Valvulas de Linea 336d
Valvulas de Linea 336d
Page 1 of 9
Cerrar SIS
Pantalla anterior
Producto: EXCAVATOR
Modelo: 336D2 EXCAVATOR FAJ12588
Configuración: 336D2, 336D2 L & 336D2 GC Excavators FAJ00001-UP (MACHINE) POWERED BY C9 Engine
Pruebas y Ajustes
336D2 and 340D2 Excavators Hydraulic System
Número de medio -UENR6248-04 Fecha de publicación -01/09/2015 Fecha de actualización -21/08/2018
i06278334
Specification
Table 1
"Relief Valve (Line) - Test and Adjust"
Cylinder Machine
Cylinder Relief Pressure Setting Actual
Position Settings
Introduction
The line relief valves are located between each cylinder and the respective control valve. The line
relief valve limits the overload pressures that can be created in the implement cylinders. The line
relief valves are accessible from above the main control valve and below the machine after
removal of the access plate.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 25/10/2023
336D2, 336D2 L & 336D2 GC Excavators FAJ00001-UP (MACHINE) POWERED ... Page 2 of 9
Required Tools
Illustration 1 g02571852
Tooling (A)
198-4240 Digital Pressure Indicator Gp
Table 2
Tool Item Qty Part Number Description
A 198-4240 Digital Pressure Indicator Gp
A1 1 198-4234 Indicator
A2 2 198-4239 Pressure Sensor 41,368 kPa (6,000 psi)
A3 2 198-4236 Extension Cable
Machine Preparation
1. Position the machine on level ground.
3. Release the pressure in the hydraulic system. Refer to Testing and Adjusting, "Hydraulic
System Pressure - Release".
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 25/10/2023
336D2, 336D2 L & 336D2 GC Excavators FAJ00001-UP (MACHINE) POWERED ... Page 3 of 9
Illustration 2 g03882172
Pump compartment
(1) Pressure tap (drive pump pressure)
(2) Pressure tap (idler pump pressure)
4. Attach both 41,368 kPa (6,000 psi) pressure sensors to pressure tap (1) and pressure tap (2).
Test Procedure
Note: A temporary setting of the main relief valve is required before any line relief valves can be
adjusted. Refer to Table 3 for temporary main relief setting for the function being tested.
Table 3
Function Temporary Main Relief Setting
Boom Cylinder Rod End
Stick Cylinder Head End
37000 + 2000 - 1000 kPa (5366 + 290 - 145 psi)
Bucket Cylinder Head End
Bucket Cylinder Rod End
Boom Cylinder Head End
38000 + 2000 - 1000 kPa (5511 + 290 - 145 psi)
Stick Cylinder Rod End
Table 4
Relief Valve Pressure Change With One Turn Of Adjustment Screw
Main relief valve 14400 kPa (2100 psi)
Line relief valves 11000 kPa (1595 psi)
Note: Pressure values in Table 4 are approximate values. Use a pressure gauge for adjustment.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 25/10/2023
336D2, 336D2 L & 336D2 GC Excavators FAJ00001-UP (MACHINE) POWERED ... Page 4 of 9
Bucket Cylinder Head End, Bucket Cylinder Rod End, Boom Cylinder Rod
End, and Stick Cylinder Head End
Note: A continuous relief of the valve for more than 10 seconds is not allowed.
Illustration 3 g03409458
Main control valves (front view)
(4) Line relief valve (boom cylinder rod end)
(5) Line relief valve (stick cylinder head end)
(6) Line relief valve (bucket cylinder rod end)
(7) Line relief valve (bucket cylinder head end)
3. Place the machine controls at the following settings: engine speed dial "10" and AEC switch
OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for
engine rpm settings.
5. Move the joystick for the stick until the stick is at the full STICK OUT position (full
retraction of the stick cylinder).
6. Check the main relief valve pressure setting at pressure tap (1) or pressure tap (2). The main
relief valve pressure setting should be 35000 + 500 -1000 kPa (5076 + 73 - 145 psi).
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 25/10/2023
336D2, 336D2 L & 336D2 GC Excavators FAJ00001-UP (MACHINE) POWERED ... Page 5 of 9
Illustration 4 g02102305
Main relief valve (standard)
(A) Adjustment screw
(L) Locknut
Illustration 5 g02102306
Main relief valve (heavy lift)
(A) Adjustment screw
(L) Locknut
7. Loosen the locknut. Set the main relief pressure to 37000 + 2000 - 1000 kPa
(5366 + 290 - 145 psi). Tighten the locknut.
Note: Turn the adjustment screw clockwise in order to increase the pressure. Turn the
adjustment screw counterclockwise in order to decrease the pressure.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 25/10/2023
336D2, 336D2 L & 336D2 GC Excavators FAJ00001-UP (MACHINE) POWERED ... Page 6 of 9
8. Verify the temporary main relief pressure setting with a second function. Move the joystick
for the boom until the boom is at full BOOM RAISE position (full extension of the boom
cylinder). The main relief pressure should be 37000 + 2000 - 1000 kPa
(5366 + 290 - 145 psi).
9. Mark the original position of the line relief for the bucket cylinder head end (7).
10. Move the joystick for the bucket until the bucket is at the full BUCKET CLOSE position
(full extension of bucket cylinder).
11. Check the pressure setting of the line relief for the bucket cylinder head end (7).
12. Loosen the locknut of the bucket line relief valve. Turn adjustment screw of the bucket line
relief valve until the pressure reading at pressure tap (1) is 35000 kPa (5076 psi).
13. Move the joystick for the bucket until the bucket is at the full BUCKET CLOSE position
(full extension of bucket cylinder).
14. Check the pressure setting of the line relief for the bucket cylinder head end (7).
15. Turn the adjustment screw of the bucket line relief valve until the pressure reading at
pressure tap (1) is 37000 + 2000 - 1000 kPa (5366 + 290 - 145 psi).
Note: In order to prevent over setting, the adjustment should be stopped immediately
after the pressure becomes within specification.
16. Repeat Step 9 to Step 15 for the following line relief valves:
17. Reset main relief valve pressure setting to the normal operating condition after the
completion of the line relief test and adjust. Refer to Testing and Adjusting, "Relief Valve
(Main) - Test and Adjust".
Note: A continuous relief of the valve for more than 10 seconds is not allowed.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 25/10/2023
336D2, 336D2 L & 336D2 GC Excavators FAJ00001-UP (MACHINE) POWERED ... Page 7 of 9
Illustration 6 g03409471
Main control valve
(8) Line relief valve for the boom cylinder head end
(9) Line relief valve for the stick cylinder rod end
1. Mark the original position of the line relief valve for the stick cylinder rod end (9).
2. Loosen the locknut for line relief valve (9). Turn the adjustment screw clockwise by one
quarter turn. Tighten the locknut.
5. Place the machine controls at the following settings: engine speed dial "10" and AEC switch
OFF. Refer to Testing and Adjusting, "Engine Performance - Test (Engine Speed)" for
engine rpm settings.
7. Move the joystick for the stick until the stick is at the full STICK OUT position (full
retraction of stick cylinder).
8. Check the main relief valve pressure setting at pressure tap (1) or pressure tap (2). The main
relief pressure setting should be 35000 + 500 - 1000 kPa (5076 + 73 - 145 psi).
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 25/10/2023
336D2, 336D2 L & 336D2 GC Excavators FAJ00001-UP (MACHINE) POWERED ... Page 8 of 9
Illustration 7 g02102305
Main relief valve (standard)
(A) Adjustment screw
(L) Locknut
Illustration 8 g02102306
Main relief valve (heavy lift)
(A) Adjustment screw
(L) Locknut
9. Loosen the locknut. Set the main relief pressure to 38000 + 2000 - 1000kPa
(5511 + 290 - 145 psi). Tighten the locknut.
Note: Turn the adjustment screw clockwise in order to increase the pressure. Turn the
adjustment screw counterclockwise in order to decrease the pressure.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 25/10/2023
336D2, 336D2 L & 336D2 GC Excavators FAJ00001-UP (MACHINE) POWERED ... Page 9 of 9
10. Mark the original position of the line relief valve for the boom cylinder head end (8).
11. Move the joystick for the boom until the boom is at the full BOOM RAISE position (full
extension of boom cylinders).
12. Check the pressure setting of the line relief valve for the boom cylinder head end (8).
13. Loosen the locknut of the boom line relief valve. Turn adjustment screw of the boom line
relief valve until the pressure reading at pressure tap (1) is 36000 kPa (5221 psi).
14. Move the joystick for the boom until the boom is at the full BOOM RAISE position (full
extension of boom cylinders).
15. Check the pressure setting of the line relief valve for the boom cylinder head end (8).
16. Turn the adjustment screw of the boom line relief valve until the pressure reading at
pressure tap (1) is 38000 + 2000 - 1000kPa (5511 + 290 - 145 psi).
Note: In order to prevent over setting, the adjustment should be stopped immediately
after the pressure becomes within specification.
17. Move the joystick for the stick until the stick is at the full STICK OUT position (full
retraction of stick cylinder).
18. Check the pressure setting of the line relief for the stick cylinder rod end (9).
19. Loosen the locknut for the stick line relief valve (9). Turn adjustment screw of the stick line
relief valve counterclockwise until the pressure reading at pressure tap (1) is 36000 kPa
(5221 psi).
20. Move the joystick for the stick until the stick is at the full STICK OUT position (full
retraction of stick cylinder).
21. Check the pressure setting of the line relief for the stick cylinder rod end (9).
22. Turn the adjustment screw of the stick line relief valve until the pressure reading at pressure
tap (1) is 38000 + 2000 - 1000kPa (5511 + 290 - 145 psi).
Note: In order to prevent over setting, the adjustment should be stopped immediately
after the pressure becomes within specification.
23. Reset main relief valve pressure setting to the normal operating condition after the
completion of the line relief test and adjust. Refer to Testing and Adjusting, "Relief Valve
(Main) - Test and Adjust".
Copyright 1993 - 2023 Caterpillar Inc. Wed Oct 25 15:02:21 CST 2023
Todos los derechos reservados.
Red privada para licenciados del SIS.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sis... 25/10/2023