Activity Plan

This document outlines the tasks and timeline for a research project on construction processes. The project involves identifying a problem, reviewing literature, developing research objectives and methodology, analyzing construction processes through a questionnaire, comparing the processes, identifying the best process, documenting results, and completing a final thesis by Q2 2024. Key milestones include completing the literature review by Q1 2023, analyzing collected data by Q2 2023, and identifying the best construction process by Q3 2023.

Uploaded by

brwmsthora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Activity Plan

This document outlines the tasks and timeline for a research project on construction processes. The project involves identifying a problem, reviewing literature, developing research objectives and methodology, analyzing construction processes through a questionnaire, comparing the processes, identifying the best process, documenting results, and completing a final thesis by Q2 2024. Key milestones include completing the literature review by Q1 2023, analyzing collected data by Q2 2023, and identifying the best construction process by Q3 2023.

Uploaded by

brwmsthora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID Task Task Name Qtr 4, 2022 Qtr 1, 2023 Qtr 2, 2023 Qtr 3, 2023 Qtr 4, 2023 Qtr 1, 2024

Qtr 2, 2023 Qtr 3, 2023 Qtr 4, 2023 Qtr 1, 2024 Qtr 2, 2024
Mode Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
1 Research Project
2 Problem identification
3 Literature review
4 Identification of
objectives
5 Identification of
methodology
6 Review of
construcution
7 process
Questinnaire
preperation
8 Data collection
and analysis
9 Comparison of
construction
processes
10 Identification of
the best process
11 Documentation
12 Final thesis

Task Inactive Summary External Tasks

Split Manual Task External Milestone

Milestone Duration-only Deadline


Project: Activity plan
Summary Manual Summary Rollup Progress
Date: Thu 12/29/22
Project Summary Manual Summary Manual Progress

Inactive Task Start-only

Inactive Milestone Finish-only