P141 - Test Report

The document summarizes the test results of overcurrent and earth fault relays in a 66/11kV substation. It details the injection of various current levels and measurement of operating times for protection functions like I>, I>>, I0>, I0>>. All measurements were found to match expected operation times, and the relays were found to pass the tests. Key settings for protections like I>, I0>, and LBB are also listed.

Uploaded by

sravankotlas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
443 views3 pages

P141 - Test Report

The document summarizes the test results of overcurrent and earth fault relays in a 66/11kV substation. It details the injection of various current levels and measurement of operating times for protection functions like I>, I>>, I0>, I0>>. All measurements were found to match expected operation times, and the relays were found to pass the tests. Key settings for protections like I>, I0>, and LBB are also listed.

Uploaded by

sravankotlas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

HANUR SOLAR POWERPLANT

66/11KV SUBSTATION Page 1 of 2


O/C & E/F RELAY TEST REPORT
DATE:25/07/23

TEST REPORT FOR OVER CURRENT AND EARTH FAULT RELAY

Customer : M/S ECOREN ENERGY Date : 24/07/2023

Model No : P141811N2M0520J Aux. Voltage :110 VDC

Serial No : 34386318/03/18 Frequency : 50 Hz

MAKE : ALSTOM MICOM Settings Recommended by:

Panel Ref : 66/11KV TRANSFORMER CUM


FEEDER RELAY PANAL-(6KLA)

All setting values are reference to secondary side.

MEASURNMENT CHECK

CT RATIO 400/1A

PHASE INJECTED VALUE MEASURD VALUE


R PH 1A 400.1
Y PH 1A 399.1
B PH 1A 399.5

OVER CURRENT PROTECTION (50/51):


Setting :
I>Char IEC-S INVERSE
I> 0.62 A
tms> 0.1 S
I>> 5.45 A
tms>> 0S

TIMING TEST:
Expected Relay operated Time(Sec)
FUNCTION Injected Current (A) Operation
R Y B
Time(Sec)
I> 0.80 (1.3times) 2.73 2.78 2.79 2.79
I> 1.24 (2 times) 1.00 1.03 1.03 1.03
I> 3.1 (5 times) 0.42 0.44 0.44 0.45

Non- Directional Over current and Earth Fault Relay Page 1 of 3


HANUR SOLAR POWERPLANT
66/11KV SUBSTATION Page 2 of 2
O/C & E/F RELAY TEST REPORT
DATE:25/07/23

Overcurrent Fault Protection (51):

I>>: 5.45 Time: 0


Phase Ref Injected current (A) Operating Time(Sec)
R 5.45 0.042
Y 5.45 0.040
B 5.45 0.042

Earth fault Protection (50N):


I0> Char IEC-S INVERSE
I0 > 0.11 A
TMS0> 0.1 S
I0>> 0.56 A
T0>> 0.2 S

TIMING TEST:
Expected Time Relay operated Time(S)
FUNCTION Injected Current (A) (Sec)
Ie ( Injected on R/Y/B)
I0 > 0.143 (1.3 times) 2.66 2.72
I0 > 0.22 (2 times) 1.00 1.04
I0 > 0.55 (5 times) 0.42 0.44

Earth Fault Protection (51N):

I0>>:0.57 Time: 0.2


Phase Ref Injected current (A) Operating Time(Sec)
R 0.57 0.225
Y 0.57 0.228
B 0.57 0.227

Non- Directional Over current and Earth Fault Relay Page 2 of 3


HANUR SOLAR POWERPLANT
66/11KV SUBSTATION Page 3 of 2
O/C & E/F RELAY TEST REPORT
DATE:25/07/23

LBB:
Setting:
I</IN< Current Set 0.2A
CB Fail-1 Timer 100mS
CB Fail-2 Timer 200mS
Volt Protection Reset I<Only
Current Protection Reset I<Only

Protection operates with start signal of remaining protection. The overcurrent protection 2nd stage is
turned on to get the start signal for breaker failure protection.
Phase Ref Injected current (A) Operating Time(Sec)
R 5.45
Y 5.45 0.126
B 5.45

MODEL NO P141811N2M0520J
SL NO 34386318/03/18
: 66/11KV TRANSFORMER CUM FEEDER RELAY
PANEL
PANAL-(6KLA)
RESULT PASS
REMARKS

Tested By Witnessed By Witnessed By


For M/s.ISSPL For M/s. For M/s.

Name: Kamal P Name: Suresh Kumar Name:

Testing Engineer

Date: 25.07.2023

Non- Directional Over current and Earth Fault Relay Page 3 of 3