This document contains 9 slips summarizing the scope of piling works for the foundations of an academic block at UiTM Sarawak. The slips include details on preambles to the work such as underground utilities and ground conditions. They also quantify the number, length, and concrete volume required for driven concrete piles of various types including vertical, raking, and rock socketed piles. Unit rates and total costs are provided for each work item.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
278 views

Slip Sort Slip Sort: SQD: SQD: SQD: SQD

This document contains 9 slips summarizing the scope of piling works for the foundations of an academic block at UiTM Sarawak. The slips include details on preambles to the work such as underground utilities and ground conditions. They also quantify the number, length, and concrete volume required for driven concrete piles of various types including vertical, raking, and rock socketed piles. Unit rates and total costs are provided for each work item.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

SLIP SORT SLIP SORT

AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 1 Academic Block UiTM Sarawak Piling Works 2
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
Preambles to piling works Piling plant Item

Description : Quantity: Description : Quantity:


1. Ground water level establised at 3.60m below existing Bringing to and removing from site all plants required for
ground level on 7th October 2018 this section of the works
2. 6 nos. of boreholes were sunk on the site.
3. Underground high voltage cable cross the east side of the site.
SQD : SQD :
4. The works is on a flat and high ground level.
5. The piling work is expected to start from platform level.
CHK SQD : CHK SQD :

RED : RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 3 Academic Block UiTM Sarawak Piling Works 4
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
Piling plant Item 400mm Diameter reinforced in-situ concrete, ordinary No.
prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Maintaining on site all plant required for this section of Total number of piles
the works

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 164 No.
RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 5 Academic Block UiTM Sarawak Piling Works 6
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary M 400mm Diameter reinforced in-situ concrete, ordinary M
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Total concreted length of piles, done by tremie method Total bored depth, maximum depth of 22.60m, vertical.

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 4,113.40 M Quantity as per 3,731.80 M
Piling Schedule RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 7 Academic Block UiTM Sarawak Piling Works 8
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary M 400mm Diameter reinforced in-situ concrete, ordinary M
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Extra over for boring through rock, maximum depth of Total bored depth, maximum depth of 20.30m, raking
22.60m, vertical. piles, Inclination 20° / angle ratio 1 in 2.7475.

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 3,731.80 M Quantity as per 135.60 M
Piling Schedule RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 9 Academic Block UiTM Sarawak Piling Works 10
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary M 400mm Diameter reinforced in-situ concrete, ordinary M
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Extra over for boring through rock, maximum depth of Extra over for placing concrete by tremie pipe
20.30m, raking piles, Inclination 20° / angle ratio 1 in
2.7475.
SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 135.60 M Quantity as per 4,113.40 M
Piling Schedule RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 11 Academic Block UiTM Sarawak Piling Works 12
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary No. 400mm Diameter reinforced in-situ concrete, ordinary No.
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Cut-off top of pile to required level Prepare concrete pile head and reinforcement for
capping

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 164 No. Quantity as per 164 No.
Piling Schedule RED : Piling Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 13 Academic Block UiTM Sarawak Piling Works 14
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary Kg. 400mm Diameter reinforced in-situ concrete, ordinary Kg.
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
20mm Diameter, high tensile reinforcement bar, to BS 12mm Diameter, mild steel reinforcement bar, to BS 4449,
4449, as straight and bent vertical bars. as helical binders.

SQD : SQD :

CHK SQD : CHK SQD :


Quantity as per 135810.51 Kg. Quantity as per 16926.47 Kg.
Rebar Schedule RED : Rebar Schedule RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:


SLIP SORT SLIP SORT
AP/JUN 2019/DQS251 AP/JUN 2019/DQS251

Job : Element : Slip No. : Job : Element : Slip No. :


Academic Block UiTM Sarawak Piling Works 15 Academic Block UiTM Sarawak Piling Works 16
(All Provisional) (All Provisional)
Heading : Unit : Heading : Unit :
400mm Diameter reinforced in-situ concrete, ordinary Item 400mm Diameter reinforced in-situ concrete, ordinary Item
prescribed mix Grade 35, with a minimium stress of prescribed mix Grade 35, with a minimium stress of
35N/MM2 at 28 days, for Working Piles. 35N/MM2 at 28 days, for Working Piles.
Description : Quantity: Description : Quantity:
Allow for Pile Integrity Test (PIT), to all 400mm diameter Allow for dynamic pile testing on on 5 nos. of piles to be
piles, by using Shock Method. selected by the Engineer using the Pile Dynamic Analyser
(PDA) and to carry out computer Case Pile Wave Analysis
SQD : Program (CAPWAP) analysis to stimulate pile/soil model SQD :
and load settlement behaviour of tested pile.

CHK SQD : CHK SQD :

RED : RED :

CHK RED: CHK RED:

RATE : RATE :

TOTAL COST: TOTAL COST:

You might also like