Flexibility I can change I can I can modify I cannot
the order of connect my the order of make
my energy RGM to at least 1 any
transfers and another energy changes _
connect it to RGM if transfer and to the OUT
other RGM needed. still work. original OF
model. 4
Originality All my energy There 1 There are 2 There _
transfers differ energy energy are 3 OUT
from other transfer that transfers energy OF
teams. uses the that use the transfers 4
Creativity
same same that use
principle in principle in the
other RGM other RGM same
principle
in other
RGM
Elaboration The structure The The The _
is completely structure has structure structur OUT
stable and a few errors has many e does OF
well- in the construction not hold 4
constructed. construction. problems. itself.
Efficiency The RGM The RGM The RGM The _
works perfect needs help needs help RGM OUT
throughout the in 1 in 2 does not OF
five energy occasion. occasion. work 4
transfers properly.
PROJECT Points XXXXXXXXXXXX XXXXXXXX XXXXXXXX XXXXXX _
REQUIREMENT obtained OUT
S after the OF
presentation. 20
DESIGN The design is a The design The design _
perfect shows most does not OUT
representation of the comply with OF
of each energy energy the real 4
transfer. transfers RGM.
used in
POINTS 4 3 2 1
RUBE
GOLDBERG
CHALLENG
E