Report Simulasi Hubung Singkat

The short-circuit report summarizes the results of a fault study on a 13.8kV electrical system. A 3-phase fault at Bus 2 results in a maximum current of 118.965kA. A 3-phase fault at Bus 11 results in a maximum current of 8.571kA. The report lists the fault currents contributed by each component in the system, including transformers, generators, and loads, along with associated impedance values.

Uploaded by

9drr7mm5sn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views16 pages

Report Simulasi Hubung Singkat

The short-circuit report summarizes the results of a fault study on a 13.8kV electrical system. A 3-phase fault at Bus 2 results in a maximum current of 118.965kA. A 3-phase fault at Bus 11 results in a maximum current of 8.571kA. The report lists the fault currents contributed by each component in the system, including transformers, generators, and loads, along with associated impedance values.

Uploaded by

9drr7mm5sn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Project: ETAP Page: 1

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: Bus2


Nominal kV = 13.800
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus2 Total 0.00 44.829 0.00 104.62 108.95 47.574 47.574 5.10E-001 1.13E+001 1.36E+000 9.53E+000

Bus14 Bus2 94.81 24.870 105.16 115.34 104.35 17.409 0.000 7.77E-001 2.04E+001

SG-1401 Bus2 10.15 0.365 67.42 65.27 112.09 0.255 0.000 1.61E+002 1.38E+003

GEN 101 Bus2 110.00 19.597 110.00 110.00 110.00 29.916 47.574 1.36E+000 2.59E+001 1.36E+000 9.53E+000

U1 Bus14 115.50 2.179 115.50 115.50 115.50 1.311 0.000 4.05E-001 3.64E+000 2.02E+001 1.82E+002

SB-1401A SG-1401 13.97 0.151 100.17 43.68 98.86 0.092 0.000 2.50E+003 6.12E+003

Vaccum A/B SG-1401 112.82 0.274 112.82 112.82 112.82 0.167 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 112.82 0.200 112.82 112.82 112.82 0.122 0.000 3.20E+002 4.92E+003

SB-1402A SG-1402 13.91 0.149 100.12 43.63 98.90 0.091 0.000 2.31E+003 6.30E+003

DB-121 Bus11 16.43 0.004 100.77 45.43 98.70 0.002 0.000 4.37E+004 2.66E+005

DB-131 Bus11 15.23 0.003 100.61 44.59 98.65 0.002 0.000 5.47E+004 3.28E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 44.829 47.574 39.239 47.202
Peak Current (kA), Method C : 118.965 126.250 104.130 125.260
Breaking Current (kA, rms, symm) : 47.574 39.239 47.202
Steady State Current (kA, rms) : 43.224 47.574 39.239 47.202

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 2

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: Bus11


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus11 Total 0.00 8.571 0.00 110.14 110.37 8.531 8.531 1.37E+001 1.23E+002 1.46E+001 1.24E+002

DB-121 Bus11 6.79 0.004 66.32 65.04 109.95 0.003 0.000 1.06E+005 2.44E+005

DB-131 Bus11 5.50 0.003 65.82 64.74 109.95 0.002 0.000 1.30E+005 3.01E+005

SB-1402A SG-1402 4.03 0.160 64.80 64.90 109.95 0.106 0.000 1.45E+003 6.45E+003

Bus2 SG-1401 98.31 7.736 102.75 107.19 102.98 7.978 8.531 * 1.51E+001 1.36E+002 1.46E+001 1.24E+002

SB-1401A SG-1401 4.09 0.162 64.90 64.85 109.95 0.108 0.000 1.19E+003 6.41E+003

Vaccum A/B SG-1401 110.00 0.294 110.00 110.00 110.00 0.195 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 110.00 0.214 110.00 110.00 110.00 0.142 0.000 3.20E+002 4.92E+003

CL-2 DB-121 110.00 0.063 110.00 110.00 110.00 0.036 0.000 9.67E+004 2.30E+005

CL-3 DB-131 110.00 0.051 110.00 110.00 110.00 0.029 0.000 1.21E+005 2.88E+005

Load 5 SB-1402A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 110.00 0.751 110.00 110.00 110.00 0.432 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 110.00 0.920 110.00 110.00 110.00 0.529 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Bus14 Bus2 110.92 2.026 112.34 112.31 111.50 1.143 0.000 1.19E+002 2.49E+001

GEN 101 Bus2 107.25 1.596 107.25 107.25 107.25 0.939 0.000 1.36E+000 2.59E+001 1.36E+000 9.53E+000

CT 1-4 SB-1401A 110.00 0.263 110.00 110.00 110.00 0.151 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 110.00 1.665 110.00 110.00 110.00 0.957 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 1 SB-1401B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004
Project: ETAP Page: 3

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

(Cont.)

Fault at bus: Bus11


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.571 8.531 7.428 8.560
Peak Current (kA), Method C : 20.893 20.796 18.107 20.867
Breaking Current (kA, rms, symm) : 8.531 7.428 8.560
Steady State Current (kA, rms) : 8.412 8.531 7.428 8.560

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 4

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: Bus14


Nominal kV = 150.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus14 Total 0.00 12.549 0.00 150.83 147.34 5.754 5.754 3.54E-001 3.36E+000 4.54E-001 1.53E+001

Bus2 Bus14 41.61 1.004 89.96 91.63 104.54 2.069 5.274 * 1.74E+000 4.21E+001 3.72E-001 1.67E+001

U1 Bus14 110.00 11.547 110.00 110.00 110.00 3.685 0.482 4.05E-001 3.64E+000 2.02E+001 1.82E+002

SG-1401 Bus2 48.50 0.209 102.43 89.68 103.83 0.055 0.000 1.02E+003 1.19E+003

GEN 101 Bus2 104.76 11.253 104.76 104.76 104.76 2.993 0.000 1.36E+000 2.59E+001 1.36E+000 9.53E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.549 5.754 10.882 11.167
Peak Current (kA), Method C : 30.787 14.117 26.696 27.396
Breaking Current (kA, rms, symm) : 5.754 10.882 11.167
Steady State Current (kA, rms) : 12.524 5.754 10.882 11.167

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 5

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: DB-121


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DB-121 Total 0.00 1.025 0.00 105.55 106.47 1.005 1.005 8.40E+003 1.30E+004 9.10E+003 1.36E+004

Bus11 DB-121 104.30 0.962 104.56 105.00 104.76 0.964 1.005 * 9.11E+003 1.38E+004 9.10E+003 1.36E+004

CL-2 DB-121 105.00 0.064 105.00 105.00 105.00 0.042 0.000 9.67E+004 2.30E+005

DB-131 Bus11 104.34 0.000 104.57 104.79 104.99 0.000 0.000

SB-1402A SG-1402 104.33 0.001 104.56 104.79 104.99 0.001 0.000 2.66E+005 3.68E+005

Bus2 SG-1401 102.32 0.055 102.36 102.37 102.34 0.031 0.000 * 6.29E+003 6.95E+003

SB-1401A SG-1401 104.33 0.001 104.56 104.79 104.99 0.001 0.000 2.75E+005 3.53E+005

Vaccum A/B SG-1401 105.00 0.002 105.00 105.00 105.00 0.001 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.002 105.00 105.00 105.00 0.001 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 1.025 1.005 0.887 1.020
Peak Current (kA), Method C : 1.687 1.655 1.461 1.679
Breaking Current (kA, rms, symm) : 1.005 0.887 1.020
Steady State Current (kA, rms) : 0.962 1.005 0.887 1.020

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 6

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: DB-131


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DB-131 Total 0.00 1.012 0.00 105.40 106.17 0.997 0.997 8.54E+003 1.32E+004 9.10E+003 1.36E+004

Bus11 DB-131 104.30 0.962 104.56 105.00 104.76 0.964 0.997 * 9.11E+003 1.38E+004 9.10E+003 1.36E+004

CL-3 DB-131 105.00 0.051 105.00 105.00 105.00 0.033 0.000 1.21E+005 2.88E+005

DB-121 Bus11 104.35 0.000 104.57 104.80 104.99 0.000 0.000

SB-1402A SG-1402 104.33 0.001 104.56 104.79 104.99 0.001 0.000 2.66E+005 3.68E+005

Bus2 SG-1401 102.32 0.055 102.36 102.37 102.34 0.031 0.000 * 6.29E+003 6.95E+003

SB-1401A SG-1401 104.33 0.001 104.56 104.79 104.99 0.001 0.000 2.75E+005 3.53E+005

Vaccum A/B SG-1401 105.00 0.002 105.00 105.00 105.00 0.001 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.002 105.00 105.00 105.00 0.001 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 1.012 0.997 0.877 1.009
Peak Current (kA), Method C : 1.664 1.639 1.441 1.658
Breaking Current (kA, rms, symm) : 0.997 0.877 1.009
Steady State Current (kA, rms) : 0.962 0.997 0.877 1.009

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 7

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1401A


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1401A Total 0.00 45.709 0.00 99.18 100.06 50.847 50.847 5.14E+001 3.44E+002 3.98E+001 2.39E+002

SG-1401 SB-1401A 69.17 43.179 85.31 104.98 86.40 48.971 50.847 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

CT 1-4 SB-1401A 105.00 0.261 105.00 105.00 105.00 0.193 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 105.00 1.651 105.00 105.00 105.00 1.224 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 1 SB-1401B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.34E+001

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

SB-1402A SG-1402 70.48 0.052 79.42 98.78 99.64 0.033 0.000 1.02E+004 1.48E+003

DB-121 Bus11 71.37 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.80E+004

DB-131 Bus11 70.95 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.11E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.709 50.847 39.595 49.072
Peak Current (kA), Method C : 106.611 118.595 92.349 114.454
Breaking Current (kA, rms, symm) : 50.847 39.595 49.072
Steady State Current (kA, rms) : 44.814 50.847 39.595 49.072

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 8

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1401B


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1401B Total 0.00 45.709 0.00 99.18 100.06 50.847 50.847 5.14E+001 3.44E+002 3.98E+001 2.39E+002

Load 1 SB-1401B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

SG-1401 SB-1401A 69.17 43.179 85.31 104.98 86.40 48.971 50.847 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

CT 1-4 SB-1401A 105.00 0.261 105.00 105.00 105.00 0.193 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 105.00 1.651 105.00 105.00 105.00 1.224 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.34E+001

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

SB-1402A SG-1402 70.48 0.052 79.42 98.78 99.64 0.033 0.000 1.02E+004 1.48E+003

DB-121 Bus11 71.37 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.80E+004

DB-131 Bus11 70.95 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.11E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.709 50.847 39.595 49.072
Peak Current (kA), Method C : 106.611 118.595 92.349 114.454
Breaking Current (kA, rms, symm) : 50.847 39.595 49.072
Steady State Current (kA, rms) : 44.814 50.847 39.595 49.072

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 9

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1402A


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1402A Total 0.00 45.670 0.00 99.22 100.00 50.814 50.814 5.21E+001 3.44E+002 3.98E+001 2.39E+002

SG-1402 SB-1402A 69.18 43.185 85.31 104.98 86.40 48.971 50.814 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

Load 5 SB-1402A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 105.00 0.744 105.00 105.00 105.00 0.552 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 105.00 0.911 105.00 105.00 105.00 0.676 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

DB-121 Bus11 71.38 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.82E+004

DB-131 Bus11 70.96 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.13E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.33E+001

SB-1401A SG-1401 70.51 0.053 79.44 98.77 99.66 0.034 0.000 9.94E+003 1.82E+003

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.670 50.814 39.560 49.013
Peak Current (kA), Method C : 106.311 118.287 92.090 114.093
Breaking Current (kA, rms, symm) : 50.814 39.560 49.013
Steady State Current (kA, rms) : 44.610 50.814 39.560 49.013

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 10

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1402B


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1402B Total 0.00 45.670 0.00 99.22 100.00 50.814 50.814 5.21E+001 3.44E+002 3.98E+001 2.39E+002

Load 4 SB-1402B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

SG-1402 SB-1402A 69.18 43.185 85.31 104.98 86.40 48.971 50.814 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

Load 5 SB-1402A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 105.00 0.744 105.00 105.00 105.00 0.552 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 105.00 0.911 105.00 105.00 105.00 0.676 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

DB-121 Bus11 71.38 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.82E+004

DB-131 Bus11 70.96 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.13E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.33E+001

SB-1401A SG-1401 70.51 0.053 79.44 98.77 99.66 0.034 0.000 9.94E+003 1.82E+003

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.670 50.814 39.560 49.013
Peak Current (kA), Method C : 106.311 118.287 92.090 114.093
Breaking Current (kA, rms, symm) : 50.814 39.560 49.013
Steady State Current (kA, rms) : 44.610 50.814 39.560 49.013

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 11

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1403A


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1403A Total 0.00 45.670 0.00 99.22 100.00 50.814 50.814 5.21E+001 3.44E+002 3.98E+001 2.39E+002

Fire Pump SB-1403A 105.00 0.744 105.00 105.00 105.00 0.552 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

SG-1402 SB-1402A 69.18 43.185 85.31 104.98 86.40 48.971 50.814 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

Load 5 SB-1402A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 105.00 0.911 105.00 105.00 105.00 0.676 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

DB-121 Bus11 71.38 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.82E+004

DB-131 Bus11 70.96 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.13E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.33E+001

SB-1401A SG-1401 70.51 0.053 79.44 98.77 99.66 0.034 0.000 9.94E+003 1.82E+003

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.670 50.814 39.560 49.013
Peak Current (kA), Method C : 106.311 118.287 92.090 114.093
Breaking Current (kA, rms, symm) : 50.814 39.560 49.013
Steady State Current (kA, rms) : 44.610 50.814 39.560 49.013

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 12

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1403B


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1403B Total 0.00 45.670 0.00 99.22 100.00 50.814 50.814 5.21E+001 3.44E+002 3.98E+001 2.39E+002

LV Motor2 SB-1403B 105.00 0.911 105.00 105.00 105.00 0.676 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

SG-1402 SB-1402A 69.18 43.185 85.31 104.98 86.40 48.971 50.814 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

Load 5 SB-1402A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 105.00 0.744 105.00 105.00 105.00 0.552 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

DB-121 Bus11 71.38 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.82E+004

DB-131 Bus11 70.96 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.13E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.33E+001

SB-1401A SG-1401 70.51 0.053 79.44 98.77 99.66 0.034 0.000 9.94E+003 1.82E+003

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.670 50.814 39.560 49.013
Peak Current (kA), Method C : 106.311 118.287 92.090 114.093
Breaking Current (kA, rms, symm) : 50.814 39.560 49.013
Steady State Current (kA, rms) : 44.610 50.814 39.560 49.013

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 13

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SG-1401


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SG-1401 Total 0.00 8.571 0.00 110.14 110.37 8.531 8.531 1.37E+001 1.23E+002 1.46E+001 1.24E+002

Bus2 SG-1401 98.31 7.736 102.75 107.19 102.98 7.978 8.531 * 1.51E+001 1.36E+002 1.46E+001 1.24E+002

SB-1401A SG-1401 4.09 0.162 64.90 64.85 109.95 0.108 0.000 1.19E+003 6.41E+003

Vaccum A/B SG-1401 110.00 0.294 110.00 110.00 110.00 0.195 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 110.00 0.214 110.00 110.00 110.00 0.142 0.000 3.20E+002 4.92E+003

SB-1402A SG-1402 4.03 0.160 64.80 64.90 109.95 0.106 0.000 1.45E+003 6.45E+003

DB-121 Bus11 6.79 0.004 66.32 65.04 109.95 0.003 0.000 1.06E+005 2.44E+005

DB-131 Bus11 5.50 0.003 65.82 64.74 109.95 0.002 0.000 1.30E+005 3.01E+005

Bus14 Bus2 110.92 2.026 112.34 112.31 111.50 1.143 0.000 1.19E+002 2.49E+001

GEN 101 Bus2 107.25 1.596 107.25 107.25 107.25 0.939 0.000 1.36E+000 2.59E+001 1.36E+000 9.53E+000

CT 1-4 SB-1401A 110.00 0.263 110.00 110.00 110.00 0.151 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 110.00 1.665 110.00 110.00 110.00 0.957 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 1 SB-1401B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 5 SB-1402A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 110.00 0.751 110.00 110.00 110.00 0.432 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 110.00 0.920 110.00 110.00 110.00 0.529 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

CL-2 DB-121 110.00 0.063 110.00 110.00 110.00 0.036 0.000 9.67E+004 2.30E+005

CL-3 DB-131 110.00 0.051 110.00 110.00 110.00 0.029 0.000 1.21E+005 2.88E+005
Project: ETAP Page: 14

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

(Cont.)

Fault at bus: SG-1401


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.571 8.531 7.428 8.560
Peak Current (kA), Method C : 20.893 20.796 18.107 20.867
Breaking Current (kA, rms, symm) : 8.531 7.428 8.560
Steady State Current (kA, rms) : 8.412 8.531 7.428 8.560

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 15

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SG-1402


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SG-1402 Total 0.00 8.571 0.00 110.14 110.37 8.531 8.531 1.37E+001 1.23E+002 1.46E+001 1.24E+002

SB-1402A SG-1402 4.03 0.160 64.80 64.90 109.95 0.106 0.000 1.45E+003 6.45E+003

DB-121 Bus11 6.79 0.004 66.32 65.04 109.95 0.003 0.000 1.06E+005 2.44E+005

DB-131 Bus11 5.50 0.003 65.82 64.74 109.95 0.002 0.000 1.30E+005 3.01E+005

Bus2 SG-1401 98.31 7.736 102.75 107.19 102.98 7.978 8.531 * 1.51E+001 1.36E+002 1.46E+001 1.24E+002

SB-1401A SG-1401 4.09 0.162 64.90 64.85 109.95 0.108 0.000 1.19E+003 6.41E+003

Vaccum A/B SG-1401 110.00 0.294 110.00 110.00 110.00 0.195 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 110.00 0.214 110.00 110.00 110.00 0.142 0.000 3.20E+002 4.92E+003

Load 5 SB-1402A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 110.00 0.751 110.00 110.00 110.00 0.432 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 110.00 0.920 110.00 110.00 110.00 0.529 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

CL-2 DB-121 110.00 0.063 110.00 110.00 110.00 0.036 0.000 9.67E+004 2.30E+005

CL-3 DB-131 110.00 0.051 110.00 110.00 110.00 0.029 0.000 1.21E+005 2.88E+005

Bus14 Bus2 110.92 2.026 112.34 112.31 111.50 1.143 0.000 1.19E+002 2.49E+001

GEN 101 Bus2 107.25 1.596 107.25 107.25 107.25 0.939 0.000 1.36E+000 2.59E+001 1.36E+000 9.53E+000

CT 1-4 SB-1401A 110.00 0.263 110.00 110.00 110.00 0.151 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 110.00 1.665 110.00 110.00 110.00 0.957 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 1 SB-1401B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004
Project: ETAP Page: 16

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

(Cont.)

Fault at bus: SG-1402


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.571 8.531 7.428 8.560
Peak Current (kA), Method C : 20.893 20.796 18.107 20.867
Breaking Current (kA, rms, symm) : 8.531 7.428 8.560
Steady State Current (kA, rms) : 8.412 8.531 7.428 8.560

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.