0% found this document useful (0 votes)
27 views

CC Mini Project Final Report

This document describes a course project to design and implement the network for Vic Modern Hotel. The hotel has three floors with different departments on each floor. The network design includes three routers to connect the floors, VLANs for each department, wireless access, secure remote access via SSH, and port security on switches. The network is implemented using Cisco Packet Tracer to simulate the configuration of routers, switches, wireless access points, and host devices. Testing confirms all devices can communicate securely on the hotel network as required.

Uploaded by

Brito sham
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

CC Mini Project Final Report

This document describes a course project to design and implement the network for Vic Modern Hotel. The hotel has three floors with different departments on each floor. The network design includes three routers to connect the floors, VLANs for each department, wireless access, secure remote access via SSH, and port security on switches. The network is implemented using Cisco Packet Tracer to simulate the configuration of routers, switches, wireless access points, and host devices. Testing confirms all devices can communicate securely on the hotel network as required.

Uploaded by

Brito sham
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

HOTEL NETWORK MANAGEMENT PROJECT

A COURSE PROJECT REPORT

By
ASMITHA J.A(RA2111031010015)
GOGULRAM.S(RA2111031010020)
KAVIN.D(RA2111031010027)
RINI MARGARET.A(RA2111031010035)
SARANYA.S(RA2111031010039)
AKHAS AHAMED ATHAM YOUSUFF(RA2111031010052)

Under the guidance of

Dr. Metilda Florance

In partial fulfilment for the Course

of

18CSS202J - NWC

FACULTY OF ENGINEERING AND TECHNOLOGY

SRM INSTITUTE OF SCIENCE AND TECHNOLOGY

Kattankulathur, Chengalpattu District

MAY 2023
SRM INSTITUTE OF SCIENCE AND TECHNOLOGY

(Under Section 3 of UGC Act, 1956)

BONAFIDE CERTIFICATE

Certified that this mini project report " HOTEL NETWORK


MANAGEMENT PROJECT " is the bonafide work of ASMITHA
J.A(RA2111031010015),GOGULRAM.S(RA2111031010020),KAVIN
.D(RA2111031010027),RINIMARGARET.A(RA2111031010035),SA
RANYA.S(RA2111031010039),AKHAS AHAMED ATHAM
YOUSUFF(RA2111031010052)

who carried out the project work under my supervision.

SIGNATURE
Dr. Metilda Florance
Assistant Professor
NWC
SRM Institute of Science and Technology

6
TABLE OF CONTENTS

CHAPTERS CONTENTS PAGE


NO.

1. ABSTRACT
2. INTRODUCTION
3. REQUIREMENT ANALYSIS
4. ARCHITECTURE & DESIGN
5. IMPLEMENTATION
6. CODE
7. EXPERIMENT RESULTS & OUTPUT
8. CONCLUSION & FUTURE
ENHANCEMENT
9. REFERENCES

7
ACKNOWLEDGEMENT
We express our heartfelt thanks to our honorable Vice
Chancellor Dr. C. MUTHAMIZHCHELVAN, for being the beacon in all
our endeavors.
We would like to express my warmth of gratitude to our
Registrar Dr. S. Ponnusamy, for his encouragement
We express our profound gratitude to our Dean (College of
Engineering and Technology) Dr. T. V.Gopal, for bringing out novelty in
all executions.
We would like to express my heartfelt thanks to Chairperson,
School of Computing Dr. Revathi Venkataraman, for imparting confidence
to complete my course project
We wish to express my sincere thanks to Course Audit
Professor Dr.Annapurani Panaiyappan, Professor and Head,
Department of Networking and Communications and Course
Coordinators for their constant encouragement and support.

We are highly thankful to our my Course project Faculty Dr.


Metilda Florance , Assistant professor , NWC, for his/her assistance,
timely suggestion and guidance throughout the duration of this course project.
We extend my gratitude to our HoD Dr.Thenmozhi, Associate
professor, NWC and my Departmental colleagues for their Support.

Finally, we thank our parents and friends near and dear ones who
directly and indirectly contributed to the successful completion of our
project. Above all, I thank the almighty for showering his blessings on me to
complete my Course project.

8
HOTEL NETWORK MANAGEMENT PROJECT

Abstract:
Design and implementation of Vic Modern Hotel network. The hotel has
three floors; in the first floor there three departments (Reception, store
and Logistics), in the second floor there are three departments (Finance,
HR and Sales Marketing), while the third floor hosts the IT and Admin.
Therefore, the following are part of the considerations during the design
and implementation.

1. There should be three routers connecting each floor (all placed in the
server room in
IT department).
2. All routers should be connected to each other using serial DCE cable.
3. The network between the routers should be
10.10.10.0/30.10.10.10.4/30,10.10.10.8/30
4. Each floor is expected to have one switch (placed in the respective
floor).
5. Each floor is expected to have WIFI networks connected to laptops
and phones.
6. Each department is expected to have a printer.
7. Each department is expected to be in different VLAN

Hardware:

Microsoft Windows 8.1, 10, 11 (64bit), Ubuntu 20.04, 22.04 LTS (64bit)
or macOS 10.14 or newer. amd64(x86-64) CPU. 4GB of free RAM. 1.4
GB of free disk space.

Software:
Cisco packet tracer:

9
Packet Tracer is a cross-platform visual simulation program designed by
Cisco Systems that allows users to create network topologies and imitate
modern computer networks. The software allows users to simulate the
configuration of Cisco routers and switches using a simulated command
line interface

Introduction:
.

The hotel has three floors; in the first floor there three departments
(Reception, store and Logistics), in the second floor there are three
departments (Finance, HR and Sales/Marketing), while the third floor
hosts the IT and Admin. Therefore, the following are part of the
considerations during the design and implementation;

There should be three routers connecting each floor (all placed in the
server room in IT department).

All routers should be connected to each other using serial DCE cable.

The network between the routers should be 10.10.10.0/30,10.10.10.4/30


and 10.10.10.8/30.

Each floor is expected to have one switch (placed in the respective floor).

Each floor is expected to have WIFI networks connected to laptops and


phones.

Each department is expected to have a printer.

Each department is expected to be in different VLAN with the following


details;

1st Floor;

10
- Reception- VLAN 80, Network of 192.168.8.0/24

- Store- VLAN 70, Network of 192.168.7.0/24

- Logistics- VLAN 60, Network of 192.168.6.0/24

2nd Floor;

- Finance- VLAN 50, Network of 192.168.5.0/24

- HR- VLAN 40, Network of 192.168.4.0/24

- Sales- VLAN 30, Network of 192.168.3.0/24

3rd Floor;

- Admin- VLAN 20, Network of 192.168.2.0/24

- IT- VLAN 10, Network of 192.168.1.0/24

Use OSPF as the routing protocol to advertise routes.

All devices in the network are expected to obtain IP address dynamically


with their respective router configured as the DHCP server.

All the devices in the network are expected to communicate with each
other.

Configure SSH in all the routers for remote login.

In IT department, add PC called Test-PC to port fa0/1 and use it to test


remote login.
11
Configure port security to IT-dept switch to allow only Test-PC to access
port fa0/1 (use sticky method to obtain mac-address with violation mode
of shutdown.)

Use Case:

The network topology below satisfy the user requirements above and
everything is verified, tested and working fine.

Cisco Packet Tracer Network Diagram

Technologies Implemented:
Creating a network topology using Cisco Packet Tracer.

Hierarchical Network Design.

Connecting Networking devices with Correct cabling.

12
Creating VLANs and assigning ports VLAN numbers.

Subnetting and IP Addressing.

Configuring Inter-VLAN Routing (Router on a stick).

Configuring DHCP Server (Router as the DHCP Server).

Configuring SSH for secure Remote access.

Configuring switchport security or Port-Security on the switches.

Configuring WLAN or wireless network (Cisco Access Point).

Host Device Configurations.

Test and Verifying Network Communication.

Conclusions:
The conclusion of this project is A Hotel management system
is a computerized management system. This system keeps the records of
hardware assets besides software of this organization. The proposed
system will keep a track of Workers, Recidents, Accounts and generation
of report regarding the present status