GEOREPORT Mudlogging Example
GEOREPORT Mudlogging Example
PAGE 1
Vertical 24 hr ROP
Depth: 7019 ft MD 5111.5 ft TVD - -
Depth : progress: ft/hr :
Current Activity Safety meeting & preoperational to pressure test Weatherford lines.
BY PROGNOSIS BY SAMPLE
FORMATION
MD TVD TVDss MD TVD TVDss
Intracastilletes 2202 2202’ -2168.2’ NS* NS* NS*
Top Jimol 3583’ 3551’ -3517.5’ 3599’ 3564’ -3530.3’
Top Shale zone 5090’ 4542’ -4508’ 5053’ 4536’ -4502.3’
Top Lower shale zone 6381’ 4986’ -4952.5’ 6379’ 4987’ -4953.3’
Ballena Limestone
7041’ 5115’ -5081’
(Tentaive Projected Top)
*NS: No samples recovered due to severe mud losses.
Continued RIH string from 4887 ft to 6777 ft. Connected top drive RIH string washing from 6777
ft to 6895 ft. TOC at 6895 ft.
Performed Drill out cement from 6895 ft to 6933 ft with 382 gpm, 1300, 5-10 klb on bit, 50-60
rpm, 6-10 Klb/ft. Continued performing Drill out cement from 6933 ft to 6937 ft with 204 gpm,
550 psi, 5-15 klb on bit, 50-60 rpm, 7-11 Klb/ft. Continued performing Drill out cement from
6937 ft to 6973 ft with 350 gpm, 1100 psi, 5 klb on bit, 100 rpm, 8-10 Klb/ft. Continued
performing Drill out cement from 6973 ft to 7010 ft with 350 gpm, 1150 psi, 8-10 klb on bit, 100
rpm, 8-9 Klb/ft.
Circulated and reciprocated string with 350 gpm, 1100 psi, 50 rpm, 7-9 Klb/ft.
24 hr Ops
Pumped Hi-Vis pill (60 bbls, 130 sec/qt, 8.5 ppg) and displaced to surface with 450 gpm, 1700
summary:
psi. Reciprocated string with 100 rpm, 8 Klb/ft.
Installed kill line at B section of BOP and test with 140 gpm, 110 psi. Continued reciprocating
string.
Performed mud displacement: water by baradril-n 8.6 ppg with 210 gpm, 530 psi. Cleaned
tanks & conditioned to drill shoe.
Drilled cement, shoe & rat hole from 7010 to 7019 ft with 303 - 356 gpm, 1000-1500 psi, 5-10
klb on bit, 108 rpm, 10-14 k ft-lb.
Circulated & reciprocated till hole clean from 6965 ft 7010 ft. 403 gpm, 1400 psi, 40 rpm, 7-9
klb-ft.
Geological Report DATE: 13-MARCH-2012
(00:00 to 24:00 hrs) BALLENA 16-ST REPORT No: (43)
PAGE 2
Max Trip
Gas Background Max Conn Swab Chromatograph ppm
Gas
Interval (ft) Ppm ppm ppm C1/C2/C3/(Ic4+Nc4)/(ic5+Nc5)
ppm
7019 -- -- 12528 -- 12513 / 42 / 2 / 4+2 / 1+0
Gas Shows
FROM
TO
Formation
Lithology
TOTAL GAS %
C1 ppm
C2 ppm
C3 ppm
iC4 ppm
nC4 ppm
iC5 ppm
nC5 ppm
BGG ppm
Comments