2.aggregate & Moisture Adjustment (RISHIKESH)

The document presents results from tests conducted to determine the moisture content of different aggregate sizes. For sand, 5-10mm, 10-20mm, and 20-40mm aggregates: - The total moisture content, absorption, and free moisture content are reported. - Sand has the highest total moisture content at 1.73% and free moisture of 0.54%. - 20-40mm aggregate has the lowest total moisture at 0.30% and negative free moisture of -0.23%.

Uploaded by

Neeraj Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views46 pages

2.aggregate & Moisture Adjustment (RISHIKESH)

The document presents results from tests conducted to determine the moisture content of different aggregate sizes. For sand, 5-10mm, 10-20mm, and 20-40mm aggregates: - The total moisture content, absorption, and free moisture content are reported. - Sand has the highest total moisture content at 1.73% and free moisture of 0.54%. - 20-40mm aggregate has the lowest total moisture at 0.30% and negative free moisture of -0.23%.

Uploaded by

Neeraj Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 46

Moisture Content

Aggregate Size :- SAND


Wt. of Empty Container W1 482
Wt. of Wet Aggregate W2 1000
Wt. of Dry Agg.+ Container W3 1469
Wt. of Dry Aggregate W4=W3-W1 983
Wt. of Water W5 17
Total M.C. TMC=(W2-W4)/W4*100 1.73
Absorption Ab (%) 1.19
Free M.C. TMC-Ab (%) 0.54
Aggregate Size :- 5-10 mm
Wt. of Empty Container W1 479
Wt. of Wet Aggregate W2 1000
Wt. of Dry Agg.+ Container W3 1470
Wt. of Dry Aggregate W4=W3-W1 991
Wt. of Water W5 9
Total M.C. TMC=(W2-W4)/W4*100 0.91
Absorption Ab (%) 0.71
Free M.C. TMC-Ab (%) 0.20
Aggregate Size :- 10-20 mm
Wt. of Empty Container W1 480
Wt. of Wet Aggregate W2 1000
Wt. of Dry Agg.+ Container W3 1471
Wt. of Dry Aggregate W4=W3-W1 991
Wt. of Water W5 9
Total M.C. TMC=(W2-W4)/W4*100 0.91
Absorption Ab (%) 0.55
Free M.C. TMC-Ab (%) 0.36
Aggregate Size :- 20-40 mm
Wt. of Empty Container W1 484
Wt. of Wet Aggregate W2 1000
Wt. of Dry Agg.+ Container W3 1481
Wt. of Dry Aggregate W4=W3-W1 997
Wt. of Water W5 3
Total M.C. TMC=(W2-W4)/W4*100 0.30
Absorption Ab (%) 0.53
Free M.C. TMC-Ab (%) -0.23
Project : TPSP
Location : Mix : M15A40 (Rishikesh) day
Cement :
Concrete Mix Adjustment

Batch Wt. Corrected Corrected Saturated


Material kg/m³ Screen Size Percent Weight (kg) Weight (kg) Batch Weight Correction surface Dry
(kg) Wt(kg)

Cement 255 ADMIXTURE DOSE :- 1.66


Water 153
Passing 4.75mm 91.98 697 697
Sand 758 720 38 796
Retainned on 4.75mm 8.02 61 23
Passing 4.75mm 9.00 23 61
4.75 - 10mm 257 4.75 - 10mm 88.64 228 228 301 -44 213
Retainned on 10 mm 2.36 6 13
Passing 10 mm 3.49 13 6
10 - 20 mm 359 10 - 20 mm 88.27 317 317 349 10 369
Retainned on 20 mm 8.24 30 26
Passing 20 mm 4.04 26 30
20 - 40 mm 643 20 - 40 mm 95.11 612 612 647 -4 639
Retainned on 40 mm 0.85 5 5
2017 2425 497 2017 2017
Date :

Total Batch Wt
Moist Wt With
Moisture (kg)
Moisture Wt.
kg/m³

255
5 148

0.54 4 800

0.20 0 213

0.36 1 370

-0.23 -1 638

2425
Project : TPSP
Location : Mix: M20A40 (Rishikesh) Shift : Date :
Cement :

Concrete Mix Adjustment


Saturated
Corrected
Batch Wt. Weight Corrected surface
Material Screen Size Percent Batch Correction Moisture
kg/m³ (kg) Weight (kg) Dry
Weight (kg)
Wt(kg)
Cement 280 ADMIXTURE DOSE :- 1.82
Water 152
Passing 4.75mm 91.98 693 693
Sand 753 721 32 785 0.54
Retainned on 4.75mm 8.02 60 29
Passing 4.75mm 9.00 29 60
4.75 - 10mm 320 4.75 - 10mm 88.64 284 284 360 -40 280 0.20
Retainned on 10 mm 2.36 8 16
Passing 10 mm 3.49 16 8
10 - 20 mm 449 10 - 20 mm 88.27 396 396 425 24 473 0.36
Retainned on 20 mm 8.24 37 21
Passing 20 mm 4.04 21 37
20 - 40 mm 513 20 - 40 mm 95.11 488 488 529 -16 497 -0.23
Retainned on 40 mm 0.85 4 4
2035 2467 2035 2035
ate :

Total Batch Wt
Moist Wt
With Moisture
(kg)
Wt. kg/m³

280
5 147
4 789

1 281

2 475

-1 496

2467
Project : TPSP
Location : Mix : M25A40 Shift :
Cement :
Concrete Mix Adjustment
Batch
Corrected Weight Corrected Batch
Material Wt. Screen Size Percent Weight (kg)
(kg) Weight (kg)
kg/m³

Cement 310 ADMIXTURE DOSE :- 2.635


Water 155
Passing 4.75mm 92.60 668 668
Sand 721 689
Retainned on 4.75mm 7.40 53 21
Passing 4.75mm 8.39 21 53
4.75 -
10mm 254 4.75 - 10mm 89.03 226 226 290
Retainned on 10 mm 2.58 7 11
Passing 10 mm 2.87 11 7
10 - 20
mm 381 10 - 20 mm 88.72 338 338 369
Retainned on 20 mm 8.41 32 24
Passing 20 mm 3.78 24 32
20 - 40
mm 635 20 - 40 mm 95.33 605 605 643
Retainned on 40 mm 0.89 6 6
1991 2456 1991
ft : Date :

justment

Saturated surface Total Batch Wt With


Correction Moisture Moist Wt (kg)
Dry Wt(kg) Moisture Wt. kg/m³

310
5 150
32 753 0.54 4 757

-36 218 0.20 0 218

12 393 0.36 1 395

-8 627 -0.23 -1 626

1991 2456
Project : TPSP
Location : Mix : M20A20 (Rishikesh) day Date :
Cement :
Concrete Mix Adjustment

Batch Wt. Corrected Corrected Saturated Moist Wt


Material kg/m³ Screen Size Percent Weight (kg) Weight (kg) Batch Weight Correction surface Dry Moisture (kg)
(kg) Wt(kg)

Cement 300 ADMIXTURE DOSE :- 2.10


Water 156 8
Passing 4.75mm 92.60 685 685
Sand 740 727 13 753 0.54 4
Retainned on 4.75mm 7.40 55 42
Passing 4.75mm 8.39 42 55
4.75 - 10mm 501 4.75 - 10mm 89.03 446 446 522 -21 480 0.20 1
Retainned on 10 mm 2.58 13 22
Passing 10 mm 2.87 22 13
10 - 20 mm 752 10 - 20 mm 88.72 667 667 743 9 761 0.36 3
Retainned on 20 mm 8.41 63 63
1993 2449 1993 1993
Total Batch Wt
With Moisture
Wt. kg/m³

300
148

757

481

763

2449
t
a
l
B
a
t
Project : TPSP c
h
Location : Mix: M25A20 (Rishikesh) Shift : Date :
W
Cement : 350 kg/m³ t

Concrete Mix Adjustment W


i
Batch Corrected Saturated t
Material Wt. Screen Size Percent Weight (kg) Corrected Batch Correction surface Dry Moisture Moist Wt (kg) h
kg/m³ Weight (kg) Weight (kg) Wt(kg) M
o
Cement 350 ADMIXTURE DOSE :- 2.98 i
###
s
Water 164.5 8 t
###
u
Passing 4.75mm 91.98 780 780 r
Sand 848 824 24 872 0.54 5 ###
e
Retainned on 4.75mm 8.02 68 44
Passing 4.75mm 9.00 44 68 W
4.75 - t
10mm 486 4.75 - 10mm 88.64 431 431 520 -34 452 0.20 1 ###
.
Retainned on 10 mm 2.36 11 21
Passing 10 mm 3.49 21 11 k
10 - 20 g
mm 594 10 - 20 mm 88.27 524 524 585 9 603 0.36 2 ###
/
Retainned on 20 mm 8.24 49 49 m
³
1928 2442.5 1928 1928 ###

157.5

1080
Total Batch Wt With
Moisture Wt. kg/m³

350
156.7
877

453

605

2442.5
Project : TPSP
Location : Mix: M25A20(SCC) (Asena & Rishikesh)
Cement : 410KG

Concrete Mix Adjustment


Batch Corrected
Corrected
Material Wt. Screen Size Percent Weight (kg) Batch Weight
Weight (kg)
kg/m³ (kg)

Cement 410 ADMIXTURE DOSE :- 3.82


Water 212
Passing 4.75mm 91.98 816 816
Sand 887 865
Retainned on 4.75mm 8.02 71 50
Passing 4.75mm 9.00 50 71
4.75 -
10mm 551 4.75 - 10mm 88.64 488 488 568
Retainned on 10 mm 2.36 13 8
Passing 10 mm 3.49 8 13
10 - 20
mm 236 10 - 20 mm 88.27 208 208 241
Retainned on 20 mm 8.24 19 19
1674 2296 1674
o
t
a
l

B
a
t
c
h
Shift : Date :
W
t
justment W
i
t
Saturated Total Batch Wt
Moist Wt h
Correction surface Dry Moisture With Moisture
(kg)
Wt(kg) Wt. kg/m³
M
o
i
### 410
s
7 t
### 205
u
22 909 0.54 5 r
### 913
e

W
-17 534 0.20 1 t
### 535
.

k
g
-5 231 0.36 1 ###
/ 232
m
³
1674 ### 2296
Location : Mix : M15A20 Shift : Date :
Cement :
Concrete Mix Adjustment
Corrected Saturated
Corrected
Batch Wt. Weight Batch Correctio surface
Material Screen Size Percent Weight Moisture
kg/m³ (kg) Weight n Dry
(kg)
(kg) Wt(kg)

Cement 280 Admixture Dose :- 4.2


Water 162

Passing 4.7 92.60 783 783


Sand 846 818 28 874 0.54
Retainned o 7.40 63 35
Passing 4.7 8.39 35 63
4.75 -
10mm
415 4.75 - 10mm 89.03 369 369 450 -35 380 0.20
Retainned o 2.58 11 18
Passing 10 2.87 18 11
10 - 20
mm
623 10 - 20 mm 88.72 553 553 616 7 630 0.36
Retainned o 8.41 52 52
1884 2326 1884 1884
Date :

Total Batch Wt
Moist Wt
With Moisture
(kg)
Wt. kg/m³

280

8 154

5 879

1 381

2 632

2326
Project : TPSP
Location : Mix: M40A20 (Asena & Rishikesh) Shift : Date :
Cement : 402 kg/m³

Concrete Mix Adjustment


Batch Corrected Saturated
Weight Corrected Moist Wt
Material Wt. Screen Size Percent Batch Weight Correction surface Dry Moisture
(kg) Weight (kg) (kg)
kg/m³ (kg) Wt(kg)

Cement 402 ADMIXTURE DOSE :- 3.82


Water 149 8
Passing 4.75mm 92.60 673 673
Sand 727 713 14 741 0.54 4
Retainned on 4.75mm 7.40 54 40
Passing 4.75mm 8.39 40 54
4.75 -
10mm 474 4.75 - 10mm 89.03 422 422 496 -22 452 0.20 1
Retainned on 10 mm 2.58 12 20
Passing 10 mm 2.87 20 12
10 - 20
mm 712 10 - 20 mm 88.72 632 632 704 8 720 0.36 3
Retainned on 20 mm 8.41 60 60
1913 2464 1913 1913
Total Batch Wt
With Moisture
Wt. kg/m³

402
141
745

453

723

2464
Project : TPSP
Location : Mix: M30A20 (Asena & Rishikesh)
Cement : 377 kg/m³

Concrete Mix Adjustment

Batch Corrected
Weight Corrected
Material Wt. Screen Size Percent Batch Weight
(kg) Weight (kg)
kg/m³ (kg)

Cement 377 ADMIXTURE DOSE :- 3.82


Water 143
Passing 4.75mm 92.00 651 651
Sand 708 696
Retainned on 4.75mm 8.00 57 45
Passing 4.75mm 9.04 45 57
4.75 -
10mm 493 4.75 - 10mm 89.38 441 441 527
Retainned on 10 mm 1.58 8 30
Passing 10 mm 4.01 30 8
10 - 20
mm 739 10 - 20 mm 88.54 654 654 717
Retainned on 20 mm 7.45 55 55
1940 2460 1940
Shift : Date :

ustment

Saturated Total Batch Wt


Moist Wt
Correction surface Dry Moisture With Moisture
(kg)
Wt(kg) Wt. kg/m³

377
4 139
12 720 0.82 6 726

-34 459 0.18 1 460

22 761 -0.33 -3 758

1940 2460

0
Project : TPSP
Location : Mix: M25A10 (SCC) (Asena & Rishikesh) Shift : Date :

Concrete Mix Adjustment


Batch Corrected Corrected Saturated Total Batch Wt
Material Wt. Screen Size Percent Weight (kg) Weight Batch Weight Correction surface Dry Moisture Moist Wt (kg) With Moisture
kg/m³ (kg) (kg) Wt(kg) Wt. kg/m³

Cement 410 0.95 410


Water 210 9 201
Passing 4.75mm 92.60 837 837
Sand 904 902 2 906 0.82 7 914
Retainned on 4.75mm 7.40 67 65

Passing 4.75mm 8.39 65 67


4.75 -
10mm 770 4.75 - 10mm 89.03 686 686 772 -2 768 0.18 1 769
Retainned on 10 mm 2.58 20 20

1674 2294 1674 1674 2294

165
441
Project : TPSP
Location : Mix: M30A10 (SCC) (Asena & Rishikesh) Shift :

Cement :

Concrete Mix Adjustment


Batch Corrected Corrected
Material Wt. Screen Size Percent Weight (kg) Weight Batch Weight
kg/m³ (kg) (kg)

Cement 430 0.95


Water 180

Passing 4.75mm 91.98 814 814


Sand 885 891
Retainned on 4.75mm 8.02 71 77

Passing 4.75mm 9.00 77 71


4.75 -
10mm 850 4.75 - 10mm 88.64 753 753 844

Retainned on 10 mm 2.36 20 20

1735 2345 1735


P
ft : Date :

Adjustment
Saturated Total Batch Wt
Correction surface Dry Moisture Moist Wt (kg) With Moisture
Wt(kg) Wt. kg/m³

430
6 174

-6 879 0.54 5 884

6 856 0.20 2 857

1735 2345
Project : TPSP
Location : Mix: M25A10 (P.Shot) (Asena & Rishikesh) Shift : Day Date :

Cement :

Concrete Mix Adjustment


Batch Weight Corrected Corrected Saturated
Material Wt. Screen Size Percent (kg) Weight Batch Weight Correction surface Dry Moisture Moist Wt (kg)
kg/m³ (kg) (kg) Wt(kg)

Cement 421 ADMIXTURE DOSE :- 3.37


Water 168 51

Passing 4.75mm 91.59 823 823


Sand 899 920 -21 878 4.39 40
Retainned on 4.75mm 8.41 76 96

Passing 4.75mm 10.66 96 76


4.75 -
10mm 903 4.75 - 10mm 87.79 793 793 882 21 924 1.13 11

Retainned on 10 mm 1.55 14 14

1802 2391 1802 1802


Total Batch Wt
With Moisture
Wt. kg/m³

421
117

919

934

2391
Project : TPSP
Location : Mix: M25A10 (SFRS) (Asena & Rishikesh) Shift : Date :

Cement :

Concrete Mix Adjustment


Batch Weight Corrected
Corrected Batch Saturated Moist Wt
Material Wt. Screen Size Percent (kg) Weight (kg) Weight Correction surface Dry Moisture (kg)
kg/m³ (kg) Wt(kg)

Cement 421 ADMIXTURE DOSE :- 4.00


Water 168 25

Passing 4.75mm 91.90 832 832


Sand 905 887 18 923 2.17 20
Retainned on 4.75mm 8.10 73 55
Passing 4.75mm 6.44 55 73
4.75 -
10mm
857 4.75 - 10mm 91.60 785 785 875 -18 839 0.48 4
Retainned on 10 mm 1.96 17 17

1762 2351 1762 1762


Total Batch Wt
With Moisture
Wt. kg/m³

421

143

944

843

2351
Project : TPSP
Location : Mix: M30A40 (Asena & Rishikesh)
Cement :
Concrete Mix Adjustment

Batch Wt. Corrected


Material Screen Size Percent Weight (kg)
kg/m³ Weight (kg)

Cement 352 ADMIXTURE DOSE :-


138
Passing 4.75mm 92.40 661 661
Sand 715
Retainned on 4.75mm 7.60 54 22
Passing 4.75mm 8.63 22 54
4.75 - 10mm 254 4.75 - 10mm 88.99 226 226
Retainned on 10 mm 2.38 6 8
Passing 10 mm 2.30 8 6
10 - 20 mm 356 10 - 20 mm 90.54 322 322
Retainned on 20 mm 7.16 25 66
Passing 20 mm 10.01 66 25
20 - 40 mm 661 20 - 40 mm 89.22 590 590
Retainned on 40 mm 0.77 5 5

1986 2476
TPSP
Shift : Date :

Mix Adjustment
Corrected Saturated
Moist Total Batch Wt
Batch Weight Correction surface Dry Moisture With Moisture
Wt (kg) Wt. kg/m³
(kg) Wt(kg)

1.44 352
-7 145
683 32 747 -0.65 -5 743

289 -35 219 0.79 2 221

395 -39 317 -0.40 -1 316

620 41 702 -0.38 -3 699

1986 1986 2476


Project : TPSP
Location : Mix : Shift :
Cement :
Concrete Mix Adjustment
Corrected
Batch Corrected
Weight Batch
Material Wt. Screen Size Percent Weight
(kg) Weight
kg/m³ (kg)
(kg)
Cement 348 ADMIXTURE DOSE :- 2.44
Water 147
Passing 4.75mm 92.05 637 637
Sand 692 661
Retainned on 4.75mm 7.95 55 24
Passing 4.75mm 9.26 24 55
4.75 -
257 4.75 - 10mm 87.63 225 225 293
10mm
Retainned on 10 mm 3.11 8 13
Passing 10 mm 3.26 13 8
10 - 20
385 10 - 20 mm 88.80 342 342 378
mm
Retainned on 20 mm 7.94 31 28
Passing 20 mm 4.40 28 31
20 - 40
642 20 - 40 mm 94.89 609 609 644
mm
Retainned on 40 mm 0.71 5 5
1976 2471 1976
hift : Date :

djustment
Saturated Total Batch Wt
Moist Wt
Correction surface Moisture With Moisture
(kg)
Dry Wt(kg) Wt. kg/m³

348

-7 154

31 723 -0.65 -5 719

-36 221 0.79 2 223

7 392 -0.40 -2 390

-2 640 -0.38 -2 637 .

1976 2471
Project : TPSP
Location : Mix: M35A10 (P.Shot) (Asena & Rishikesh) Shift :

Cement :

Concrete Mix Adjustment


Batch Corrected Corrected
Weight
Material Wt. Screen Size Percent Weight Batch Weight Correction
(kg)
kg/m³ (kg) (kg)

Cement 500 ADMIXTURE DOSE :- 4.00


Water 175

Passing 4.75mm 90.82 715 715


Sand 787.5 778 9
Retainned on 4.75mm 9.18 72 63

Passing 4.75mm 8.02 63 72


4.75 -
10mm 787.5 4.75 - 10mm 87.37 688 688 797 -9

Retainned on 10 mm 4.61 36 36

712 2250 1575


Date :

ent
Saturated Total Batch Wt
surface Dry Moisture Moist Wt (kg) With Moisture
Wt(kg) Wt. kg/m³

500
49 126

797 4.86 41 837.3

778 1.10 9 787.0

1575 2250
Project : TPSP
Location : Mix: M25A10 (Dry Shot) (Asena & Rishikesh) Shift :

Cement :

Concrete Mix Adjustment


Batch Corrected
Weight Corrected
Material Wt. Screen Size Percent Batch Weight
(kg) Weight (kg)
kg/m³ (kg)

Cement 422

Water 190

Passing 4.75mm 92.64 896 896


Sand 967 964
Retainned on 4.75mm 7.36 71 68

Passing 4.75mm 8.72 68 71


4.75 -
10mm 785 4.75 - 10mm 86.06 676 676 788

Retainned on 10 mm 5.22 41 41

1752 2364 1752


P
ft : Date :

Adjustment
Saturated Total Batch Wt
Correction surface Dry Moisture Moist Wt (kg) With Moisture
Wt(kg) Wt. kg/m³

422 422 2384


29 161 122 68

2391
3 970 2.69 27 997
1007

-3 782 0.26 2 784 833

1752 2364
Project : TPSP
Location : Mix : M35A20 (Rishikesh) day Date :
Cement :
Concrete Mix Adjustment

Batch Wt. Corrected Corrected Saturated Moist Wt


Material kg/m³ Screen Size Percent Weight (kg) Weight (kg) Batch Weight Correction surface Dry Moisture (kg)
(kg) Wt(kg)

Cement 393 ADMIXTURE DOSE :- 3.73


Water 148 3
Passing 4.75mm 91.00 656 656
Sand 721 699 22 743 1.03 8
Retainned on 4.75mm 9.00 65 43
Passing 4.75mm 8.90 43 65
4.75 - 10mm 481 4.75 - 10mm 88.94 428 428 520 -39 442 -0.23 -1
Retainned on 10 mm 2.16 10 27
Passing 10 mm 3.79 27 10
10 - 20 mm 721 10 - 20 mm 88.02 635 635 704 17 738 -0.50 -4
Retainned on 20 mm 8.19 59 59
1923 2464 1923 1923
Total Batch Wt
With Moisture
Wt. kg/m³

393
145

751

441

734

2464