Assignment 5
Assignment 5
Well Workover
Assignment №5
Almaty, 2023
Assignment 5 – INSPECTION, TESTING AND MAINTENANCE
SELECTION OF PRESSURE RATING
1) Problem
An operator proposes to reperforate the producing zone in a well for which the BOP
requirement has been determined. The operator provides the following information
concerning the well:
8-5/8", 32#, J-55 casing cemented at 4,000'.
5-1/2", 17#, J-55 liner cemented from 3,960' to 4,500'.
Water shut-off (WSO) on 5-1/2" x 8-5/8" lap.
Liner perforated from 4,400' to 4,500'.
Total depth: 4,500'.
Producing clean, 38o API gravity oil (sp. gr. 0.835).
Static fluid level at 1,500' below surface.
Shut-in casing pressure: 50 psig.
Proposed workover fluid weight: 73.5 pcf.
Formation pressure gradient : 0.465 psi/ft.
Casing Inspections/Testing
Illustrates a casing ram test sub. Casing rams can be tested by connecting this test sub
between the test joint and the test plug so that the sub can be placed in the casing rams to
be tested. A casing ram test sub can be made by welding tool joint connections on the
ends of a short length of casing of desired diameter.
Maintenance procedures
Field welding on a blowout preventer or related equipment is not recommended. The
service life of annular preventer packing units can be extended by: Closing on pipe rather
than full closure. Using closing pressures recommended by the manufacturer. Utilising
the type of elastomer packing unit that best suits the drilling fluid conditions and
environment expected .d. Proper use of a regulator or accumulator when stripping tool
joints. Rapid movement of a tool joint through the preventer packing unit may cause
severe damage and early failure of the packing unit.