0% found this document useful (0 votes)
259 views

Quotation Final

This document is a quotation from N.S. Contractors for borewell drilling services. It provides pricing for drilling borewells of varying depths from 100 to 1200 feet in 100 foot increments, with rates ranging from 95 to 470 rupees per foot. It also lists additional charges for water injection, casing pipes, PVC pipes, collars, welding, bore caps, bore bata, transportation, and requires a 100,000 rupee advance payment. The contractor's address and contact details are provided at the top and bottom of the document.

Uploaded by

likhithanaveen2
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
259 views

Quotation Final

This document is a quotation from N.S. Contractors for borewell drilling services. It provides pricing for drilling borewells of varying depths from 100 to 1200 feet in 100 foot increments, with rates ranging from 95 to 470 rupees per foot. It also lists additional charges for water injection, casing pipes, PVC pipes, collars, welding, bore caps, bore bata, transportation, and requires a 100,000 rupee advance payment. The contractor's address and contact details are provided at the top and bottom of the document.

Uploaded by

likhithanaveen2
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Mobile: 7019296659

9148217659
NS N.S. CONTRACTORS
Design/Build, Maintenance, Repair, Remodels
Specialist in4.5”&8½”BorewellsInstallation& Servicing
of SubmersiblePumps. JetPumps

No.
To,
Date: 05/07/2023
Bangalore

QUOTATION
Sl.No. Description Qty Per Rate
Ft
1. Drilling 001’ to 300’ 300 95.00
301’ to 400’ 100 105.00
401’ to 500’ 100 115.00
501’ to 600’ 100 130.00
601’ to 700’ 100 150.00
701’ to 800’ 100 180.00
801’ to 900’ 100 210.00
901’ to 1000’ 100 270.00
1001’ to 1100’ 100 370.00
1101’ to 1200’ 100 470.00
Water Injection Per Ft 20.00
CasingPipe Per Ft 480.00
PVCPipe10” Per Ft 400.00
Collar Each 250.00
Weldingcharge Each Joint 250.00
BoreCap 250.00
BoreBata 1000.00
Transportation 1000.00
Total
Advance
Grand Total

Advance --- 100000 (One Lakh ) .


N.S CONTRACTORS

# 76,25th‘A’Cross,5th Main Road,Karesandra,B.S.K.2ndStage,Bangalore-70.


E-Mail : [email protected]

You might also like