’ll start by growing our working definition of a program slice. We continue with the notation we
used for define-use paths: a program P that has a program graph G(P), and a set of program variables
V. The first try refines the definition in [Gallagher 91] to allow nodes in P(G) to refer to statement
fragments.

Definition

Given a program P, and a set V of variables in P, a slice on the variable set V at statement n, written
S(V,n), is the set of all statements in P that contribute to the values of variables in V.
Listing elements of a slice S(V,n) will be cumbersome, because the comelementsare program
statement fragments. Since it is much simpler to list fragment numbers in P(G), we ake the following
trivial change (it keeps the set theory purists happy):

Given a program P, and a programallsyllabusgraphG(P)inwhichstatements and statement fragments are

numbered, and a set V of variables in P, the slice on the variable set V at statement fragment n,
written S(V,n), is the set node numbers of all statement fragments in P prior to n that contribute to the
values of variables in V at statement fragment n.
The idea of slices is to separate a progr m into components that have some useful meaning. First, we
need to explain two parts of the definition. Here we mean “prior to” in the dynamic sense, so a slice
captures the execution time behavior of a program with respect to the variable(s) in the slice.
Eventually, we will develop a lattice (a directed, acyclic graph) of slices, in which nodes are slices,
and edges correspond to the subset relationship.

The “contribute” part is more complex. In a sense, declarative statements (such as CONST and TYPE)
have an effect on the value of a variable. A CONST definition sets a value that can never be changed
by a definition node, and the difference between INTEGER and REAL variables can be a source of
trouble. One resolution might be to simply exclude all non-executable statements. We will include
CONST declarations in slices. The notion of contribution is partially clarified by the predicate (P-use)
and computation (C-use) usage distinction of [Rapps 85], but we need to refine these forms of variable
usage. Specifically, the USE relationship pertains to five forms of usage:

P-use used in a predicate (decision)

C-use used in computation

O-use used for output

Page 91
L-use used for location (pointers, subscripts)

S1: S(salesman, 17) = {17}

S2: S(salesman, 18) = {17}

S3: S(salesman, 32) = {17}

The salesman variable is the simplest case in the program. It has one defining node (an I-def at node
17). It also occurs at nodes 18 and 22, both times as an output variable (O-use), hence it is not included
in slices S2 and S3. Both <17, 18> and <17, 32> are definition-clear du-paths.

Slices on the locks variable show why it is potentially fault-prone. It has a P-use at node 23 and a C-use
at node 26, and has two definitions, the I-defs at nodes 22 and 24.

S4: S(locks, 22) = {22}

S5: S(locks, 23) = {22, 23, 24, 29, 30}

S6: S(locks, 26) = {22, 23, 24, 29, 30}


S7: S(locks, 29) = {29}

Page 92
I-use iteration (internal counters, loop indices)

While we’re at it, we identify two forms of definition nodes:

I-def defined by input

A-def defined by assignment

For now, presume that the slice S(V, n) is a slice on one variable, that is, the set V consists of a single
variable, v. If statement fragment n is a defining node for v, then n is included in the slice. If statement
fragment n is a usage node for v, then n is not included in the slice. P-uses and C-uses of other

variables (not the v in the slice set V) are included to the exten comtthattheirexecution affects the
value of the variable v. As a guideline, if the value of v is the same whether a statement fragment is
included or excluded, exclude the statement fragment. L-use and I-use variables are typically
invisible outside their modules, but this hardly precludes the proble s such variables often create.
Another judgment call: here (withallsyllabussomeperil)wechoosetoexclude these from the intent of
“contribute”. Thus O-use, L-use, and I-use nodes are excl ded from slices..

Example

The commission problem is used in this book ecause it contains interesting data flow properties, and
these are not present in the Triangle problem (or in NextDate). Follow these examples while looking at
the source code for the commi ion pro em th t we used to analyze in terms of define-use paths.
The slices for stocks and barrels are boring. Both are short, definition-clear paths contained entirely
within a loop, so they are not affected by iterations of the loop. (Think of the loop body as a DD-Path.)

S8: S(stocks, 25) = {22, 23, 24, 25, 29, 30}

S9: S(stocks, 27) = {22, 23, 24, 25, 29, 30}

S10: S(barrels, 25) = {22, 23, 24, 25, 29, 30}

S11: S(barrels, 28) = {22, 23, 24, 25, 29, 30}

The next four slices illustrate how repetition appears in slices. Node 19 is an A-def for num_locks, and
node 26 contains both an A-def and a C-use. The remaining nodes in S 13 (22, 23, 24, 29, and 30)
pertain to the While-loop controlled by locks. Slices S 13, S14, and S15 are equal because nodes 33 and
36 are, respectively, an O-use and a C-use of num_locks.

S12: S(num_locks, 19) = {19}

S13: S(num_locks, 26) = {19, 22, 23, 24, 26, 29, 30}

S14: S(num_locks, 33) = {19, 22allsyllabus,23,24,26,29,30}

S15: S(num_locks, 36) = {19, 22, 23, 24, 26, 29, 30}

The slices on num_stocks and num_ arrels are quite similar. They are initialized by A-defs at nodes 20
and 21, and then are redefined by A-defs at nodes 27 and 28. Again, the remaining nodes (22, 23, 24,
29, and 30) pertain to the While-loop controlled by locks.

S16: S(num_stocks, 20) = {20}

S17: S(num_stocks, 27) = {20, 22, 23, 24, 25, 27, 29, 30}

S18: S(num_stocks, 34) = {20, 22, 23, 24, 25, 27, 29, 30}

S19: S(num_stocks, 36) = {20, 22, 23, 24, 25, 27, 29, 30}

S20: S(num_barrels, 21) = {21}

S21: S(num_barrels, 28) = {21, 22, 23, 24, 25, 28, 29, 30}

S22: S(num_barrels, 35) = {21, 22, 23, 24, 25, 28, 29, 30}

S23: S(num_barrels, 36) = {21, 22, 23, 24, 25, 28, 29, 30}

The next three slices demonstrate our convention regarding compiler-defined values.

S24: S(lock_price, 36) = {3}

S25: S(stock_price, 36) = {4}

S26: S(barrel_price, 36) = {5}

Page 93
The slices on sales and commission are the interesting ones. There is only one defining node for sales,
the A-def at node 36. The remaining slices on sales show the P-uses, C-uses, and the O-use in
definition-clear paths.

S27: S(sales, 36) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36}

S28: S(sales, 37) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36}

S29: S(sales, 39) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36}

S30: S(sales, 43) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36}

S31: S(sales, 45) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36}

S32: S(sales, 48) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36}
S33: S(sales, 50) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36}
com
Think about slice S27 in terms of its “components”, the slices on the C-use variables. We can write
S27 = S24 S25 S26 S13 S17 S21, where the values of the six C-use variables at node 36 are
defined by the six slices joined together by the union operati n. Notice how the formalism
S35: S(commission, 42) = {41, allsyllabus42}

corresponds to our intuition: if the value of sales is wrong, we fir t look at how it is computed, and
if this is OK, we check how the components are computed.

Everything comes together (literall ) with the slices on commission. There are six A-def nodes for
commission (corresponding to the six du-paths we identified earlier). Three computations of
commission are controlled by P-uses of sales in the IF, ELSE IF logic. This yields three “paths” of
slices that compute commission. (See Figure 10.4.)

S34: S(commission, 41) = {41}

S36: S(commission, 43) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36, 41, 42, 43}

S37: S(commission, 47) = {47}

S38: S(commission, 48) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36, 47, 48}

S39: S(commission, 50) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36, 50}

Whichever computation is taken, all come together in the last slice.

S40: S(commission, 51) = {3, 4, 5, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 36, 41, 42, 43, 47, 48,
50}

The slice information improves our insight. Look at the lattice in Figure 10.4; it is a directed acyclic
graph in which slices are nodes, and an edge represents the proper subset relationship.

Page 94
10.2.2 Style and Technique

Figure 3.4 Lattice of Slices on Commission

This lattice is drawn so that the position of the slice nodes roughly corresponds with their position in
the source code. The definition-clear paths <43, 51>, <48, 51>, and <50,51> correspond to the edges
that show slices S36, S38, and S39 are subsets of slice S 40. Figure 3.5 shows a lattice of slices for the
entire program. Some slices (those that are identical to others) have been deleted for clarity. All are
listed in Table 7, along with slice-specific test objectives that are appropriate.

Figure 3.5 Lattice of Slices in the Commission Program


There is a natural hybrid between slallsyllabusice-basedtestingandfunctional testing. Since slices are defined
with respect to variables, slices correspond to a functional decomposition of a program. Because the
subfunctions are smaller, corresponding sets of functional test cases will be more reasonable.

When we analyze a program in term of “interesting” slices, we can focus on parts of interest while
disregarding unrelated parts. We couldn’t do this with du-paths — they are sequences that include
statements and variables that may not be of interest. Before discussing some analytic techniques,
we’ll first look at “good style”. We could have built these stylistic precepts into the definitions, but
then the definitions become even more cumbersome.

Table 7 Test Objectives for Slices in Figure 10.5 Equivalent Slices

Test Objective

1, 2, 3 salesman read and written correctly

4 locks read correctly

5, 6 locks sentinel correct

7 additional locks read correctly

8, 9 (10, 11) iterative read of stocks correct

Page 95
(8, 9) 10, 11 iterative read of barrels correct

12 num_locks initialized correctly

13, 14, 15 num_locks computed correctly

16 num_stocks initialized correctly

17, 18, 19 num_stocks computed correctly

20 num_barrels initialized correctly

21, 22, 23 num_barrels computed correctly

lock_price constant definiticomncorrect


24

25 stock_price constant definiti n rre t

26

27, 28, 29, 30, 31,


32, 33

34 commission on first 1000 correct for sales > 1800

35 commission on next 800 correct for sales > 1800

36 commi ion on excess over 1800 correct for sales > 1800

37 commis ion on first 1000 correct for 1000 <sales <1800


barrel_price constant definition orrect
38

39

40

allsyllabussalescomputedcorrectly

commission on excess over 1000 correct for 1000 <sales <1800

commission on sales < 1000 correct


co
m
m
is
si
on
w
rit
te
n
co
rr
ec
tl
y
1. Never make a slice S(V, n) for which variables v of V do not appear in statement fragment n.
This possibility is permitted by the definition of a slice, but it is bad practice. As an example,
suppose we defined a slice on the locks variable at node 27. Defining such slices necessitates
tracking the values of all variables at all points in the program.

2. Make slices on one variable. The set V in slice S(V,n) can contain several variables, and
sometimes such slices are useful. The slice S(V, 36) where

V= { num_locks, num_stocks, num_barrels }

Page 96
contains all the elements of the slice S({sales}, 36) except the CONST declarations and
statement 36. Since these two slices are so similar, why define the one in terms of C-uses?

3. Make slices for all A-def nodes. When a variable is computed by an assignment statement, a slice on
the variable at that statement will include (portions of) all du-paths of the variables used in the
computation. Slice S({sales}, 36) is a good example of an A-def slice.

4. Make slices for P-use nodes. When a variable is used in a predicate, the slice on that variable at the
decision statement shows how the predicate variable got its value. This is very useful in decision-
intensive programs like the Triangle program and NextDate.

5. Slices on non-P-use usage nodes aren’t very interesting. We discussed C-use slices in point 2,
where we saw they were very redundant with the A-def slice. Slices on O-use variables can always be
expressed as unions of slices on all the A-defs (and I-defs) of the O-use variable. Slices on I-use and
O-use variables are useful during debugging, but if they are mandated for all testing, the test effort is
dramatically increased.

6. Consider making slices compilable. Nothing in the definition of a sli e requires that the set of
statements is compilable, but if we make this choice, it means that a set f compiler directive and
declarative statements is a subset of every slice. As an example, the sli e S 5, which is S(locks, 23) =

{22, 23, 24, 29, 30}, contains the statements com


22 READ(locks);
23 WHILE locks <> -1 DO
24 BEGIN
29 READ(locks);
30 END; {WHILE locks}

If we add statements 1-14 and 53, we have the compilable slice shown here:

1 program lock stock and barre


2 const allsyllabus
3 lock_price = 45.0;
4 stock_price = 30.0;
5 barrel_price = 25.0;
6 type
7 STRING 30 = string[30]; {Salesman’s Name}
8 var
9 locks, stocks, barrels, num_locks, num_stocks,
10 num_barrels, salesman_index, order_index : INTEGER;
11 sales, commission : REAL;
12 salesman : STRING_30;
13
14 BEGIN {program lock_stock_and_barrel}
22 READ(locks);
23 WHILE locks <> -1 DO
24 BEGIN
29 READ(locks);
30 END; {WHILE locks}
53 END. {program lock_stock_and_barrel}

If we added this same set of statements to all the slices we made for the commission program, our
lattices remain undisturbed, but each slice is separately compilable (and therefore executable). In
Page 97
the first chapter, we suggested that good testing practices lead to better programming practices. Here
we have a good example. Think about developing programs in terms of compilable slices. If we did
this, we could code a slice and immediately test it. We can then code and test other slices, and them
merge them (Gallagher calls this “slice splicing”) into a pretty solid program. Try coding the
commission program this way.

Guidelines and Observations

Dataflow testing is clearly indicated for programs that are computationally intensive. As a corollary, in
control intensive programs, if control variables are computed (P-uses), dataflow testing is also
indicated. The definitions we made for define/use paths and slices give us very precise ways to
describe parts of a program that we would like to test. There are academic tools that support these
definitions, but they haven’t migrated to the commercial marketplace. Some pieces are there; you can
find programming language compilers that provide on-screen highlighting of slices, and most
debugging tools let you “watch” certain variables as you step through a program execution. Here
are some tidbits that may prove helpful to you, particularly when yocomuhaveadifficult module to
test.

1. Slices don’t map nicely into test cases (because the other, non-related de is still in an
executable path). On the other hand, they are a handy way to eliminate interaction among variables.
Use the slice composition apprallsyllabusoachtore-developdifficultection of code, and these slices before
you splice (compose) them with other slices.

2. Relative complements of slice yield a “diagnostic” capability. The relative complement of a set
B with respect to another set A is the set of all elements of A that are not elements of B. It is denoted as
A -B. Consider the relative complement set S(commission, 48) - S(sales, 35):

S(commission, 48) = {3, 4, 5,36,18,19, 20, 23, 24, 25, 26, 27, 34, 38, 39, 40, 44,45,47}

S(sales, 35) = {3, 4, 5, 36, 18, 19, 20, 23, 24, 25, 26, 27}

S(commission, 48) - S(sales, 35) = {34, 38, 39, 40, 44,45,47}

If there is a problem ith commission at line 48, we can divide the program into two parts, the
computation of sales at line 34, and the computation of commission between lines 35 and 48.
If sales is OK at line 34, the problem must lie in the relative complement; if not, the problem
may be in either portion.

3. There is a many-to-many relationship between slices and DD-Paths: statements in one slice may be
in several DD-Paths, and statements in one DD-Path may be in several slices. Well-chosen relative
complements of slices can be identical to DD-Paths. For example, consider S(commission, 40) -
S(commission, 37).

4. If you develop a lattice of slices, it’s convenient to postulate a slice on the very first statement. This
way, the lattice of slices always terminates in one root node. Show equal slices with a two-way arrow.

5. Slices exhibit define/reference information. Consider the following slices on num_locks:

S(num_locks, 17) = φ
Page 98
S(num_locks, 24) = {17, 20, 27?}

S(num_locks, 31) = {17, 20, 24, 27}

S(num_locks, 34) = {17, 20, 24, 27}

S(num_locks, 17) is the first definition of num_locks.

S(num_locks, 24) - S(num_locks, 17) is a definition-clear, define reference path.

When slices are equal, the corresponding paths are definition-clear.

EXERCISES
1. Think about the static versus dynamic ambiguity of du-paths in ter s of DD-Paths. As a start,
com

what DD-Paths are found in the du-paths p12, p13, and p14 for sales?

2. Try to merge some of the DD-Path based test coverage metrics int the Rapps/Weyuker hierarchy
shown in Figure 10.2.
e. S(num_stocks, 34) allsyllabus
3. Express slice S40 as the union of other pertinent slices.
4. Find the following program ice :

a. S(commission, 48)

b. S(sales, 35)

c. S(commission, 40), S(commi ion, 39), S(commission, 38)

d. S(num_locks, 34)

f. S(num_barrels, 34)

5. Find the definition-clear paths (with respect to SALES) from line 35 to: 36, 40, 42, 45, 47.

6. Make a lattice of “interesting” slices. As a minimum, include the ones from question 4.

Page 99
UNIT 4

LEVELS OF TESTING, INTEGRATION TESTING


4.1 Traditional View of Testing Levels

The traditional model of software development is the Waterfall model, which is drawn as a V in
Figure 4.1 to emphasize the basic levels of testing. In this view, information produced in one of the
development phases constitutes the basis for test case identification at that level. Nothing controversial
here: we certainly would hope that system test cases are somehow correlated with the requirements
specification, and that unit test cases are derived from the detailed design of the unit. Two
observations: there is a clear presumption of functional testing here, and there is an implied “bottom-
up” testing order.

Figure 4.1 The Waterfall Life Cycle

Of the three traditional levels ofallsyllabustesting(unit,integration,and system), unit testing is best

understood. The testing theory and techniques we worked through in Parts I and II are directly
applicable to unit testing. System testing is understood better than integration testing, but both need
clarification. The bottom-up approach sheds some insight: test the individual components, and then
integrate these into subsystems until the entire s stem is tested. System testing should be something
that the customer (or user) understand , and it often borders on customer acceptance testing.
Generally, system testing is function rather than structural; this is mostly due to the absence of a
structural basis for system test cases. In the traditional view, integration testing is what’s left over: it’s
not unit testing, and it’s not system testing. Most of the usual discussions on integration testing center

on the orderwwwinhichunits are integrated: top-down, bottom-up, or the “big bang” (everything at
once). Of the three levels, integration is the least well understood; we’ll do something about that in this
chapter and the next. The waterfall model is closely associated with top-down development and design
by functional decomposition. The end result of preliminary design is a functional decomposition of the
entire system into a treelike structure of functional components. Figure 4.2 contains a partial
functional decomposition of our ATM system. With this decomposition. top-down integration would
begin with the main program, checking the calls to the three next level procedures (Terminal I/O,
ManageSessions, and ConductTransactions). Following the tree, the ManageSessions procedure would
be tested, and then the CardEntry, PIN Entry, and SelectTransaction procedures. In each case, the
actual code for lower level units is replaced by a stub, which is a throw-away piece of code that takes
the place of the actual code. Bottom-up integration would be the opposite sequence, starting with the
CardEntry, PIN Entry, and SelectTransaction procedures, and working up toward the main program. In
bottom-up integration, units at higher levels are replaced by drivers (another form of throw-away
code) that emulate the procedure calls. The big bang approach simply puts all the units together at
once, with no stubs or drivers. Whichever approach is taken, the goal of traditional integration testing
is to integrate

Page 100
previously tested units with respect to the functional decomposition tree. While this describes
integration testing as a process, discussions of this type offer little information about the goals or
techniques. Before addressing these (real) issues, we need to understand the consequences of the
alternative life cycle models.

Figure 4.2 Partial Functional Decomposition of the ATM System

4.2 Alternative Life Cycle Models

Since the early 1980s, practitioners have devised alternatives in response to shortcomings of the
traditional waterfall model of software development [Agresti 86]. Common to all of these alternatives
is the shift away from the functional decomposition to an emphasis on composition. Decomposition is

a perfect fit both to the top-down progression of comthewaterfall model and to the bottom-up testing
order. One of the major weaknesses of waterfall devel p ent cited by [Agresti 86] is the over-reliance
on this whole paradigm. Functional decomp siti n can only be well done when the system is
completely understood, and it promotes analysis to the near exclusion of
synthesis. The result is a very long allsyllabuseparationbetweenrequirements specification and a
completed system, and during this interval, there is no opportunity for feedback from the customer.
Composition, on the other hand, is c o er the way people work: start with something known and
understood, then add to it gradually, and maybe remove undesired portions. There is a very nice
analogy with positive and negative sculpture. In neg tive sculpture, work proceeds by removing
unwanted material, as in the mathematician’s view of sculpting Michelangelo’s David: start with a
piece of marble, and simply chip away all non-David. Positive sculpture is often done with a medium
like wax. The central shape i pproximated, and then wax is either added or removed until the desired
shape is attained. Think about the consequences of a mistake: with negative sculpture, the whole work
must be thrown w y, and restarted. (There is a museum in Florence, Italy that contains half a dozen
such false starts to The David.) With positive sculpture, the erroneous part is simply removed and
replaced. The centrality of composition in the alternative models has a major implication for
integration testing.

4.2.1 Waterfall Spin-offs

There are three mainline derivatives of the waterfall model: incremental development, evolutionary
development, and the Spiral model [Boehm 88]. Each of these involves a series of increments or
builds, as shown in Figure 4.3. Within a build, the normal waterfall phases from detailed design
through testing occur, with one important difference: system testing is split into two steps, regression
and progression testing.

Figure 4.3 Life Cycle with a Build Sequence

Page 101
It is important to keep preliminary design as an integral phase, rather than to try to amortize such high
level design across a series of builds. (To do so usually results in unfortunate consequences of design
choices made during the early builds that are regrettable in later builds.) Since preliminary design
remains a separate step, we are tempted to conclude that integration testing is unaffected in the spin-
off models. To some extent this is true: the main impact of the series of builds is that regression testing
becomes necessary. The goal of regression testing is to assure that things that worked correctly in the
previous build still work with the newly added code. Progression testing assumes that regression
testing was successful, and that the new functionality can be tested. (We like to think that the addition
of new code represents progress, not a regression.) Regression testing is an absolute necessity in a
series of builds because of the well-known “ripple effect” of changes to an existing system. (The
industrial average is that one change in five introduces a new fault.)

The differences among the three spin-off models are due to how the builds are identified. In

detailed design through unit testing. Most organizations cannot supp rt su h rapid staff fluctuations,
incremental development, the motivation for separate builds is usually to level off the staff profile.

With pure waterfall development, there can be a huge bulge of compersnnelfor the phases from
so the system is divided into builds that can be supported by existing personnel. In evolutionary

the system evolves to meet the changing needs of the user. The spiral model is a combination of rapid
prototyping and evolutionary development, in which a build is defined first in terms of rapid
prototyping, and then is subjected to a go/no go decision ased on technology-related risk factors.
development, there is still the presumption of a build sequence, but only the first build is defined. Based on

it, later builds are identified,allsyllabususuallyinresponsetopriorities set by the customer/user, so

From this we see that keeping preliminary design s n integral step is difficult for the evolutionary
and spiral models. To the extent that this cannot be maintained as an integral activity, integration
testing is negatively affected.
Because a build is a set of deliver e end-user functionality, one advantage of these spin-off models is
that all three yield earlier synthesis. This also results in earlier customer feedback, so two of the

deficiencies owwwfaterfalldevelopment are mitigated.

4.2.2 Specification Based Models

Two other variations are responses to the “complete understanding” problem. (Recall that functional
decomposition is successful only when the system is completely understood.) When systems are not
fully understood (by either the customer or the developer), functional decomposition is perilous at
best. The rapid prototyping life cycle (Figure 12.4) deals with this by drastically reducing the
specification-to-customer feedback loop to produce very early synthesis. Rather than build a final
system, a “quick and dirty” prototype is built and then used to elicit customer feedback. Depending on
the feedback, more prototyping cycles may occur. Once the developer and the customer agree that a
prototype represents the desired system, the developer goes ahead and builds to a correct specification.
At this point, any of the waterfall spin-offs might also be used.

Page 102
Figure 4.4 Rapid Prototyping Life Cycle

Rapid prototyping has interesting implications for system testing. Where are the requirements? Is the
last prototype the specification? How are system test cases traced back to the prototype? One good
answer to questions such as these is to use the prototyping cycle(s) as information gathering activities,
and then produce a requirements specification in a more traditional manner. Another possibility is to
capture what the customer does with the prototype(s), define these as scenarios that are important to
the customer, and then use these as system test cases. The main contribution of rapid prototyping is
that it brings the operational (or behavioral) viewpoint to the requirements specification phase.
Usually, requirements specification techniquescomephasize the structure of a system, not its behavior.
This is unfortunate, because most customers d n’t are about the structure, and they do care about the
behavior.

Executable specifications (Figure 4.allsyllabus5)reanextensionoftherapid prototyping concept. With this


approach, the requirements are specified in an executable format (such as finite state machines or
Petri nets). The customer then exec te the pecification to observe the intended system behavior, and
provides feedback as in the rapid prototyping model.

Figure 4.5 Executable Specification

One big difference is that the requirements specification document is explicit, as opposed to a
prototype. More important, it is often a mechanical process to derive system test cases from an
executable specification. Although more work is required to develop an executable specification, this
is partially offset by the reduced effort to generate system test cases. Another important distinction:
when system testing is based on an executable specification, we have a form of structural testing at the
system level.

4.2.3 An Object-Oriented Life Cycle Model

When software is developed with an object orientation, none of our life cycle models fit very well. The
main reasons: the object orientation is highly compositional in nature, and there is dense interaction
among the construction phases of object-oriented analysis, object-oriented design, and object-oriented
programming. We could show this with pronounced feedback loops among waterfall phases, but the
fountain model [Henderson-Sellers 90] is a much more appropriate

Page 103
metaphor. In the fountain model, (see Figure 12.6) the foundation is the requirements analysis of real
world systems.

4.3 Formulations of the SATM System

Figure 4.6 Fountain Model of Object-Oriented Software Development

As the object-oriented paradigm proceeds, details “bubble up” through specification, design, and
coding phases, but at each stage, some of the “flow” drops back to the previous phase(s). This model
captures the reality of the way people actually work (even with the traditional approaches).

In this and the next three chapters, we will relate our discussioncomtahigher level example, the

Simple Automatic Teller Machine (SATM) system. The version devel ped here is a revision of that

found in [Topper 93]; it is built arallsyllabusoundthefifteenscreenshown in Figure 4.7. This is a


greatly reduced system; commercial ATM systems have hundreds of screens and numerous time-outs.
The SATM terminal is sketched in Figure 12.8; in ddition to the display screen, there are function
buttons B1, B2, and B3, a digit keypad with a cance key, slots for printer receipts and ATM cards, and
doors for deposits and cash withdrawals. The SATM system is described here in two ways: with a
structured analysis approach, and with an object-oriented approach. These descriptions are not
complete, but they contain detai sufficient to illustrate the testing techniques under discussion.

4.3.1 SATM with Structured An lysis

The structured analysis approach to requirements specification is the most widely used method in the
world. It enjoys extensive CASE tool support as well as commercial training, and is described in
numerous texts. The technique is based on three complementary models: function, data, and control.
Here we use data flo diagrams for the functional models, entity/relationship models for data, and finite
state machine models for the control aspect of the SATM system. The functional and data models
were drawn with the Deft CASE tool from Sybase Inc. That tool identifies external devices (such as
the terminal doors) with lower case letters, and elements of the functional decomposition with
numbers (such as 1.5 for the Validate Card function). The open and filled arrowheads on flow arrows
signify whether the flow item is simple or compound. The portions of the SATM system shown here
pertain generally to the personal identification number (PIN) verification portion of the system.

Page 104
Figure 4.7 Screens for the SATM System

The Deft CASE tool distinguishes between simple and compound flows, where compound flows may
be decomposed into other flows, which may themselves be compound. The graphic appearance of this
choice is that simple flows have filled arrowheads, while compound flows have open arrowheads. As
an example, the compound flow “screen” has the following decomposition:

screen is comprised of
screen1 welcome

enter PIN
screen2
wrong PIN
allsyllabus PIN failed, card ret ined
screen3

screen4

screen5 select trans type

screen6 select account type

screen7 enter amount

screen8 insufficient funds

screen9 cannot dispense that amount

screen10 cannot process withdrawals

screen11 take your cash

screen12 cannot process deposits

screen13 put dep envelop in slot

screen14 another transaction?

screen15 Thanks; take card and receipt


Page 105
Figure 4.8 The SATM Terminal

Figure 4.9 Context Diagram of the SATM System

Figure 4.10 Level 1 Dataflow DiagallsyllabusrmoftheSATMSystem

Figure 4.11 is an (incomplete) Entit /Re tionship diagram of the major data structures in the SATM
system: Customers, Accounts, Terminals, and Transactions. Good data modeling practice dictates
postulating an entity for each portion of the system that is described by data that is retained (and used
by functional components). Among the data the system would need for each customer are the
customer’s identification and personal account number (PAN); these are encoded into the magnetic
strip on the customer’s ATM c rd. We would also want to know information about a customer’s
account(s), including the account numbers, the balances, the type of account (savings or checking),
and the Personal Identific tion Number (PIN) of the account. At this point, we might ask why the PIN

is not wwwassociatedith the customer, and the PAN with an account. Some design has crept into the
specification at this point: if the data were as questioned, a person’s ATM card could be used by
anyone; as it is, the present separation predisposes a security checking procedure. Part of the E/R
model describes relationships among the entities: a customer HAS account(s), a customer conducts
transaction(s) in a SESSION, and, independent of customer information, transaction(s) OCCUR at an
ATM terminal. The single and double arrowheads signify the singularity or plurality of these
relationships: one customer may have several accounts, and may conduct none or several transactions.
Many transactions may occur at a terminal, but one transaction never occurs at a multiplicity of
terminals.

Figure 4.11 Entity/Relationship Model of the SATM System

Page 106
The dataflow diagrams and the entity/relationship model contain information that is primarily
structural. This is problematic for testers, because test cases are concerned with behavior, not with
structure. As a supplement, the functional and data information are linked by a control model; here we
use a finite state machine. Control models represent the point at which structure and behavior
intersect; as such, they are of special utility to testers.

Figure 4.12 Upper Level SATM Finite State Machine


The upper level finite state machine in Figure 4.12 divides the system into states that correspond to

stages of customer usage. Other choices are possible, for instance, comweightchoose states to be
screens being displayed (this turns out to be a poor choice). Finite state machines can be hierarchically
decomposed in much the same way as dataflow diagra s. The decomposition of the
Await PIN state is shown in Figure 4.13. In both of these figures, state transitions are caused either by
events at the ATM terminal (suchallsyllabusasakeystroke)orbydataconditions (such as the recognition that
a PIN is correct). When a transition occurs, a corresponding action may also occur. We choose
to use screen displays as such actions; this choice will prove to be very handy when we develop
system level test cases.

The function, data, and control models are the basis for design activities in the waterfall model (and its
spin-offs). During design, some of the original decisions may be revised based on additional insights
and more detailed requirement (for example, performance or reliability goals). The end result is a
functional decomposition such as the partial one shown in the structure chart in Figure 4.14. Notice
that the original first level decomposition into four subsystems is continued: the functionality has
beendecomposed to lower levels of detail. Choices such as these are the essence of design, and design
is beyond the scope of this book. In practice, testers often have to live with the results of poor design
choices.

Figure 4.13 PIN Entry Finite State Machine

If we only use a structure chart to guide integration testing, we miss the fact that some (typically lower
level) functions are used in more than one place. Here, for example, the ScreenDriver function is used
by several other modules, but it only appears once in the functional decomposition. In the next
chapter, we will see that a “call graph” is a much better basis for integration test case identification.
We can develop the beginnings of such a call graph from a more detailed view of

Page 107
portions of the system. To support this, we need a numbered decomposition, and a more detailed view
of two of the components.

Here is the functional decomposition carried further in outline form: the numbering scheme preserves
the levels of the components in Figure 12.14.

Figure 4.14 A Decomposition Tree for the SATM System

1 SATM System

1.1 Device Sense & Control

1.1.1 Door Sense & Control

1.1.1.1 Get Door Status

1.1.1.2 Control Door

1.1.1.3 Dispense Cash

1.1.2 Slot Sense & Control

1.1.2.1 WatchCardSlot

1.1.2.2 Get Deposit Slot Status

1.1.2.3 Control Card Roller

1.1.2.3 Control Envelope Roller

1.1.2.5 Read Card Strip

1.2 Central Bank Comm.

1.2.1 Get PIN for PAN

1.2.2 Get Account Status

1.2.3 Post Daily Transactions

1.3 Terminal Sense & Control

1.3.1 Screen Driver

1.3.2 Key Sensor

Page 108
1.4 Manage Session

1.4.1 Validate Card

1.4.2 Validate PIN

1.4.2.1 GetPIN

1.4.3 Close Session

1.4.3.1 New Transaction Request

1.4.3.2 Print Receipt

1.4.3.3 Post Transaction Local

1.4.4 Manage Transaction


1.4.4.1 Get Transaction Type

allsyllabusec 1.4.4.2 Get Account Type

1.4.4.3 Report Balance

1.4.4.4 Process Deposit

1.4.4.5 Process Withdrawal

As part of the specification and design pro s, each functional component is normally expanded to
show its inputs, outputs, and mechanism. We do this here with pseudo-code (or PDL, for program
design language) for three modules. This particular PDL is loosely based on Pascal; the point of any
PDL is to communicate, not to develop something that can be compiled. The main program
description follows the finite state machine description given in Figure 4.12. States in that diagram are
“implemented” with a Case statement.

Main Program
State = AwaitCard
CASE State OF
AwaitCard: ScreenDriver(1, null)
WatchCardSlot(CardSlotStatus)
WHILE CardSlotStatus is Idle DO
WatchCardSlot(CardSlotStatus)
ControlCardRoller(accept)
ValidateCard(CardOK, PAN)
IF CardOK THEN State = AwaitPIN
ELSE ControlCardRoller(eject)

Page 109
State = AwaitCard
AwaitPIN: ValidatePIN(PINok, PAN)
IF PINok THEN ScreenDriver(2, null)
State = AwaitTrans
ELSE ScreenDriver(4, null)
State = AwaitCard
AwaitTrans: ManageTransaction
State = CloseSession
CloseSession: IF NewTransactionRequest
THEN State = AwaitTrans
ELSE PrintReceipt
PostTransactionLocal
CloseSession

End, (CASE State)


END. (Main program SATM)

ControlCardRoller(eject)
State = AwaitCard

The ValidatePIN procedure is based on another finite state machinecomshwninFigure 4.13, in which
states refer to the number of PIN entry attempts.
Procedure ValidatePIN(PINok, allsyllabusluPAN)

GetPINforPAN(PAN, ExpectedPIN)

Try = First
CASE Try OF
First: ScreenDriver(2, null)
GetPIN(EnteredPIN)
IF EnteredPIN = ExpectedPIN
THEN PINok = TRUE
RETURN
ELSE ScreenDriver(3, null)
Try = Second
Second: ScreenDriver(2, n )
GetPIN(EnteredPIN)
IF EnteredPIN = ExpectedPIN
THEN PINok = TRUE
RETURN
ELSE ScreenDriver(3, null)
Try = Third
Third: ScreenDriver(2, null)
GetPIN(EnteredPIN)
IF EnteredPIN = ExpectedPIN
THEN PINok = TRUE
RETURN
ELSE ScreenDriver(4, null)
PINok = FALSE
END, (CASE Try)
END. (Procedure ValidatePIN)
The GetPIN procedure is based on another finite state machine in which states refer to the number of
digits received, and in any state, either another digit key can be touched, or the cancel key can be

Page 110
touched. Rather than another CASE statement implementation, the “states” are collapsed into
iterations of a WHILE loop.

Procedure GetPIN(EnteredPIN, CancelHit)


Local Data: DigitKeys = {0, 1, 2, 3, 4, 5, 6, 7, 8, 9}
BEGIN
CancelHit = FALSE
EnteredPIN = null string
DigitsRcvd=0
WHILE NOT(DigitsRcvd=4 OR CancelHit) DO
BEGIN
KeySensor(KeyHit)
IF KeyHit IN DigitKeys
THEN BEGIN
EnteredPIN = EnteredPIN + KeyHit
INCREMENT(DigitsRcvd)
IF DigitsRcvd=1 THEN ScreenDriver(2, 'X-')
IF DigitsRcvd=2 THEN ScreenDriver(2, 'XX-')
IF DigitsRcvd=3 THEN ScreenDriver(2, 'XXX-')
IF DigitsRcvd=4 THEN ScreenDriver(2, 'XXXX')
END allsyllabus
END {WHILE}
END. (Procedure GetPIN)

If we follow the pseudocode in these three modu es, we can identify the “uses” relationship among the
modules in the functional decomposition.

Module U e Mod e

SATM Main W tchC rdSlot

Control Card Roller

Screen Driver

Validate Card

Validate PIN

Manage Transaction

New Transaction Request

ValidatePIN GetPINforPAN

GetPIN

Page 111
Screen Driver

GetPIN KeySensor

Screen Driver

Notice that the “uses” information is not readily apparent in the functional decomposition. This
information is developed (and extensively revised) during the more detailed phases of the design
process. We will revisit this in Chapter 13.

4.4 Separating Integration and System Testing


We are almost in a position to make a clear distinction between integration and system testing. We

need this distinction to avoid gaps and redundancies across levels of comtesting,to clarify appropriate
goals for these levels, and to understand how to identify test cases at different levels. This whole
discussion is facilitated by a concept essential to all levels of testing: the n tion of a “thread”. A
thread is a construct that refers to execution time behavior; when we test a system, we use test cases to
select (and execute) threads. Weallsyllabuscnspeakoflevelsofthread: system threads describe system
level behavior, integration threads correspond to integration level behavior, and unit threads
correspond to unit level behavior. M n thors use the term, b t few define it, and of those that do, the
offered definitions aren’t very helpful. For now, we take “thread” to be a primitive term, much like
function and data. In the next two chapters, we sh ll see that threads are most often recognized in
terms of the way systems are described and developed. For example, we might think of a thread as a
path through a finite state machine description of a system, or we might think of a thread as something
that is determined by a d t context and a sequence of port level input events, such as those in the
context diagram of the SATM system. We could also think of a thread as a sequence of source
statements, or as a sequence of machine instructions. The point is, threads are a generic concept, and
they exist independently of how a system is described and developed.

We have already observed the structural versus behavioral dichotomy; here we shall find that both of
these views help us separate integration and system testing. The structural view reflects both the
process by which a system is built and the techniques used to build it. We certainly expect that test
cases at various levels can be traced back to developmental information. While this is necessary, it
fails to be sufficient: we will finally make our desired separation in terms of behavioral constructs.

Figure 4.15 SATM Class Hierarchy

Page 112
4.4.1 Structural Insights

Everyone agrees that there must be some distinction, and that integration testing is at a more detailed
level than system testing. There is also general agreement that integration testing can safely assume
that the units have been separately tested, and that, taken by themselves, the units function correctly.
One common view, therefore, is that integration testing is concerned with the interfaces among the
units. One possibility is to fall back on the symmetries in the waterfall life cycle model, and say that
integration testing is concerned with preliminary design information, while system testing is at the
level of the requirements specification. This is a popular academic view, but it begs an important
question: how do we discriminate between specification and preliminary design? The pat academic
answer to this is the what vs. how dichotomy: the requirements specification defines what, and the
preliminary design describes how. While this sounds good at first, it doesn’t stand up well in practice.
Some scholars argue that just the choice of a requirements specification technique is a design choice

The life cycle approach is echoed by designers who often take a “comDn’tTread On Me” view of a

requirements specification: a requirements specification should neither predispose nor preclude a

design option. With this view, when information in a specification is so detailed that it “steps on the

designer’s toes”, the specification allsyllabusistoodetailed.Thissoundgood, but it still doesn’t yield


an operational way to separate integration and system testing.
The models used in the development proces provide some clues. If we follow the definition of the
SATM system, we could first postulate that system testing should make sure that all fifteen display
screens have been generated. (An output domain based, functional view of system testing.) The
entity/relationship model also helps: the one-to-one and one-to-many relationships help us understand
how much testing must e done. The control model (in this case, a hierarchy of finite state machines) is
the most helpful. We can postulate system test cases in terms of paths through the finite state
machine(s); doing this yields a system level analog of structural testing. The functional models
(dataflow diagrams and structure charts) move in the direction of levels because both express a
functional decomposition. Even with this, we cannot look at a structure chart and identify where
system testing ends and integration testing starts. The best we can do with structural information is
identify the extremes. For instance, the following threads are all clearly at the system level:

1. Insertion of an invalid card. (this is probably the “shortest” system thread)

2. Insertion of a valid card, followed by three failed PIN entry attempts.

3. Insertion of a valid card, a correct PIN entry attempt, followed by a balance inquiry.

4. Insertion of a valid card, a correct PIN entry attempt, followed by a deposit.

5. Insertion of a valid card, a correct PIN entry attempt, followed by a withdrawal.

6. Insertion of a valid card, a correct PIN entry attempt, followed by an attempt to withdraw more
cash than the account balance.

Page 113
We can also identify some integration level threads. Go back to the PDL descriptions of ValidatePIN
and GetPIN. ValidatePIN calls GetPIN, and GetPIN waits for KeySensor to report when a key is
touched. If a digit is touched, GetPIN echoes an “X” to the display screen, but if the cancel key is
touched, GetPIN terminates, and ValidatePIN considers another PIN entry attempt. We could push
still lower, and consider keystroke sequences such as two or three digits followed by cancel keystroke.

Integration Testing

4.4.2 Behavioral Insights

Here is a pragmatic, explicit distinction that has worked well in industrial applications. Think about a
system in terms of its port boundary, which is the location of system level inputs and outputs. Every
system has a port boundary; the port boundary of the SATM system includes the digit keypad, the
function buttons, the screen, the deposit and withdrawal doors, the card and receipt
slots, and so on. Each of these devices can be thought of as a “port”, and events occur at system ports.
The port input and output events are visible to the customer,comandthecustomer very often
understands system behavior in terms of sequences of port events. Given this, we mandate that system
port events are the “primitives” of a system test case, that is, a system test case (or
equivalently, a system thread) is expressed as an interleaved sequen e f port input and port output
events. This fits our understandingallsyllabusofatestcase,inwhichwe specify pre-conditions, inputs,
outputs, and post-conditions. With this mandate we can always recognize a level violation: if a test
case (thread) ever requires an input (or an output) that is not visible at the port boundary, the test case
cannot be a system level test case (thread). Notice that this is clear, recognizable, and enforceable. We
will refine this in Chapter 14 when we discuss threads of system behavior.

Craftspersons are recognized by two es ential characteristics: they have a deep knowledge of the tools
of their trade, and they have a similar knowledge of the medium in which they work, so that they
understand their tools in terms of how they “work” with the medium. In Parts II and III, we focused on
the tools (techniques) available to the testing craftsperson. Our goal there was to understand testing
techniques in terms of their advantages and limitations with respect to particular types of faults. Here e
shift our emphasis to the medium, with the goal that a better understanding of the medium will
improve the testing craftsperson’s judgment.

4.5 A Closer Look at the SATM System

we described the SATM system in terms of its output screens (Figure 4.7), the terminal itself (Figure
4.8), its context and partial dataflow (Figures 4.9 and 4.10), an entity/relationship model of its data
(Figure 4.11), finite state machines describing some of its behavior (Figures 4.12 and 4.13), and a
partial functional decomposition (Figure 4.14). We also developed a PDL description of the main
program and two units, ValidatePIN and GetPIN.

We begin here by expanding the functional decomposition that was started in Figure 4.12; the
numbering scheme preserves the levels of the components in that figure. For easier reference, each

Page 114
component that appears in our analysis is given a new (shorter) number; these numbers are given in
Table 1. (The only reason for this is to make the figures and spreadsheet more readable.) If you look
closely at the units that are designated by letters, you see that they are packaging levels in the
decomposition; they are never called as procedures. The decomposition in Table 1 is pictured as a
decomposition tree in Figure 13.1. This decomposition is the basis for the usual view of integration
testing. It is important to remember that such a decomposition is primarily a packaging partition of the
system. As software design moves into more detail, the added information lets us refine the functional
decomposition tree into a unit calling graph. The unit calling graph is the directed graph in which
nodes are program units and edges correspond to program calls; that is, if unit A calls unit B, there is a
directed edge from node A to node B. We began the development of the call graph for the SATM
system in Chapter 12 when we examined the calls made by the main program and the ValidatePIN and
GetPIN modules. That information is captured in the adjacency matrix given below in Table 2. This
matrix was created with a spreadsheet; this turns out to be a handy tool for testers.

Table 1 SATM Units and Abbreviated Names Unit Number

Level Number Unit Name


allsyllabus

1 1 SATM System

A 1.1 Device Sen e & Control

D 1.1.1 Door Sense & Control

2 1.1.1.1 Get Door St t

3 1.1.1.2 Control Door

4 1.1.1.3 Dispense Cash

E 1.1.2 Slot Sense & Control

5 1.1.2.1 WatchCardSlot

6 1.1.2.2 Get Deposit Slot Status

7 1.1.2.3 Control Card Roller

8 1.1.2.3 Control Envelope Roller

9 1.1.2.5 Read Card Strip

10 1.2 Central Bank Comm.

Page 115
11 1.2.1 Get PIN for PAN

12 1.2.2 Get Account Status

13 1.2.3 Post Daily Transactions

B 1.3 Terminal Sense & Control

14 1.3.1 Screen Driver

15 1.3.2 Key Sensor

C 1.4 Manage Session

16 1.4.1 Validate Card

17 1.4.2 Validate PIN

18 1.4.2.1 GetPIN
allsyllabus

F 1.4.3 Close Session

19 1.4.3.1 New Trans ction Request

20 1.4.3.2 Print Receipt

21 1.4.3.3 Po t Transaction Local

22 1.4.4 Man ge Transaction

23 1.4.4.1 Get Transaction Type

24 1.4.4.2 Get Account Type

25 1.4.4.3 Report Balance

26 1.4.4.4 Process Deposit

27 1.4.4.5 Process Withdrawal

The SATM call graph is shown in Figure 4.5.2 Some of the hierarchy is obscured to reduce the
confusion in the drawing. One thing should be quite obvious: drawings of call graphs do not scale up
well. Both the drawings and the adjacency matrix provide insights to the tester. Nodes with high
degree will be important to integration testing, and paths from the main program (node 1) to the sink
nodes can be used to identify contents of builds for an incremental development.

Page 116
4.5.2 Decomposition Based Integration

Most textbook discussions of integration testing only consider integration testing based on the
functional decomposition of the system being tested. These approaches are all based on the functional
decomposition, expressed either as a tree (Figure 4.5.1) or in textual form. These discussions
inevitably center on the order in which modules are to be integrated. There are four choices: from the
top of the tree downward (top down), from the bottom of the tree upward (bottom up), some
combination of these (sandwich), or most graphically, none of these (the big bang). All of these
integration orders presume that the units have been separately tested, thus the goal of decomposition
based integration is to test the interfaces among separately tested units.

Figure 4.5.1 SATM Functional Decomposition Tree

Table 2 Adjacency Matrix for the SATM Call Graph

Figure 4.5.2 SATM Call Graph

We can dispense with the big bang approach most easily: in this view of integration, all the units are
compiled together and tested at once. The drawback to this is that when (not if!) a failure is observed,
there are few clues to help isolate the location(s) of the fault. (Recall the distinction we made in
Chapter 1 between faults and failures.)

4.5.2 Top-Down Integration

Top-down integration begins with the main program (the root of the tree). Any lower level unit that is
called by the main program appears as a “stub”, where stubs are pieces of throw-away code that
emulate a called unit. If we performed top-down integration testing for the SATM system, the first
step would be to develop stubs for all the units called by the main program: WatchCardSlot, Control
Card Roller, Screen Driver, Validate Card, Validate PIN, Manage Transaction, and New

Page 117
Transaction Request. Generally, testers have to develop the stubs, and some imagination is required.
Here are two examples of stubs.

Procedure GetPINforPAN (PAN, ExpectedPIN) STUB


IF PAN = '1123' THEN PIN := '8876';
IF PAN = '1234' THEN PIN := '8765';
IF PAN = '8746' THEN PIN := '1253';
End,

Procedure KeySensor (KeyHit) STUB


data: KeyStrokes STACK OF ' 8 ' . ' 8 ' , ' 7 ' , ' cancel '
KeyHit = POP (KeyStrokes)
End,

In the stub for GetPINforPAN, the tester replicates a table look-up with just a few values that will

appear in test cases. In the stub for KeySensor, the tester must devis comeasequence of port events
that can occur once each time the KeySensor procedure is called. (Here, we pr vided the keystrokes to
partially enter the PIN ‘8876’, but the user hit the cancel button before the fourth digit.) In practice,
the effort to develop stubs is usually quite significant. There is good reason to consider stub code as

part of the software development, anallsyllabusdmaintinitunderconfiguration management.


Once all the stubs for SATM main h ve een provided, we test the main program as if it were a stand-
alone unit. We could apply any of the appropriate functional and structural techniques, and look for
faults. When we are convinced that the m in program logic is correct, we gradually replace stubs with
the actual code. Even this can be prob ematic. Would we replace all the stubs at once? If we did, we
would have a “small bang” for units with a high outdegree. If we replace one stub at a time, we retest
the main program once for e ch replaced stub. This means that, for the SATM main program example
here, we would repeat its integration test eight times (once for each replaced stub, and once with all
the stubs).

4.5.2 Bottom-up Inwwwtegration

Bottom-up integration is a “mirror image” to the top-down order, with the difference that stubs are
replaced by driver modules that emulate units at the next level up in the tree. In bottom-up integration,
we start ith the leaves of the decomposition tree (units like ControlDoor and DispenseCash), and test
them with specially coded drivers. There is probably less throw-away code in drivers than there is in
stubs. Recall we had one stub for each child node in the decomposition tree. Most systems have a
fairly high fan-out near at the leaves, so in the bottom-up integration order, we won’t have as many
drivers. This is partially offset by the fact that the driver modules will be more complicated.

4.5.3 Sandwich Integration

Sandwich integration is a combination of top-down and bottom-up integration. If we think about it in


terms of the decomposition tree, we are really just doing big bang integration on a sub-tree. There will
be less stub and driver development effort, but this will be offset to some extent by the added

Page 118
difficulty of fault isolation that is a consequence of big bang integration. (We could probably discuss
the size of a sandwich, from dainty finger sandwiches to Dagwood-style sandwiches, but not now.)

4.6 Call Graph Based Integration

One of the drawbacks of decomposition based integration is that the basis is the functional
decomposition tree. If we use the call graph instead, we mitigate this deficiency; we also move in the
direction of behavioral testing. We are in a position to enjoy the investment we made in the discussion
of graph theory. Since the call graph is a directed graph, why not use it the way we used program
graphs? This leads us to two new approaches to integration testing: we’ll refer to them as pair-wise
integration and neighborhood integration.

4.6.1 Pair-wise Integration


The idea behind pair-wise integration is to eliminate the stub/driver comdevelpent effort. Rather than
develop stubs and/or drivers, why not use the actual code? At first, this sounds like big bang
integration, but we restrict a session to just a pair of units in the call graph. The end result is that we
have one integration test session for e ch edge in the call graph (40 for the SATM call graph in Figure
4.2). This is not much of a reduction in sessions from either top-down or bottom-up (42
(informally) define the neighborhoodallsyllabusofanodeinagraphtobethe set of nodes that are one edge
away from the given node. In a directed graph, this means all the immediate predecessor nodes and
sessions), but it is a drastic reduction in t /driver development.

4.6.2 Neighborhood Integration

We can let the mathematics carry us still further b borrowing the notion of a “neighborhood” from
topology. (This isn’t too much of tretch — graph theory is a branch of topology.) We

all the immediate successor nodes (notice that these correspond to the set of stubs and drivers of the
node). The eleven neighborhoods for the SATM example (based on the call graph in Figure 4.2) are
given in Table 3.

Table 3 SATM Neighborhoods Node

Predecessors Successors

16 1 9, 10, 12

17 1 11, 14, 18

18 17 14, 15

19 1 14, 15

Page 119
which combine to

23 22 14, 15

24 22 14, 15

26 22 14, 15, 6, 8, 2, 3

27 22 14, 15, 2, 3, 4, 13

25 22 15

22 1 23, 24, 26, 27, 25

1 n/a 5, 7, 2, 21, 16, 17, 19, 22

neighborhood for each interior node, plus one extra in case there are leaf n des connected directly to
the root node. (An interior node has a non-zero indegree and a non-zero outdegree.) We have

We can always compute the number of neighborhoods for a givencomcallgraph. There will be one
Neighborhood = nodes -sink nodes

Interior nodes = allsyllabusnodes-(sourcenodes+sink nodes)


Neighborhoods = interior nodes + so rce nodes

Neighborhood integration yields a dr tic reduction in the number of integration test sessions (down to
11 from 40), and it avoids stub nd driver development. The end result is that neighborhoods are
essentially the sandwwwwichesthate slipped past in the previous section. (There is a slight difference,
because the base information for neighborhoods is the call graph, not the decomposition tree.) What
they share with sand ich integration is more significant: neighborhood integration testing has the fault
isolation difficulties of “medium bang” integration.

4.7 Path Based Integration

Much of the progress in the development of mathematics comes from an elegant pattern: have a clear
idea of where you want to go, and then define the concepts that take you there. We do this here for
path based integration testing, but first we need to motivate the definitions.

We already know that the combination of structural and functional testing is highly desirable at the
unit level; it would be nice to have a similar capability for integration (and system) testing. We also
know that we want to express system testing in terms of behavioral threads. Lastly, we revise our goal
for integration testing: rather than test interfaces among separately developed and tested units, we
focus on interactions among these units. (“Co-functioning” might be a good term.) Interfaces are
structural; interaction is behavioral.
Page 120
When a unit executes, some path of source statements is traversed. Suppose that there is a call to
another unit along such a path: at that point, control is passed from the calling unit to the called unit,
where some other path of source statements is traversed. We cleverly ignored this situation in Part III,
because this is a better place to address the question. There are two possibilities: abandon the single-
entry, single exit precept and treat such calls as an exit followed by an entry, or “suppress” the call
statement because control eventually returns to the calling unit anyway. The suppression choice works
well for unit testing, but it is antithetical to integration testing.

We can finally make the definitions for path based integration testing. Our goal is to have an
integration testing analog of DD-Paths.

Definition

An MM-Path is an interleaved sequence of module execution paths and messages.

The basic idea of an MM-Path is that we can now describe sequecomnesfodule execution paths
that include transfers of control among separate units. Since these transfers are by messages, MM-
Paths always represent feasible execution paths, and these paths ross unit boundaries. We can find
MM-Paths in an extended program g allsyllabusraphinwhichnodesaremodule execution paths and edges
are messages. The hypothetical example in Figure 4.7.3 shows an MM-Path (the dark line) in which
module A calls module B, which in turn calls module C.

Figure 4.7..3 MM-Path Across Three Unit

In module A, nodes 1 and 5 are source nodes, and nodes 4 and 6 are sink nodes. Similarly in module
B, nodes 1 and 3 are source nodes, and nodes 2 and 4 are sink nodes. Module C has a single source
node, 1, and a single sink node, 4. There are seven module execution paths in Figure 4.7.3:

MEP(A,1) = <1, 2, 3,5>

MEP(A,2) = <1, 2, 4>

MEP(A,3) = <5, 6>

MEP(B,1) = <1, 2>

MEP(B,1) = <3, 4>

MEP(C,1) = <1, 2, 4, 5>

MEP(C,2) = <1, 3, 4, 5>

Page 121
We can now define an integration testing analog of the DD-Path graph that serves unit testing so
effectively.

Definition

Given a set of units, their MM-Path graph is the directed graph in which nodes are module execution
paths and edges correspond to messages and returns from one unit to another.

Notice that MM-Path graphs are defined with respect to a set of units. This directly supports
composition of units and composition based integration testing. We can even compose down to the
level of individual module execution paths, but that is probably more detailed than necessary.

Figure 4.7.4 MM-Path Graph Derived from Figure 4.7.4


Figure 4.7.4 shows the MM-Path graph for the example in Figure 4 7.3. The solid arrows indicate

messages; the corresponding returallsyllabusnsareindicatedbydottedarrows. We should consider the


relationships among module execution paths, program path, DD-Paths, and MM-Paths. A program
path is a sequence of DD-Paths, and an MM-Path is a sequence of module execution paths.
Unfortunately, there is no simple relationship between DD-Paths and module execution paths. Either
might be contained in the other, but more ikely, they partially overlap. Since MM-Paths implement a
function that transcends unit boundaries, we do have one relationship: consider the “intersection” of an
MM-Path with a unit. The module execution paths in such an intersection are an analog of a slice with
respect to the (MM-P th) function. Stated another way, the module execution paths in such an
intersection re the restriction of the function to the unit in which they occur.

The MM-Path definition needs some practical guidelines. How long is an MM-Path? Nothing in the
definition prohibits an MM-Path to cover an entire ATM session. (This extreme loses the forest
because of the trees.) There are three observable behavioral criteria that put endpoints on MM-Paths.
The first is “event quiescence”, which occurs when a system is (nearly) idle, waiting for a port input
event to trigger further processing. The SATM system exhibits event quiescence in several places: one
is the tight loop at the beginning of SATM Main where the system has displayed the welcome screen
and is waiting for a card to be entered into the card slot. Event quiescence is a system level property;
there is an analog at the integration level: message quiescence. Message quiescence occurs when a unit
that sends no messages is reached (like module C in Figure 13.3).

There is a still subtler form: data quiescence. This occurs when a sequence of processing culminates in
the creation of stored data that is not immediately used. In the ValidateCard unit, the account balance
is obtained, but it is not used until after a successful PIN entry. Figure 13.5 shows how data
quiescence appears in a traditional dataflow diagram.

Page 122
The first guideline for MM-Paths: points of quiescence are “natural” endpoints for an MM-Path. Our
second guideline also serves to distinguish integration from system testing.

Definition

An atomic system function (ASF) is an action that is observable at the system level in terms of port
input and output events.

An atomic system function begins with a port input event, traverses one or more MM-Paths, and
terminates with a port output event. When viewed from the system level, there is no compelling reason
to decompose an ASF into lower levels of detail (hence the atomicity). In the SATM system, digit
entry is a good example of an ASF, so are card entry, cash dispensing, and session closing. PIN entry
is probably too big, it might be called a molecular system function.

Figure 4.7.5 Data Quiescence allsyllabus

Our second guideline: atomic system functions are an upper limit for MM-Paths: we don’t want MM-
Paths to cross ASF boundaries. This means th t ASFs represent the seam between integration and
system testing. They are the largest item to be tested by integration testing, and the smallest item for
system testing. We can test an ASF at both levels. Again, the digit entry ASF is a good example.
During system testing, the port input event is a physical key press that is detected by KeySensor and
sent to GetPIN as a tring variable. (Notice that KeySensor performs the physical to logical transition.)
GetPIN determines whether a digit key or the cancel key was pressed, and responds accordingly.
(Notice that button presses are ignored.) The ASF terminates with either screen 2 or 4 being displayed.
Rather than require system keystrokes and visible screen displays, we could use a driver to provide
these, and test the digit entry ASF via integration testing. We can see this using our continuing
example.

4.7.2 MM-Paths and ASFS in the SATM System

The PDL descriptions developed in Chapter 12 are repeated for convenient reference; statement
fragments are numbered as we did to construct program graphs.

1. Main Program
2. State = AwaitCard
3. CASE State OF
4. AwaitCard: ScreenDriver (1, null)
5. WatchCardSlot (CardSlotStatus)
6. WHILE CardSlotStatus is Idle DO
7. WatchCardSlot (CardSlotStatus)
8. ControlCardRoller (accept)

Page 123
9. ValidateCard (CardOK, PAN)
10. IF CardOK THEN State = AwaitPIN
11. ELSE ControlCardRoller (eject)
12. State = AwaitCard
13. AwaitPIN: ValidatePIN (PINok, PAN)
14. IF PINok THEN ScreenDriver (5, null)
15. State = AwaitTrans
16. ELSE ScreenDriver (4, null)
17. State = AwaitCard
18. AwaitTrans:ManageTransaction
19. State = CloseSession
20. CloseSession:IF NewTransactionRequest
21. THEN State = AwaitTrans
22. ELSE PrintReceipt
23. PostTransactionLocal
24. CloseSession
25. ControlCardRoller (eject)
26. State = AwaitCard
27. End, (CASE State)
28. END. (Main program SATM)

29. Procedure ValidatePIN (PINok, PAN)


allsyllabus

30. GetPINforPAN (PAN, ExpectedPIN)


31. Try = First
32. CASE Try OF
33. First: ScreenDriver ( 2, nul )
34. GetPIN (EnteredPIN)
35. IF EnteredPIN = ExpectedPIN
36. THEN PINok = TRUE
37. RETURN
38. ELSE ScreenDriver ( 3, n )
39. Try = Second
40. Second: ScreenDriver ( 2, nu )
41. GetPIN (EnteredPIN)
42. IF EnteredPIN ExpectedPIN
43. THEN PINok = TRUE
44. RETURN
45. ELSE ScreenDriver ( 3, null )
46. Try = Third
47. Third: ScreenDriver (2, null )
48. GetPIN (EnteredPIN)
49. IF EnteredPIN = ExpectedPIN
50. THEN PINok = TRUE
51. RETURN
52. ELSE ScreenDriver ( 4, null )
53. PINok = FALSE
54. END, (CASE Try)
55. END.(Procedure ValidatePIN)
56. Procedure GetPIN (EnteredPIN, CancelHit)
57. Local Data: DigitKeys = { 0, 1, 2, 3, 4, 5, 6, 7, 8, 9 }
58. BEGIN
59. CancelHit FALSE
60. EnteredPIN = null string
61. DigitsRcvd=0

Page 124
62. WHILE NOT (DigitsRcvd=4 OR CancelHit) DO
63. BEGIN
64. KeySensor (KeyHit)
65. IF KeyHit IN DigitKeys
66. THEN BEGIN
67. EnteredPIN = EnteredPIN + KeyHit
68. INCREMENT (DigitsRcvd)
69. IF DigitsRcvd=1 THEN ScreenDriver (2, ' X- ' )
70. IF DigitsRcvd=2 THEN ScreenDriver (2, ' XX- ' )
71. IF DigitsRcvd=3 THEN ScreenDriver (2, ' XXX- ' )
72. IF DigitsRcvd=4 THEN ScreenDriver (2, ' XXXX ' )
73. END
74. END {WHILE}
75. END. (Procedure GetPIN)

There are 20 source nodes in SATM Main: 1, 5, 6, 8, 9, 10, 12, 14, 15, 17, 18, 19, 20, 21, 22, 23, 24,
25, 26, 27. ValidatePIN has 11 source nodes: 29, 31, 34, 35, 39, 41, 46, 47, 48, 53; and in GetPIN
there are 6 source nodes: 56, 65, 70, 71, 72, 73.

SATM Main contains 16 sink nodes: 4, 5, 7, 8, 9, 11, 13, 14, 16, 18, 20, 22, 23, 24, 25, 28. There
are 14 sink nodes in ValidatePIN : 30, 33, 34, 37, 38, 40, 41, 44, 47, 48, 51, 52, 55; and 5 sink nodes

in GetPIN: 64, 69, 70, 71, 72.allsyllabus


Most of the module execution paths in SATM M in are very short; this pattern is due to the high
density of messages to other units. Here are the first two module execution paths in SATM Main: <1,
2, 3, 4>, <5> and <6, 7>, <8> . The modu e execution paths in ValidatePIN are slightly longer: <29,
30>, <31, 32, 33>, <34>, <35, 36, 37>, and so on. The beginning portion of GetPIN is a good example
of a module execution path: the eq ence < 58, 59, 60, 61, 62, 63, 64> begins with a source node (58)
and ends with a sink node (64) which is a call to the KeyHit procedure. This is also a point of “event
quiescence”, where nothing will happen until the customer touches a key.

There are four MM-Paths in statements 64 through 72: each begins with KeySensor observing a port
input event (a keystroke) and ends with a closely knit family of port output events (the calls to
ScreenDriver with different PIN echoes). We could name these four MM-Paths GetDigit1, GetDigit2,
GetDigit3, and GetDigit4. They are slightly different because the later ones include the earlier IF
statements. (If the tester was the designer, this module might be reworked so that the WHILE loop
repeated a single MM-Path.) Technically, each of these is also an atomic system function since they
begin and end with port events.

There are interesting ASFs in ValidatePIN. This unit controls all screen displays relevant to the PIN
entry process. It begins with the display of screen 2 (which asks the customer to enter his/her PIN).
Next, GetPIN is called, and the system is event quiescent until a keystroke occurs. These keystrokes
initiate the GetDigit ASFs we just discussed. Here we find a curious integration fault. Notice that
screen 2 is displayed in two places: by the THEN clauses in the WHILE loop in GetPIN and by the
first statements in each CASE clause in ValidatePIN. We could fix this by removing the screen
displays from GetPIN and simply returning the string (e.g., ‘X—’) to be displayed.

Page 125
UNIT 5

5.1 Threads

SYSTEM TESTING, INTERACTION TESTING


Of the three levels of testing, the system level is closest to everyday experience. We test many things:
a used car before we buy it, an on-line network service before we subscribe, and so on. A common
pattern in these familiar forms is that we evaluate a product in terms of our expectations; not with
respect to a specification or a standard. Consequently, the goal is not to find faults, but to demonstrate
performance. Because of this, we tend to approach system testing from a functional standpoint rather
than from a structural one. Since it is so intuitively familiar, system testing in practice tends to be less
formal than it might be, and this is compounded by the reduced testing interval that usually remains
before a delivery deadline. We begin with further elaboration on the thread concept, highlighting some
of the practical problems of thread-based system testing. Since system testing is closely coupled with
requirements specification, we will discuss how to find threads in common notations. All of this leads
to an orderly thread-based system testing strategy that exploits the symbiosis between functional and
structural testing; we will apply the strategy to our SATM system.

Threads are hard to define, in fact allsyllabusomeplisheddefinitionsare counter-productive, misleading,

and/or wrong. It’s possible to simply treat threads as a primitive concept which needs no formal
definition. For now we will use examples to deve op “shared vision”. Here are several views of a
thread:

• a scenario of normal usage


• a system level test case

• a stimulus/response pair

• behavior that results from a sequence of system level inputs

• an interleaved sequence of port input and output events

• a sequence of transitions in a state machine description of the system

• an interleaved sequence of object messages and method executions

• a sequence of machine instructions

• a sequence of source instructions

• a sequence of atomic system functions

Threads have distinct levels. A unit level thread is usefully understood as an execution-time path of
source instructions, or alternatively as a path of DD-Paths. An integration level thread is a sequence of
MM-Paths that implements an atomic system function. We might also speak of an integration

Page 126
level thread as an alternating sequence of module executions and messages. If we continue this
pattern, a system level thread is a sequence of atomic system functions. Because atomic system
functions have port events as their inputs and outputs, the sequence of atomic system functions implies
an interleaved sequence of port input and output events. The end result is that threads provide a
unifying view of our three levels of testing. Unit testing tests individual functions, integration testing
examines interactions among units, and system testing examines interactions among atomic system
functions. In this chapter, we focus on system level threads and we answer some fundamental
questions: How big is a thread? Where do we find them? How do we test them?

5.1.1 Thread Possibilities

Defining the endpoints of a system level thread is a little awkward. We motivate a tidy, graph theory
based definition by working backwards from where we want to go with threads. Here are three
candidate threads:

single MM-Path. It begins with a port inp t event (the digit keystroke) and ends with a port output event (the

screen digit echo), so it qua ifies as a stimulus/response pair. This level of granularity is too fine for the

purposes of system testing. We saw this to be an appropriate level for integration

• Entry of a digit

• Entry of a Personal Identification Number (PIN)

• A simple transaction: ATM Card Entry, PIN entry, select trancomitcas n type (deposit, withdraw),
present account details (checking or savings, amo nt), conduct the operation, and report the
results.

• An ATM session, containing two or more simp e tr nsactions.

Digit entry is a good example of minimal atomic system function that is implemented with a
testing. allsyllabus
The second candidate, PIN Entry, is a good example of an upper limit to integration testing, and at the
same time, a starting point of system testing. PIN Entry is a good example of an atomic system
function. It is also a good example of a family of stimulus/response pairs (system level behavior that is
initiated by a port input event, traverses some programmed logic, and terminates in one of several
possible responses [port output events]). As we saw in Chapter 13, PIN Entry entails a sequence of
system level inputs and outputs:

1. A screen requesting PIN digits

2. An interleaved sequence of digit keystrokes and screen responses

3. The possibility of cancellation by the customer before the full PIN is entered

4. A system disposition: (A customer has three chances to enter the correct PIN. Once a correct PIN
has been entered, the user sees a screen requesting the transaction type; otherwise a screen

Page 127
advises the customer that the ATM card will not be returned, and no access to ATM functions is
provided.)

5.1.2 Thread Definitions

Definition

A unit thread is a path in the program graph of a unit.

There are two levels of threads used in integration testing: MM-Paths and atomic system functions.
The definitions from Chapter 13 are repeated here so the coherence across the levels is more evident.
Recall that MM-Paths are defined as paths in the directed graph in which module execution paths are
nodes, and edges show execution time sequence.

Definition

An MM-Path is a path in the MM-Path graph of a set of units.

Definition

Given a system defined in terms of tomic system functions, the ASF Graph of the system is the
directed graph in which nodes are atomic tem functions and edges represent sequential flow.
Definition

A source ASF is an atomic systemallsyllabusfunctionthatappearsasasource node in the ASF graph of

a system; similarly, a sink ASF is an tomic tem function that appears as a sink node in the ASF

graph.

In the SATM system, the Card Entry ASF is a source ASF, and the session termination ASF is a
sink ASF. Notice that intermediary ASFs could never be tested at the system level by themselves —
they need the predecessor ASFs to “get there”.

Definition

A system thread is a path from a source ASF to a sink ASF in the ASF graph of a system.

Definition

Given a system defined in terms of system threads, the Thread Graph of the system is the directed
graph in which nodes are system threads and edges represent sequential execution of individual
threads.

This set of definitions provides a coherent set of increasingly broader views of threads, starting with
threads within a unit and ending with interactions among system level threads. We can use these views
as the ocular on a microscope, switching views to get to different levels of granularity.

Page 128
Having these concepts is only part of the problem, supporting them is another. We next take a tester’s
view of requirements specification to see how to identify threads.

5.2 Basis Concepts for Requirements Specification

Recall the notion of a basis of a vector space: a set of independent elements from which all the
elements in the space can be generated. Rather than anticipate all the variations in scores of
requirements specification methods, notations, and techniques, we will discuss system testing with
respect to a basis set of requirements specification constructs: data, actions, ports, events, and threads.
Every system can be expressed in terms of these five fundamental concepts (and every requirements
specification technique is some combination of these). We examine these fundamental concepts here
to see how they support the tester’s process of thread identification.
5.2.1 Data
the system. We describe data in terms of variables, data structures,comfields,records, data stores, and files. Entity/relationship models are the
most common choice at the highest level, and some form of a regular expression (e.g., Jackson diagrams or data structure diagrams) is used
at a more detailed
When a system is described in terms of its data, the focus is on the inf r ati n used and created by

portion of the SATM system in this allsyllabuswy,butitwouldn’tworkwell for the user interface portion. Sometimes
threads can be identified directly from the data model. Relationships between data
level. The data-centered view is also the starting point for everal flavors of object-oriented
analysis. Data refers to information that is either initialized, stored, updated, or (possibly) destroyed.
In the SATM system, initial data describe the various accounts (PANs) and their PINs, and each
account has a data structure with information such s the account balance. As ATM transactions
occur, the results are kept as created data and used in the daily posting of terminal data to the central
bank. For many systems, the data centered view dominates. These systems are often developed in
terms of CRUD actions (Create, Retrieve, Update, Delete). We could describe the transaction

entities can be one-to-one, one-to-many, many-to-one, or many-to-many; these distinctions all have
implications for threads that process the data. For example, if bank customers can have several
accounts, each account ill need a unique PIN. If several people can access the same account, they
will need ATM cards ith identical PANs. We can also find initial data (such as PAN,
www
ExpectedPIN pairs) that are read but never written. Such read-only data must be part of the system
initialization process. If not, there must be threads that create such data. Read-only data is therefore an
indicator of source ASFs.

5.2.2 Actions

Action-centered modeling is by far the most common requirements specification form. This is a
historical outgrowth of the action-centered nature of imperative programming languages. Actions have
inputs and outputs, and these can be either data or port events. Here are some methodology-specific
synonyms for actions: transform, data transform, control transform, process, activity, task, method,
and service. Actions can also be decomposed into lower level actions, as we saw with the dataflow
diagrams in Chapter 12. The input/output view of actions is exactly the basis of functional
Page 129
testing, and the decomposition (and eventual implementation) of actions is the basis of structural
testing.

5.2.4 Events

5.2.3 Ports

Every system has ports (and port devices); these are the sources and destinations of system level
inputs and outputs (port events). The slight distinction between ports and port devices is sometimes
helpful to testers. Technically, a port is the point at which an I/O device is attached to a system, as in
serial and parallel ports, network ports, and telephone ports. Physical actions (keystrokes and light
emissions from a screen) occur on port devices, and these are translated from physical to logical (or
logical to physical). In the absence of actual port devices, much of system testing can be accomplished
by “moving the port boundary inward” to the logical instances of port events. From now on, we will
just use the term “port” to refer to port devices. The ports in the SATM system
include the digit and cancel keys, the function keys, the display screen, the deposit and withdrawal
doors, the card and receipt slots, and several less obvious devices,comsuhasthe rollers that move
cards and deposit envelopes into the machine, the cash dispenser, the re eipt printer, and so on.
Thinking about the ports helps the tester define both the input space that functional system testing
needs; and similarly, the output devices provide output-based fun tional test information. (For

example, we would like to have enoallsyllabusughthreadstogenerateall15SATM screens.)

Events are somewhat schizophrenic: the have some ch racteristics of data and some of actions. An
event is a system level input (or output) that occurs at a port. Like data, events can be inputs to or
outputs of actions. Events can be discrete (such as SATM keystrokes) or they can be continuous
(such as temperature, altitude, or pre re). Discrete events necessarily have a time duration, and
this can be a critical factor in real-time systems. We might picture input events as destructive read-out
data, but it’s a stretch to imagine output events as destructive write operations.

Events are like actions in the sense that they are the translation point between real-world physical
events and internal logical manifestations of these. Port input events are physical-to-logical
translations, and symmetrically, port output events are logical-to-physical translations. System
testers should focus on the physical side of events, not the logical side (the focus of integration
testers). There are situationswwwereh the context of present data values changes the logical meaning
of physical events. In the SATM system, for example, the port input event of depressing button B1
means “Balance” when screen 5 is being displayed, “checking” when screen 6 is being displayed, and
“yes” when screens 10, 11, and 14 are being displayed. We refer to such situations as “context
sensitive port events”, and we would expect to test such events in each context.

5.2.5 Threads

Unfortunately for testers, threads are the least frequently used of the five fundamental constructs.
Since we test threads, it usually falls to the tester to find them in the interactions among the data,
events, and actions. About the only place that threads appear per se in a requirements specification is
when rapid prototyping is used in conjunction with a scenario recorder. It’s easy to find threads in

Page 130
control models, as we will soon see. The problem with this is that control models are just that — they
are models, not the reality of a system.

5.2.6 Relationships Among Basis Concepts

Figure 5.1 is an entity/relationship model of our basis concepts. Notice that all relationships are many-
to-many: Data and Events are generalized into an entity; the two relationships to the Action entity are
for inputs and outputs. The same event can occur on several ports, and typically many events occur on
a single port. Finally, an action can occur in several threads, and a thread is composed of several
actions. This diagram demonstrates some of the difficulty of system testing. Testers must use events
and threads to ensure that all the many-to-many relationships among the five basis concepts are
correct.

Figure 5.1 E/R Model of Basis Concepts

5.2.7 Modeling with the Basis Conallsyllabuscepts

All flavors of requirements specific tion develop models of a system in terms of the basis concepts.
Figure 5.2 shows three fundamental forms of requirements specification models: structural, contextual,
and behavioral. Structural models are used for development; these express the functional
decomposition and data decomposition, and the interfaces among components. Contextual models are
often the starting point of struct r modeling. They emphasize system ports and, to a lesser extent,
actions, and threads very indirect y. The models of behavior (also called control models) are where
four of the five basis constructs come together. Selection of an appropriate control model is the
essence of requirements specification: models that are too weak cannot express important system
behaviors, while models that are too powerful typically obscure interesting behaviors. As a general
rule, decision tables are a good choice only for computational systems, finite state machines are good
for menu-driven systems, and Petri nets are the model of choice for concurrent systems. Here we use
finite state machines for the SATM system, and in Chapter 16, we will use Petri nets to analyze thread
interaction.

Figure 5.2 Modeling Relationships Among Basis Constructs

We must make an important distinction between a system itself (reality) and models of a system.
Consider a system in which some function F cannot occur until two prerequisite events E1 and E2
have occurred, and that they can occur in either order. We could use the notion of event partitioning to
model this situation. The result would be a diagram like that in Figure 5.3.

Page 131
5.3 Finding Threads

Figure 5.3 Event Partitioning View of Function F

In the event partitioning view, events E1 and E2 occur from their respective external entities. When
they occur, they are held in their respective event stores. (An event store acts like a destructive read
operation.) When both events have occurred, function F gets its prerequisite information from the
event stores. Notice we cannot tell from the model which event occurs first; we only know that both
must occur. We could also model the system as a finite state machine (Figure 5.4), in which states
record which event has occurred. The state machine view explicitly shows the two orders of the
events.

Figure 5.4 FSM for Function F allsyllabus


Both of these models express the same prerequisites for the function F, and neither is the reality of the
system. Of these two models, the state machine is more useful to the tester, because paths are instantly
convertible to threads.

The finite state machine models of the SATM system are the best place to look for system testing
threads. We’ll start with a hierarch of state machines; the upper level is shown in Figure 5.5. At this
level, states correspond to stages of processing, and transitions are caused by logical (rather than port)
events. The Card Entry “state” for example, would be decomposed into lower levels that deal with
details like jammed cards, cards that are upside-down, stuck card rollers, and checking the card against
the list of cards for which service is offered. Once the details of a macro-state are tested, we use an
easy thread to get to the next macro-state.

Figure 5.5 Top Level SATM State Machine

Page 132
The PIN Entry state is decomposed into the more detailed view in Figure 5.6. The adjacent states are
shown because they are sources and destinations of transitions from the PIN Entry portion. At this
level, we focus on the PIN retry mechanism; all of the output events are true port events, but the input
events are still logical events. The states and edges are numbered for reference later when we discuss
test coverage. To start the thread identification process, we first list the port events shown on the state
transitions; they appear in Table 1. We skipped the eject card event because it isn’t really part of the
PIN Entry component.

Table 1 Events in the PIN Entry Finite State Machine Port Input Events

Port Output Events

Legitimate Card Display screen 1

Wrong Card Display screen 2

Correct PIN Display screen 3


allsyllabus

Incorrect PIN Display screen 4

Canceled Display screen 5

Notice that Correct PIN and Incorrect PIN are rea y compound port input events. We can’t actually
enter an entire PIN, we enter digits, and at an point, we might hit the cancel key. These more detailed
possibilities are shown in Figure 5.7. A truly paranoid tester might decompose the digit port input
event into the actual choice (0-pressed, 1-pressed, …,9-pressed), but this should have been tested at a
lower level. The port events in the PIN Try finite state machine are in Table 2.

Figure 5.6 PIN Entry Finite State Machine

The “x” in the state names in the PIN Try machine refers to which try (first, second, or third) is
passing through the machine.

Table 2 Port Events in the PIN Try Finite State Machine Port Input Events

Port Output Events


digit echo ‘X---’

Page 133
cancel echo ‘XX--’

echo ‘XXX-’

echo ‘XXXX’

In addition to the true port events in the PIN Try finite state machine, there are three logical output
events (Correct PIN, Incorrect PIN, and Canceled); these correspond exactly to the higher level events
in Figure 5.6. The hierarchy of finite state machines multiplies the number of threads. There are 156
distinct paths form the First PIN Try state to the Await Transaction Choice or Card Entry states in
Figure 5.6. Of these, 31 correspond to eventually correct PIN entries (1 on the first try, 5 on the
second try, and 25 on the third try); the other 125 paths correspond to those with incorrect digits or
with cancel keystrokes. This is a fairly typical ratio. The input portion of systems,
com
especially interactive systems, usually has a large number of threads t deal with input errors and
exceptions. It is “good form” to reach a state machine in which transiti ns are caused by actual port
input events, and the actions on transitions are port output events. If we have such a finite state
machine, generating system test cases for these threads is a mechani al process — just follow a path
of transitions, and note the port inpallsyllabusutandoutputsastheyoccur along the path. This interleaved
sequence is performed by the test executor (person or program). Tables 3 and 4 follow two paths
through the hierarchic state machine .

Figure 5.7 PIN TrywwwFiniteStateMachine

Table 3 corresponds to a thread in which a PIN is correctly entered on the first try. Table 4
corresponds to a thread in hich a PIN is incorrectly entered on the first try, cancels after the third digit
on the second try, and gets it right on the third try. To make the test case explicit, we assume a pre-
condition that the expected PIN is ‘1234’.

Table 3 Port Event Sequence for Correct PIN on First Try Port Input Event

Port Output Event

Screen 2 displayed with ‘----’


1 pressed

Page 134
Screen 2 displayed with ‘X---’
2 pressed

Screen 2 displayed with ‘XX--’


3 pressed

Screen 2 displayed with ‘XXX-’

4 pressed

Screen 2 displayed with ‘XXXX’

(Correct PIN) Screen 5 displayed com

The event in parentheses in the last row of Table 3 is the logical event that “bumps up” to the parent
state machine and causes a transition there to the Await Transaction Choi e state.

Table 4 Port Event Sequence for Correct PIN on Third Try Port Inp t Event

Port Output Event

Screen 2 displayed with ‘---’


1 pressed

Screen 2 displa ed with ‘X---’


allsyllabus
2 pressed

Screen 2 displayed with ‘XX--’

3 pressed

Screen 2 displayed with ‘XXX-’

5 pressed

Screen 2 displayed with ‘XXXX’

(Incorrect PIN) Screen 3 displayed

(second try) Screen 2 displayed with ‘----’

Page 135
1 pressed

Screen 2 displayed with ‘X---’


2 pressed

Screen 2 displayed with ‘XX--’


3 pressed

Screen 2 displayed with ‘XXX-’

cancel key pressed


(end of second try)
Screen 3 displayed

Screen 2 displayed with ‘----’


1 pressed
allsyllabusScreen2displayedwith‘X---’

2 pressed Screen 2 displayed with ‘XX--’

Screen 2 displa ed with ‘XXX-’


3 pressed

4 pressed
Screen 2 displayed with ‘XXXX’
Screen 5 displayed

(Correct PIN)
If you look closely at Tables 3 and 4, you will see that the bottom third of Table 4 is exactly Table 3;
thus a thread can be a subset of another thread.

5.4 Structural Strategies for Thread Testing

While generating thread test cases is easy, deciding which ones to actually use is more complex. (If
you have an automatic test executor, this is not a problem.) We have the same path explosion problem
at the system level that we had at the unit level. Just as we did there, we can use the directed graph
insights to make an intelligent choice of threads to test.

Page 136
5.4.1 Bottom-up Threads

When we organize state machines in a hierarchy, we can work from the bottom up. There are six paths
in the PIN Try state machine. If we traverse these six, we test for three things: correct recognition and
echo of entered digits, response to the cancel keystroke, and matching expected and entered PINs.
These paths are described in Table 5 as sequences of the transitions in Figure 14.7. A thread that
traverses the path is described in terms of its input keystrokes, thus the input sequence 1234
corresponds to the thread described in more detail in Table 3 (the cancel keystroke is indicated with a
‘C’). Once this portion is tested, we can go up a level to the PIN Entry machine, where there are four
paths. These four are concerned with the three try mechanism and the sequence of screens presented to
the user. In Table 6, the paths in the PIN Entry state machine (Figure 5.6) are named as transition
sequences.

Table 5 Thread Paths in the PIN Try FSM Input Event Sequence

Path of Transitions

1234 x1, x2, x3, x4, x5

1235 x1, x2, x3, x4, x6

C x7, x11

1C x1, x8, x11

12C x1, x2, x9, x11

123C x1, x2, x3, x10, x11

Table 6 Thread Paths in the PIN Entry FSM Input Event Sequence

Path of Transitions

1234 1

12351234 2, 3

1235C1234 2,4,5

CCC 2, 4, 6

These threads were identified with the goal of path traversal in mind. Recall from our discussion of
structural testing that these goals can be misleading. The assumption is that path traversal uncovers
faults, and traversing a variety of paths reduces redundancy. The last path in Table 6 illustrates how
structural goals can be counter-productive. Hitting the cancel key three times does indeed cause the

Page 137
three try mechanism to fail, and returns the system to the Card Entry state, but it seems like a
degenerate thread. There is a more serious flaw with these threads: we could not really execute them
“by themselves”, because of the hierarchic state machines. What really happens with the ‘1235’ input
sequence in Table 5? It traverses an interesting path in the PIN Try machine, and then it “returns” to
the PIN Entry machine where it is seen as a logical event (incorrect PIN), which causes a transition to
state 2.2 (Second PIN Try). If no additional keystrokes occur, this machine would remain in state 2.2.
We show how to overcome such situations next.

5.4.2 Node and Edge Coverage Metrics

Because the finite state machines are directed graphs, we can use the same test coverage metrics that
we applied at the unit level. The hierarchic relationship means that the upper level machine must treat
the lower machine as a procedure that is entered and returned. (Actually, we need to do this for one
more level to get to true threads that begin with the Card Entry state.) The two obvious choices are

node coverage and edge coverage. Table 7 is extended comfroTable 4 to show the node and edge
coverage of the three-try thread. Node (state) coverage is anal g us to statement coverage at the unit
level — it is the bare minimum. In the PIN Entry example, we can attain node coverage
without ever executing a thread with a correct PIN. If you examine Table 8, you will see that two
threads (initiated by C1234 and 12allsyllabus3C1C1C)traverseallthetate in both machines. Edge
(state transition) coverage is a more acceptable standard. If the state machines are “well formed”
(transitions in terms of port events), edge coverage also g arantees port event coverage. The threads in
Table 9 were picked in a structural way, to guarantee that the less traveled edges (those caused by
cancel keystrokes) are traversed.

5.5 Functional Strategies for Thread Testing

The finite state machine based appro ches to thread identification are clearly useful, but what if no
behavioral model exists for a system to be tested? The testing craftsperson has two choices: develop a
behavioral model, or resort to the system level analogs of functional testing. Recall that when
functional test cases are identified, we use information from the input and output spaces as well as the
function itself. We describe functional threads here in terms of coverage metrics that are derived from
three of the basis concepts (events, ports, and data).

Table 7 Node and Edge Traversal of a Thread Port Input Event

Port Output Event Nodes Edges

Screen 2 displayed with ‘----’ 2.1 a

1 pressed 2.1.1

Screen 2 displayed with ‘X---’ x1

2 pressed 2.1.2

Page 138
x2
Screen 2 displayed with ‘XX--’
3 pressed 2.1.3

x3
Screen 2 displayed with ‘XXX-’
5 pressed 2.1.4

x4
Screen 2 displayed with ‘XXXX’
(Incorrect PIN) 2.1.5, 3 x6, 2
Screen 3 displayed
2.2
(second try) Screen 2 displayed with ‘----’
1 pressed 2.2.1

x1
Screen 2 displayed with ‘X---’
2 pressed 2.2.2

x2

3 pressed 2.2.3
Screen 2displayedwith‘XX--’
allsyllabus
x3
Screen 2 displa ed with ‘XXX-’

cancel pressed Screen 3 displ yed 2.2.4 x10

(end of 2nd try) 2.2.6 x11


Screen 2 displayed with ‘----’
2.3 4

1 pressed 2.3.1
Screen 2 displayed with ‘X---’

x1
2 pressed
Screen 2 displayed with ‘XX--’ 2.3.2

x2
3 pressed
Screen 2 displayed with ‘XXX-’ 2.3.3

x3 2.3.4

4 pressed
Page 139
Screen 2 displayed with ‘XXXX’ x4

(Correct PIN) Screen 5 displayed 2.3.5, 3 x5, 5

Table 8 Thread/State Incidence Input Events

2.1 2.x.1 2.x.2 2.x.3 2.x.4 2.x.5 2.2.6 2.2 2.3 3 1

1234 x x x x x x x

12351234 x x x x x x x x

C1234 x x x x x x x x x

1C12C1234 x x x x x x x x

123C1C1C x x x x x x x x x
allsyllabus
Table 9 Thread/Transition Incidence Inp t Events

x1 x2 x3 x4 x5 x6 x7 x8 x9 x10 x11 1 2 3 4 5 6

1234 x x x x x x

12351234 x x x x x x x x

C1234 x x x x x x x x x

1C12C1234 x x x x x x x x x x x

123C1C1C x x x x x x x x x

5.5.1 Event-Based Thread Testing

Consider the space of port input events. There are five port input thread coverage metrics of interest.
Attaining these levels of system test coverage requires a set of threads such that:

• PI1: each port input event occurs

• PI2: common sequences of port input events occur

• PI3: each port input event occurs in every “relevant” data context

• PI4: for a given context, all “inappropriate” input events occur

• PI5: for a given context, all possible input events occur

Page 140
The PI1 metric is a bare minimum, and is inadequate for most systems. PI2 coverage is the most
common, and it corresponds to the intuitive view of system testing because it deals with “normal use”.
It is difficult to quantify, however. What is a “common” sequence of input events? What is an
uncommon one?

We can also define two coverage metrics based on port output events:

• PO1: each port output event occurs

• PO2: each port output event occurs for each cause

PO1 coverage is an acceptable minimum. It is particularly effective when a system has a rich variety
of output messages for error conditions. (The SATM system does not.) PO2 coverage is a good goal,
but it is hard to quantify; we will revisit this in Chapter 16 when we examine thread
door might be jammed. In practice, some of the most difficult faultscomfoundinfield trouble reports are those in which an output occurs allsyllabusforanunsuspectedcause.One example: my local ATM system (not the SATM) has a screen that informs me that “Your daily withdrawal limit has been reached”.

interaction. For now, note that PO2 coverage refers to threads that interact with respect to a port
output event.. Usually a given output event only has a small number of causes. In the SATM
system, screen 10 might be displayed for three reasons: the terminal ight be out of cash, it may be
impossible to make a connection with the central bank to get the a ount balance, or the withdrawal

This screen should occur when I attempt to withdraw more than $300 in one day. When I see this
screen, I used to assume that my wife h s made a m jor withdrawal (thread interaction), so I request a
lesser amount. I found out that the ATM also produces this screen when the amount of cash in the
dispenser is low. Rather than provide a lot of cash to the first users, the central bank prefers to provide
less cash to more users.

5.5.2 Port-Based Thread Testing

Port-based testing is a useful complement to event-based testing. With port-based testing, we ask, for
each port, what events can occur at that port. We then seek threads that exercise input ports and output
ports with respect to the event lists for each port. (This presumes such event lists have been specified;
some requirements specification techniques mandate such lists.) Port-based testing is particularly
useful for systems in which the port devices come from external suppliers. The main reason for port-
based testing can be seen in the entity/relationship model of the basis constructs (Figure 14.1). The
many-to-many relationship between ports and events should be exercised in both directions. Event
based testing covers the one-to-many relationship from events to ports, and conversely, port-based
testing covers the one-to many relationship from ports to events. The SATM system fails us at this
point — there is no SATM event that occurs at more than one port.

5.5.3 Data-Based Thread Testing

Port and event based testing work well for systems that are primarily event driven. Such systems are
sometimes called “reactive” systems because they react to stimuli (port input events), and often the
reaction is in the from of port output events. Reactive systems have two important characteristics:

Page 141
they are “long-running” (as opposed to the short burst of computation we see in a payroll program)
and they maintain a relationship with their environment. Typically, event driven, reactive systems do
not have a very interesting data model (as we see with the SATM system), so data model based
threads aren’t particularly useful. But what about conventional systems which are data driven? These
systems, described as “static” in [Topper 93], are transformational (rather than reactive); they support
transactions on a database. When these systems are specified, the entity/relationship model is
dominant, and is therefore a fertile source of system testing threads. To attach our discussion to
something familiar, we use the entity/relationship model of a simple library system (see Figure 5.8)
from [Topper 93].

Figure 5.8 E/R Model of a Library

Here are some typical transactions in the library system:


These transactions are all mainline threads;allsyllabusinfact,theyrepresent families of threads. For example,
1. Add a book to the library.

2. Delete a book from the library.

3. Add a borrower to the library.

4. Delete a borrower from the library.

5. Loan a book to a borrower.

6. Process the return of a book from borrower.

suppose the book loan transaction is attempted for a borrower whose current number of checked out
books is at the lending limit (a nice boundary value example). We might also try to return a book that
was never owned by the library. One more: suppose we delete a borrower that has some unreturned
books. All of these are interesting threads to test, and all are at the system level. We can identify each
of these examples, and many more, by close attention to the information in the entity/relationship
model. As we did with event-based testing, we describe sets of threads in terms of data-based
coverage metrics. These refer to relationships for an important reason. Information in relationships is
generally populated by system level threads, whereas that in the entities is usually handled at the unit
level. (When entity/relationship modeling is the starting point of object-oriented analysis, this is
enforced by encapsulation.)

• DM1: Exercise the cardinality of every relationship.

• DM2: Exercise the participation of every relationship.

• DM3: Exercise the functional dependencies among relationships.

Page 142
Cardinality refers of the four possibilities of relationship that we discussed in Chapter 3: one-to-one,
one-to-many, many-to-one, and many-to-many. In the library example, both the loan and the writes
relationships are many-to-many, meaning that one author can write many books, and one book can
have many authors; and that one book can be loaned to many borrowers (in sequence) and one
borrower can borrow many books. Each of these possibilities results in a useful system testing thread.

5.6 SATM Test Threads

Participation refers to whether or not every instance of an entity participates in a relationship. In the
writes relationship, both the Book and the Author entities have mandatory participation (we cannot
have a book with no authors, or an author of no books). In some modeling techniques, participation is
expressed in terms of numerical limits; the Author entity, for example, might be expressed as “at least
1 and at most 12”. When such information is available, it leads directly to obvious boundary value
system test threads.
Sometimes transactions determine explicit logical connections acommngrelationships; these are
known as functional dependencies. For example, we cannot loan a b k that is not possessed by the
library, and we would not delete a book that is out on loan. Also, we w uld not delete a borrower
who still has some books checked out. These kinds of dependencies are reduced when the database

is normalized, but they still exist, anallsyllabusdtheyleadtointerestingytem test threads.

If we apply the discussion of thi chapter to the SATM system, we get a set of threads that
constitutes a thorough system level test. We deve op such a set of threads here in terms of an overall
state model in which states correspond to ke atomic system functions. The macro-level states are:
Card Entry, PIN Entry, Transaction Req e t, (and processing), and Session Management. The stated
order is the testing order, because these stages are in prerequisite order. (We cannot enter a PIN until
successful card entry, we c nnot request a transaction until successful PIN entry, and so on.) We also
need some pre-condition data that define some actual accounts with PANs, Expected PINs, and
account balances. These are given in Table 10. Two less obvious pre-conditions are that the ATM
terminal is initially displaying screen 1 and the total cash available to the withdrawal dispenser is $500
(in $10 notes).

Table 10 SATM Test Data PAN

Expected PIN Checking Balance Savings Balance

100 1234 $1000.00 $800.00

200 4567 $100.00 $90.00

300 6789 $25.00 $20.00

Page 143
We will express threads in tables in which pairs of rows correspond to port inputs and expected port
outputs at each of the four major stages. We start with three basic threads, one for each transaction
type (balance inquiry, deposit, and withdrawal).

PIN Entry Transaction Session


Thread 1 (balance) Card Entry (PAN)
Request Management

Port Inputs 100 1234 B1, B1 B2

Port Outputs screen 2 screen 5 screen 6, screen 14 screen 15, eject


$1000.00 card, screen 1

In thread 1, a valid card with PAN = 100 is entered, which causes screen 2 to be displayed. The PIN
receipt. When B2 is pushed, screen 15 is displayed, the receipt i printed,comtheATM card is ejected, and then screen 1 is displayed.
digits ‘1234’ are entered, and since they match the expected PIN f r the PAN, screen 5 inviting a
transaction selection is displayed. When button B1 is touched the first ti e (requesting a balance
inquiry), screen 6 asking which account is displayed. When B1 is pressed the second time
(checking), screen 14 is displayed and the checking account balan e ($1000.00) is printed on the

Thread 2 is a deposit to checking: S me PAN and PIN, but B2 is touched when screen 5 is displayed,
and B1 is touched when screen 6 is disp yed. The amount 25.00 is entered when screen 7 is displayed
and then screen 13 is displayed. The deposit door opens and the deposit envelope is placed in the
deposit slot. Screen 14 is displa ed, and when B2 is pushed, screen 15 is displayed,
the receipt showing the new checking cco nt balance of $1025.00 is printed, the ATM card is
ejected, and then screen 1 is displayed.
allsyllabus
PIN Entry Transaction Session
Thread 2 (deposit) Card Entry (PAN)
Request Management

Port Inputs 100 1234 B2, B1, 25.00 insert B2


env.

Port Outputs screen 2 screen 5 screen 6, screen 7, screen 15, eject


screen 13, dep. door card, screen 1
opens, screen 14,
$1025.00

Thread 3 is a withdrawal from savings: Again the same PAN and PIN, but B3 is touched when screen
5 is displayed, and B2 is touched when screen 6 is displayed. The amount 30.00 is entered when
screen 7 is displayed and then screen 11 is displayed. The withdrawal door opens and three $10 notes
are dispensed. Screen 14 is displayed, and when B2 is pushed, screen 15 is displayed, the

Page 144
receipt showing the new savings account balance of $770.00 is printed, the ATM card is ejected, and
then screen 1 is displayed.

Thread 3 Card Entry (PAN) PIN Entry Transaction Session


(withdrawal) Request Management

Port Inputs 100 1234 B3, B2, 30.00 B2

Port Outputs screen 2 screen 5 screen 6, screen 7, screen 15, eject


screen 11, card, screen 1
withdrawal door
opens, 3 $10 notes,
screen 14, $770.00

A few of these detailed descriptions are needed to show the pattern; the re aining threads are
described in terms of input and output events that are the objective of the test thread.

Thread 4 is the shortest thread in the SATM system, it consists f an invalid card, which is
immediately rejected. com

Thread 4 PIN Entr Transaction Session


Card Entry (PAN)
Request Management

Port Inputs 400

Port Outputs eject card screen 1


allsyllabus

Following the macro-states along thread 1, we next perform variations on PIN Entry. We get four
new threads from Table 9, hich yield edge coverage in the PIN Entry finite state machines.

PIN Entry Transaction Session


Thread 5 (balance) Card Entry (PAN)

www Request Management


Port Inputs 100 12351234 as in thread 1

Port Outputs screen 2 screens 3,2,5

PIN Entry Transaction Session


Thread 6 (balance) Card Entry (PAN)
Request Management

Port Inputs 100 C1234 as in thread 1

Port Outputs screen 2 screens 3,2,5

Page 145
PIN Entry Transaction Session
Thread 7 (balance) Card Entry (PAN)
Request Management

Port Inputs 100 1C12C1234 as in thread 1

Port Outputs screen 2 screens 3,2, 3,2,5

PIN Entry Transaction Session


Thread 8 (balance) Card Entry (PAN)
Request Management

Port Inputs 100 123C1C1C

Port Outputs screen 2 screens 3,2, 3,2,4,1


amount-driven threads. Thread 9 rejects the attempt to withdraw ancomamountnot in $10 increments,
Moving to the Transaction Request stage, there are variations with respe t t the type of transaction
(balance, deposit, or withdraw), the account (checking or savings) and several that deal with the
amount requested. Threads 1, 2, and 3 cover the type and account variations, so we focus on the

Thread 10 rejects the attempt to withdraw more than the account balance, and Thread 11 rejects the
attempt to withdraw more cash than the dispenser contains.

Thread 9 Card Entry (PAN) PIN Entry Transaction Session


(withdrawal) Request Management

Port Inputs 100 1234 B3, B2, 15.00 Cancel B2

Port Outputs screen 2 creen 5 screens 6,7, 9, 7 screen 15, eject

allsyllabus card, screen 1


10
Thread Card Entry (PAN) PIN Entry Transaction Session
(withdrawal) Request Management

Port Inputs 300 6789 B3, B2, 50.00 Cancel B2

Port Outputs screen 2 screen 5 screens 6,7,8 screen 15, eject


card, screen 1

11
Thread Card Entry (PAN) PIN Entry Transaction Session
(withdrawal) Request Management

Port Inputs 100 1234 B3, B2, 51


0.
00
B2
Cancel

Page 146
Port Outputs screen 2 screen 5 screens 6,7, 10 screen 15, eject
card, screen 1

Having exercised the transaction processing portion, we proceed to the session management stage,
where we test the multiple transaction option.

PIN Entry Transaction Session


Thread 12 (balance) Card Entry (PAN)
Request Management

Port Inputs 100 1234 B1, B1 B1, Cancel

Port Outputs screen 2 screen 5 screen 6, screen 14 screen 15, screen 5,


$1000.00 screen 15, eject
com card, screen 1

At this point, the threads provide coverage of all output screens ex ept f r screen 12, which informs
the user that deposits cannot be processed. Causing this condition is problematic (maybe we should
place a fish sandwich in the deposit envelope slot). This is an example of a thread selected by a pre-
condition that is a hardware failure. We just give it a thread name here, it’s thread 13. Next, we
develop threads 14 through 22 to exercise context sensitive input events. They are shown in Table 11;
notice that some of the first 13 threads exercise context sensitivity.

Table 11 Threads for Context Sensitive Input Events Thread

Keystroke Screen Logica Meaning

6 cancel 2 PIN Entry error


allsyllabus
14 cancel 5 transaction selection error

15 cancel 6 account selection error

16 cancel 7 amount selection error

17 cancel 8 amount selection error

18 cancel 13 deposit envelope not ready

1 B1 5 balance

1 B1 6 checking

19 B1 10 yes (a non-withdrawal transaction)

Page 147
20 B1 12 yes (a non-deposit transaction)

12 B1 14 yes (another transaction)

2 B2 5 deposit

3 B2 6 savings

21 B2 10 no (no additional transaction)

22 B2 12 no (no additional transaction)

1 B2 14 no (no additional transaction)


$80, and suppose that the balance obtained form the central bank comattheCard Entry stage is $50. There are two possibilities: one is
to use the central bank balance, record all transactions, and then
These 22 threads comprise a reasonable test of the portion of the SATM system that we have
specified. Of course there are untested aspects; one good example inv lves the balance of an
account. Consider two threads, one that deposits $40 to an account, and a se ond that withdraws
we wish to enter $40.00. We expectallsyllabusanechoaftereachdigitkeystroke, but in which position does

resolve these when the daily posting occurs. The other is to maintain a running local balance, which
is what would be shown on a balance inquir tr n ction. If the central bank balance is used, the
withdrawal transaction is rejected, but if the loc nce i ed, it is processed.

Another prominent untested portion of the SATM tem i the Amount Entry process that occurs
in screens 7 and 8. The possibility of c nce ke troke t ny point during amount entry produces
a multiplicity greater than that of PIN Entry. There is a more subtle (and therefore more interesting)
test for Amount Entry. What actu lly h ppens when we enter an amount? To be specific, suppose

the echo occur? Two obvious solutions: always require six digits to be entered (so we would enter
‘004000’) or use the high order digits first and shift left as successive digits are entered, as shown in
Figure 14.10. Most ATM systems use the shift approach, and this raises the subtle point: how does
the ATM system kno hen all amount digits have been entered? The ATM system clearly cannot
predict that the deposit amount is $40.00 instead of $400.00 or $4000.000 because there is no “enter”
key to signify when the last digit has been entered. The reason for this digression is that this is a good
example of the kind of detail discovered by testers that is often missing from a requirements
specification. (Such details would likely be found with either Rapid Prototyping or using an
executable specification.)

Page 148
Figure 5.10 Digit Echoes with Left Shifts

5.7 System Testing Guidelines


If we disallow compound sessions (more than one transaction) and if we disregard the multiplicity due

to Amount Entry possibilities, there are 435 distinct threads percomvalidaccount in the SATM
system. Factor in the effects of compound sessions and the Amount Entry p ssibilities and there are
tens of thousands of possible threads for the SATM system. We end this chapter with three
strategies to deal with the thread explosion problem.

5.7.1 Pseudo-Structural System Teallsyllabussting

When we studied unit testing, we saw that the com ination of functional and structural testing yields a
desirable cross-check. We can only claim pseudo-structural testing [Jorgensen 94], because the node
and edge coverage metrics are defined in terms of a control model of a system, and are not derived
directly from the system implementation. (Recall we started out with a concern over the distinction
between reality and mode of reality.) In general, behavioral models are only approximations of a
system’s realit , which is why we could decompose our models down to several levels of detail. If we
made true structural model, its size and complexity would make it too cumbersome to use. The big
weakness of pseudo-structural metrics is that the underlying model may be a poor choice. The three
most common behavioral models (decision tables, finite state machines, and Petri nets) are
appropriate, respectively, to transformational, interactive, and concurrent systems. Decision tables and
finite state machines are good choices for ASF testing. If an ASF is described using a decision table,
conditions typically include port input events, and actions are port output events. We can then devise
test cases that cover every condition, every action, or most completely, every rule. As we saw for
finite state machine models, test cases can cover every state, every transition, or every path.

Thread testing based on decision tables is cumbersome. We might describe threads as sequences of
rules from different decision tables, but this becomes very messy to track in terms of coverage. We
need finite state machines as a minimum, and if there is any form of interaction, Petri nets are a better
choice. There we can devise thread tests that cover every place, every transition, and every sequence
of transitions.

Page 149
EXERCISES

1. One of the problems of system testing, particularly with interactive systems, is to anticipate all the
strange things the user might do. What happens in the SATM system if a customer enters three digits of
a PIN and then walks away?

2. To remain “in control” of abnormal user behavior (the behavior is abnormal, not the user), the SATM
system might introduce a timer with a 30 second time-out. When no port input event occurs for 30
seconds, the SATM system asks if the user needs more time. The user can answer yes or no. Devise a
new screen and identify port events that would implement such a time-out event.

3. Suppose you add this time-out feature to the SATM system. What regression testing would you
perform?

4. Make an additional refinement to the PIN Try finite state machine (Figure 14.6) to implement your
timeout mechanism, then revise the thread test case in Table 3.
5. The text asserts that “the B1 function button occurs in fivecomseparatecontexts (screens being
displayed) and has three different meanings”. Examine the fifteen s reens (points of event quiescence)
and decide whether there are three or five different logi al meanings to a B1 keystroke.
Faults and failures due to interactionallsyllabusretheneofteter.Their subtlety makes them difficult to
6. Does it make sense to use test coverage metrics in conjunction with operational profiles? Discuss this.

7. Develop an operational profile for the NextDate pro lem. Use the decision table formulation, and
provide individual condition probabilities. Since rule is the conjunction of its conditions, the
product of the condition entry probabilities is the rule probability.

5.8 Interaction Testing

recognize and even more difficult to reveal b te ting. The e are deep faults, ones that remain in a

system even after exwwwtensivethread testing. Unfortunately, faults of interaction most frequently
occur as failures in delivered systems that have been in use for some time. Typically they have a very
low probability of execution, and they occur only after a large number of threads have been executed.
Most of this chapter is devoted to describing forms of interaction, not to testing them. As such, it is
really more concerned ith requirements specification that with testing. The connection is important:
knowing how to specify interactions is the first step in detecting and testing for them. This chapter is
also a somewhat philosophical and mildly mathematical discussion of faults and failures of interaction;
we cannot hope to test something if we don’t understand it. We begin with an important addition to
our five basis constructs, and use this to develop a taxonomy of types of interaction. Next, we develop
a simple extension to conventional Petri nets that reflects the basis constructs, and then we illustrate
the whole discussion with the SATM and Saturn Windshield Wiper systems, and sometimes with
examples from telephone systems. We conclude by applying the taxonomy to an important application
type: client-server systems.

5.8.1 Context of Interaction

Page 150
Part of the difficulty of specifying and testing interactions is that they are so common. Think of all the
things that interact in everyday life: people, automobile drivers, regulations, chemical compounds, and
abstractions, to name just a few. We are concerned with interactions in software controlled systems
(particularly the unexpected ones), so we start by restricting our discussion to interactions among our
basis system constructs: actions, data, events ports, and threads.

One way to establish a context for interaction is to view it as a relationship among the five constructs.
If we did this, we would find that the relation Interacts With is a reflexive relationship on each entity
(data interacts with data, actions with other actions, and so on). It also is a binary relationship between
data and events, data and threads, and events and threads. The data modeling approach isn’t a dead-
end, however. Whenever a data model contains such pervasive relationships, that is a clue that an
important entity is missing. If we add some tangible reality to our fairly abstract constructs, we get a
more useful framework for our study of interaction. The missing element is location, and location has
two components: time and position. Data modeling provides another choice: we can treat location as
sixth basic entity, or as ancomattributeof the other five. We choose the attribute approach here.

What does it mean for location (time and position) to be an attribute f any of the five basis constructs?

This is really a short-callsyllabusomingofnearlyallrequirements specification notations and


techniques. (This is probably also the re son that interactions are seldom recognized and tested.)
Information about location is usuall cre ted when a system is implemented. Sometimes location is
mandated as a requirement — when this happens, the requirement is really a forced implementation
choice. We first clarify the meaning of the components of location: time and position.

We can take two views of time: as an instant or as a duration. The instantaneous view lets us
describe when something happens — it i point when time is an axis. The duration view is an interval
on the time axis. When we think about durations, we usually are interested in the length of the time
interval, not the endpoints (the start and finish times). Both views are useful. Because threads execute,
they have a duration; they also have points in time when they execute. Similar observations apply to
events. Often events have very short durations, and this problematic if the duration is so short that the
event isn’t recognized by the system.

The position aspect is easier. We could take a very tangible, physical view of position and describe it
in terms of some coordinate system. Position can be a three dimensional Cartesian coordinate system
with respect to some origin, or it could be a longitude-latitude-elevation geographic point. For most
systems, it is more helpful to slightly abstract position into processor residence. Taken together, time
and position tell the tester when and where something happens, and this is essential to understand
interactions.

Before we develop our taxonomy, we need some ground rules about threads and processors. For now,
a processor is something that executes threads, or a device where events occur.

1. Since threads execute, they have a strictly positive time duration. We usually speak of the execution
time of a thread, but we might also be interested in when a thread occurs (executes). Since actions are
degenerate cases of threads, actions also have durations.

Page 151
2. In a single processor, two threads cannot execute simultaneously. This resembles a fundamental
precept of physics: no two bodies may occupy the same space at the same time. Sometimes threads
appear to be simultaneous, as in time sharing on a single processor; in fact, time shared threads are
interleaved. Even though threads cannot execute simultaneously on a single processor, events can be
simultaneous. (This is really problematic for testers.)

3. Events have a strictly positive time duration. When we consider events to be actions that execute on
port devices, this reduces to the first ground rule.

4. Two (or more) input events can occur simultaneously, but an event cannot occur simultaneously in
two (or more) processors. This is immediately clear if we consider port devices to be separate
processors.

5. In a single processor, two output events cannot begin simultaneously. This is a direct
consequence of output events being caused by thread executions. We need both the instantaneous
com

and duration views of time to fully explain this ground rule. Supp se two output events are such
that the duration of one is much greater than the duration of the ther. The durations may overlap
(because they occur on separate devices), but the start times cann t be identical, as shown in Figure
16.1. Thee is an example of this in the SATM system, when a thread causes screen 15 to be displayed
and the ejects that ATM c rd. The screen is still being displayed when the card eject
Figure 5.8.1 Overlapping Eventsallsyllabus
event occurs. (This may be a fine distinction; we could al o ay that port devices are separate
processors, and that port outp t event re really a form of inter-processor communication.)

6. A thread cannot span more th n one processor. This convention helps in the definition of threads. by
confining a thread to a single processor, we create a natural endpoint for threads; this also results in
more simple thre ds rather than fewer complex threads. In a multi-processing setting, this choice also
results in another form of quiescence — trans-processor quiescence.

Taken together, these six ground rules force what we might call “same behavior” onto the interactions
in the taxonomy e define in section 16.3.

5.9 Interaction, Composition, and Determinism

The question of non-determinism looms as a backdrop to deep questions in science and philosophy.
Einstein didn’t believe in non-determinism; he once commented that he doubted that God would play
dice with the universe. Non-determinism generally refers to consequences of random events, asking in
effect, if there are truly random events (inputs), can we ever predict their consequences? The logical
extreme of this debate ends in the philosophical/theological question of free will versus pre-
destination. Fortunately, for testers, the software version of non-determinism is less severe. You might
want to consider this section to be a technical editorial. It is based on my experience and analysis using
the OSD framework. I find it yields reasonable answers to the problem of non-determinism; you may
too.

Page 152
Let’s start with a working definition if determinism; here are two possibilities:

1. A system is deterministic if, given its inputs, we can always predict its outputs.

2. A system is deterministic if it always produces the same outputs for a given set of inputs.

Since the second view (repeatable outputs) is less stringent than the first (predictable outputs), we’ll
use it as our working definition. Then a non-deterministic system is one in which there is at least one
set of inputs that results in two distinct sets of outputs. It’s easy to devise a non-deterministic finite
state machine; Figure 16.11 is one example.

Figure 5.11 A Non-deterministic Finite State Machine

When the machine in Figure 5.11 is in state d1, if event e1 occurs, there is a transition either to state
d2 or to d3.
allsyllabus
If it is so easy to create a non-deterministic finite state machine, why all the fuss about determinism in
the first place? (It turns out that we can alw ys find a deterministic equivalent to any non-deterministic
finite state machine anyway.) Finite st te machines are models of reality; they only approximate the
behavior of a real system. This is why it is so important to choose an appropriate model — we would
like to use the best approximation. Roughly speaking, decision tables are the mode I of choice for
static interaction , finite state machines suffice for dynamic interactions in a single processor, and
some form of Petri net is needed for dynamic interactions in multiple processors. Before going on, we
should indicate instances of non-determinism in the other two models. A multiple hit decision table is
one in which the inputs (variables in the condition stub) are such that more than one rule is selected. In
Petri nets, non-determinism occurs when more than one transition is enabled. The choice of which rule
executes or which transition fires is made by an external agent. (Notice that the choice is actually an
input!)

Our question of non-determinism reduces to threads in an OSD net, and this is where interactions,
composition, and determinism come together. To ground our discussion in something “real”, consider
the SATM threads we used earlier:

T1: withdraw $40.00

T2: withdraw $60.00

T3: deposit $30.00

Threads T1, T2, and T3 interact via a data place for the account balance, and they may be executed in
different processors. The initial balance is $50.00.

Page 153
Begin with thread TI; if no other thread executes, it will execute correctly, leaving a balance of $10.00.
Suppose we began with thread T2; we should really call it “attempt to withdraw $60.00”, because, if
no other thread executes, it will result in the insufficient funds screen. We should really separate T2
into two threads, T2.1 which is a successful withdrawal that ends with the display of screen 11 (take
cash), and T2.2 which is a failed withdrawal that ends with the display of screen 8 (insufficient funds).
Now let’s add some interaction with thread T3. Threads T2 and T3 are 2-connected via the balance
data place. If T3 executes before T2 reads the balance data, then T2.1 occurs, otherwise T2.2 occurs.
The difference between the two views of determinism is visible here: When the OSD net of T2 begins
to execute, we cannot predict the outcome (T2.1 or T2.2), so by the first definition, this is non-
deterministic. By the second definition, however, we can recreate the interaction (including times)
between T2 and T2. If we do, and we capture the behavior as a marking of the composite OSD net, we
will satisfy the repeatable definition of determinism.

5.11 Client-Server Testing

Client-server systems are difficult to test because they exhibitcomthest difficult form of interactions,
the dynamic ones across multiple processors. Here we can enj y the benefits of our
strong theoretical development. Client-server systems always entail at least two processors, one where
the server software exists an allsyllabusdexecutes,andone(usuallyeveral) where the client software
executes. The main components are usually a database management system, application programs
that use the database, and presentation programs that produce user-defined output. The position of
these components results in the fat server vs. fat client distinction [Lewis 94] (see Figure 5.12).

Figure 5.12 Fat Clients and Server

Client-server systems also include a network to connect the clients with the server, the network
software, and a graphical user interface (GUI) for the clients. To make matters worse, we can
differentiate homogeneous and heterogeneous CS systems in terms of client processors that are
identical or diverse. The multiple terminal version of the SATM system would be a fat client system,
since the central bank does very little of the transaction processing.
Page 154
EXERCISES

1. Figure 16.4 has a nice connection with set theory. Take the propositions p, q, r, and s to be the
following set theory statements about some sets S and P:

p: S P
q: S P=∅
r: S P≠∅
s: S ⊄ P

Convince yourself that the relationships in the Square of Opposition apply to these set theory
propositions.

2. Find and discuss examples of n-connectivity for the events in Table 4.

3. The Central ATM system (CATM) is the “other side” of the SATM system; it supports the
following activities: allsyllabus

a. Open and Close bank account .

b. Maintain daily balances of accounts to ref ect the twice daily postings of SATM transactions. These
occur at 9:00 am and 3:00 pm.

c. Provide Expected PIN and acco nt nce information to an SATM terminal,

d. Apply a service charge ($1.00) to any account that shows more than three ATM transactions in a
given day.

Consider the CATM and SATM functions, and allocate these to Fat Server and Fat Client
formulations.

4. List examples of the various kinds of interactions you can find in the combined CATM/SATM system.
Decide whether these interactions are affected by the fat server vs. the fat client formulations.

Page 155
UNIT 6
PROCESS FRAMEWORK
6.1 Validation and Verification
While software products and processes may be judged on several properties ranging from time-to-
market to performance to usability, the software test and analysis techniques we consider are focused
more narrowly on improving or assessing dependability. Assessing the degree to which a software
system actually fulfills its requirements, in the sense of meeting the user's real needs, is called
validation. Fulfilling requirements is not the same as conforming to a requirements specification. A
specification is a statement about a particular proposed solution to a problem, and that proposed
solution may or may not achieve its goals. Moreover, specifications are written by people, and
therefore contain mistakes. A system that meets its actual goals is useful, while a system that is

consistent with its specification is dependable. com


"Verification" is checking the consistency of an implementation with a specification. Here,
"specification" and "implementation" are roles, not particular artifa ts. F r example, an overall
design could play the role of "spe allsyllabuscifiction"andamoredetailed design could play the role of
"implementation"; checking whether the detailed design is con i tent with the overall design would
then be verification of the detailed de ign. Later, the same detailed design could play the role of
"specification" with respect to source code, which would e verified against the design. In every case,
though, verification is a check of consistency between two descriptions, in contrast to validation which
compares a description (whether a requirements specification, a design, or a running system) against
actual needs. Figure 5.1 sketches the relation of verification and validation activities with respect to
artifacts prod ced in a software development project. The figure should not be interpreted as
prescribing a sequential process, since the goal of a consistent set of artifacts and user satisfaction are
the same whether the software artifacts (specifications, design, code, etc.) are developed sequentially,
iteratively, or in parallel.

Figure 2.1: Validation activities check work products against actual user requirements, while
verification activities check consistency of work products.

Page 156
Validation activities refer primarily to the overall system specification and the final code. With respect
to overall system specification, validation checks for discrepancies between actual needs and the
system specification as laid out by the analysts, to ensure that the specification is an adequate guide to
building a product that will fulfill its goals. With respect to final code, validation aims at checking
discrepancies between actual need and the final product, to reveal possible failures of the development
process and to make sure the product meets end-user expectations. Validation checks between the
specification and final product are primarily checks of decisions that were left open in the specification
(e.g., details of the user interface or product features). We have omitted one important set of
verification checks from Figure 2.1 to avoid clutter. In addition to checks that compare two or more
artifacts, verification includes checks for self-consistency and well-formedness. For example, while
we cannot judge that a program is "correct" except in reference to a specification of what it should do,
we can certainly determine that some programs are "incorrect" because they are ill- formed. We may
likewise determine that a specification itself is ill-formed because it is inconsistent (requires two
properties that cannot both be true) or ambiguous (can be interpreted to require some property or not),
or because it does not satisfy some other well-formedness constraint that we impose, such as
adherence to a standard i posed by a regulatory
agency.
correctness and reliability, eighs allsyllabuspropertiesasmoreandless critical, and distinguishes which
Validation against actual requirement necessarily involves human comgdju ent and the potential for
ambiguity, misunderstanding, and disagreement. In contrast, a pecification should be sufficiently
precise and unambiguous that there c n e no disagreement about whether a particular system behavior
is acceptable. While the term testing is often used informally both for gauging usefulness and
verifying the product, the activities differ in both go ls and approach.

Dependability properties include correctness, reliability, robustness, and safety. Correctness is


absolute consistency with a specific tion, w ys and in all circumstances. Correctness with respect to
nontrivial specifications is almost never achieved. Reliability is a statistical approximation to
correctness, expressed as the likelihood of correct behavior in expected use. Robustness, unlike
properties should bewwwmaintainedeven under exceptional circumstances in which full functionality
cannot be maintained. A good requirements document, or set of documents, should include both a
requirements analysis and a requirements specification, and should clearly distinguish between the
two. The requirements analysis describes the problem. The specification describes a proposed
solution. This is not a book about requirements engineering, but we note in passing that confounding
requirements analysis with requirements specification will inevitably have negative impacts on both
validation and verification.

6.2 Degrees of Freedom

Given a precise specification and a program, it seems that one ought to be able to arrive at some
logically sound argument or proof that a program satisfies the specified properties. After all, if a civil
engineer can perform mathematical calculations to show that a bridge will carry a specified amount of
traffic, shouldn't we be able to similarly apply mathematical logic to verification of programs?

Page 157
For some properties and some very simple programs, it is in fact possible to obtain a logical
correctness argument, albeit at high cost. In a few domains, logical correctness arguments may even
be cost-effective for a few isolated, critical components (e.g., a safety interlock in a medical device).
In general, though, one cannot produce a complete logical "proof" for the full specification of practical
programs in full detail. This is not just a sign that technology for verification is immature. It is, rather,
a consequence of one of the most fundamental properties of computation.

Suppose we do make use of the fact that programs are executed on real machines with finite
representations of memory values. Consider the following trivial Java class:

1 class Trivial{
2 static int sum(int a, int b) { return a+b; }
3}

The Java language definition states that the representation of an i comntis32binary digits, and thus
there are only 232 × 232 = 264 ≈ 1021 different inputs on which the method Trivial.sum() need be tested
to obtain a proof of its correctness. At one nanosecond (10 -9 se nds) per test case, this will take
approximately 1012 seconds, or about 30,000 years.

A technique for verifying a propertyallsyllabuscanbeinaccurateinoneoftwo directions (Figure 6.2). It


may be pessimistic, meaning that it is not guaranteed to accept a program even if the program does
possess the property being analyzed, or it c n be optimistic if it may accept some programs that do not
possess the property (i.e., it may not detect all viol tions). Some analysis techniques may give a third
possible answer, "don't know." We can consider these techniques to be either optimistic or pessimistic
depending on how we interpret the "don't know" result. Perfection is unobtainable, but one can choose
techniques that err in only a particular direction.

Figure 6.2: Verification trade-off dimensions

Page 158
A software verification technique that errs only in the pessimistic direction is called a conservative
analysis. It might seem that a conservative analysis would always be preferable to one that could
accept a faulty program. However, a conservative analysis will often produce a very large number of
spurious error reports, in addition to a few accurate reports. A human may, with some effort,
distinguish real faults from a few spurious reports, but cannot cope effectively with a long list of
purported faults of which most are false alarms. Often only a careful choice of complementary
optimistic and pessimistic techniques can help in mutually reducing the different problems of the
techniques and produce acceptable results.

Many different terms related to pessimistic and optimistic inaccuracy appear in the literature on
program analysis. We have chosen these particular terms because it is fairly easy to remember which
is which. Other terms a reader is likely to encounter include:
Safe A safe analysis has no optimistic inaccuracy; that is, it accepts only correct programs. In other

kinds of program analysis, safety is related to the goal of the analys comis.Forexample, a safe analysis
related to a program optimization is one that allows that optimization only when the result of the
optimization will be correct.
Sound Soundness is a term to describe evaluation of formulas An analysis f a program P with respect

to a formula F is sound if theallsyllabusanalysisreturnsTrueonly when the program actually does


satisfy the formula. If satisfaction of a formula F is taken as an indication of correctness, then a
sound analysis is the same as a safe or con ervative analysis.

If the sense of F is reversed (i.e., if the truth of F indicates a fault rather than correctness) then a sound
analysis is not necessarily conservative. In that case it is allowed optimistic inaccuracy but must not
have pessimistic inaccuracy. (Note, however, that use of the term sound has not always been
consistent in the software engineering iterature. Some writers use the term unsound as we use the term
optimistic.)

Complete Completeness, like soundness, is a term to describe evaluation of formulas. An analysis of a


program P with respect to a formula F is complete if the analysis always returns True when the
program actually does satisfy the formula. If satisfaction of a formula F is taken as an indication of
correctness, then a complete analysis is one that admits only optimistic inaccuracy. An analysis that is
sound but incomplete is a conservative analysis.

Many examples of substituting simple, checkable properties for actual properties of interest can be
found in the design of modern programming languages. Consider, for example, the property that each
variable should be initialized with a value before its value is used in an expression. In the C language,
a compiler cannot provide a precise static check for this property, because of the possibility of code
like the following:

1 int i, sum;
2 int first=1;
3 for (i=0; i<10; ++i) {
4 if (first) {
5 sum=0; first=0;

Page 159
6 }
7 sum += i;
8 }

It is impossible in general to determine whether each control flow path can be executed, and while a
human will quickly recognize that the variable sum is initialized on the first iteration of the loop, a
compiler or other static analysis tool will typically not be able to rule out an execution in which the
initialization is skipped on the first iteration. Java neatly solves this problem by making code like this
illegal; that is, the rule is that a variable must be initialized on all program control paths, whether or
not those paths can ever be executed.

Software developers are seldom at liberty to design new restrictions into the programming languages
and compilers they use, but the same principle can be applied through external tools, not
only for programs but also for other software artifacts. Consider, for example, the following condition that we might wish to impose on requirements documents:
word or phrase is a "significant domain term" is a matter of humancomjudgment. Moreover, human inspection
of the requirements document to check this requirement will be extremely tedious and
1. Each significant domain term shall appear with a definition in the glossary of the document.

This property is nearly impossible to check automatically, since deter ining whether a particular

error-prone. What can we do? One approach is to separate the decision that requires human judgment
(identifying words and phrases as "significant") from the tedious check for presence in the
glossary.
1.a Each significant domain term shall be set off in the requirements document by the use of a
standard style term. The default visual representation of the term style is a single underline in
printed documents and purple text in on-line displays.
Each word or phrase in the term tyle shall appear with a definition in the glossary of the
1.b
document.
allsyllabus
Property (1a) still requires human judgment, but it is now in a form that is much more amenable to
inspection. Property (1b) can be easily automated in a way that will be completely precise (except that
the task of determining hether definitions appearing in the glossary are clear and correct must also be
left to humans). As a second example, consider a Web-based service in which user sessions need not
directly interact, but they do read and modify a shared collection of data on the server. In this case a
critical property is maintaining integrity of the shared data. Testing for this property is notoriously
difficult, because a "race condition" (interference between writing data in one process and reading or
writing related data in another process) may cause an observable failure only very rarely.

Fortunately, there is a rich body of applicable research results on concurrency control that can be
exploited for this application. It would be foolish to rely primarily on direct testing for the desired
integrity properties. Instead, one would choose a (well- known, formally verified) concurrency control
protocol, such as the two-phase locking protocol, and rely on some combination of static analysis and
program testing to check conformance to that protocol. Imposing a particular concurrency control
protocol substitutes a much simpler, sufficient property (two-phase locking) for the complex property
of interest (serializability), at some cost in generality; that is, there are
Page 160
programs that violate two-phase locking and yet, by design or dumb luck, satisfy serializability of data
access.

6.3 Varieties of Software

It is a common practice to further impose a global order on lock accesses, which again simplifies
testing and analysis. Testing would identify execution sequences in which data is accessed without
proper locks, or in which locks are obtained and relinquished in an order that does not respect the two-
phase protocol or the global lock order, even if data integrity is not violated on that particular
execution, because the locking protocol failure indicates the potential for a dangerous race condition
in some other execution that might occur only rarely or under extreme load.

With the adoption of coding conventions that make locking and unlocking actions easy to recognize, it
may be possible to rely primarily on flow analysis to determine conformance with the locking
protocol, with the role of dynamic testing reduced to a "back-up" to raise confidence in the soundness
of the static analysis. Note that the critical decision to impose a particular locking protocol is not a

post-hoc decision that can be made in a testing "ph comase"attheend of development. Rather, the plan
for verification activities with a suitable balance f cost and assurance is part of system design.

The software testing and analysisallsyllabustechniquespresentedinthe main parts of this book were
developed primarily for procedural nd object-oriented software. While these "generic" techniques
are at least partly applicable to most varieties of softw re, particular application domains (e.g., real-
time and safety-critical software) and construction methods (e.g., concurrency and physical
distribution, graphical user interfaces) call for particular properties to be verified, or the relative
importance of different properties, we as imposing constraints on applicable techniques. Typically a
software system does not fa neatly into one category but rather has a number of relevant characteristics
that must be considered when planning verification.
Exercises
2.1 The Chipmunk marketing division is worried about the start-up time of the new version of the
RodentOS operating system (an (imaginary) operating system of Chipmunk). The marketing
division representative suggests a software requirement stating that the start-up time shall not
be annoying to users.

Explain why this simple requirement is not verifiable and try to reformulate the requirement to
make it verifiable.

2.2 Consider a simple specification language SL that describes systems diagrammatically in terms
of functions, which represent data transformations and correspond to nodes of the diagram, and
flows, which represent data flows and correspond to arcs of the diagram. [4] Diagrams can be
hierarchically refined by associating a function F (a node of the diagram) with an SL
specification that details function F. Flows are labeled to indicate the type of data. Suggest
some checks for self-consistency for SL.

Page 161
2.3 A calendar program should provide timely reminders; for example, it should remind the user of
an upcoming event early enough for the user to take action, but not too early. Unfortunately,
"early enough" and "too early" are qualities that can only be validated with actual users. How
might you derive verifiable dependability properties from the timeliness requirement?

2.4 It is sometimes important in multi-threaded applications to ensure that a sequence of accesses


by one thread to an aggregate data structure (e.g., some kind of table) appears to other threads
as an atomic transaction. When the shared data structure is maintained by a database system,
the database system typically uses concurrency control protocols to ensure the atomicity of the
transactions it manages. No such automatic support is typically available for data structures

maintained by a program in main memory. com


Among the options available to programmers to ensure serializability (the illusion of atomic
access) are the following:
 The programmer could maintain very coarse-grain l cking, preventing any interleaving

of accesallsyllabussestotheshareddatatructure, even when such interleaving would be


harmless. (For example, each transaction could be encapsulated in an single
synchronized Java method.) This approach can cause a great deal of unnecessary
blocking between threads, hurting perform nce, but it is almost trivial to verify either
automatically or manually.
 Automated static analysis techniques can sometimes verify serializability with finer-
grain locking, even when ome methods do not use locks at all. This approach can still
reject some sets of method th t wo d en re serializability.
 The programmer could be required to e p rticular concurrency control protocol in his or
her code, and we could i d t tic n lysis tool that checks for conformance with

wwwthatprotocol. For example, adherence to the common two-phase-locking protocol,


ith a few restrictions, can be checked in this way.
 We might augment the data accesses to build a serializability graph structure
representing the "happens before" relation among transactions in testing. It can be
shown that the transactions executed in serializable manner if and only if the
serializability graph is acyclic.

Compare the relative positions of these approaches on the three axes of verification techniques:
pessimistic inaccuracy, optimistic inaccuracy, and simplified properties.

2.5 When updating a program (e.g., for removing a fault, changing or adding a functionality),
programmers may introduce new faults or expose previously hidden faults. To be sure that the
updated version maintains the functionality provided by the previous version, it is common
practice to reexecute the test cases designed for the former versions of the program.
Reexecuting test cases designed for previous versions is called regression testing.

Page 162
6.3.1 Sensitivity

When testing large complex programs, the number of regression test cases may be large. If
updated software must be expedited (e.g., to repair a security vulnerability before it is
exploited), test designers may need to select a subset of regression test cases to be reexecuted.
Subsets of test cases can be selected according to any of several different criteria. An
interesting property of some regression test selection criteria is that they do not to exclude any
test case that could possibly reveal a fault.

6.3 Basic principles


Analysis and testing (A&T) has been common practice since the earliest software projects. A&T
activities were for a long time based on common sense and individual skills. It has emerged as a
distinct discipline only in the last three decades.

This chapter advocates six principles that characterize various approaches and techniques for analysis
and testing: sensitivity, redundancy, restriction, partition, visibility, and feedback. Some of these
principles, such as partition, visibility, and feedback, are quite general in engineering. Others, notably
sensitivity, redundancy, and restriction, are specific t A&T and contribute to
characterizing A&T as a discipline.

Human developers make errors, prodallsyllabuscingfaultsinsoftware.Faults may lead to failures, but faulty

software may not fail on every execution. The sensitivity principle states that it is better to fail every
time than sometimes. Consider the cost of detecting and repairing a software fault. If it is detected
immediately (e.g., by an on-the-fly nt ctic check in a design editor), then the cost of correction is very
small, and in fact the line between fault prevention and fault detection is blurred. If a fault is detected
in inspection or unit testing, the cost is still relatively small. If a fault survives initial detection efforts
at the unit level, but triggers a failure detected in integration testing, the cost of correction is much
greater. If the first failure is detected in system or acceptance testing, the cost is very high indeed, and
the most costly faults are those detected by customers in the field.

A fault that triggers a failure on every execution is unlikely to survive past unit testing. A
characteristic of faults that escape detection until much later is that they trigger failures only rarely, or
in combination with circumstances that seem unrelated or are difficult to control. For example, a fault
that results in a failure only for some unusual configurations of customer equipment may be difficult
and expensive to detect. A fault that results in a failure randomly but very rarely - for example, a race
condition that only occasionally causes data corruption - may likewise escape detection until the
software is in use by thousands of customers, and even then be difficult to diagnose and correct.

The small C program in Figure 6.1 has three faulty calls to string copy procedures. The call to strcpy,
strncpy, and stringCopy all pass a source string "Muddled," which is too long to fit in the array
middle. The vulnerability of strcpy is well known, and is the culprit in the by-now-standard buffer
overflow attacks on many network services. Unfortunately, the fault may or may not cause an
observable failure depending on the arrangement of memory (in this case, it depends on what
Page 163
appears in the position that would be middle[7], which will be overwritten with a newline character).
The standard recommendation is to use strncpy in place of strcpy. While strncpy avoids overwriting
other memory, it truncates the input without warning, and sometimes without properly null-
terminating the output. The replacement function stringCopy, on the other hand, uses an assertion to
ensure that, if the target string is too long, the program always fails in an observable manner.

1 /**
2 * Worse than broken: Are you feeling lucky?
3 */
4
5 #include <assert.h>
6
7 char before[ ] = "=Before=";
8 char middle[ ] = "Middle";
9 char after[ ] = "=After=";
10
11 void show() {
12 printf("%s\n%s\n%s\n", before, middle, after);
22 show(); allsyllabus

13 }
14
15 void stringCopy(char *target, const char *source, int howBig);
16
17 int main(int argc, char *argv) {
18 show();
19 strcpy(middle, "Muddled"); /* Fault, but may not fail */
20 show();
21 strncpy(middle, "Muddled", sizeof(midd e)); /* Fault, may not fail */

23 stringCopy(middle, "Muddled",sizeof(middle)); /* Guaranteed to fail */


24 show();
25 }
26
27 /* Sensitive version of strncpy; can be counted on to fail
28 * in an observable way EVERY time the source is too large
29 * for the target, unlike the standard strncpy or strcpy.
30 */
31 void stringCopy(char *target, const char *source, int howBig) {
32 assert(strlen(source) < howBig);
33 strcpy(target, source);
34 }

Figure 6.1: Standard C functions strcpy and strncpy may or may not fail when the source string is too
long. The procedure stringCopy is sensitive: It is guaranteed to fail in an observable way if the source
string is too long. The sensitivity principle says that we should try to make these faults

Page 164
easier to detect by making them cause failure more often. It can be applied in three main ways: at the
design level, changing the way in which the program fails; at the analysis and testing level, choosing a
technique more reliable with respect to the property of interest; and at the environment level, choosing
a technique that reduces the impact of external factors on the results.

Redundancy

Replacing strcpy and strncpy with stringCopy in the program of Figure 6.1 is a simple example of
application of the sensitivity principle in design. Run-time array bounds checking in many
programming languages (including Java but not C or C++) is an example of the sensitivity principle
applied at the language level. A variety of tools and replacements for the standard memory
management library are available to enhance sensitivity to memory allocation and reference faults in C
and C++. The fail-fast property of Java iterators is another application of the sensitivity principle. A
Java iterator provides a way of accessing each item in a collection data structure. Without the fail-fast
property, modifying the collection while iterating over it could lead to
unexpected and arbitrary results, and failure might occur rarely and be hard to detect and diagnose. com

A fail-fast iterator has the property that an immediate and bservable failure (throwing
ConcurrentModificationException) occurs when the illegal modificati n urs. Although fail-fast
behavior is not guaranteed if the update occurs in a different thread, a fail-fast iterator is far more
sensitive than an iterator without the fail-fast property.

Redundancy is the opposite of independence.allsyllabusIfonepartofasoftware artifact (program, design

document, etc.) constrains the content of another, then they are not entirely independent, and it is
possible to check them for consistency. The concept and definition of redundancy are taken from
information theory. In communication, redundanc can be introduced into messages in the form of
error- detecting and error-correcting code to guard against transmission errors. In software test and
analysis, we wish to detect faults th t could lead to differences between intended behavior and actual
behavior, so the most valu ble form of redundancy is in the form of an explicit, redundant statement of
intent.
Where redundancy can be introduced or exploited with an automatic, algorithmic check for
consistency, it has the advantage of being much cheaper and more thorough than dynamic testing or
manual inspection. Static type checking is a classic application of this principle: The type declaration
is a statement of intent that is at least partly redundant with the use of a variable in the source code.
The type declaration constrains other parts of the code, so a consistency check (type check) can be
applied. An important trend in the evolution of programming languages is introduction of additional
ways to declare intent and automatically check for consistency. For example, Java enforces rules about
explicitly declaring each exception that can be thrown by a method.

Checkable redundancy is not limited to program source code, nor is it something that can be
introduced only by programming language designers. For example, software design tools typically
provide ways to check consistency between different design views or artifacts. One can also
intentionally introduce redundancy in other software artifacts, even those that are not entirely formal.
For example, one might introduce rules quite analogous to type declarations for

Page 165
semistructured requirements specification documents, and thereby enable automatic checks for
consistency and some limited kinds of completeness. When redundancy is already present - as between
a software specification document and source code - then the remaining challenge is to make sure the
information is represented in a way that facilitates cheap, thorough consistency checks. Checks that
can be implemented by automatic tools are usually preferable, but there is value even in organizing
information to make inconsistency easier to spot in manual inspection. Of course, one cannot always
obtain cheap, thorough checks of source code and other documents. Sometimes redundancy is
exploited instead with run-time checks. Defensive programming, explicit run-time checks for
conditions that should always be true if the program is executing correctly, is another application of
redundancy in programming.

Restriction
When there are no acceptably cheap and effective ways to check a property, sometimes one can
execution. Simple as the property is, it is not possible for a compilercomoranalysis tool to precisely
change the problem by checking a different, more restrictive property or by li iting the check to a
smaller, more restrictive class of programs.

Consider the problem of ensuring that each variable is initialized bef re it is used, on every

determine whether it holds. See the program in Figure 6.2 for an illustration. Can the variable k ever
be uninitialized the first time i is added to it? If someCondition(0) always returns true, then k will be
initialized to zero on the first time thro gh the loop, efore k is incremented, so perhaps there is no
potential for a run-time error - but method someCondition could be arbitrarily complex and might
even depend on some condition in the environment. Java's solution to this problem is to enforce a
stricter, simpler condition: A program is not permitted to have any syntactic control paths
on which an uninitialized reference co d occ r, regardless of whether those paths could actually be
executed. The program in Figure 6.2 has such a path, so the Java compiler rejects it.

1 allsyllabus
/** A trivial method with a potentially uninitialized variable.

2 * Maybe someCondition(0) is always true, and therefore k is


3 * always initialized before use ... but it's impossible, in
4 * general, to kno for sure. Java rejects the method.

5 */ www
6 static void questionable() {
7 int k;
8 for (int i=0; i < 10; ++i) {
9 if (someCondition(i)) {
10 k=0;
11 } else {
12 k+=i;
13 }
14 }
15 System.out.println(k);
16 }
17 }
Page 166
Figure 3.2: Can the variable k ever be uninitialized the first time i is added to it? The property is
undecidable, so Java enforces a simpler, stricter property.

Java's rule for initialization before use is a program source code restriction that enables precise,
efficient checking of a simple but important property by the compiler. The choice of programming
language(s) for a project may entail a number of such restrictions that impact test and analysis.
Additional restrictions may be imposed in the form of programming standards (e.g., restricting the use
of type casts or pointer arithmetic in C), or by tools in a development environment. Other forms of
restriction can apply to architectural and detailed design. Consider, for example, the problem of
ensuring that a transaction consisting of a sequence of accesses to a complex data structure by one
process appears to the outside world as if it had occurred atomically, rather than interleaved with
transactions of other processes. This property is called serializability: The end result of a set of such
transactions should appear as if they were applied in some serial order, even if they didn't.

Partition

Partition, often also known as "divide and conquer," is a general engineering principle. Dividing a
complex problem into subproblems to e attacked and solved independently is probably the most
allsyllabus

common human problem-solving strategy. Software engineering in particular applies this principle
in many different forms and at mo t all development levels, from early requirements
specifications to code and maintenance. Analysis and testing are no exception: the partition principle
is widely used and exploited. Partitioning c n be applied both at process and technique levels. At the
process level, we divide complex activities into sets of simple activities that can be attacked
independently. For example, testing is usually divided into unit, integration, subsystem, and system
testing. In this way, we c n foc on different sources of faults at different steps, and at each step, we can
take advantage of the results of the former steps. For instance, we can use units that have been tested
as stubs for integration testing. Some static analysis techniques likewise follow the modular structure
of the software system to divide an analysis problem into smaller steps.

Visibility

Visibility means the ability to measure progress or status against goals. In software engineering, one
encounters the visibility principle mainly in the form of process visibility, and then mainly in the form
of schedule visibility: ability to judge the state of development against a project schedule. Quality
process visibility also applies to measuring achieved (or predicted) quality against quality goals. The
principle of visibility involves setting goals that can be assessed as well as devising methods to assess
their realization.

Visibility is closely related to observability, the ability to extract useful information from a software
artifact. The architectural design and build plan of a system determines what will be observable at
each stage of development, which in turn largely determines the visibility of progress against goals at
that stage.

Page 167
A variety of simple techniques can be used to improve observability. For example, it is no accident
that important Internet protocols like HTTP and SMTP (Simple Mail Transport Protocol, used by
Internet mail servers) are based on the exchange of simple textual commands. The choice of simple,
human-readable text rather than a more compact binary encoding has a small cost in performance and
a large payoff in observability, including making construction of test drivers and oracles much
simpler. Use of human-readable and human-editable files is likewise advisable wherever the
performance cost is acceptable.

Feedback

Feedback is another classic engineering principle that applies to analysis and testing. Feedback applies
both to the process itself (process improvement) and to individual techniques (e.g., using test histories
to prioritize regression testing).

Systematic inspection and walkthrough derive part of their success fr m feedback. Participants in inspection are
guided by checklists, and checklists are revised and refined based on experience. New checklist items may be
derived from root cause analysis, analyzing previously observed failures to identify the initial errors that lead to
them.

Exercises com
allsyllabus
3.1 Indicate which principles guided the following choices:
1. Use an externally read ble format also for internal files, when possible.
2. Collect and analyze data about faults reve led and removed from the code.
3. Separate test and debugging activities; that is, separate the design and execution of
test cases to reveal failures (test) from the localization and removal of the
corresponding faults (de gging).
4. Distinguish test case design from execution.
5. Produce complete f ult reports.
6. Use information from test case design to improve requirements and design
specifications.
7. Provide interfaces for fully inspecting the internal state of a class.

3.2 A simple mechanism for augmenting fault tolerance consists of replicating computation and
comparing the obtained results. Can we consider redundancy for fault tolerance an
application of the redundancy principle?

3.3 A system safety specification describes prohibited behaviors (what the system must never
do). Explain how specified safety properties can be viewed as an implementation of the
redundancy principle.

3.4 Process visibility can be increased by extracting information about the progress of the
process. Indicate some information that can be easily produced to increase process visibility.
Page 168
6.2 The Quality Process

One can identify particular activities and responsibilities in a software development process that are
focused primarily on ensuring adequate dependability of the software product, much as one can
identify other activities and responsibilities concerned primarily with project schedule or with product
usability. It is convenient to group these quality assurance activities under the rubric "quality process,"
although we must also recognize that quality is intertwined with and inseparable from other facets of
the overall process. Like other parts of an overall software process, the quality process provides a
framework for selecting and arranging activities aimed at a particular goal, while also considering
interactions and trade-offs with other important goals. All software development activities reflect
constraints and trade-offs, and quality activities are no exception. For example, high dependability is
usually in tension with time to market, and in most cases it is better to achieve a reasonably high
degree of dependability on a tight schedule than to achieve ultra-high
dependability on a much longer schedule, although the opposite is true in some domains (e.g.,
certain medical devices).

6.2.1 Planning and Monitoring

Process visibility is a key factor in oftware process in general, and s ftware quality processes in
com

particular. A process is visible to the extent that one can an wer the question, "How does our

progress compare to our plan?" Typic allsyllabus,chedulevisibilityisa main emphasis in process

design ("Are we on schedule? How far ahead or behind?"), ut in software quality process an equal
emphasis is needed on progress against quality go s. If one cannot gain confidence in the quality of the
software system long before it reaches fina testing, the quality process has not achieved adequate
visibility. A well-designed qualit process balances several activities across the whole development
process, selecting and rr nging them to be as cost-effective as possible, and to
improve early visibility. Visibility is particularly challenging and is one reason (among several) that
quality activities are usually placed s early in a software process as possible. For example, one designs
test cases at the earliest opportunity (not "just in time") and uses both automated and manual static
analysis techniques on software artifacts that are produced before actual code.

6.2.2 Quality Goals

Process visibility requires a clear specification of goals, and in the case of quality process visibility
this includes a careful distinction among dependability qualities. A team that does not have a clear
idea of the difference between reliability and robustness, for example, or of their relative importance
in a project, has little chance of attaining either. Goals must be further refined into a clear and
reasonable set of objectives. If an organization claims that nothing less than 100% reliability will
suffice, it is not setting an ambitious objective. Rather, it is setting no objective at all, and choosing
not to make reasoned trade-off decisions or to balance limited resources across various activities. It is,
in effect, abrogating responsibility for effective quality planning, and leaving trade-offs among cost,
schedule, and quality to an arbitrary, ad hoc decision based on deadline and budget alone. The relative
importance of qualities and their relation to other project objectives varies. Time-to-market may be the
most important property for a mass market product,
Page 169
usability may be more prominent for a Web based application, and safety may be the overriding
requirement for a life-critical system.

The external properties of software can ultimately be divided into dependability (does the software do
what it is intended to do?) and usefulness. There is no precise dependability way to distinguish these,
but a rule of thumb is that when software is not dependable, we say it has a fault, or a defect, or (most
often) a bug, resulting in an undesirable behavior or failure. It is quite possible to build systems that
are very reliable, relatively free from usefulness hazards, and completely useless. They may be
unbearably slow, or have terrible user interfaces and unfathomable documentation, or they may be
missing several crucial features. How should these properties be considered in software quality? One
answer is that they are not part of quality at all unless they have been explicitly specified, since quality
is the presence of specified properties. However, a company whose products are rejected by its
customers will take little comfort in knowing that, by some definitions, they were high-quality
products.
We can do better by considering quality as fulfillment of requcomiredanddesired properties, as
distinguished from specified properties. For example, even if a client d es n t explicitly specify the
required performance of a system, there is always some level of performance that is required to be
useful. One of the most critical tasks in software quality analysis is making desired properties explicit,
since properties that remallsyllabusainunspecified(eveninformally) are very likely to surface
unpleasantly when it is discovered that they are not met. In many cases these implicit requirements
can not only be made explicit, but also made sufficiently precise that they can be made part of
dependability or reliability. For example, while it is better to explicitly recognize usability as a
requirement than to leave it implicit, it is better yet to augment [1] usability requirements with specific
interface standards, so that a deviation from the standards is recognized as a defect.

Interface standards augment, rather th n rep ace, usability requirements because conformance to the
standards is not sufficient assurance th t the requirement is met. This is the same relation that other
specifications have to the user requirements they are intended to fulfill. In general, verifying
conformance to specifications does not replace validating satisfaction of requirements.

6.2.3 Dependability Properties

The simplest of the dependability properties is correctness: A program or system is correct if it is


consistent with its specification. By definition, a specification divides all possible system behaviours
into two classes, successes (or correct executions) and failures. All of the possible behaviors of a
correct system are successes.

A program cannot be mostly correct or somewhat correct or 30% correct. It is absolutely correct on all
possible behaviors, or else it is not correct. It is very easy to achieve correctness, since every program
is correct with respect to some (very bad) specification. Achieving correctness with respect to a useful
specification, on the other hand, is seldom practical for nontrivial systems. Therefore, while
correctness may be a noble goal, we are often interested in assessing some more achievable level of
dependability. Reliability is a statistical approximation to correctness, in the sense that 100%
reliability is indistinguishable from correctness. Roughly speaking, reliability is a measure of

Page 170
the likelihood of correct function for some "unit" of behavior, which could be a single use or program
execution or a period of time. Like correctness, reliability is relative to a specification (which
determines whether a unit of behavior is counted as a success or failure). Unlike correctness,
reliability is also relative to a particular usage profile. The same program can be more or less reliable
depending on how it is used.

Particular measures of reliability can be used for different units of execution and different ways of
counting success and failure. Availability is an appropriate measure when a failure has some duration
in time. For example, a failure of a network router may make it impossible to use some functions of a
local area network until the service is restored; between initial failure and restoration we say the router
is "down" or "unavailable." The availability of the router is the time in which the system is "up"
(providing normal service) as a fraction of total time. Thus, a network router that averages 1 hour of
down time in each 24-hour period would have an availability of 2324, or 95.8%.

Mean time between failures (MTBF) is yet another measure of reliab comility,alsousing time as the
unit of execution. The hypothetical network switch that typically fails once in a 24-hour period and
takes about an hour to recover has a mean time between failures of 23 h urs. N te that availability does
not distinguish between two failures of 30 minutes each and one failure lasting an hour, while
MTBF does. The definitions of correctness and reliability have (at least) two major weaknesses. First,
since the success or failure o allsyllabusfanexecutionisrelativeto a specification, they are only as
strong as the specification. Second, they make no distinction between a failure that is a minor
annoyance and a failure that results in catastrophe. These are simplifying assumptions that we accept
for the sake of precision, but in some circumst nces - particularly, but not only, for critical systems - it
is important to consider dependabi ity properties that are less dependent on specification and that do
distinguish among failures depending on severity.

Software safety is an extension of the we -e tablished field of system safety into software. Safety is
concerned with preventing certain undesirable behaviors, called hazards. It is quite explicitly not
concerned with achieving any useful behavior apart from whatever functionality is needed to prevent

hazards. Sowwwftaresafetyis typically a concern in "critical" systems such as avionics and medical
systems, but the basic principles apply to any system in which particularly undesirable behaviors can
be distinguished from run-of-the-mill failure. For example, while it is annoying when a word
processor crashes, it is much more annoying if it irrecoverably corrupts document files. The
developers of a word processor might consider safety with respect to the hazard of file corruption
separately from reliability with respect to the complete functional requirements for the word
processor. Just as correctness is meaningless without a specification of allowed behaviors, safety is
meaningless without a specification of hazards to be prevented, and in practice the first step of safety
analysis is always finding and classifying hazards. Typically, hazards are associated with some system
in which the software is embedded (e.g., the medical device), rather than the software alone. The
distinguishing feature of safety is that it is concerned only with these hazards, and not with other
aspects of correct functioning.

The concept of safety is perhaps easier to grasp with familiar physical systems. For example, lawn-
mowers in the United States are equipped with an interlock device, sometimes called a "dead-man
switch." If this switch is not actively held by the operator, the engine shuts off. The dead-man

Page 171
switch does not contribute in any way to cutting grass; its sole purpose is to prevent the operator from
reaching into the mower blades while the engine runs.

One is tempted to say that safety is an aspect of correctness, because a good system specification
would rule out hazards. However, safety is best considered as a quality distinct from correctness and
reliability for two reasons. First, by focusing on a few hazards and ignoring other functionality, a
separate safety specification can be much simpler than a complete system specification, and therefore
easier to verify. To put it another way, while a good system specification should rule out hazards, we
cannot be confident that either specifications or our attempts to verify systems are good enough to
provide the degree of assurance we require for hazard avoidance. Second, even if the safety
specification were redundant with regard to the full system specification, it is important because (by
definition) we regard avoidance of hazards as more crucial than satisfying other parts of the system
specification.

expect a word processing program to save changes normally when the file does not fit in storage, or to expect a database to continue to operate normally when
the computer l ses power, or to expect a Web site to provide completely satisfactory service to all visitors when the l ad is 100 times greater

Correctness and reliability are contingent upon normal operating co comnditions.Itis not reasonable to

than the maximum for which it w allsyllabusadesigned.Softwarethatfails under these conditions, which
violate the premises of its design, may still be "correct" in the trict sense, yet the manner in which
the software fails is important. It is ccept e that the word processor fails to write the new file that does
not fit on disk, but unacceptable to also corrupt the previous version of the file in the attempt. It is
acceptable for the database system to cease to function when the power is cut, but unacceptable for it
to leave the database in a corrupt state. And it is usually preferable for the Web system to turn away
some arriving users rather than becoming too slow for all, or crashing. Software that gracefully
degrades or fails "softly" o t ide it normal operating parameters is robust.

Software safety is a kind of robustness, but robustness is a more general notion that concerns not only
avoidance of hazards (e g , data corruption) but also partial functionality under unusual situations.
Robustness, like safety, begins with explicit consideration of unusual and undesirable situations, and
should include augmenting software specifications with appropriate responses to undesirable events.

Figure 6.1 illustrates the relation among dependability properties.

Figure 6.1: Relation among dependability properties


Page 172
We are simplifying matters somewhat by considering only specifications of behaviors. A specification
may also deal with other properties, such as the disk space required to install the application. A
system may thus also be "incorrect" if it violates one of these static properties.

Analysis

Analysis techniques that do not involve actual execution of program source code play a prominent
role in overall software quality processes. Manual inspection techniques and automated analyses
can be applied at any development stage. They are particularly well suited at the early stages of
specifications and design, where the lack of executability of many intermediate artifacts reduces the
efficacy of testing.

.
Excerpt of Web Presence Feasibility Study

Purpose of this document

This document was prepared for the Chipmunk IT management tea com.Itdescribes the results of a

feasibility study undertaken to advise Chipmunk corporate management whether to embark on a substantial redevelopment effort to add online shopping functionality to the Chipmunk Computers' Web presence.

Architectural Requirements allsyllabus

Goals

The primary goal of a Web presence redevelopment i to add online shopping facilities. Marketing
estimates an increase of 15% over current direct sales within 24 months, and an additional 8% savings
in direct sales support costs from hifting te ephone price inquiries to online price inquiries. [ …]

The logical architecwwwtureillbedivided into three distinct subsystems: human interface, business

logic, and supporting infrastructure. Each major subsystem must be structured for phased
development, with initial features delivered 6 months from inception, full features at 12 months, and a
planned revision at 18 months from project inception. [ …]

Quality Requirements

Dependability With the introduction of direct sales and customer relationship management functions,
dependability of Chipmunk's Web services becomes businesscritical. A critical core of functionality
will be identified, isolated from less critical functionality in design and implementation, and subjected
to the highest level of scrutiny. We estimate that this will be approximately 20% of new development
and revisions, and that the V&V costs for those portions will be approximately triple the cost of V&V
for noncritical development.
Usability The new Web presence will be, to a much greater extent than before, the public face of
Chipmunk Computers. [ …]

Page 173
Security Introduction of online direct ordering and billing raises a number of security issues. Some of
these can be avoided initially by contracting with one of several service companies that provide secure
credit card transaction services. Nonetheless, order tracking, customer relationship management,
returns, and a number of other functions that cannot be effectively outsourced raise significant security
and privacy issues. Identifying and isolating security concerns will add a significant but manageable
cost to design validation. [ …]

Testing

Sometimes the best aspects of manual inspection and automated static analysis can be obtained by
carefully decomposing properties to be checked. For example, suppose a desired property of
requirements documents is that each special term in the application domain appear in a glossary of
terms. This property is not directly amenable to an automated static analysis, since current tools cannot
distinguish meaningful domain terms from other terms that have their ordinary meanings. The
property can be checked with manual inspection, but the process is tedious, expensive, and error-
prone. A hybrid approach can be applied if each domain term is marked in the text. Manually checking

that domain terms are marked is much faster and therefor comelessexpensive than manually looking
each term up in the glossary, and marking the terms permits effe tive automation of cross-checking
with the glossary.

Despite the attractiveness of automallsyllabustedtticanalyseswhenthey are applicable, and despite the

usefulness of manual inspections for a variety of documents including but not limited to program
source code, dynamic testing remains a dominant technique. A closer look, though, shows that
dynamic testing is really divided into several distinct activities that may occur at different points in a
project. Tests are executed when the corresponding code is available, but testing activities start earlier,
as soon as the artifacts req ired for designing test case specifications are available. Thus, acceptance
and system test suites shou d be generated before integration and unit test suites, even if executed in
the opposite order.

Early test design has several advantages. Tests are specified independently from code and when the
corresponding software specifications are fresh in the mind of analysts and developers, facilitating
review of test design. Moreover, test cases may highlight inconsistencies and incompleteness in the
corresponding soft are specifications. Early design of test cases also allows for early repair of software
specifications, preventing specification faults from propagating to later stages in development. Finally,
programmers may use test cases to illustrate and clarify the software specifications, especially for
errors and unexpected conditions.

No engineer would build a complex structure from parts that have not themselves been subjected to
quality control. Just as the "earlier is better" rule dictates using inspection to reveal flaws in
requirements and design before they are propagated to program code, the same rule dictates module
testing to uncover as many program faults as possible before they are incorporated in larger
subsystems of the product. At Chip- munk, developers are expected to perform functional and
structural module testing before a work assignment is considered complete and added to the project
baseline. The test driver and auxiliary files are part of the work product and are expected to make

Page 174
reexecution of test cases, including result checking, as simple and automatic as possible, since the
same test cases will be used over and over again as the product evolves.

Improving the Process

While the assembly-line, mass production industrial model is inappropriate for software, which is at
least partly custom-built, there is almost always some commonality among projects undertaken by an
organization over time. Confronted by similar problems, developers tend to make the same kinds of
errors over and over, and consequently the same kinds of software faults are often encountered project
after project. The quality process, as well as the software development process as a whole, can be
improved by gathering, analyzing, and acting on data regarding faults and failures.

The first part of a process improvement feedback loop, and often the most difficult to implement, is
gathering sufficiently complete and accurate raw data about faults and failures. A main obstacle is
tracking. It is also essential to minimize extr effort. For ex mple,comifrevisionlogs in the revision

that data gathered in one project goes mainly to benefit other projects in the future and may seem to
have little direct benefit for the current project, much less to the pers ns asked to provide the raw data.
It is therefore helpful to integrate data collection as well as p ssible with other, normal development
activities, such as version and configuration control, project management, and bug
module and checking it back in mightallsyllabusetkenroghgideto cost of repair. Raw data on faults
control database can be associated with bug tr cking record , then the time between checking out a

and failures must be aggregated into categories and prioritized. Faults may be categorized along
several dimensions, none of them perfect. Fortunate y, flawless categorization is not necessary; all that
is needed is some categorization scheme that is sufficiently fine-grained and tends to aggregate faults
with similar causes and possible remedies, and that can be associated with at least rough estimates of
relative frequency and co t. A mall number of categories - maybe just one or two - are chosen for
further study.

The analysis step consists of tracing several instances of an observed fault or failure back to the
human error from which it resulted, or even further to the factors that led to that human error. The
analysis also involves the reasons the fault was not detected and eliminated earlier (e.g., how it slipped
through various inspections and levels of testing). This process is known as "root cause analysis," but
the ultimate aim is for the most cost-effective countermeasure, which is sometimes but not always the
ultimate root cause. For example, the persistence of security vulnerabilities through buffer overflow
errors in network applications may be attributed at least partly to widespread use of programming
languages with unconstrained pointers and without array bounds checking, which may in turn be
attributed to performance concerns and a requirement for interoperability with a large body of legacy
code. The countermeasure could involve differences in programming methods (e.g., requiring use of
certified "safe" libraries for buffer management), or improvements to quality assurance activities (e.g.,
additions to inspection checklists), or sometimes changes in management practices.

Page 175
Organizational Factors

The quality process includes a wide variety of activities that require specific skills and attitudes and
may be performed by quality specialists or by software developers. Planning the quality process
involves not only resource management but also identification and allocation of responsibilities. A
poor allocation of responsibilities can lead to major problems in which pursuit of individual goals
conflicts with overall project success. For example, splitting responsibilities of development and
quality-control between a development and a quality team, and rewarding high productivity in terms of
lines of code per person-month during development may produce undesired results. The development
team, not rewarded to produce high-quality software, may attempt to maximize productivity to the
detriment of quality. The resources initially planned for quality assurance may not suffice if the initial
quality of code from the "very productive" development team is low. On the other hand, combining
development and quality control responsibilities in one undifferentiated
team, while avoiding the perverse incentive of divided responsibilities, can also have unintended effects: As deadlines near, resources may be shifted from quality assuran e to coding, at the expense of product quality.

and the mobility of people and roles (e.g, rotating engineer betweencomdevelopment and testing

Conflicting considerations support both the separation of roles (e g , re ruiting quality specialists),
Chipmunk, for example, specifications,allsyllabusdesign,andcodeareinspected by mixed teams; scaffolding
and oracles are designed by analysts and developers; integration, system, acceptance, and regression
tasks). At Chipmunk, responsibility for delivery of the new Web presence is distributed among a
development team and a quality assurance team. Both teams are further articulated into groups. The
quality assurance team is divided into the analysis and testing group, responsible for the
dependability of the system, and the usability testing group, responsible for usability. Responsibility
for security issues is assigned to the infrastructure development group, which relies partly on external
consultants for final tests based on external attack attempts.

Having distinct teams does not impl a simple division of all tasks between teams by category. At

improvement specialistwwworks incrementally while developing the system and proposes improvements at each release.
tests are assigned to the test and analysis team; unit tests are generated and executed by the
developers; and coverage is checked by the testing team before starting integration and system testing.
A specialist has been hired for analyzing faults and improving the process. The process

Exercises

4.1 We have stated that 100% reliability is indistinguishable from correctness, but they are not
quite identical. Under what circumstance might an incorrect program be 100% reliable? Hint:
Recall that a program may be more or less reliable depending on how it is used, but a program
is either correct or incorrect regardless of usage.

4.2 We might measure the reliability of a network router as the fraction of all packets that are
correctly routed, or as the fraction of total service time in which packets are correctly routed.
When might these two measures be different?
Page 176
4.3 If I am downloading a very large file over a slow modem, do I care more about the availability
of my internet service provider or its mean time between failures?

4.4 Can a system be correct and yet unsafe?


4.5 Under what circumstances can making a system more safe make it less reliable?

4.6 Software application domains can be characterized by the relative importance of schedule
(calendar time), total cost, and dependability. For example, while all three are important for
game software, schedule (shipping product in September to be available for holiday purchases)
has particular weight, while dependability can be somewhat relaxed. Characterize a domain you
are familiar with in these terms.

allsyllabus
4.7 Consider responsiveness as desirable property of an Internetcomhat program. The informal
requirement is that messages typed by each member of a chat session appear instantaneously
on the displays of other user . Refine this informal req irement into a concrete specification
that can be verified. Is anything lost in the refinement?

4.8 Identify some correctness, robustness and safety properties of a word processor.

Page 177
UNIT 7
FAULT-BASED TESTING, TEST EXECUTION
A model of potential program faults is a valuable source of information for evaluating and designing
test suites. Some fault knowledge is commonly used in functional and structural testing, for example
when identifying singleton and error values for parameter characteristics in category-partition testing
or when populating catalogs with erroneous values, but a fault model can also be used more directly.
Fault-based testing uses a fault model directly to hypothesize potential faults in a program under test,
as well as to create or evaluate test suites based on its efficacy in detecting those hypothetical faults.

Overview
Engineers study failures to understand how to prevent similar failucomresinthefuture. For example,
failure of the Tacoma Narrows Bridge in 1940 led to new understanding f scillation in high wind and
to the introduction of analyses to predict and prevent such destructive scillation in subsequent
bridge design. The causes of an airline crash are likewise extensively studied, and when traced to a

structural failure they frequently re allsyllabussultinadirectivetoapply diagnostic tests to all aircraft


considered potentially vulnerable to similar failures.
Experience with common software f ults sometimes leads to improvements in design methods and
programming languages. For example, the main purpose of automatic memory management in Java is
not to spare the programmer the trouble of releasing unused memory, but to prevent the programmer
from making the kind of memor management errors (dangling pointers, redundant deallocations, and
memory leaks) th t freq ently occur in C and C++ programs. Automatic array bounds checking cannot
prevent a programmer from using an index expression outside array bounds, but can make it much less
likely that the fault escapes detection in testing, as well as limiting the damage incurred if it does lead
to operational failure (eliminating, in particular, the buffer overflow attack as a means of subverting
privileged programs). Type checking reliably detects many other faults during program translation.

7.1 Assumptions in Fault-Based Testing

The effectiveness of fault-based testing depends on the quality of the fault model and on some basic
assumptions about the relation of the seeded faults to faults that might actually be present. In practice,
the seeded faults are small syntactic changes, like replacing one variable reference by another in an
expression, or changing a comparison from < to <=. We may hypothesize that these are representative
of faults actually present in the program.

Put another way, if the program under test has an actual fault, we may hypothesize that it differs from
another, corrected program by only a small textual change. If so, then we need merely distinguish the
program from all such small variants (by selecting test cases for which either the original or the
variant program fails) to ensure detection of all such faults. This is known as the

Page 178
competent programmer hypothesis,an assumption that the program under test is "close to" (in the
sense of textual difference) a correct program.
Fault-Based Testing: Terminology

Original program The program unit (e.g., C function or Java class) to be tested.

Program location A region in the source code. The precise definition is defined relative to the syntax
of a particular programming language. Typical locations are statements, arithmetic and Boolean
expressions, and procedure calls.

Alternate expression Source code text that can be legally substituted for the text at a program
location. A substitution is legal if the resulting program is syntactically correct (i.e., it compiles
without errors).

Alternate program A program obtained from the original progr comabysubstituting an alternate
expression for the text at some program location.
Distinct behavior of an alternate program R for a test t The behavi r f an alternate program R
is distinct from the behavior of the original program P for a test t,if R and P produce a different

result for t, or if the output of R is noallsyllabustdefinedfort.


Distinguished set of alternate programs for a test suite T A set of alternate programs are distinct if
each alternate program in the set can be distinguished from the original program by at least one test in
T.

Fault-based testing can guarantee fault detection only if the competent programmer hypothesis and the
coupling effect hypothesis hold. But guarantees are more than we expect from other approaches to
designing or evaluating test suite , inc uding the structural and functional test adequacy criteria
discussed in earlier chapters. Fault-b sed testing techniques can be useful even if we decline to take the
leap of faith required to fully accept their underlying assumptions. What is essential is to recognize the
dependence of these techniques, and any inferences about software quality based on fault-based
testing, on the quality of the fault model. This also implies that developing better fault models, based
on hard data about real faults rather than guesses, is a good investment of effort.

7.2 Mutation Analysis

Mutation analysis is the most common form of software fault-based testing. A fault model is used to
produce hypothetical faulty programs by creating variants of the program under test. Variants are
created by "seeding" faults, that is, by making a small change to the program under test following a
pattern in the fault model. The patterns for changing program text are called mutation operators, and
each variant program is called a mutant.
Mutation Analysis: Terminology

Original program under test The program or procedure (function) to be tested.

Mutant A program that differs from the original program for one syntactic element (e.g., a statement,
a condition, a variable, a label).
Page 179
Distinguished mutant A mutant that can be distinguished for the original program by executing at
least one test case.

Equivalent mutant A mutant that cannot be distinguished from the original program.

Mutation operator A rule for producing a mutant program by syntactically modifying the original
program.

Mutants should be plausible as faulty programs. Mutant programs that are rejected by a compiler, or
that fail almost all tests, are not good models of the faults we seek to uncover with systematic testing.

We say a mutant is valid if it is syntactically correct. A mutant obtained from the program of Figure
7.1 by substituting while for switch in the statement at line 13 would not be valid, since it would result
in a compile-time error. We say a mutant is useful if, in addition to being valid, its behavior differs
from the behavior of the original program for no more thancomasallsubset of program test cases. A
mutant obtained by substituting 0 for 1000 in the statement at line 4 would be valid, but not useful,
since the mutant would be distinguished from the progra under test by all inputs and thus would not
give any useful information on the effectiveness of a test suite. Defining mutation operators that
produce valid and useful mutations is a nontrivial ta k
1
2 /** Convert each line from standard input */
3 void transduce() {
4 #define BUFLEN 1000
5 char buf[BUFLEN]; /* Accumulate line into this buffer */
6 int pos=0; /* Index for next character in buffer */
7
8 char inChar; /* Next character from inp t */
9 allsyllabus
10 int atCR = 0; /* 0=" ithin line", 1="optional DOS LF" */
11
12 while ((inChar = getchar()) != EOF ) {
13 switch (inChar) {

14 case LF: www


15 if (atCR) { /* Optional DOS LF */
16 atCR = 0;
17 } else { /* Encountered CR within line */
18 emit(buf, pos);
19 pos=0;
20 }
21 break;
22 case CR:
23 emit(buf, pos);
24 pos=0;
25 atCR = 1;

Page 180
26 break;
27 default:
28 if (pos >= BUFLEN-2) fail("Buffer overflow");
29 buf[pos++] = inChar;
30 }/* switch */
31 }
32 if (pos > 0) {
33 emit(buf, pos);
34 }
35 }

Figure 7.1: Program transduce converts line endings among Unix, DOS, and Macintosh conventions.
The main procedure, which selects the output line end convention, and the output procedure emit are
not shown.
Since mutants must be valid, mutation operators are syntactic pattercomlarnsdefined relative to
particular programming languages. Figure 7.2 shows some mutation operators f r the C language.
Constraints are associated with mutation operators to guide selection of test ases likely to distinguish
mutants from the original program. For example, the mutation operator vr (s a variable replacement) can
be applied only to variables of compatible type (to be valid), and a test case that distinguishes the mutant from
the original program must execute the modified statement in a state in which the original variable and its
substitute have different values.

Open table as Operator Description Constraint


spreadsheet ID
Operand Modifications
crp constant for con tant replace constant C1 with C1 ≠ C2
allsyllabus
replacement constant C2

scr scalar for constant replace constant C with scalar C≠X


replacement variable X
acr array for constant replace constant C with array C ≠ A[I]
replacement reference A[I]
scr struct for constant replace constant C with struct C≠S
replacement field S
svr scalar variable replace scalar variable X with a X≠Y
replacement scalar variable Y
csr constant for scalar replace scalar variable X with a X≠C
variable replacement constant C
asr array for scalar variable replace scalar variable X with X ≠ A[I]
replacement an array reference A[I]

Page 181
Open table as Operator Description Constraint
spreadsheet ID
ssr struct for scalar replace scalar variable X with X≠S
replacement struct field S
vie scalar variable remove initialization of a scalar
initialization variable
elimination
car constant for array replace array reference A[I] A[I]≠C
replacement with constant C
sar scalar for array replace array reference A[I] A[I]≠C
replacement with scalar variable X
cnr comparable array replace array referen e with a
replacement comparable array referen e
sar struct for array replace array reference A[I] A[I]≠S
reference replacement with a struct field S
com

Expression Modifications

abs absolute value insertion replace e y abs(e) e<0


aor arithmetic operator rep ce arithmetic operator ψ e1ψe2≠e1φe2
replacement with arithmetic operator φ
lcr logical connector replace logical connector ψ e1ψe2 ≠
replacement with logical connector φ e1φe2
ror relational oper tor replace relational operator ψ e1ψe2 ≠
allsyllabus

replacement with relational operator φ e1φe2


uoi unary operator insertion insert unary operator

cpr constant for predicate replace predicate with a


replacement constant value
Statement Modifications
sdl statement deletion delete a statement

sca switch case replace the label of one case


replacement with another
ses end block shift move } one statement earlier
and later

Page 182
Figure 7.2: A sample set of mutation operators for the C language, with associated constraints to
select test cases that distinguish generated mutants from the original program.

Many of the mutants of Figure 7.2 can be applied equally well to other procedural languages, but in
general a mutation operator that produces valid and useful mutants for a given language may not apply
to a different language or may produce invalid or useless mutants for another language. For example, a
mutation operator that removes the "friend" keyword from the declaration of a C++ class would not be
applicable to Java, which does not include friend classes.

7.3 Fault-Based Adequacy Criteria

Given a program and a test suite T, mutation analysis consists of the following steps:

Select mutation operators If we are interested in specific classes of faults, we may select a set of
mutation operators relevant to those faults. com

Generate mutants Mutants are generated mechanically by applying utation operators to the
original program.
allsyllabus
Distinguish mutants Execute the origina program and each generated mutant with the test cases in
T . A mutant is killed when it can be di ting i hed from the original program.

Figure 7.3 shows a sample of mutants for progr m Tr nsduce, obtained by applying the mutant
operators in Figure 16.2(See 7.8.3). Test suite TS

Open Operat lin Origina /Mut 1 1 2 2 2 En Lon Mix


table as or e ant U D U D M d g ed
spreadsh
eet ID
Mi ror 28 (pos >= - - - - - - - -
BUFLEN–2)
(pos ==
BUFLEN–2)
Mj ror 32 (pos > 0) - x x x x - - -
(pos >= 0)
Mk sdl 16 atCR = 0 - - - - - - - -
nothing
Ml ssr 16 atCR = 0 - - - - - - - x
pos = 0

Open table as Description Test Description


spreadsheet Test case case

Page 183
Open table as Description Test Description
spreadsheet Test case case
1U One line, Unix 2M Two lines, Mac line-end
line-end
1D One line, DOS End Last line not terminated with
line-end line-end sequence
2U Two lines, Unix Long Very long line (greater than
line-end buffer length)
2D Two lines, DOS Mixed Mix of DOS and Unix line ends
line-end in the same file
com
Figure 7.3: A sample set of mutants for program Transduce generated with mutation operators
from Figure 7.2 x indicates the mutant is killed by the test case in the lu n head.

kills Mj, which can be distinguished from the original program by test cases 1D,2U, 2D, and 2M.
Mutants M , M , and M are not distinguished from the original program by any test in TS. We say that

mutantis nokt killed bly a test suiteallsyllabusarelive.


A mutant can remain live for two re sons:
The mutant can be distinguished from the original program, but the test suite Tdoes
notcontain a test case that distinguishes them (i.e., the test suite is not adequate with respect
to the mutant).
The mutant cannot be disting i hed from the original program by any test case (i.e., the mutant
is equivalent to the origina program).

Given a set of mutants SM and test suite T, the fraction of nonequivalent mutants killed by T measures
the adequacy of T ith respect to SM. Unfortunately, the problem of identifying equivalent mutants is
undecidable in general, and we could err either by claiming that a mutant is equivalent to the program
under test when it is not or by counting some equivalent mutants among the remaining live mutants.

The adequacy of the test suite TS evaluated with respect to the four mutants of Figure 16.3 is 25%.
However, we can easily observe that mutant Mi is equivalent to the original program (i.e., no input
would distinguish it). Conversely, mutants Mk and Ml seem to be nonequivalent to the original
program: There should be at least one test case that distinguishes each of them from the original
program. Thus the adequacy of TS, measured after eliminating the equivalent mutant Mi, is 33%.
Mutant Ml is killed by test case Mixed, which represents the unusual case of an input file containing
both DOS- and Unix-terminated lines. We would expect that Mixed would also kill Mk, but this does
not actually happen: Both Mk and the original program produce the same result for Mixed. This
happens because both the mutant and the original program fail in the same way. [1] The use of a simple
oracle for checking the correctness of the outputs (e.g., checking each output against an

Page 184
expected output) would reveal the fault. The test suite TS2 obtained by adding test case Mixed to TS
would be 100% adequate (relative to this set of mutants) after removing the fault.
Mutation Analysis vs. Structural Testing

For typical sets of syntactic mutants, a mutation-adequate test suite will also be adequate with respect
to simple structural criteria such as statement or branch coverage. Mutation adequacy can simulate and
subsume a structural coverage criterion if the set of mutants can be killed only by satisfying the
corresponding test coverage obligations. Statement coverage can be simulated by applying the
mutation operator sdl (statement deletion) to each statement of a program. To kill a mutant whose only
difference from the program under test is the absence of statement S requires executing the mutant and
the program under test with a test case that executes S in the original program. Thus to kill all mutants
generated by applying the operator sdl to statements of the program under test, we need a test suite
that causes the execution of each statement in the original
program. Branch coverage can be simulated by applying the operator cpr (constant for predicate
replacement) to all predicates of the program under test with cons comtantsTrueand False. To kill a
mutant that differs from the program under test for a predicate P set t the nstant value False, we need
to execute the mutant and the program under test with a test case that causes the execution of
the True branch of P. To kill a mutant that differs from the program under test for a predicate P set to

the constant value True,we need tallsyllabusoexecutethemutantandtheprogram under test with a test
case that causes the execution of the False branch of P.
7.4 Variations on Mutation Analy is

The mutation analysis process described in the preceding sections, which kills mutants based on the
outputs produced by execution of test cases, is known as strong mutation. It can generate a number of
mutants quadratic in the size of the progr m. Each mutant must be compiled and executed with each
test case until it is killed. The time and space required for compiling all mutants and for executing all
test cases for each mut nt may be impractical. The computational effort required for mutation analysis
can be reduced by decreasing the number of mutants generated and the number of test cases to be
executed. Weak mutation analysis decreases the number of tests to be executed by killing mutants
when they produce a different intermediate state, rather than waiting for a difference in the final result
or observable program behavior. weak mutation analysis

With weak mutation, a single program can be seeded with many faults. A "metamutant" program is
divided into segments containing original and mutated source code, with a mechanism to select which
segments to execute. Two copies of the meta-mutant are executed in tandem, one with only original
program code selected and the other with a set of live mutants selected. Execution is paused after each
segment to compare the program state of the two versions. If the state is equivalent, execution resumes
with the next segment of original and mutated code. If the state differs, the mutant is marked as dead,
and execution of original and mutated code is restarted with a new selection of live mutants.

Page 185
Estimating Population Sizes

Counting fish Lake Winnemunchie is inhabited by two kinds of fish, a native trout and an introduced
species of chub. The Fish and Wildlife Service wishes to estimate the populations to evaluate their
efforts to eradicate the chub without harming the population of native trout.

The population of chub can be estimated statistically as follows. 1000 chub are netted, their dorsal fins
are marked by attaching a tag, then they are released back into the lake. Over the next weeks,
fishermen are asked to report the number of tagged and untagged chub caught. If 50 tagged chub and
300 untagged chub are caught, we can calculate

and thus there are about 6000 untagged chub remaining in the lake.
It may be tempting to also ask fishermen to report the number ofcomtroutcaught and to perform a
similar calculation to estimate the ratio between chub and trout. However, this is valid only if trout
and chub are equally easy to catch, or if one can adjust the ratio using a kn wn model of trout and
chub vulnerability to fishing.

Counting residual faults A similaallsyllabusrprocedrecanbeusedtoe timate the number of faults in a


program: Seed a given number S of f t in the program. Test the program with some test suite and
count the number of revealed faults. Measure the num er of seeded faults detected, DS, and also the
number of natural faults DN detected. Estimate the tot l number of faults remaining in the program,
assuming the test suite is as effective at finding natural faults as it is at finding seeded faults, using the
formula

If we estimate the number of faults remaining in a program by determining the proportion of seeded
faults detected, we must be ary of the pitfall of estimating trout population by counting chub. The
seeded faults are chub, the real faults are trout, and we must either have good reason for believing the
seeded faults are no easier to detect than real remaining faults, or else make adequate allowances for
uncertainty. The difference is that we cannot avoid the problem by repeating the process with trout -
once a fault has been detected, our knowledge of its presence cannot be erased. We depend, therefore,
on a very good fault model, so that the chub are as representative as possible of trout. Of course, if we
use special bait for chub, or design test cases to detect particular seeded faults, then statistical
estimation of the total population of fish or errors cannot be justified.
Hardware Fault-based Testing

Fault-based testing is widely used for semiconductor and hardware system validation and evaluation
both for evaluating the quality of test suites and for evaluating fault tolerance.

Semiconductor testing has conventionally been aimed at detecting random errors in fabrication, rather
than design faults. Relatively simple fault models have been developed for testing

Page 186
semiconductor memory devices, the prototypical faults being "stuck- at-0" and "stuck-at-1" (a gate,
cell, or pin that produces the same logical value regardless of inputs). A number of more complex
fault models have been developed for particular kinds of semiconductor devices (e.g., failures of
simultaneous access in dualport memories). A test vector (analogous to a test suite for software) can
be judged by the number of hypothetical faults it can detect, as a fraction of all possible faults under
the model.

In evaluation of fault tolerance in hardware, the usual approach is to modify the state or behavior
rather than the system under test. Due to a difference in terminology between hardware and software
testing, the corruption of state or modification of behavior is called a "fault," and artificially
introducing it is called "fault injection." Pin-level fault injection consists of forcing a stuck-at-0, a
stuck-at-1, or an intermediate voltage level (a level that is neither a logical 0 nor a logical 1) on a pin
of a semiconductor device. Heavy ion radiation is also used to inject random

simulation of hardware logic design. Fault seeding can be used statisti ally in another way: To
estimate the number of faults remaining in a program. Usually we kn w nly the number of faults that
have been detected, and not the number that remains. However, again to the extent that the fault
faults in a running system. A third approach, growing in importance as hardware complexity

increases, uses software to modify the state of a running system ocomrtsiulate faults in a running

model is a valid statistical model ofallsyllabusactualfaultoccurrence,wecan estimate that the ratio of actual
faults found to those still remaining should be similar to the ratio of seeded faults found to those still
remaining.

Once again, the necessary assumption are troub ing, nd one would be unwise to place too much
confidence in an estimate of remaining faults. Nonetheless, a prediction with known weaknesses is
better than a seat-of-the-pants guess, and a set of estimates derived in different ways is probably the
best one can hope for. While the foc of thi chapter is on fault-based testing of software, related
techniques can be applied to whole systems (hardware and software together) to evaluate fault
tolerance. Some aspects of fault-b sed testing of hardware are discussed in the sidebar on page 323.
Exercises

7.1 Consider the C function in Figure 16.4, used to determine whether a misspelled word differs
from a dictionary ord by at most one character, which may be a deletion, an insertion, or a
substitution (e.g., "text" is edit distance 1 from "test" by a substitution, and edit distance 1 from
"tests" by deletion of "s").

1
2 /* edit1( s1, s2 ) returns TRUE iff s1 can be transformed to s2 3
* by inserting, deleting, or substituting a single character, or 4 *
by a no-op (i.e., if they are already equal).
5 */ 6 int edit1( char *s1, char *s2) {
7 if (*s1 == 0) {
8 if (*s2 == 0) return TRUE;
9 /* Try inserting a character in s1 or deleting in s2 */
10 if (*(s2+1)==0) return TRUE;
11 return FALSE;

Page 187
12 }
13 if (*s2 == 0) { /* Only match is by deleting last char from s1 */
14 if (*(s1 + 1) == 0) return TRUE;
15 return FALSE;
16 }
17 /* Now we know that neither string is empty */
18 if (*s1 == *s2) {
19 return edit1(s1 +1, s2 +1);
20 }
21
22 /* Mismatch; only dist 1 possibilities are identical strings after
23 * inserting, deleting, or substituting character
24 */
25
26 /* Substitution: We "look past" the mismatched character */
27 if (strcmp(s1+1, s2+1) == 0) return TRUE;
28 /* Deletion: look past character in s1 */
29 if (strcmp(s1+1, s2) == 0) return TRUE;
allsyllabus

30 /* Insertion: look past character in s2 */


31 if (strcmp(s1, s2+1) == 0) return TRUE;
32 return FALSE;
33 }

Figure 16.4: C function to determine whether one string is within edit distance 1 of another.

Suppose we seed a fault in line 27, rep acing s1 +1 by s1 + 0. Is there a test case that will kill
this mutant using weak mutation, but not using strong mutation? Display such a test case if
there is one, or explain why there is none.
7.2 We have described eak mutation as continuing execution up to the point that a mutant is
killed, then restarting execution of the original and mutated program from the beginning.
Why doesn't execution just continue after killing a mutant? What would be necessary to
make continued execution possible?
7.3 Motivate the wwwneedforthecompetent programmer and the coupling effect hypotheses. Would
mutation analysis still make sense if these hypotheses did not hold? Why?
7.4 Generate some invalid, valid-but-not-useful, useful, equivalent and nonequivalent mutants
for the program in Figure 16.1(See 7.8.3) using mutant operators from Figure

7.4 Test Execution

Whereas test design, even when supported by tools, requires insight and ingenuity in similar measure
to other facets of software design, test execution must be sufficiently automated for frequent
reexecution without little human involvement. This chapter describes approaches for creating the run-
time support for generating and managing test data, creating scaffolding for test execution, and
automatically distinguishing between correct and incorrect test case executions.

Page 188
From Test Case Specifications to Test Cases

Scaffolding

If the test case specifications produced in test design already include concrete input values and
expected results, as for example in the category-partition method, then producing a complete test case
may be as simple as filling a template with those values. A more general test case specification (e.g.,
one that calls for "a sorted sequence, length greater than 2, with items in ascending order with no
duplicates") may designate many possible concrete test cases, and it may be desirable to generate just
one instance or many. There is no clear, sharp line between test case design and test case generation.
A rule of thumb is that, while test case design involves judgment and creativity, test case generation
should be a mechanical step. Automatic generation of concrete test cases from more abstract test case
specifications reduces the impact of small interface changes in the course of development.
Corresponding changes to the test suite are still required with each program change, but changes to
test case specifications are likely to be smaller and more localized than changes to the concrete test
cases.

During much of development, only a portion of the full system is comtavailable for testing. In modern development methodologies, the p allsyllabusrtiallydevelopedsystemilikely consist of one or more runnable programs and may even be considered a version or prototype of the final system from very

early in construction, so it is possi e t e t to execute each new portion of the software as it is


constructed, but the external interfaces of the evolving system may not be ideal for testing; often
additional code must be added. For example, even if the actual subsystem for placing an order with a
supplier is available and fully operational, it is probably not desirable to place a thousand supply
orders each night as part of an automatic test run. More likely a portion of the order placement
software will be "stubbed out" for mo t te t executions. Code developed to facilitate testing is called
scaffolding, by analogy to the temporary structures erected around a building during construction or
maintenance. Scaffolding may include test drivers (substituting for a main or calling program), test

harnesses (substitutwwwingforparts of the deployment environment), and stubs (substituting for


functionality called or used by the software under test), in addition to program instrumentation and
support for recording and managing test execution. A common estimate is that half of the code
developed in a soft are project is scaffolding of some kind, but the amount of scaffolding that must be
constructed with a soft are project can vary widely, and depends both on the application domain and
the architectural design and build plan, which can reduce cost by exposing appropriate interfaces and
providing necessary functionality in a rational order. The purposes of scaffolding are to provide
controllability to execute test cases and observability to judge the outcome of test execution.
Sometimes scaffolding is required to simply make a module executable, but even in incremental
development with immediate integration of each module, scaffolding for controllability and
observability may be required because the external interfaces of the system may not provide sufficient
control to drive the module under test through test cases, or sufficient observability of the effect. It
may be desirable to substitute a separate test "driver" program for the full system, in order to provide
more direct control of an interface or to remove dependence on other subsystems.

Generic versus Specific Scaffolding

Page 189
The simplest form of scaffolding is a driver program that runs a single, specific test case. If, for
example, a test case specification calls for executing method calls in a particular sequence, this is easy
to accomplish by writing the code to make the method calls in that sequence. Writing hundreds or
thousands of such test-specific drivers, on the other hand, may be cumbersome and a disincentive to
thorough testing. At the very least one will want to factor out some of the common driver code into
reusable modules. Sometimes it is worthwhile to write more generic test drivers that essentially
interpret test case specifications.

At least some level of generic scaffolding support can be used across a fairly wide class of
applications. Such support typically includes, in addition to a standard interface for executing a set of
test cases, basic support for logging test execution and results. Figure 7.1 illustrates use of generic test
scaffolding in the JFlex lexical analyzer generator.

1 public final class IntCharSet {


75 ...
76 public void add(Interval intervall) {
186 ...
187 }
26 public void testAdd1() { allsyllabus
1 package JFlex.tests;
2
3 import JFlex.IntCharSet;
4 import JFlex.Interval;
5 import junit.framework.TestCase;
11 ...
12 public class CharClassesTest extend Te tC e {
25 ...
www
27 IntCharSet set = ne IntCharSet(new Interval('a','h'));
28 set.add(new Interval('o','z'));
29 set.add(new Interval('A','Z'));
30 set.add(new Interval('h','o'));
31 assertEquals("{ ['A'-'Z']['a'-'z'] }", set.toString());
32 }
33
34 public void testAdd2() {
35 IntCharSet set = new IntCharSet(new Interval('a','h'));
36 set.add(new Interval('o','z'));
37 set.add(new Interval('A','Z'));
38 set.add(new Interval('i','n'));
39 assertEquals("{ ['A'-'Z']['a'-'z'] }", set.toString());
40 }
99 ...
100 }

Page 190
Figure 7.1: Excerpt of JFlex 1.4.1 source code (a widely used open-source scanner generator) and
accompanying JUnit test cases. JUnit is typical of basic test scaffolding libraries, providing support for
test execution, logging, and simple result checking (assertEquals in the example). The illustrated
version of JUnit uses Java reflection to find and execute test case methods; later versions of JUnit use
Java annotation (metadata) facilities, and other tools use source code preprocessors or generators.

Test Oracles

It is little use to execute a test suite automatically if execution results must be manually inspected to
apply a pass/fail criterion. Relying on human intervention to judge test outcomes is not merely
expensive, but also unreliable. Even the most conscientious and hard-working person cannot
maintain the level of attention required to identify one failure in a hundred program executions, little
more one or ten thousand. That is a job for a computer. S comftwarethat applies a pass/fail criterion to
a program execution is called a test oracle, often shortened t oracle. In addition to rapidly classifying
a large number of test case executions, automated test racles make it possible to
classify behaviors that exceed human capacity in other ways, su h as hecking real-time response

against latency requirements or deaallsyllabuslingwithvoluminousoutputdata in a machine-readable


rather than human-readable form.
Capture-replay testing, a special ca e of this in which the predicted output or behavior is preserved
from an earlier execution, is discussed in this chapter. A related approach is to capture the output of a
trusted alternate version of the program under test. For example, one may produce output from a
trusted implementation that is for some reason unsuited for production use; it may too slow or may
depend on a component that is not v i e in the production environment. It is not even necessary
that the alternative implementation be more reliable than the program under test, as long as it is
sufficiently different that the failures of the real and alternate version are likely to be independent, and
both are sufficientwwwlyreliablethat not too much time is wasted determining which one has failed a
particular test case on hich they disagree.

Figure 7.2: A test harness with a comparison-based test oracle processes test cases consisting of
(program input, predicted output) pairs.

A third approach to producing complex (input, output) pairs is sometimes possible: It may be easier to
produce program input corresponding to a given output than vice versa. For example, it is simpler to
scramble a sorted array than to sort a scrambled array. A common misperception is that a test oracle
always requires predicted program output to compare to the output produced in a test execution. In
fact, it is often possible to judge output or behavior without predicting it. For example, if a program is
required to find a bus route from station A to station B, a test oracle need not

Page 191
independently compute the route to ascertain that it is in fact a valid route that starts at A and ends at
B. Oracles that check results without reference to a predicted output are often partial, in the sense that
they can detect some violations of the actual specification but not others. They check necessary but
not sufficient conditions for correctness. For example, if the specification calls for finding the
optimum bus route according to some metric, partial oracle a validity check is only a partial oracle
because it does not check optimality. Similarly, checking that a sort routine produces sorted output is
simple and cheap, but it is only a partial oracle because the output is also required to be a permutation
of the input. A cheap partial oracle that can be used for a large number of test cases is often combined
with a more expensive comparison-based oracle that can be used with a smaller set of test cases for
which predicted output has been obtained.

Self-Checks as Oracles

Ideally, a single expression of a specification would serve both as a work assignment and as a source
from which useful test oracles were automatically derived. Specifications are often incomplete, and
their informality typically makes automatic derivation of test oracles impossible. The idea is

nonetheless a powerful one, and wherever forma comlrseiformal specifications (including design
models) are available, it is worth- while to consider whether test oracles can be derived from them.

A program or module specification allsyllabusdescribesallcorrectprogrambehaviors, so an oracle based on a

specification need not be paired with a particular test case.

Figure 7.3: When self-checks are em edded in the program, test cases need not include predicted
outputs.

Self-check assertions may be left in the production version of a system, where they provide much
better diagnostic information than the uncontrolled application crash the customer may otherwise
report. If this is not acceptable - for instance, if the cost of a runtime assertion check is too high - most
tools for assertion processing also provide controls for activating and deactivating assertions. It is
generally considered good design practice to make assertions and self-checks be free of side-effects on
program state. Side-effect free assertions are essential when assertions may be deactivated, because
otherwise suppressing assertion checking can introduce program failures that appear only when one is
not testing. Self-checks in the form of assertions embedded in program code are useful primarily for
checking module and subsystem-level specifications, rather than overall program behavior. Devising
program assertions that correspond in a natural way to specifications (formal or informal) poses two
main challenges: bridging the gap between concrete execution values and abstractions used in
specification, and dealing in a reasonable way with quantification over collections of values.

Page 192
φ is an abstraction function that constructs the abstract model type (sets of key, value pairs) from the
concrete data structure. φ is a logical association that need not be implemented when reasoning about
program correctness. To create a test oracle, it is useful to have an actual implementation of φ. For this
example, we might implement a special observer method that creates a simple textual representation
of the set of (key, value) pairs. Assertions used as test oracles can then correspond directly to the
specification. Besides simplifying implementation of oracles by implementing this mapping once and
using it in several assertions, structuring test oracles to mirror a correctness argument is rewarded
when a later change to the program invalidates some part of that argument (e.g., by changing the
treatment of duplicates or using a different data structure in the implementation).

In addition to an abstraction function, reasoning about the correctness f internal structures usually
involves structural invariants, that is, properties of the data stru ture that are preserved by all operations.
Structural invariants areallsyllabusgoodcandidatesforselfchecks implemented as assertions.
They pertain directly to the concrete data structure implementation, and can be implemented within
the module that encapsulates that data structure. For example, if a dictionary structure is implemented
as a red-black tree or an AVL tree, the b l nce property is an invariant of the structure that can be
checked by an assertion within the module. Figure 7.4 illustrates an invariant check found in the
source code of the Eclipse programming invariant.

1 package org.eclipse.jdt.internal. i.text;


2 import java.text.CharacterIter tor;
3 import org.eclipse.jface.text Assert;
4 /**
5 *A <code>CharSequence</code> based implementation of 6
* <code>CharacterIterator</code>.
7 * @since 3.0
8 */
9 public class SequenceCharacterIterator implements CharacterIterator {
13 ...
14 private void invariant() {
15 Assert.isTrue(fIndex >= fFirst);
16 Assert.isTrue(fIndex <= fLast);
17 }
49 ...
50 public SequenceCharacterIterator(CharSequence sequence, int first, int last)
51 throws IllegalArgumentException {
52 if (sequence == null)
53 throw new NullPointerException();

Page 193
54 if (first < 0 || first > last)
55 throw new IllegalArgumentException();
56 if (last > sequence.length())
57 throw new IllegalArgumentException();
58 fSequence= sequence;
59 fFirst= first;
60 fLast= last;
61 fIndex= first;
62 invariant();
63 }
143 ...
144 public char setIndex(int position) {
145 if (position >= getBeginIndex() && position <= getEndIndex())
146 fIndex= position;
147 else
148 throw new IllegalArgumentException();
149
150 invariant();
151 return current();
152 }
263 ...
264 }
Figure 7.4: A structural invariant allsyllabuscheckedbrun-timeassertions. Excerpted from the Eclipse
programming environment, version 3. © 2000, 2005 IBM Corporation; used under terms of the
Eclipse Public License v1.0.

There is a natural tension between expres iveness that makes it easier to write and understand
specifications, and limits on expressiveness to obtain efficient implementations. It is not much of a
stretch to say that programming languages are just formal specification languages in which
expressiveness has been purposely limited to ensure that specifications can be executed with
predictable and satisfactory performance. An important way in which specifications used for human
communication and reasoning about programs are more expressive and less constrained than
programming languages is that they freely quantify over collections of values. For example, a
specification of database consistency might state that account identifiers are unique; that is, for all
account records in the database, there does not exist another account record with the same identifier.

The problem of quantification over large sets of values is a variation on the basic problem of program
testing, which is that we cannot exhaustively check all program behaviors. Instead, we select a tiny
fraction of possible program behaviors or inputs as representatives. The same tactic is applicable to
quantification in specifications. If we cannot fully evaluate the specified property, we can at least
select some elements to check (though at present we know of no program assertion packages that
support sampling of quantifiers). For example, although we cannot afford to enumerate all possible
paths between two points in a large map, we may be able to compare to a sample of other paths found
by the same procedure. As with test design, good samples require some
Page 194
insight into the problem, such as recognizing that if the shortest path from A to C passes through B, it
should be the concatenation of the shortest path from A to B and the shortest path from B to C.

A final implementation problem for self-checks is that asserted properties sometimes involve values
that are either not kept in the program at all (so-called ghost variables) or values that have been
replaced ("before" values). A specification of noninterference between threads in a concurrent
program may use ghost variables to track entry and exit of threads from a critical section. The
postcondition of an in-place sort operation will state that the new value is sorted and a permutation of
the input value. This permutation relation refers to both the "before" and "after" values of the object to
be sorted. A run-time assertion system must manage ghost variables and retained "before" values and
must ensure that they have no side-effects outside assertion checking.

It may seem unreasonable for a program specification to quantify over an infinite collection, but in
fact it can arise quite naturally when quantifiers are combined with negation. If we say "there is no
com

integer greater than 1 that divides k evenly," we have combined negati n with "there exists" to form
a statement logically equivalent to universal ("for all") quantification ver the integers. We may be
clever enough to realize that it suffices to check integers between 2 and √k, but that is no longer a
direct translation of the specification statement.
can at least avoid unnecessary repetitionallsyllabusofthiscostandopportunity for error. The principle is simple. The first time such a test c se
is executed, the oracle function is carried out by a human, and
Capture and Replay

Sometimes it is difficult to either devi e a precise description of expected behavior or adequately


characterize correct behavior for effective self-checks. For example, while many properties of a
program with a graphical interface may be specified in a manner suitable for comparison-based or
self-check oracles, some properties are likel to require a person to interact with the program and
judge its behavior. If one cannot comp ete void human involvement in test case execution, one

the interaction sequence is captured Provided the execution was judged (by the human tester) to be
correct, the captured log no forms an (input, predicted output) pair for subsequent automated retesting.
The savings from automated retesting with a captured log depends on how many build-and-test cycles
we can continue to use it in, before it is invalidated by some change to the program. Distinguishing bet
een significant and insignificant variations from predicted behavior, in order to prolong the effective
lifetime of a captured log, is a major challenge for capture/replay testing. Capturing events at a more
abstract level suppresses insignificant changes. For example, if we log only the actual pixels of
windows and menus, then changing even a typeface or background color can invalidate an entire suite
of execution logs.

Mapping from concrete state to an abstract model of interaction sequences is sometimes possible but
is generally quite limited. A more fruitful approach is capturing input and output behavior at multiple
levels of abstraction within the implementation. We have noted the usefulness of a layer in which
abstract input events (e.g., selection of an object) are captured in place of concrete events (left mouse
button depressed with mouse positioned at 235, 718). Typically, there is a similar abstract layer in
graphical output, and much of the capture/replay testing can work at this level. Small changes to a
program can still invalidate a large number of execution logs, but it is much

Page 195
more likely that an insignificant detail can either be ignored in comparisons or, even better, the
abstract input and output can be systematically transformed to reflect the intended change.

Exercises

7.1 Voluminous output can be a barrier to naive implementations of comparison- based oracles. For
example, sometimes we wish to show that some abstraction of program behavior is preserved
by a software change. The naive approach is to store a detailed execution log of the original
version as predicted output, and compare that to a detailed execution log of the modified
version. Unfortunately, a detailed log of a single execution is quite lengthy, and
maintaining detailed logs of many test case executions may be impractical. Suggest more

7.2 We have described as an ideal but usually unachievable comgalthattest oracles could be
derived automatically from th allsyllabuseamespecificationstatement used to record and
communicate the intended behavior of a program or module. To what extent does the "test first"
approach of extreme programming (XP) chieve this goal? Disc ss advantages and limitations of
using test cases as a specification statement.

7.3 Often we can choose between on-line self-checks (recognizing failures as they occur) and producing a log of
events or t te for off-line checking. What considerations might motivate one choice or the other?
efficientapproachestoimplementing comparison-based test oracles when it is not possible to

Page 196
UNIT 8
PLANNING AND MONITORING THE PROCESS,
DOCUMENTING ANALYSIS AND TEST
Any complex process requires planning and monitoring. The quality process requires coordination of
many different activities over a period that spans a full development cycle and beyond. Planning is
necessary to order, provision, and coordinate all the activities that support a quality goal, and
monitoring of actual status against a plan is required to steer and adjust the process.

Overview

Planning involves scheduling activities, allocating resources, and devising observable, unambiguous
program units). It may shape tasks to f cilitate coordination; for example,comdelivery may be broken into smaller increments to allow early testing. Some aspect of the project plan, such as feedback and design for testability, may belong equall to the quality plan and other aspects of the project plan.

milestones against which progress and performance can be monitored. Monit ring means answering
the question, "How are we doing?" Quality planning is one aspect f pr je t planning, and quality
processes must be closely coordinated with other development pr cesses. Coordination among
quality and development tasks may constrain ordering (e.g., unit tests are executed after creation of
for subsequent releases and projectsallsyllabusAllocatingreponiiitamong team members is a crucial

and difficult part of planning. When one person plays multiple roles, explicitly identifying each

Quality planning begins at the inception of a project and is developed with the overall project plan,
instantiating and building on a quality strateg that spans several projects. Like the overall project
plan, the quality plan is developed increment , eginning with the feasibility study and
continuing through development and de iver . Form tion of the plan involves risk analysis and
contingency planning. Execution of the plan invo ve monitoring, corrective action, and planning

responsibility is still essential for ensuring that none are neglected.

Quality and Process

A software plan involves many intertwined concerns, from schedule to cost to usability and
dependability. Despite the intertwining, it is useful to distinguish individual concerns and objectives to
lessen the likelihood that they will be neglected, to allocate responsibilities, and to make the overall
planning process more manageable.

An appropriate quality process follows a form similar to the overall software process in which it is
embedded. In a strict (and unrealistic) waterfall software process, one would follow the "V model"
(Figure 8.1 in a sequential manner, beginning unit testing only as implementation commenced
following completion of the detailed design phase, and finishing unit testing before integration testing
commenced. In the XP "test first" method, unit testing is conflated with subsystem and system testing.
A cycle of test design and test execution is wrapped around each small-grain incremental development
step. The role that inspection and peer reviews would play in other
Page 197
processes is filled in XP largely by pair programming. A typical spiral process model lies somewhere
between, with distinct planning, design, and implementation steps in several increments coupled with
a similar unfolding of analysis and test activities. A general principle, across all software processes, is
that the cost of detecting and repairing a fault increases as a function of time between committing an
error and detecting the resultant faults. Thus, whatever the intermediate work products in a software
plan, an efficient quality plan will include a matched set of intermediate validation and verification
activities that detect most faults within a short period of their introduction. Any step in a software
process that is not paired with a validation or verification step is an opportunity for defects to fester,
and any milestone in a project plan that does not include a quality check is an opportunity for a
misleading assessment of progress.

The particular verification or validation step at each stage depends on the nature of the intermediate
work product and on the anticipated defects. For example, anticipated defects in a requirements
statement might include incompleteness, ambiguity, inconsistency, and overambition relative to

project goals and resources. A review step might address some of comthese,and automated analyses
might help with completeness and consistency checking.

The evolving collection of work products can be viewed as a set of des riptions of different parts
and aspects of the software system, at different levels of detail. Portions of the implementation have the
useful property of being executallsyllabusableinaconventionalsene, and are the traditional subject of
testing, but every level of specification and design can be both the subject of verification activities
and a source of information for verifying other artifacts. A typical intermediate artifact - say, a
subsystem interface definition or a database schem - will be subject to the following steps:

Internal consistency check Check the artifact for compliance with structuring rules that define "well-
formed" artifacts of that type. An important point of leverage is defining the syntactic and semantic
rules thoroughly and preci e y enough that many common errors result in detectable violations. This is
analogous to synt x nd strong-typing rules in programming languages, which are not enough to
guarantee program correctness but effectively guard against many simple errors.
External consistencywwwcheckCheck the artifact for consistency with related artifacts. Often this
means checking for conformance to a "prior" or "higher-level" specification, but consistency checking
does not depend on sequential, top-down development - all that is required is that the related
information from t o or more artifacts be defined precisely enough to support detection of
discrepancies. Consistency usually proceeds from broad, syntactic checks to more detailed and
expensive semantic checks, and a variety of automated and manual verification techniques may be
applied.

Generation of correctness conjectures Correctness conjectures, which can be test outcomes or other
objective criteria, lay the groundwork for external consistency checks of other work products,
particularly those that are yet to be developed or revised. Generating correctness conjectures for other
work products will frequently motivate refinement of the current product. For example, an interface
definition may be elaborated and made more precise so that implementations can be effectively tested.

Test and Analysis Strategies

Page 198
Lessons of past experience are an important asset of organizations that rely heavily on technical skills.
A body of explicit knowledge, shared and refined by the group, is more valuable than islands of
individual competence. Organizational knowledge in a shared and systematic form is more amenable
to improvement and less vulnerable to organizational change, including the loss of key individuals.
Capturing the lessons of experience in a consistent and repeatable form is essential for avoiding errors,
maintaining consistency of the process, and increasing development efficiency.
Cleanroom

The Cleanroom process model, introduced by IBM in the late 1980s, pairs development with V&V
activities and stresses analysis over testing in the early phases. Testing is left for system certification.
The Cleanroom process involves two cooperating teams, the development and the quality teams, and
five major activities: specification, planning, design and verification, quality certification, and
feedback.

In the specification activity, the devallsyllabuseopmentteamdefinesthe required behavior of the system,

while the quality team defines usage scenarios that are later used for deriving system test suites. The

planning activity identifies incremental development and certification phases.

After planning, all activities are iterated to produce incremental releases of the system. Each system
increment is fully deployed and certified before the following step. Design and code undergo formal
inspection ("Correctness verification") before release. One of the key premises underpinning the
Cleanroom process model is that rigorous design and formal inspection produce "nearly fault-free
software."

The quality strategy is an intellectual asset of an individual organization prescribing a set of solutions
to problems specific to that organization. Among the factors that particularize the strategy are:

Structure and size Large organizations typically have sharper distinctions between development and
quality groups, even if testing personnel are assigned to development teams. In smaller organizations,
it is more common for a single person to serve multiple roles. Where responsibility is distributed
among more individuals, the quality strategy will require more elaborate attention to

Page 199
coordination and communication, and in general there will be much greater reliance on documents to
carry the collective memory.

In a smaller organization, or an organization that has devolved responsibility to small, semi-


autonomous teams, there is typically less emphasis on formal communication and documents but a
greater emphasis on managing and balancing the multiple roles played by each team member.

Overall process We have already noted the intertwining of quality process with other aspects of an
overall software process, and this is of course reflected in the quality strategy. For example, if an
organization follows the Cleanroom methodology, then inspections will be required but unit testing
forbidden. An organization that adopts the XP methodology is likely to follow the "test first" and pair
programming elements of that approach, and in fact would find a more document-heavy approach a
difficult fit.

Notations, standard process steps, and even tools can be reflected in the quality strategy to the extent
they are consistent from project to project. For example, if ancomrganization consistently uses a
particular combination of UML diagram notations to document subsyste interfaces, then the quality
strategy might include derivation of test designs from those n tati ns, as well as review and
analysis steps tailored to detect the most common and important design flaws at that point. If a

particular version and configurationallsyllabuscontrolsystemiswoveninto process management, the


quality strategy will likewise exploit it to support and enforce quality process steps.
Application domain The domain m y impose both particular quality objectives (e.g., privacy and
security in medical records processing), and in some cases particular steps and documentation required
to obtain certification from an externa authority. For example, the RTCA/DO-178B standard for
avionics software requires testing to the modified condition/decision coverage (MC/DC) criterion.

SRET

The software reliability engineered testing (SRET) approach, developed at AT&T in the early 1990s,
assumes a spiral development process and augments each coil of the spiral with rigorous testing
activities. SRET identifies two main types of testing: development testing, used to find and remove
faults in soft are at least partially developed in-house, and certification testing, used to either accept or
reject outsourced software. The SRET approach includes seven main steps. Two initial, quick
decision-making steps determine which systems require separate testing and which type of testing is
needed for each system to be tested. The five core steps are executed in parallel with each coil of a
spiral development process.

Page 200
The five core steps of SRET are:

Extreme Programming (XP)

Define "Necessary" Reliability Determine operational models, that is, distinct patterns of system
usage that require separate testing, classify failures according to their severity, and engineer the
reliability strategy with fault prevention, fault removal, and fault tolerance activities.

Develop Operational Profiles Develop both overall profiles that span operational models and
operational profiles within single operational models.

Prepare for Testing Specify test cases and procedures.

Execute Tests

Interpret Failure Data Interpretation of failure data depends on the type of testing. In development
testing, the goal is to track progress and compare present failure intensities with objectives. In
certification testing, the goal is to determine if a software componen comtorsystem should be accepted
or rejected.

The extreme programming methodology (XP) emphasizes simplicity ver generality, global vision and
communication over structuredallsyllabusorganization,frequentchanges over big releases, continuous
testing and analysis over separation of roles and responsibilities, and continuous feedback over
traditional planning.

Customer involvement in an XP project includes requirements analysis (development, refinement, and


prioritization of user stories) and acceptance testing of very frequent iterative releases. Planning is
based on prioritization of user storie , which are implemented in short iterations. Test cases
corresponding to scenarios in user storie serve as partial specifications.
Test cases suitable for batch execution are part of the system code base and are implemented prior to
the implementation of features they check ("test-first"). Developers work in pairs, incrementally
developing and testing a module. Pair programming effectively conflates a review activity with
coding. Each release is checked by running all the tests devised up to that point of development, thus
essentially merging unit testing with integration and system testing. A failed acceptance test is viewed
as an indication that additional unit tests are needed.

Although there are no standard templates for analysis and test strategies, we can identify a few
elements that should be part of almost any good strategy. A strategy should specify common quality
requirements that apply to all or most products, promoting conventions for unambiguously stating and
measuring them, and reducing the likelihood that they will be overlooked in the quality plan for a
particular project. A strategy should indicate a set of documents that is normally produced during
Page 201
the quality process, and their contents and relationships. It should indicate the activities that are
prescribed by the overall process organization. Often a set of standard tools and practices will be
prescribed, such as the interplay of a version and configuration control tool with review and testing
procedures. In addition, a strategy includes guidelines for project staffing and assignment of roles and
responsibilities. An excerpt of a sample strategy document is presented in Chapter 24(See 8.5).

Test and Analysis Plans

An analysis and test plan details the steps to be taken in a particular project. A plan should answer the
following questions:
 What quality activities will be carried out?
What are the dependencies among the quality activities and between quality and development
activities?
 What resources are needed and how will they be allocated?

How will both the process and the evolving product be mocomnitredtoaintain an
adequateassessment of quality and early warning of quality and schedule pr ble s?

Each of these issues is addressed to some extent in the quality strategy, but must be elaborated and
particularized. This is typically the responsibility of a quality manager, who should participate in the

initial feasibility study to identify allsyllabusqualitygoalsandestimatethe contribution of test and


analysis tasks on project cost and schedule.
To produce a quality plan that adeq ately addresses the questions above, the quality manager must
identify the items and features to be verified, the resources and activities that are required, the
approaches that should be followed, and criteria for evaluating the results. Items and features to be
verified circumscribe the target of the q ity plan. While there is an obvious correspondence between
items to be developed or modified and those to undergo testing, they may differ somewhat in detail.
For example, overall ev lu tion of the user interface may be the purview of a separate human factors
group. The items to be verified, moreover, include many intermediate artifacts such as requirements

spewwwcificationsand design documents, in addition to portions of the delivered system. Approaches


to be taken in verification and validation may vary among items. For example, the plan may prescribe
inspection and testing for all items and additional static analyses for multi-threaded subsystems.
Quality goals must be expressed in terms of properties satisfied by the product and must be further
elaborated ith metrics that can be monitored during the course of the project. For example, if known
failure scenarios are classified as critical, severe, moderate, and minor, then we might decide in
advance that a product version may enter end-user acceptance testing only when it has undergone
system testing with no outstanding critical or severe failures.

Defining quality objectives and process organization in detail requires information that is not all
available in the early stages of development. Test items depend on design decisions; detailed
approaches to evaluation can be defined only after examining requirements and design specifications;
tasks and schedule can be completed only after the design; new risks and contingencies may be
introduced by decisions taken during development. On the other hand, an early plan is necessary for
estimating and controlling cost and schedule. The quality manager must

Page 202
start with an initial plan based on incomplete and tentative information, and incrementally refine the
plan as more and better information becomes available during the project.

The primary tactic available for reducing the schedule risk of a critical dependence is to decompose a
task on the critical path, factoring out subtasks that can be performed earlier. For example, an
acceptance test phase late in a project is likely to have a critical dependence on development and
system integration. One cannot entirely remove this dependence, but its potential to delay project
completion is reduced by factoring test design from test execution.

Figure 8.1 shows alternative schedules for a simple project that starts at the beginning of January and
must be completed by the end of May. In the top schedule, indicated as CRITICAL SCHEDULE, the
tasks Analysis and design, Code and Integration, Design and execute subsystem tests, and Design and
execute system tests form a critical path that spans the duration of the entire project. A delay in any of
the activities will result in late delivery. In this schedule, only the Produce user documentation task
does not belong to the critical path, and thus only delays of this task can be tolerated.

Figure 8.1: Three possible simple schedules with different risks and resource allocation. The bars
indicate the duration of the tasks. Diamonds indicate milestones, and arrows between bars indicate
precedence between tasks.

In the middle schedule, marked as UNLIMITED RESOURCES, the test design and execution activities
are separated into distinct tasks. Test design tasks are scheduled early, right after analysis and design,
and only test execution is scheduled after Code and integration. In this way the tasks Design
subsystem tests and Design system tests are removed from the critical path, which now spans 16 weeks
with a tolerance of 5 weeks with respect to the expected termination of the project. This schedule
assumes enough resources for running Code and integration, Production of user documentation,
Design of subsystem tests, and Design of system tests.

Page 203
The LIMITED RESOURCES schedule at the bottom of Figure 20.1 rearranges tasks to meet resource
constraints. In this case we assume that test design and execution, and production of user
documentation share the same resources and thus cannot be executed in parallel. We can see that,
despite the limited parallelism, decomposing testing activities and scheduling test design earlier results
in a critical path of 17 weeks, 4 weeks earlier than the expected termination of the project. Notice that
in the example, the critical path is formed by the tasks Analysis and design, Design subsystem tests,
Design system tests, Produce user documentation, Execute subsystem tests, and
Execute system tests. In fact, the limited availability of resources results in dependencies among
Design subsystem tests, Design system tests and Produce user documentation that last longer than the
parallel task Code and integration.
The completed plan must include frequent milestones for assessing progress. A rule of thumb is that,
for projects of a year or more, milestones for assessing progress should occur at least every three
months. For shorter projects, a reasonable maximum interval for assessment is one quarter of project

duration. com
Figure 8.2 shows a possible schedule for the initial analysis and test plan f r the business logic of the
Chipmunk Web presence in the form of a GANTT diagram. In the initial plan, the manager has
allocated time and effort to inspec allsyllabustionofallmajorartifacts,as well as test design as early as
practical and ongoing test execution during development. Divi ion of the project into major parts is
reflected in the plan, but further ela or tion of tasks associated with units and smaller subsystems must
await corresponding elaboration of the architectural design. Thus, for example, inspection of the
shopping facilities code and the unit test suites is shown as a single aggregate task. Even this initial
plan does reflect the usual Chipmunk deve opment strategy of regular "synch and stabilize" periods
punctuating development, and the initial quality plan reflects the Chipmunk strategy of assigning
responsibility for producing nit te t uites to developers, with review by a member of the quality team.

Figure 20.2: Initial schedule for quality activities in development of the business logic subsystem
of the Chipmunk Web presence, presented as a GANTT diagram.

The GANTT diagram shows four main groups of analysis and test activities: design inspection, code
inspection, test design, and test execution. The distribution of activities over time is constrained by
resources and dependence among activities. For example, system test execution starts

Page 204
after completion of system test design and cannot finish before system integration (the sync and
stablize elements of development framework) is complete. Inspection activities are constrained by
specification and design activities. Test design activities are constrained by limited resources. Late
scheduling of the design of integration tests for the administrative business logic subsystem is
necessary to avoid overlap with design of tests for the shopping functionality subsystem.

Risk Planning

The GANTT diagram does not highlight intermediate milestones, but we can easily identify two in
April and July, thus dividing the development into three main phases. The first phase (January to
April) corresponds to requirements analysis and architectural design activities and terminates with the
architectural design baseline. In this phase, the quality team focuses on design inspection and on the
design of acceptance and system tests. The second phase (May to July) corresponds to subsystem
design and to the implementation of the first complete version of the system. It terminates with the
first stabilization of the administrative business logic subsystem. In this phase, the quality team
completes the design inspection and the design of test cases. In the final stage, the development team
produces the final version, while the quality teamcomfocuseson code inspection and test execution.

Absence of test design activities in the last phase results from careful identifi ation of activities that
allowed early planning of critical tasks.

Risk is an inevitable part of every project,allsyllabusndsoriskplanningmust be a part of every plan. Risks

cannot be eliminated, but they can be assessed, controlled, and monitored.

The duration of integration, system, and acceptance test execution depends to a large extent on the
quality of software under test. Softw re th t is sloppily constructed or that undergoes inadequate
analysis and test before commitment to the code base will slow testing progress. Even if responsibility
for diagnosing test f ilures lies with developers and not with the testing group, a test execution session
that results in many failures and generates many failure reports is inherently more time consuming
than executing a suite of tests with few or no failures. This schedule vulnerability is yet another reason
to emphasize earlier activities, in particular those that provide early indications of quality problems.
Inspection of design and code (with quality team participation) can help control this risk, and also
serves to communicate quality standards and best practices among the team. If unit testing is the
responsibility of developers, test suites are part of the unit deliverable and should undergo inspection
for correctness, thoroughness, and automation. While functional and structural coverage criteria are no
panacea for measuring test thoroughness, it is reasonable to require that deviations from basic
coverage criteria be justified on a case-by-case basis. A substantial deviation from the structural
coverage observed in similar products may be due to many causes, including inadequate testing,
incomplete specifications, unusual design, or implementation decisions. The modules that present
unusually low structural coverage should be inspected to identify the cause.

The cost of analysis and test is multiplied when some requirements demand a very high level of
assurance. For example, if a system that has previously been used in biological research is modified or
redeveloped for clinical use, one should anticipate that all development costs, and particularly
Page 205
costs of analysis and test, will be an order of magnitude higher. In addition to the risk of
underestimating the cost and schedule impact of stringent quality requirements, the risk of failing to
achieve the required dependability increases. One important tactic for controlling this risk is isolating
critical properties as far as possible in small, simple components. Of course these aspects of system
specification and architectural design are not entirely within control of the quality team; it is crucial
that at least the quality manager, and possibly other members of the quality team, participate in
specification and design activities to assess and communicate the impact of design alternatives on cost
and schedule.

Monitoring the Process

The quality manager monitors progress of quality activities, including results as well as schedule, to
identify deviations from the quality plan as early as possible and take corrective action. Effective
monitoring, naturally, depends on a plan that is realistic, well organized, and sufficiently detailed
com

with clear, unambiguous milestones and criteria. We say a process is visible to the extent that it can
be effectively monitored.

Successful completion of a planned


otherwise it is too tempting to meet
activity must be distinguished fro
n impending deadline by omitting
mere termination, as
some planned work.

Skipping planned verification activitiesallsyllabusoraddressingthemuperficially can seem to


accelerate a the quality process are summarized in the sidebar on page 391.
late project, but the boost is only app rent; the real effect is to postpone detection of more faults to
later stages in development, where their detection and removal will be far more threatening to project
success.
Risk Management in the Quality Plan: Risks Generic to Process Management

The quality plan must identify potenti ri k and define appropriate control tactics. Some risks and
control tactics are generic to process management, while others are specific to the quality process.
Here we provide a brief overview of some risks generic to process management. Risks specific to

Personnel Risks Example Control Tactics


A staff member is lost (becomes ill, Cross train to avoid overdependence on individuals;
changes employer, etc.) or is encourage and schedule continuous education; provide
underqualified for task (the project open communication with opportunities for staff self-
plan assumed a level of skill or assessment and identification of skills gaps early in the
familiarity that the assigned member project; provide competitive compensation and promotion
did not have). policies and a rewarding work environment to retain staff;
include training time in the project schedule.
Technology Risks Example Control Tactics

Many faults are introduced Anticipate and schedule extra time for testing unfamiliar
interfacing to an unfamiliar interfaces; invest training time for COTS components and
commercial off-the-shelf (COTS) for training with new tools; monitor, document, and
component. publicize common errors and correct idioms; introduce
new tools in lower-risk pilot projects or prototyping
Page 206
exercises.
Test and analysis automation tools do Introduce new tools in lower-risk pilot projects or
not meet expectations. prototyping exercises; anticipate and schedule time for
training with new tools.

COTS components do not meet Include COTS component qualification testing early in
quality expectations. project plan; introduce new COTS components in lower-
risk pilot projects or prototyping exercises.
Schedule Risks Example Control Tactics
Inadequate unit testing leads to Track and reward quality unit testing as evidenced by
unanticipated expense and delays in low-fault densities in integration.
integration testing.
Difficulty of scheduling meetings Set aside times in a weekly s hedule in which
makes inspection a bottleneck in inspections take precedence ver ther meetings and
development. other work; try distributed and asynchronous inspection
techniques, with a lower frequency of face-to-face
allsyllabus

inspection meetings. com

Risk Management in the Quality Plan: Risks Specific to Quality Management

Here we provide a brief overview of some risk specific to the quality process. Risks generic to
process management are summarized in the sidebar at page 390.
Development Risks Ex mp e Contro Tactics
Poor quality software delivered to Provide e r w rning and feedback; schedule
testing group or inadequate unit test inspection of de ign, code and test suites; connect
and analysis before committing to the development and inspection to the reward system;
code base. increase training through inspection; require coverage
or other criteria at unit test level.
Executions Risks Example Control Tactics
Execution costs higher than planned; Minimize parts that require full system to be executed;
scarce resources available for testing inspect architecture to assess and improve testability;
(testing requires expensive or complex increase intermediate feedback; invest in scaffolding.
machines or systems not easily
available.)
Requirements Risks Example Control Tactics
High assurance critical requirements. Compare planned testing effort with former projects
with similar criticality level to avoid underestimating
testing effort; balance test and analysis; isolate critical
parts, concerns and properties.

Page 207
One key aggregate measure is the number of faults that have been revealed and removed, which can
be compared to data obtained from similar past projects. Fault detection and removal can be tracked
against time and will typically follow a characteristic distribution similar to that shown in Figure 8.3.
The number of faults detected per time unit tends to grow across several system builds, then to
decrease at a much lower rate (usually half the growth rate) until it stabilizes.

Figure 8.3: A typical distribution of faults for system builds throughcomtie.

An unexpected pattern in fault detecallsyllabustionmaybeasymptomof problems. If detected faults stop


growing earlier than expected, one might hope it indicates exceptionally high quality, but it would
be wise to consider the alternative hypothesis th t f ult detection efforts are ineffective. A growth rate
that remains high through more than half the p anned system builds is a warning that quality goals
may be met late or not at all, and ma indicate weaknesses in fault removal or lack of discipline in
development (e.g., a ru h to add features before delivery, with a consequent deemphasis on quality
control).
A second indicator of problems in the q ality process is faults that remain open longer than expected.

Quality pwwwroblemsareconfirmed when the number of open faults does not stabilize at a level
acceptable to stakeholders.
The accuracy with hich we can predict fault data and diagnose deviations from expectation depends on
the stability of the software development and quality processes, and on availability of data from
similar projects. Differences between organizations and across application domains are wide, so by far
the most valuable data is from similar projects in one's own organization.

The faultiness data in Figure 8.3 are aggregated by severity levels. This helps in better understanding
the process. Growth in the number of moderate faults late in the development process may be a
symptom of good use of limited resources concentrated in removing critical and severe faults, not
spent solving moderate problems. Accurate classification schemata can improve monitoring and may
be used in very large projects, where the amount of detailed information cannot be summarized in
overall data. The orthogonal defect classification (ODC) approach has two main steps: (1) fault
classification and (2) fault analysis.

Page 208
ODC fault classification is done in two phases: when faults are detected and when they are fixed. At
detection time, we record the activity executed when the fault is revealed, the trigger that exposed the
fault, and the perceived or actual impact of the fault on the customer. A possible taxonomy for
activities and triggers is illustrated in the sidebar at page 395. Notice that triggers depend on the
activity. The sidebar at page 396 illustrates a possible taxonomy of customer impacts.

The detailed information on faults allows for many analyses that can provide information on the
development and the quality process. As in the case of analysis of simple faultiness data, the
interpretation depends on the process and the product, and should be based on past experience. The
taxonomy of faults, as well as the analysis of faultiness data, should be refined while applying the
method. When we first apply the ODC method, we can perform some preliminary analysis using only
part of the collected information:

Distribution of fault types versus activities Different quality activities target different classes of
faults. For example, algorithmic (that is, local) faults are targeted pcomrimarilybyunit testing, and we
expect a high proportion of faults detected by unit testing to be in this class. If the proportion of
algorithmic faults found during unit testing is unusually small, or a larger than normal proportion of
algorithmic faults are found during integration testing, then one may reas nably suspect that unit

Distribution of triggers over time during field test F ults corresponding to simple usage should
arise early during field test, while faults corresponding to complex usage should arise late. In both
cases, the rate of disclosure of new faults should asymptotically decrease. Unexpected distributions
tests have not been well designed. If the mix of faults found during integration testing contains an

unusually high proportion of algoriallsyllabusthmicfaults,itisalsopoible that integration testing has

not focused strongly enough on interface faults.

of triggers over time may indicate poor y tem or acceptance test. If triggers that correspond to
simple usage reveal many faults late in cceptance testing, we may have chosen a sample that is not
representative of the user popul tion. If faults continue growing during acceptance test, system testing

may have faiwwwled,andemay decide to resume it before continuing with acceptance testing.
Age distribution over target code Most faults should be located in new and rewritten code, while
few faults should be found in base or re-fixed code, since base and re-fixed code has already been
tested and corrected. Moreover, the proportion of faults in new and rewritten code with respect to base
and re-fixed code should gradually increase. Different patterns may indicate holes in the fault tracking
and removal process or may be a symptom of inadequate test and analysis that failed in revealing
faults early (in previous tests of base or re-fixed code). For example, an increase of faults located in
base code after porting to a new platform may indicate inadequate tests for portability.

Distribution of fault classes over time The proportion of missing code faults should gradually
decrease, while the percentage of extraneous faults may slowly increase, because missing functionality
should be revealed with use and repaired, while extraneous code or documentation may be produced
by updates. An increasing number of missing faults may be a symptom of instability of the product,
while a sudden sharp increase in extraneous faults may indicate maintenance problems.

Improving the Process

Page 209
Many classes of faults that occur frequently are rooted in process and development flaws. For
example, a shallow architectural design that does not take into account resource allocation can lead to
resource allocation faults. Lack of experience with the development environment, which leads to
misunderstandings between analysts and programmers on rare and exceptional cases, can result in
faults in exception handling. A performance assessment system that rewards faster coding without
regard to quality is likely to promote low quality code.

The occurrence of many such faults can be reduced by modifying the process and environment. For
example, resource allocation faults resulting from shallow architectural design can be reduced by
introducing specific inspection tasks. Faults attributable to inexperience with the development
environment can be reduced with focused training sessions. Persistently poor programming practices
may require modification of the reward system.
Often, focused changes in the process can lead to product improvement and significant cost reduction.

Unfortunately, identifying the weak aspects of a processcomanbeextremely difficult, and


often the results of process analysis surprise even expert managers. The analysis of the fault history
can help software engineers build a feedback mechanism to track relevant faults to their root causes,
thus providing vital information for improving the process. In some ases, information can be fed

occurrence of severe memory management faults in C programs, we might revise inspection checklists and
introduce dynamic analysis tools, but it may be too late to change early design decisions or select a different
programming langu ge in the project underway. More fundamental changes may be made in future projects.
back directly into the current product development, but more often it helps software engineers improve the

development of futureallsyllabusproducts.Forexample,ifanalysis of faults reveals frequent

Root cause analysis (RCA) is a technique for identifying and eliminating process faults. RCA was
first developed in the nuclear power industr and later extended to software analysis. It consists of
four main steps to select signific nt cl sses of faults and track them back to their original causes:
What are the faults?wwwThegoalof this first step is to identify a class of important faults. Faults are

What, When, Why, and Ho .

categorized by severity and kind. The severity of faults characterizes the impact of the fault on the
product. Although different methodologies use slightly different scales and terms, all of them identify
a few standard levels, described in Table 8.1.
Table 8.1: Standard severity levels for root cause analysis (RCA). Open table as spreadsheet
Level Description Example
Critical The product is unusable. The fault causes the program to crash.
Severe Some product features cannot The fault inhibits importing files saved with a
be used, and there is no previous version of the program, and there is no
workaround. way to convert files saved in the old format to the
new one.
Page 210
Table 8.1: Standard severity levels for root cause analysis (RCA). Open table as spreadsheet
Level Description Example
Moderate Some product features require The fault inhibits exporting in Postscript format.
workarounds to use, and reduce Postscript can be produced using the printing
efficiency, reliability, or facility, but the process is not obvious or
convenience and usability. documented (loss of usability) and requires extra
steps (loss of efficiency).
Cosmetic Minor inconvenience. The fault limits the choice of colors for
customizing the graphical interface, violating the
specification but causing only minor
inconvenience. com

The RCA approach to categorizing faults, in contrast to ODC, d es n t use a predefined set of
categories. The objective of RCA is not to compare different lasses of faults over time, or to
analyze and eliminate all possible faults, but rather to identify the few most important classes of faults
and remove their causes. SucallsyllabuscessfulapplicationofRCAprogressively eliminates the causes
of the currently most important faults, which lose importance over time, so applying a static
predefined classification would be useless. Moreover, the precision with which we identify faults
depends on the specific project and process and v ries over time.
ODC Classification of Triggers Listed by Activity

Design Review and Code Inspection

Design Conformance A discrep nc between the reviewed artifact and a prior-stage artifact that serves
as its specification.

Logic/Flow An algorithmic or logic flaw.

Backward Compatibility A difference between the current and earlier versions of an artifact that
could be perceived by the customer as a failure.

Internal Document An internal inconsistency in the artifact (e.g., inconsistency between code and
comments).

Lateral Compatibility An incompatibility between the artifact and some other system or module with
which it should interoperate.

Concurrency A fault in interaction of concurrent processes or threads.

Language Dependency A violation of language-specific rules, standards, or best practices.

Side Effects A potential undesired interaction between the reviewed artifact and some other part of
the system.

Page 211
Rare Situation An inappropriate response to a situation that is not anticipated in the artifact. (Error
handling as specified in a prior artifact design conformance, not rare situation.)

System Test

Structural (White-Box) Test

Simple Path The fault is detected by a test case derived to cover a single program element.

Complex Path The fault is detected by a test case derived to cover a combination of program
elements.

Functional (Black-Box) Test

Coverage The fault is detected by a test case derived for testing a single procedure (e.g., C function or
Java method), without considering combination of values for possible parameters.
Variation The fault is detected by a test case derived to exercise a particular combination of

parameters for a single procedure. com

Sequencing The fault is detected by a test case derived for testing a sequen e of procedure calls.
Interaction The fault is detected by a test case derived for testing procedure interactions.

Workload/Stress The fault is detectedallsyllabusdringworkloadorstresstesting.

Recovery/Exception The fault is detected whi e testing exceptions and recovery procedures.
Startup/Restart The fault is detected whi e te ting initialization conditions during start up or after
possibly faulty shutdowns.

Hardware Configuration The fault is detected while testing specific hardware configurations.

Software Configuration The fault is detected while testing specific software configurations.

Blocked Test Failure occurred in setting up the test scenario.


ODC Classification of Customer Impact

Installability Ability of the customer to place the software into actual use. (Usability of the installed
software is not included.)

Integrity/Security Protection of programs and data from either accidental or malicious destruction or
alteration, and from unauthorized disclosure.

Performance The perceived and actual impact of the software on the time required for the customer
and customer end users to complete their tasks.

Maintenance The ability to correct, adapt, or enhance the software system quickly and at minimal
cost.

Page 212
Serviceability Timely detection and diagnosis of failures, with minimal customer impact.

Migration Ease of upgrading to a new system release with minimal disruption to existing customer
data and operations.

Documentation Degree to which provided documents (in all forms, including electronic) completely
and correctly describe the structure and intended uses of the software.

Usability The degree to which the software and accompanying documents can be understood and
effectively employed by the end user.

Standards The degree to which the software complies with applicable standards.

Reliability The ability of the software to perform its intended function without unplanned interruption
or failure.
Accessibility The degree to which persons with disabilities cancomobtainthe full benefit of the
software system.
Capability The degree to which the software performs its intended fun tions consistently with

documented system requirements. allsyllabus

Requirements The degree to which the system, in complying with document requirements, actually
meets customer expectations
ODC Classification of Defect Types for Targets Design and Code

Assignment/Initialization A variable was not assigned the correct initial value or was not assigned
any initial value.

Checking Procedure parameters or v ri b es were not properly validated before use.

Algorithm/Method A correctness or efficiency problem that can be fixed by reimplementing a single


procedure or local data structure, without a design change.

Function/Class/Object A change to the documented design is required to conform to product


requirements or interface specifications.

Timing/Synchronization The implementation omits necessary synchronization of shared resources,


or violates the prescribed synchronization protocol.

Interface/Object-Oriented Messages Module interfaces are incompatible; this can include


syntactically compatible interfaces that differ in semantic interpretation of communicated data.

Relationship Potentially problematic interactions among procedures, possibly involving different


assumptions but not involving interface incompatibility.

A good RCA classification should follow the uneven distribution of faults across categories. If, for
example, the current process and the programming style and environment result in many interface
faults, we may adopt a finer classification for interface faults and a coarse-grain classification of

Page 213
other kinds of faults. We may alter the classification scheme in future projects as a result of having
identified and removed the causes of many interface faults.

The 80/20 or Pareto Rule

Classification of faults should be sufficiently precise to allow identifying one or two most significant
classes of faults considering severity, frequency, and cost of repair. It is important to keep in mind that
severity and repair cost are not directly related. We may have cosmetic faults that are very expensive
to repair, and critical faults that can be easily repaired. When selecting the target class of faults, we
need to consider all the factors. We might, for example, decide to focus on a class of moderately
severe faults that occur very frequently and are very expensive to remove, investing fewer resources in
preventing a more severe class of faults that occur rarely and are easily repaired.

When did faults occur, and when were they found? It is typical of mature software processes to
collect fault data sufficient to determine when each fault was detected (e.g., in integration test or in a
design inspection). In addition, for the class of faults identified in the first step, we attempt to

determine when those faults were introduced (e.g., was a particular comfaultintroduced in coding, or
did it result from an error in architectural design?).

Why did faults occur? In this core RCA step, we attempt to tra e representative faults back to
causes, with the objective of identifying a "root" cause associated with any faults in the class.
Analysis proceeds iteratively by atteallsyllabusmptingtoexplaintheerrorthat led to the fault, then the cause
of that error, the cause of that cause, and so on. The rule of thumb "ask why six times" does not
provide a precise stopping rule for the analysis, but suggests that several steps may be needed to find a
cause in common among a large fraction of the f ult class under consideration.

Fault classification in root cause analy i i justified by the so-called 80/20 or Pareto rule. The Pareto
rule is named for the Italian economi t Vilfredo Pareto, who in the early nineteenth century proposed a
mathematical power l w formula to describe the unequal distribution of wealth in his country,
observing that 20% of the people owned 80% of the wealth.

Pareto observed that in many populations, a few (20%) are vital and many (80%) are trivial. In fault
analysis, the Pareto rule postulates that 20% of the code is responsible for 80% of the faults. Although
proportions may vary, the rule captures two important facts:
1. Faults tend to accumulate in a few modules, so identifying potentially faulty modules can
improve the cost effectiveness of fault detection.
2. Some classes of faults predominate, so removing the causes of a predominant class of faults
can have a major impact on the quality of the process and of the resulting product.

The predominance of a few classes of faults justifies focusing on one class at a time.

Tracing the causes of faults requires experience, judgment, and knowledge of the development
process. We illustrate with a simple example. Imagine that the first RCA step identified memory leaks
as the most significant class of faults, combining a moderate frequency of occurrence with severe
impact and high cost to diagnose and repair. The group carrying out RCA will try to identify the cause
of memory leaks and may conclude that many of them result from forgetting to release memory in
exception handlers. The RCA group may trace this problem in exception handling to

Page 214
lack of information: Programmers can't easily determine what needs to be cleaned up in exception
handlers. The RCA group will ask why once more and may go back to a design error: The resource
management scheme assumes normal flow of control and thus does not provide enough information to
guide implementation of exception handlers. Finally, the RCA group may identify the root problem in
an early design problem: Exceptional conditions were an afterthought dealt with late in design.

The Quality Team

Each step requires information about the class of faults and about the development process that can be
acquired through inspection of the documentation and interviews with developers and testers, but the
key to success is curious probing through several levels of cause and effect.

How could faults be prevented? The final step of RCA is improving the process by removing root
causes or making early detection likely. The measures taken may have a minor impact on the
development process (e.g., adding consideration of exceptional conditions to a design inspection

checklist), or may involve a substantial modification of the comprocess(e.g., making explicit


consideration of exceptional conditions a part of all requirements analysis and design steps). As in
tracing causes, prescribing preventative or detection measures requires judg ent, keeping in mind that
the goal is not perfection but cost-effective improvement. ODC and RCA are two examples of
feedback and improvement, which are an important dimension of most good s ftware processes.

The quality plan must assign roles andallsyllabusreponsibilitiestopeople.As with other aspects of planning,

assignment of responsibility occurs at a strategic evel and a tactical level. The tactical level,
represented directly in the project plan, assigns responsibility to individuals in accordance with the
general strategy. It involves balancing eve of effort across time and carefully managing personal
interactions. The strategic level of organization is represented not only in the quality strategy
document, but in the structure of the org nization itself.
The strategy for assigning responsibility may be partly driven by external requirements. For example,
independent quality teams may be required by certification agencies or by a client organization.
Additional objectives include ensuring sufficient accountability that quality tasks are not easily
overlooked; encouraging objective judgment of quality and preventing it from being subverted by
schedule pressure; fostering shared commitment to quality among all team members; and developing
and communicating shared knowledge and values regarding quality.

Each of the possible organizations of quality roles makes some objectives easier to achieve and some
more challenging. Conflict of one kind or another is inevitable, and therefore in organizing the team it
is important to recognize the conflicts and take measures to control adverse consequences. If an
individual plays two roles in potential conflict (e.g., a developer responsible for delivering a unit on
schedule is also responsible for integration testing that could reveal faults that delay delivery), there
must be countermeasures to control the risks inherent in that conflict. If roles are assigned to different
individuals, then the corresponding risk is conflict between the individuals (e.g., if a developer and a
tester do not adequately share motivation to deliver a quality product on schedule).

Page 215
An independent and autonomous testing team lies at one end of the spectrum of possible team
organizations. One can make that team organizationally independent so that, for example, a project
manager with schedule pressures can neither bypass quality activities or standards, nor reallocate
people from testing to development, nor postpone quality activities until too late in the project.
Separating quality roles from development roles minimizes the risk of conflict between roles played
by an individual, and thus makes most sense for roles in which independence is paramount, such as
final system and acceptance testing. An independent team devoted to quality activities also has an
advantage in building specific expertise, such as test design. The primary risk arising from separation
is in conflict between goals of the independent quality team and the developers.

When quality tasks are distributed among groups or organizations, the plan should include specific
checks to ensure successful completion of quality activities. For example, when module testing is
performed by developers and integration and system testing is performed by an independent quality

performed by an independent organization under contract, the contra t sh uld carefully describe the
testing process and its results and documentation, and the client rganization should verify
team, the quality team should check the completeness of module tests performed by developers, for

example, by requiring satisfaction of coverage criteria or inspecting commduletest suites. If testing is

satisfactory completion of the contracted tasks.


It may be logistically impossible toallsyllabusmintainanindependentquality group, especially in small
professionals working more closely with the development team.
projects and organizations, where f exi i it in assignments is essential for resource management.
Aside from the logistical issues, division of responsibility creates additional work in communication
and coordination. Finally, quality activities often demand deep knowledge of the project,
particularly at detailed levels (e.g., unit and ear y integration test). An outsider will have less insight
into how and what to test, and may be unable to effectively carry out the crucial earlier activities,
such as establishing acceptance criteri nd reviewing architectural design for testability. For all
these reasons, even organizations that re y on an independent verification and validation (IV&V)
group for final product qualification llocate other responsibilities to developers and to quality

The more development and quality roles are combined and intermixed, the more important it is to
build into the plan checks and balances to be certain that quality activities and objective assessment
are not easily tossed aside as deadlines loom. For example, XP practices like "test first" together with
pair programming (sidebar on page 381) guard against some of the inherent risks of mixing roles.
Separate roles do not necessarily imply segregation of quality activities to distinct individuals. It is
possible to assign both development and quality responsibility to developers, but assign two
individuals distinct responsibilities for each development work product. Peer review is an example of
mixing roles while maintaining independence on an item-by-item basis. It is also possible for
developers and testers to participate together in some activities.

Many variations and hybrid models of organization can be designed. Some organizations have
obtained a good balance of benefits by rotating responsibilities. For example, a developer may move
into a role primarily responsible for quality in one project and move back into a regular development
role in the next. In organizations large enough to have a distinct quality or testing group, an
appropriate balance between independence and integration typically varies across levels

Page 216
of project organization. At some levels, an appropriate balance can be struck by giving responsibility
for an activity (e.g., unit testing) to developers who know the code best, but with a separate oversight
responsibility shared by members of the quality team. For example, unit tests may be designed and
implemented by developers, but reviewed by a member of the quality team for effective automation
(particularly, suitability for automated regression test execution as the product evolves) as well as
thoroughness. The balance tips further toward independence at higher levels of granularity, such as in
system and acceptance testing, where at least some tests should be designed independently by
members of the quality team.

Outsourcing test and analysis activities is sometimes motivated by the perception that testing is less
technically demanding than development and can be carried out by lower-paid and lower-skilled
individuals. This confuses test execution, which should in fact be straightforward, with analysis and
test design, which are as demanding as design and programming tasks in development. Of course, less
skilled individuals can design and carry out tests, just as less skilled individuals can design and write

programs, but in both cases the results are unlikely to be satisfcomactory.


Outsourcing can be a reasonable approach when its objectives are n t erely minimizing cost, but
maximizing independence. For example, an independent judgment of quality may be particularly
valuable for final system and acceptance testing, and may be essential for measuring a product against
an independent quality standallsyllabusard(e.g.,qualifyingaproduct for medical or avionic use). Just
as an organization with mixed roles requires special attention to avoid the conflicts between roles
played by an individual, radical separation of responsi ility requires special attention to control
conflicts between the quality assessment team and the development team.

The plan must clearly define milestones and delivery for outsourced activities, as well as checks on the
quality of delivery in both direction : Te t organizations usually perform quick checks to verify the
consistency of the software to be te ted with respect to some minimal "testability" requirements;
clients usually check the completeness and consistency of test results. For example, test organizations
may ask for the results of inspections on the delivered artifact before they start testing, and may
include some quick tests to verify the installability and testability of the artifact. Clients may check
that tests satisfy specified functional and structural coverage criteria, and may inspect the test
documentation to check its quality. Although the contract should detail the relation between the
development and the testing groups, ultimately, outsourcing relies on mutual trust between
organizations.

Documenting Analysis and Test


Mature software processes include documentation standards for all the activities of the software
process, including test and analysis activities. Documentation can be inspected to verify progress
against schedule and quality goals and to identify problems, supporting process visibility, monitoring,
and replicability.

Overview

Page 217
Documentation is an important element of the software development process, including the quality
process. Complete and well-structured documents increase the reusability of test suites within and
across projects. Documents are essential for maintaining a body of knowledge that can be reused
across projects. Consistent documents provide a basis for monitoring and assessing the process, both
internally and for external authorities where certification is desired. Finally, documentation includes
summarizing and presenting data that forms the basis for process improvement. Test and analysis
documentation includes summary documents designed primarily for human comprehension and details
accessible to the human reviewer but designed primarily for automated analysis.

Organizing Documents

Documents are divided into three main categories: planning, specification, and reporting. Planning documents describe the organization of the quality process and include strategies and plans for the division or the company, and plans for individual projects. Specification documents describe test suites and test cases. A complete set of analysis and test specification documents

include test design specifications, test case specification, checklists, and analysis procedure specifications. Reporting documents include details and summary of analysis and test results. com

In a small project with a sufficiently small set of documents, the arrange ent of other project artifacts
(e.g., requirements and desallsyllabusigndocuments)togetherwith tandard content (e.g., mapping of
subsystem test suites to the build schedule) provides sufficient organization to navigate through the
collection of test and analysis documentation. In larger projects, it is common practice to produce and
regularly update a global guide for navigating mong individual documents.

Naming conventions help in quickly identif ing documents. A typical standard for document names
would include keywords indicating the general scope of the document, its nature, the specific
document, and its version, as in Fig re 8.4.
Figure 8.4: Sample document naming conventions, compliant with IEEE standards.

Chipmunk Document Template Document Title

Approvals

Page 218
issued by name signature date
approved by name signature date
distribution status (internal use only, restricted, …)
distribution list (people to whom the document must be sent)

History

version description

Table of Contents
List of sections.
Goals of the document allsyllabus
Summary
Summarize the contents of the doc ment. The summary should clearly explain the relevance of
the document to its possible uses.

 Describe the purpose of this document: Who should read it, and why?

Required documents and references


 Provide a reference to other documents and artifacts needed for understanding and exploiting
this document. Provide a rationale for the provided references.

Glossary
 Provide a glossary of terms required to understand this document.

Section 1
 …

Section N
 …

Test Strategy Document

Page 219
Analysis and Test Plan

While the format of an analysis and test strategy vary from company to company, the structure of an
analysis and test plan is more standardized

The overall quality plan usually comprises several individual plans of limited scope. Each test and
analysis plan should indicate the items to be verified through analysis or testing. They may include
specifications or documents to be inspected, code to be analyzed or tested, and interface specifications
to undergo consistency analysis. They may refer to the whole system or part of it - like a subsystem or
a set of units. Where the project plan includes planned development increments, the analysis and test
plan indicates the applicable versions of items to be verified.
For each item, the plan should indicate any special hardware or external software required for testing. For
example, the plan might indicate that one suite of subsystem tests for a security package can be executed with
a software simulation of a smart card reader, while another suite requires access to the physical device. Finally,
for each item, the plan sh uld reference related documentation, such as requirements and design
specifications, and user, installation, and operations guides.

An Excerpt of the Chipmunk Analysis and Test Strategy com


allsyllabus
Document CP05-14.03: Analysis and Test Strategy

Applicable Standards and Procedures

Artifact Applicable Standards and Guidelines


Web application Accessibility: W3C-WAI …
Reusable component (internally deve oped) Inspection procedure: [WB12-03.12]

External component Qualification procedure: [WB12-22.04]

Documentation Standards

Project documents must be archived according to the standard Chipmunk archive procedure [WB02-01.02].
Standard required documents include

Document Content & Organization Standard


Quality plan [WB06-01.03]
Test design specifications [WB07-01.01] (per test suite)
Test case specifications [WB08-01.07] (per test suite)
Test logs [WB10-02.13]
Test summary reports [WB11-01.11]

Page 220
Inspection reports [WB12-09.01]

Analysis and Test Activities

Tools

The following tools are approved and should be used in all development projects. Exceptions require
configuration committee approval and must be documented in the project plan.

Fault logging Chipmunk BgT [WB10-23.01]

Staff and Roles


verified and those that are excluded from consideration (usually becausecomresponsibility for them is
A development work unit consists of unit source code, including unit test cases, stubs, and
harnesses, and unit test documentation. A unit may be committed t the pr ject baseline when the
source code, test cases, and test results have passed peer review. A test and analysis plan may not
address all aspects of software quality and testing activities. It should indicate the features to be
that a feature not considered in theallsyllabuscurrentplaniscoveredatanother point is a major cause of missing verification in large project .
placed elsewhere). For example, if the item to be verified includes a graphical user interface, the
test and analysis plan might state th t it de only with f nctional properties and not with usability,
which is to be verified separately by a usability and human interface design team. Explicit
indication of features not to be tested, as well s those included in an analysis and test plan, is
important for assessing completeness of the overa set of analysis and test activities. Assumption

The quality plan must clearly indic te criteria for deciding the success or failure of each planned
activity, as well as the conditions for suspending and resuming analysis and test. The core of an
analysis and test plan is a detailed schedule of tasks. The schedule is usually illustrated with GANTT
and PERT diagrams showing the relation among tasks as well as their relation to other project
milestones. The schedule includes the allocation of limited resources (particularly staff) and indicates
responsibility for reresources and responsibilities sults.

A quality plan document should also include an explicit risk plan with contingencies. As far as
possible, contingencies should include unambiguous triggers (e.g., a date on which a contingency is
activated if a particular task has not be completed) as well as recovery procedures. Finally, the test and
analysis plan should indicate scaffolding, oracles, and any other software or hardware support required
for test and analysis activities.

Test Design Specification Documents

Design documentation for test suites and test cases serve essentially the same purpose as other
software design documentation, guiding further development and preparing for maintenance. Test
Page 221
suite design must include all the information needed for initial selection of test cases and maintenance
of the test suite over time, including rationale and anticipated evolution. Specification of individual
test cases includes purpose, usage, and anticipated changes.
A Standard Organization of an Analysis and Test Plan

Analysis and test items:


 The items to be tested or analyzed. The description of each item indicates version and
installation procedures that may be required.

Features to be tested:
 The features considered in the plan.

Features not to be tested:


 Features not considered in the current plan.

Approach:
 The overall analysis and test approach, sufficiently detailed t per it identification of the
major test and analysis tasks and estimation of time and resources.

Pass/Fail criteria: allsyllabus com


Rules that determine the status of an artifact subjected to analysis and test.

Suspension and resumption criteria:


 Conditions to trigger suspension of test nd n lysis activities (e.g., an excessive failure
rate) and conditions for restarting or resuming an activity.

Risks and contingencies:


 Risks foreseen when designing the pl n nd contingency plan for each of the identified
risks.

Deliverables:
 A list all A&T artifacts and documents that must be produced.

Task and schedule:


 A complete description of analysis and test tasks, relations among them, and relations between
A&T and development tasks, with resource allocation and constraints. A task schedule usually
includes GANTT and PERT diagrams.

Staff and responsibilities:


 Staff required for performing analysis and test activities, the required skills, and the allocation
of responsibilities among groups and individuals. Allocation of resources to tasks is described
in the schedule.

Environmental needs:
 Hardware and software required to perform analysis or testing activities.

Test design specification documents describe complete test suites (i.e., sets of test cases that focus on
particular aspects, elements, or phases of a software project). They may be divided into unit,
Page 222
integration, system, and acceptance test suites, if we organize them by the granularity of the tests, or
functional, structural, and performance test suites, if the primary organization is based on test
objectives. A large project may include many test design specifications for test suites of different kinds
and granularity, and for different versions or configurations of the system and its components. Test
design specifications identify the features they are intended to verify and the approach used to select
test cases. Features to be tested should be cross-referenced to relevant parts of a software specification
or design document. A test design specification also includes description of the testing procedure and
pass/fail criteria. The procedure indicates steps required to set up the testing environment and perform
the tests, and includes references to scaffolding and oracles. Pass/fail criteria distinguish success from
failure of a test suite as a whole. In the simplest case a test suite execution may be determined to have
failed if any individual test case execution fails, but in system and acceptance testing it is common to
set a tolerance level that may depend on the number and severity of failures.

Test and Analysis Reports

Test Suite Identifier

WB07-15.01

Features to Be Tested

Reports of test and analysis results serve both developers and testcomsdesigners. They identify open

faults for developers and aid in scheduling fixes and revisions. They help test designers assess and

refine their approach, for example,allsyllabusnotingwhensomeclaoffaults is e aping early test and


analysis and showing up only in subsystem and system testing
Functional Test Design Specification of check configuration
Functional test for check configur tion, mod le specification WB02-15.32.[a]

Approach

Combinatorial functional test of feature parameters, enumerated by category- partition method over
parameter table on page 3 of this document.[b]
Procedure

Designed for conditional inclusion in nightly test run. Build target T02 15 32 11 includes JUnit
harness and oracles, with test reports directed to standard test log. Test environment includes table
MDB 15 32 03 for loading initial test database state.

Test cases[c]

WB07-15.01.C01 malformed model number

WB07-15.01.C02 model number not in DB


… …

Page 223
WB07- valid model number with all legal required slots and some legal optional
15.01.C09[d] slots

… WB07- …
15.01.C19 empty model DB

WB07-15.01.C23 model DB with a single element

WB07-15.01.C24 empty component


DB
WB07-15.01.C29 component DB with a single
element
Pass/Fail Criterion

Successful completion requires correct execution of all test cases with no violations in test
log.
Test Case Specification for check configuration
Test Case Identifier

WB07-15.01.C09
Module check configuration of the ChipmunkallsyllabusWebpresencesystem, business
Test items

logic
Inputsubsystem. Test Case Specification:
specification

Model No. valid No. of required slots for selected mode


(#SMRS) many

No. of optional slotswwwforselectedmodel many


(#SMOS)
Correspondence of selection ith model slots complete No. of required
components ith selection ≠ empty = No. of required slots No. of optional
components with select ≠ empty < No. of optional slots

Required component selection all valid Optional component


selection all valid

No. of models in DB many

No. of components in DB many

Test case:

Model number Chipmunk C20


Page 224
#SMRS 5
Screen 13"
Processor Chipmunk II plus
Hard disk 30 GB
RAM 512 MB
OS RodentOS 3.2 Personal Edition

#SMOS 4
External storage device DVD player

Output Specification
 return value valid

Environment Needs

Execute with ChipmunkDBM v3.4 database initialized from table MDB 15 32 03.

Special Procedural Requirements


 none

Intercase Dependencies
 none

A prioritized list of open faults is allsyllabusthecoreofaneffectivefault handling and repair procedure.


Failure reports must be consolidated nd categorized so that repair effort can be managed
systematically, rather than jumping err tically from problem to problem and wasting time on duplicate
reports. They must be prioritized so that effort is not squandered on faults of relatively minor
importance while critical faults are neglected or even forgotten.