Intermodal Transportation Terminal 2
Intermodal Transportation Terminal 2
GROUP E
BUSINESS AND MERCANTILE DIVISION E-1 (Business and Mercantile, ZONING C-1 C-1 (Commercial One or Light
(COMMERCIAL) where no work is done except change of Commercial) - a neighborhood or community
parts and maintenance requiring no open level of commercial use or occupancy,
flames, welding, or use of highly flammable characterized mainly as a low rise
liquids) building/structure for low intensity
commercial/trade, service and business
activities, e.g., one to three (1 to 3) storey
shopping centers, small offices or
mixed-use/occupancy buildings and the like.
Note:
* The parking slot requirements shall be an integral part of
buildings/structures and any parking slot provided outside the
building/structure will be quantified only as buffer parking.
Transit Stations and the Provide on each side of the
like RROW one (1) off-RROW (or
(UTS) off-street) passenger loading
space that can accommodate
four (4) queued
jeepney/shuttle slots or three
(3) queued bus slots
whichever is applicable; in
case of elevated mass transit
stations, on-roadway
terminals or on-RROW
terminals on both sides of the
RROW may be considered
1. Garage for jeepneys and taxis VIII.9.
not greater
than six (6) units in number
2. Garage for bus and trucks not
greater
than three (3) units in number
3. Retailing of CHBs, gravel and
sand and
other concrete products
VIII.7
Duly-Approved
Zoning b
Commercial Commercial 70 e 20 10 30
1 80 f 10 10 20
(Com-1)
Utility/Transportation/ 50 e 40 10 50
Services
60 f 30 10 40
*e w/o firewall
F w/ firewall
Minimum Minimum Minimum
Number of Width of Width of Total Width of
Dwelling Units Carriageway/ Sidewalk the
Roadway on each side RROW
(meters) (meters) (meters)
1-2 S 26DEG 39’E 2222.01 M (LANDAYAN MUN. LOT 2-B) 1. Total Lot Area (TLA)TLA = 33,289 sqm.
2-3 N 55DEG 20’E 135.74 M (LOT 2-C) 2. Percentage of Site Occupancy (PSO)PSO = 75 % of Total
3-4 N 55DEG 20’E 128.48 M (RURAL PROGRESS ADMIN) Lot Area=sqm.
4-5 S 35DEG 18’E 132.32 M (LOT 2-A-3 OPEN CANAL) 3. Impervious Surface Area (ISA)ISA = 20 % of Total Lot Area=
5-6 S 58DEG 14’W 97.69 M (LOT 2-A-3 OPEN CANAL) 1,285.97 sqm.
6-7 S 59DEG 15’W 89.85 M (LOT 2-A-3 OPEN CANAL) 4. Unpaved Surface Area (USA)USA = 5 % of Total Lot Area=
7-8 S 59DEG 38’W 83.84 M (LOT 2-A-3 OPEN CANAL) 321.49 sqm.
8-1 N 32DEG 06’W 115.06 M (ROAD WIDENING) 5. Gross Floor Area (GFA)GFA = 2843.74 sqm x 2 floors=
5,687.48 sqm
TOTAL LOT AREA = 33,289 SQM 6. Allowable Maximum Building Footprint (AMBF) = TLA x PSO
AMBF = TLA x PSO = 6,429.8291 sqm. x 0.75= 4,822.37 sqm.
7. Total Open Space within Lot (%) (TOSL)TOSL = ISA + USA=
1,285.96582 sqm. + 321.491455 sqm.= 1,607.46 sqm.
8. Floor – Lot Area Ratio (FLAR) FLAR = GFA / TLA=
5,687.48 sqm. / 6429.8291 sqm.= 0.8845
9. Total Gross Floor Area (TGFA)TGFA = AMBF x NO. OF
FLOORS (include roof deck if there's any)= 4,822.37 sqm. x 2
(floors)= 9,644.74 sqm