An inspection of the municipal generator in Looc, Occidental Mindoro on September 8, 2023 revealed critical issues affecting its performance and reliability. The municipal engineer determined that essential repairs were needed to ensure continued electricity provision and efficient operation of electrical systems relying on the generator. A follow-up inspection on October 2, 2023 confirmed that a comprehensive repair was successfully completed, restoring the generator to optimal working condition to provide reliable power without interruptions.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
33 views2 pages
Pre and Post Inspection
An inspection of the municipal generator in Looc, Occidental Mindoro on September 8, 2023 revealed critical issues affecting its performance and reliability. The municipal engineer determined that essential repairs were needed to ensure continued electricity provision and efficient operation of electrical systems relying on the generator. A follow-up inspection on October 2, 2023 confirmed that a comprehensive repair was successfully completed, restoring the generator to optimal working condition to provide reliable power without interruptions.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
Republic of the Philippines
Province of Occidental Mindoro
Municipality of Looc
OFFICE OF THE MUNICIPAL ENGINEER
PRE – INSPECTION REPORT
To whom it may concern:
After an inspection conducted under my supervision on September 8, 2023, at municipal generator
within the compound, it has been determined that essential repairs are imperative. The assessment has revealed several critical issues affecting its performance and reliability. Addressing these concerns is essential to ensure the continued provision of electricity and the efficient functioning of various electrical systems that rely on it. Furthermore, proactive repairs and maintenance will significantly extend the dynamo's operational lifespan, preventing potential disruptions and ensuring a dependable power supply for essential functions.
With this, immediate repairs and improvements to the municipal generator are imperative.
ORLAN MARC A. TRIA
Municipal Engineer Republic of the Philippines Province of Occidental Mindoro Municipality of Looc
OFFICE OF THE MUNICIPAL ENGINEER
POST – INSPECTION REPORT
To whom it may concern:
As per inspection conducted on October 2, 2023 at Generator Facility, it is confirmed that a
comprehensive repair has been successfully completed. The undersigned affirms that through diligent and skilled efforts, the generator has been restored to optimal working condition. Generator dynamo is now equipped to provide a reliable and uninterrupted power supply, ensuring the continued functioning of essential electrical systems and minimizing disruptions.