Ho 87

This permit document provides access for a fiber cable preparation job by Huawei, Shahid Tech, and Hayat Communications at the INDC Building 1 site from March 3, 2021 to March 25, 2021. The job requires working at night and involves others. Muhammad Bangash of Huawei is the contact for the job. The permit notes legal and safety obligations for the contractors and that noisy or malodorous work must be done after hours.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views1 page

Ho 87

This permit document provides access for a fiber cable preparation job by Huawei, Shahid Tech, and Hayat Communications at the INDC Building 1 site from March 3, 2021 to March 25, 2021. The job requires working at night and involves others. Muhammad Bangash of Huawei is the contact for the job. The permit notes legal and safety obligations for the contractors and that noisy or malodorous work must be done after hours.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Permit

Classification: Internal ACCESS PERMIT No.


DI/HO/2021/87

Stage 1: Application (To be completed by Business Partner /Tenant / Contractor / Service Provider)
Request Portfolio Commercial X Residential Retail

New Permit X Yes No (If Not a New Permit, Old Permit No. ___________________________)

Entity/Mall/Community INDC Job Location /Unit/Site


Du Telecoms INDC Building 1
Business Partner/Tenant
Contractor / Service Provider Huawei/Shahid Tech/ Hayat Communications No. of Persons 7

Permit Validity (Date & Time) From 3-03-2021 9 AM To 25.3.2021 6 PM

Material Move-In/Out Major Fit-out Works Minor Fit-Out Works


Permit Required for (mark X) Minor Demolition Entry to Critical Zone FM Services
Working at Night Working on Roof Top X Others
Brief description of the Job:
Fiber Cable Preparation for Huawei GPON Migration in Building 1

Undertaking by the Contractor / Service Provider: YES NO N/A


1. Permits/certificates/NOCs & approved drawings from relevant authority are in possession during application.
2. Aware of applicable mall specific rules & HSE precautionary measures & will adhere prior to commencing
works.
3. Aware & will adhere to necessary permit requirements for HSE specific tasks / guidelines / PPE needs
4. Will provide a qualified fire watch for monitoring the Impaired area(s) and undertaking letter attached.
5. Subcontractor list with copies of valid trade license are attached & will be liable for their respective activities.
6. Will report all minor or major incidents to permit issuer immediately after the occurrence.
7. All employees or workers assigned for this project are not showing any illness signs or symptoms
HSE Permit Request Confined Space Entry Working at Height (3m or more height) Mechanical Lifting
(Mark applicable task and request for Hot Works Spray Painting Use/Handling of Dangerous Goods Excavation Works
HSE Permit accordingly) Service Isolation Work with or in the vicinity of Radiation Hazard Major Demolition
Signature &
Name Muhammad Bangash Contact No. 0566962718 3.3.2021/ 11AM
Date/Time
IMPORTANT NOTES:
1. This Permit has been issued on the request of the Applicant and does not relieve the Business Partner or the Contractor appointed by them from any legal
and/or contractual obligations.
2. This permit is deemed to be cancelled and the works will be stopped immediately on any Health & Safety or other violations on site noticed during the
inspections or notified to the Facilities Manager or building security.
3. The applicant is fully liable for any penalties, rectification / cost implication of any damages and interruptions caused due to such violations by the
contractor and their subcontractors. The works can be resumed only after necessary corrective actions.
4. Any noisy or malodourous activities such as drilling, coring, painiting, drainage terminations etc. are permitted only after working hours and the applicant
to coordinate with the building security for the same to avoid stoppage of works.
5. Any works on existing building services and systems such as MDB/SMDB modifications/terminations, Fire Alarm & Fire Fighting, Emergency Lighting, BMS,
HVAC Controls etc. must be carried out through the FM Service Provider only.
6. Contractors to produce Fit-out Completion Certificate issued by DDA prior to occupying for operating the unit.
7. Applicant shall take adequate control measures & provide qualified fire watch(es) for monitoring affected areas in event of Fire Detection and/or protection
system impairment. Fire watch(es) shall be in place till impaired systems are re-instated to satisfaction of Facilities Manager / FM service provider.
8. Applicant shall conduct Tool Box Talks to their work force daily basis to brief work place and task related risk controls and building emergency response.
Such shall be recorded and evidenced to HSE/Security/Permit Issuer whenever required.
Stage 2: Endorsement (To be completed by the Facilities Manager/Mall Manager/Authorized Representative)
HSE precautions must be followed
Any high level work need HSE permit
Signature HSE Permit Required? N
Name
Mohammad Haseeba & Date (Y/N)

Stage 3: Access Confirmation (To be completed by Building Security)


Signature
Name No. of Passes issued
& Date
General Notes:
1. Stage 1 of this permit request shall be duly filled and signed by the applicant, after complying with the undertaking requirements.
2. Copy of NOCs and valid permits must be available in the vicinity of the job for verification during inspections.
3. The renewal of the permit after its expiry is subject to the evaluation of the work status and requirements only.
TEC-BFM-F24 Page 1 of 1 R8 – 5 Jan 2021