Jobsheet 1 Winding-Operation-1
Jobsheet 1 Winding-Operation-1
JOB SHEET
DIPLOMA IN POLYMER COMPOSITES
COURSE & CLASS
PROCESSING TECHNOLOGY
SESSION SEMESTER 3
DQP30072 PRESS &
CODE & SUBJECT SHEET NO JS1
FILAMENT WINDING
NO OF STUDENTS WEEK
DURATION VENUE WORKSHOP
Tools/Equipment required:
TOOLS /
EQUIPMENTS / 1. Computerised 4-axes Filament Winding Machine
Page 1 of 8
DPP B2(c)
PROCEDURE
These are the practical steps to abide during the practical activity:
1. Students should read through the steps described before attempting the practical
activity
2. Plan the work to be carried out in list of priorty
3. Students are required to record their findings in the appropriate appendix and
results column
Page 2 of 8
DPP B2(c)
Page 3 of 8
DPP B2(c)
Page 4 of 8
DPP B2(c)
Page 5 of 8
DPP B2(c)
RESULT :
Notes :
The result shall consists all the keypoints stated above.
Page 6 of 8
DPP B2(c)
QUESTION/DISCUSSION :
1. Using a simple diagram, name all axis for the machine used in this task.
3. Name the types of mandrel that can be apply in filament winding process.
4. Using a simple flowchart, describe the software control application from loading
the winding pattern until end of the process.
5. From your opinion, which is more relevant when producing composite pipe using;
a. RTM
b. Filament winding
Give your reason?
Page 7 of 8
DPP B2(c)
CONCLUSION :
REFERENCE :
Checked by :
Signature :
Name :
Designation :
Date :
Page 8 of 8