Elv System

The document is a progress report on an MEP (extra low voltage) system design schedule. It provides status updates for 28 categories of ELV system drawings for different locations of a building project. The status for most drawings is shown as "pending" across all locations, except for item 8 (fire alarm drawings) which lists percentage completion levels ranging from 30% to 90% for various floors.

Uploaded by

ZAHID IQBAL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
722 views2 pages

Elv System

The document is a progress report on an MEP (extra low voltage) system design schedule. It provides status updates for 28 categories of ELV system drawings for different locations of a building project. The status for most drawings is shown as "pending" across all locations, except for item 8 (fire alarm drawings) which lists percentage completion levels ranging from 30% to 90% for various floors.

Uploaded by

ZAHID IQBAL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

MEP (ELV)System Design Schedule progress report:

Description Location Global ICON Location SIGNATURE Location SOLITAIRE Location


EXTRA Low Voltage System Plans: Details
1 drawing:Schematic,drawings:Wiring details,Fixing details etc. PENDING PENDING PENDING PENDING PENDING PENDING

ELV System Layout Plans: These plans provide an overview of the entire
ELV system within the building. They should include the locations of
2 key components and devices related to various ELV systems, such as PENDING PENDING PENDING PENDING
data and telecommunication, audio-visual, security, access control, and
building automation.

Cable Pathway and Conduit Layout: These drawings illustrate the


routing of cables and conduits throughout the building, ensuring
3 proper organization and separation of different types of cabling to PENDING PENDING PENDING PENDING
prevent interference.

Structured Cabling Diagrams: Detailed drawings showing the


layout and configuration of structured cabling systems, including
4 the placement of data and voice cabling, network equipment, and PENDING PENDING PENDING PENDING
telecommunication distribution panels.

Wiring and Connection Diagrams: Detailed diagrams showing the


5 wiring and connections for ELV components and devices, PENDING
including information on cable types, terminations, and labeling.

Data and Telephone and Voice Communication Systems detailed


6 drawing: PENDING PENDING PENDING PENDING

7 CCTV Security Systems:detailed drawing: PENDING PENDING PENDING PENDING

Fire Alarm and Detection Systems detailed drawing:


8 Integrated and interfaced with the other services: 90%
üü 30% 35% 25%
13Th Flr 4TH flr 3RD FLR 2ND FLR

Building Management System (BMS):BMS System detailed


9 drawing: PENDING PENDING PENDING PENDING

Guest Room Management Systems:GRMS System detailed


10 drawing: PENDING PENDING PENDING PENDING

Access Control and Surveillance Camera Coverage Maps: Maps


indicating the coverage areas for access control devices and
11 surveillance cameras, which can be crucial for security and PENDING PENDING PENDING PENDING
monitoring.

Security System Plans: Drawings illustrating the placement of


security components such as surveillance cameras, access control
12 devices, motion detectors, and alarms. These plans should also PENDING PENDING PENDING PENDING
show wiring and cable routes for security system connections.

13 PABX System detailed drawing: PENDING PENDING PENDING PENDING

Audio-Visual System Schematics: Diagrams detailing the layout


of audio-visual systems, including the placement of displays,
14 projectors, speakers, amplifiers, and related components. This PENDING PENDING PENDING PENDING
may also include wiring diagrams for audio and video
distribution.

Public Address (PA) and Emergency Communication Systems


15 Drawings: PENDING PENDING PENDING PENDING

Emergency Communication Systems: Plans that detail the


location of emergency communication systems, including areas
16 covered by public address (PA) systems and emergency PENDING PENDING PENDING PENDING
notification devices.

17 Wi-Fi and Networking Equipment: PENDING PENDING PENDING PENDING

Energy Management and Building Automation Systems with


18 interfacing detailed drawings: PENDING PENDING PENDING PENDING

Building Automation System (BAS) Diagrams: Schematics that


depict the layout of the building automation system, including the
19 locations of control panels, sensors, actuators, and the network PENDING PENDING PENDING PENDING
infrastructure needed for system integration.

Fire and Life Safety Integration: If the ELV systems are


integrated with fire and life safety systems, there should be
20 drawings showing the connections and interfaces between the two PENDING PENDING PENDING PENDING
systems, as well as the locations of fire alarm devices that are part
of the ELV network.

Cable Tray Layout and Routing Elevation and Sections:detailed


21 drawing: PENDING PENDING PENDING PENDING

22 Cable Tray Hanging & Support Detailed drawing: PENDING PENDING PENDING PENDING

23 Cable Sizing table with detailed Schedules & Specifications: PENDING PENDING PENDING PENDING

IT Server Room Data Center: complete design drawings layout Lower


24 details: Ground
PENDING PENDING 3RD Floor PENDING 5TH Floor PENDING Services Floor

Fiber Optic Network Diagrams: For high-speed data


transmission, particularly in larger buildings, diagrams outlining
25 the layout of fiber optic cabling and associated equipment may be PENDING PENDING PENDING PENDING
essential.

Equipment Rack Layouts: Diagrams showing the placement and


organization of equipment racks and enclosures that house ELV
26 system components, including servers, switches, and other PENDING PENDING PENDING PENDING
hardware.

System Integration Schematics: If ELV systems need to be


27 integrated with one another or with other building systems, PENDING PENDING PENDING PENDING
provide schematics illustrating the connections and interfaces.
Utility Coordination:
28 Coordination Drawings between MEP systems to ensure there PENDING PENDING PENDING PENDING
are no conflicts or clashes between them: