OEE Calculator

The document contains a template for calculating overall equipment effectiveness (OEE) with fields to enter production data, planned and unplanned downtimes, performance, quality, and OEE percentage. It compares the calculated OEE percentage to a best-of-class score of 80%.

Uploaded by

Kory Santiago
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views1 page

OEE Calculator

The document contains a template for calculating overall equipment effectiveness (OEE) with fields to enter production data, planned and unplanned downtimes, performance, quality, and OEE percentage. It compares the calculated OEE percentage to a best-of-class score of 80%.

Uploaded by

Kory Santiago
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Enter your production data into the grey cells and watch the numbers adjust automatically.

OEE
calculation made easy!

Availability % 87%
Shift Structure
Number of working days per week 5
Shifts per day 2
Hours per shift 8

Total Production Hours 80

Planned Downtimes (hr/ week)


Ex.: Sanitations,C/O,Breaks, Lunches,
Meeting, ect. 5

Available Production Opening Time 75

Unplanned Downtimes (hr/week)


Ex.: Breakdowns, Missing product, Missing
employees, Adjustments & Others
10

Performance % 73%

Machine Standard Speed (theorical max) 1200


(u/min)
Estimated actual speed (u/min) 875

Quality % 98.50%
Quality % (nbr of reject/100 units)
Estimated percentage of reject 1.50%

OEE 62.2%
Best of class manufacturer OEE score is 80%

Number of Production 28
Hours Lost per Week
(Available production opening time x OEE)