0% found this document useful (0 votes)
374 views1 page

NFPA Open-Grid Ceilings

This document provides requirements for sprinkler locations in various situations: 1) Sprinklers in exhaust ducts subject to freezing must be protected from freezing. Minimum clearances are required between sprinkler deflectors and open-grid ceilings depending on the sprinkler spacing and occupancy hazard classification. 2) Open-grid ceilings can only be installed below sprinklers if the grid meets certain criteria or the ceiling is listed for such use. 3) Drop-out ceilings and materials can be installed below sprinklers if listed for that purpose, with some exceptions for quick-response or extended coverage sprinklers. Sprinklers cannot be installed directly below drop-out ceilings.

Uploaded by

fopoku2k2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
374 views1 page

NFPA Open-Grid Ceilings

This document provides requirements for sprinkler locations in various situations: 1) Sprinklers in exhaust ducts subject to freezing must be protected from freezing. Minimum clearances are required between sprinkler deflectors and open-grid ceilings depending on the sprinkler spacing and occupancy hazard classification. 2) Open-grid ceilings can only be installed below sprinklers if the grid meets certain criteria or the ceiling is listed for such use. 3) Drop-out ceilings and materials can be installed below sprinklers if listed for that purpose, with some exceptions for quick-response or extended coverage sprinklers. Sprinklers cannot be installed directly below drop-out ceilings.

Uploaded by

fopoku2k2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SPRINKLER LOCATION REQUIREMENTS 13-73

9.3.9.2 Protection Against Freezing. Sprinklers in exhaust The spacing of the sprinklers over the open -grid ceiling
ducts subject to freezing shall be properly protected against shall then comply with the following:
freezing. ( See 16.4. 1. ) (a ) In light hazard occupancies where sprinkler spacing
9.3.9.3 Sprinkler Access. Access shall be provided to all sprin- (either spray or old-style sprinklers) is less than 10 ft
klers for inspection , testing , and maintenance. x 10 ft (3 m x 3 m ) , a minimum clearance of at least
18 in . ( 450 mm ) shall be provided between the
9.3.9.4 Strainers. A listed line strainer shall be installed in the sprinkler deflectors and the upper surface of the
main water supply preceding sprinklers having nominal K- open -grid ceiling. Where spacing is greater than
factors smaller than K-2.8 ( 40 ) . 10 ft x 10 ft ( 3 m x 3 m ) but less than 10 ft x 12 ft
9.3.10* Open-Grid Ceilings. Open -grid ceilings shall only be ( 3 m x 3.7 m ) , a clearance of at least 24 in .
( 600 mm ) shall be provided from spray sprinklers
installed beneath sprinklers where one of the following is met:
and at least 36 in . ( 900 mm ) from old-style sprin-
(1) Open-grid ceilings in which the openings are '4 in . klers. Where spacing is greater than 10 ft x 12 ft
( 6 mm ) or larger in the least dimension , where the thick- ( 3 m x 3.7 m ) , a clearance of at least 48 in . ( 1.2 m )
ness or depth of the material does not exceed the least shall be provided.
dimension of the opening , and where such openings ( b ) In ordinary hazard occupancies, open -grid ceilings
constitute 70 percent of the area of the ceiling material . shall be permitted to be installed beneath spray
sprinklers only. Where sprinkler spacing is less than
10 ft x 10 ft ( 3 m x 3 m ) , a minimum clearance of at
A I II II II I
least 24 in . ( 600 mm ) shall be provided between the
|—I ZX I—I ZX I—I ZX I—I ZX h- sprinkler deflectors and the upper surface of the
-
hH I I I I h- open-grid ceiling. Where spacing is greater than
Complete
|H - h- H I—I I—I vertical 10 ft x 10 ft ( 3 m x 3 m ) , a clearance of at least
36 in . ( 900 m ) shall be provided.
-H h- H I—I h- H h- divider (2) Other types of open -grid ceilings shall be permitted to be
installed beneath sprinklers where they are listed for such
g -H ZX I—I ZX I—I ZX I—I service and are installed in accordance with instructions
” -H
8 —I
<D
I I I I
I—I

— —
h-H
I I I—I —
•Floor or

U - walkway —
either solid
| or with
_ ventilation
contained in each package of ceiling material.
9.3.11 Drop-Out Ceilings and Ceiling Materials.
“H I—I I—I I— I r openings 9.3.11.1* Drop-out ceilings and ceiling materials shall be
permitted to be installed beneath sprinklers where the ceiling
ZX I—I ZX I—I ZX I—I ZX h-
-H panels or ceiling materials are listed for that service and are
installed in accordance with their listings.
l -H l~ H I—I I—I h-
9.3.11.2 Drop-out ceilings and ceiling materials meeting the
i-- H I— I I—I EH h-
I—I
criteria in 9.3. 11.1 shall not be installed below quick-response
H -
h H -
hH h-
I or extended coverage sprinklers unless specifically listed for
that application.
FIGURE 9.3.7 (a ) Sprinklers in Multitier Bookstacks with 9.3.11.3 Drop-out ceilings and ceiling materials meeting the
Complete Vertical Dividers. criteria in 9.3. 1 1.1 shall not be considered ceilings within the
context of this standard.
1 I I
T -H h -H ZX h -H
I

h + H ZX h - 9.3.11.4* Piping installed above drop-out ceilings and ceiling


materials meeting the criteria in 9.3. 11.1 shall not be consid-
« -H h -H h -H h -H trU Incomplete
r vertical ered concealed piping.
IH h -H
h -H
h -H
h -H
hfH
h+H
|— divider
h-
9.3.11.5* Sprinklers shall not be installed beneath drop-out

£
I - H ZX h + H h + H ZX h + H h
^ Ventilation
ceilings or ceiling materials meeting the criteria in 9.3. 11.1 .
9.3.12* Old-style sprinklers shall be installed in fur storage
vaults.
h+H h+H h+ H |— openings
9.3.13 Stages.
h+H h+H h+ H h-
h+ H 9.3.13.1 Sprinklers shall be installed under the roof at the ceil-
h+H h+ H h-
ing, in spaces under the stage either containing combustible
materials or constructed of combustible materials, and in all
h + H ZX h + H h + H ZX h- adjacent spaces and dressing rooms, storerooms, and work-
h+H h+H h+ H h- shops.
h+H h+ H h+H h- 9.3.13.2 Where proscenium opening protection is required, a
h+ H
. -H h+H h+ H h- deluge system shall be provided with open sprinklers located
not more than 3 ft ( 900 mm ) away from the stage side of the
proscenium arch and spaced up to a maximum of 6 ft ( 1.8 m )
FIGURE 9.3.7 ( b ) Sprinklers in Multitier Bookstacks with on center. ( See Chapter 19 for design criteria. )
Incomplete Vertical Dividers.