Bridge Engineering
Bridge Engineering
Components of Bridges
Structural Materials
Classifications of Bridges
Topic of Discussion
Introduction to Bridges
Components of Bridges
Structural Materials
Classifications of Bridges
Bridge Engineering
Introduction
• A bridge is a structure providing passage over an obstacle
without closing the way beneath.
• The required passage may be for a road, railway, pedestrians,
a canal or a pipeline.
• The obstacle to be crossed may be a river, road, railway or
valley.
Bridge Engineering
Topic of Discussion
Introduction to Bridges
Components of Bridges
Structural Materials
Classifications of Bridges
Bridge Engineering
Components of Bridges
Bridge Engineering
Components of Bridges
• Superstructure: The components above the level of bearings
are grouped as Superstructure.
Bridge Engineering
Components of Bridges
Bridge Engineering
Topic of Discussion
Introduction to Bridges
Components of Bridges
Structural Materials
Classifications of Bridges
Bridge Engineering
Loads on Bridges
• Dead load • Live Load
• Wind Load • Seismic Load
• Snow Load • Impact Load due to vehicles/
• Buoyancy Force floating vessels
• Longitudinal Forces caused by tractive effort/ braking of vehicles
• Longitudinal Forces due to frictional resistance of expansion bearings
• Centrifugal Forces due to curvature
• Horizontal Forces due to water currents
• Earth pressure due to live load surcharge
• Wave Pressure
• Temperature Effects
• Erection Stresses
• Deformation Effects
• Miscellaneous Secondary Stresses
Bridge Engineering
Load Transfer Mechanisms
Bridge Engineering
Topic of Discussion
Introduction to Bridges
Components of Bridges
Structural Materials
Classifications of Bridges
Bridge Engineering
Basic Forms of Bridges
There are six basic forms of bridges based on their load transfer
mechanism.
• Beam Bridges
• Truss Bridges
• Arch Bridges
• Cantilever Bridges
• Suspension Bridges
Bridge Engineering
Basic Forms of Bridges: Beam Bridge
Bridge Engineering
Basic Forms of Bridges: Truss Bridge
Bridge Engineering
Basic Forms of Bridges: Arch Bridge
Bridge Engineering
Basic Forms of Bridges: Cantilever Bridge
Bridge Engineering
Basic Forms of Bridges: Suspension Bridge
Bridge Engineering
Basic Forms of Bridges: Cable Stayed Bridge
Bridge Engineering
Topic of Discussion
Introduction to Bridges
Components of Bridges
Structural Materials
Classifications of Bridges
Bridge Engineering
Structural Materials for Bridges
Timber, stone masonry, brick masonry, steel, aluminium, reinforced
concrete, prestressed concrete, composite, etc.
Bridge Engineering
Topic of Discussion
Introduction to Bridges
Components of Bridges
Structural Materials
Classifications of Bridges
Bridge Engineering
Historical Evolution of Bridges
• Primitive man was a wanderer in search of food and shelter from
different places resulting in bridges being the earliest civil
infrastructure built by him.
• A tree accidentally fallen across a stream became the earliest form
of beam bridges.
• A natural rock arch formed by erosion of the loose soil below
became the earliest form of arch bridges.
• Creepers hanging from tree to tree used by animals to cross from
one bank to another were the earliest forebearers of suspension
bridges.
• Around 4000 BC men were settling down to community life
realizing the importance of permanent bridges. Thus, evolution of
bridges started which progressed further after industrial revolution.
Bridge Engineering
Historical Evolution of Bridges
Bridge Engineering
Topic of Discussion
Introduction to Bridges
Components of Bridges
Structural Materials
Classifications of Bridges
Bridge Engineering
Classification of Bridges
Bridge Engineering
Classification of Bridges
Bridge Engineering
Classification of Bridges
Bridge Engineering
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
Co. Pvt. Ltd.
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press,
Taylor & Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
BRIDGE ENGINEERING
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Preliminary Drawings
Subsoil Exploration
Traffic Projection
Topic of Discussion
Preliminary Drawings
Subsoil Exploration
Traffic Projection
Bridge Engineering
Ideal Sites for Bridges
Choice of a suitable site is a crucial decision for planning,
designing and construction of bridges. Characteristics of an
ideal site for a bridge across a river are:
Bridge Engineering
Ideal Sites for Bridges
• The approaches should be free from obstacles such as hills,
frequent drainage crossings, sacred places, graveyards, built-
up areas or troublesome land acquisition
• Absence of sharp curves in the approaches
• Proximity to direct alignment of the road to be connected
• Absence of expensive river training work
• Avoidance of excessive under water construction
Bridge Engineering
Topic of Discussion
Preliminary Drawings
Subsoil Exploration
Traffic Projection
Bridge Engineering
Site Selection for Bridges
Bridge Engineering
Site Selection for Bridges
Bridge Engineering
Site Selection for Bridges
Bridge Engineering
Topic of Discussion
Preliminary Drawings
Subsoil Exploration
Traffic Projection
Bridge Engineering
Preliminary Data for Bridges
The investigation for a major bridge project should comprise
following data.
• Soil profile along the probable bridge sites over the length of
the bridges and the approaches
Bridge Engineering
Preliminary Data for Bridges
• Susceptibility of the site to earthquakes
Bridge Engineering
Preliminary Data for Bridges
• Availability of good quality stones, aggregates, cement, steel,
and timber in places nearest to the bridge site
• Availability of electricity
Bridge Engineering
Topic of Discussion
Preliminary Drawings
Subsoil Exploration
Traffic Projection
Bridge Engineering
Preliminary Drawings
• Index Map
• Site Plan
• Cross-Section
• Longitudinal Section
• Soil Profile
Bridge Engineering
Preliminary Drawings: Index Map
• Index Map:
An index map drawn to a suitable scale (usually 1: 50000) shows
the proposed location of the bridge, alternative sites investigated
and rejected, existing communication network, general
topography of the area and important towns, landmarks in the
vicinity.
Bridge Engineering
Preliminary Drawings: Index Map
Bridge Engineering
Preliminary Drawings: Contour Survey Plan
Bridge Engineering
Preliminary Drawings: Site Plan
• Site Plan:
A site plan shows the details of the selected site and details of
the river upto a distance of 100-200 metres upstream and down
stream of the selected site. The plan, preferably drawn at a scale
of 1: 1000, must include:
a) Name of the stream, road and nearest distance marker
b) Approximate outlines of the banks and channels at high
water level and low water level
c) Direction of flow
d) Alignment of existing approaches and proposed crossing
with its approaches
e) Angle and direction of skewness, in case of skew alignment
Bridge Engineering
Preliminary Drawings: Site Plan
Bridge Engineering
Preliminary Drawings: Site Plan
Bridge Engineering
Preliminary Drawings: Cross-Section
• Cross-Section:
A cross-section of the river at the proposed bridge site may be
drawn at a scale of 1:1000 horizontally and 1:100 vertically. The
cross-section should include:
Bridge Engineering
Preliminary Drawings: Cross-Section
Bridge Engineering
Preliminary Drawings: Longitudinal Section
• Longitudinal Section:
A longitudinal section of the stream shows the site of the bridge
with highest flood level, ordinary flood level, low water level and
bed levels at suitably spaced intervals along the approximate
centre line of the deep water channel. A suitable scale may be
used for horizontal distance, but the vertical scale should not be
less than 1:1000.
Bridge Engineering
Preliminary Drawings: Catchment Area Map
Bridge Engineering
Preliminary Drawings: Soil Profile
• Soil Profile:
Soil Profile should be determined by subsoil exploration along
each of the probable bridge alignments. Wherever possible,
borings should be done at the possible locations of the
abutments and piers. The drawings should show the bed and
banks as well as the classifications and levels of the subsoil
layers. The levels of rock or other hard soil suitable for resting
the foundations should be clearly marked.
Bridge Engineering
Topic of Discussion
Preliminary Drawings
Subsoil Exploration
Traffic Projection
Bridge Engineering
Subsoil Exploration
Bridge Engineering
Subsoil Exploration: Preliminary Investigation
• Preliminary Investigations aim at obtaining a general idea about
the soil strata. The methods comprise study of existing
geological information, field investigations with sounding rods,
auger borings, wash borings, test pits and geophysical
methods.
• Sounding rod is first churned into the soil upto 2 m by hand and
then driven with a 50 kN hammer. Resistance to driving is
carefully interpreted to understand the type of the soil met with.
This method is useful in determining the location of the rock at
shallow depths.
Bridge Engineering
Subsoil Exploration: Preliminary Investigation
• Each auger and post-hole auger are used singly for shallow
depths and in conjunction with a 60 mm pipe casing and
additional coupled rods for larger depths up to 15-20 m.
Samples are taken out in the augers for examination.
Bridge Engineering
Subsoil Exploration: Detailed Investigation
Bridge Engineering
Subsoil Exploration: Detailed Investigation
Bridge Engineering
Subsoil Exploration: Detailed Investigation
• Borings charts for the bore holes are first drawn individually
listing the various details. By plotting the data for a number of
bore holes along the cross-section of a stream and connecting
the corresponding points for each layer, the subsoil profile for
a proposed site can be obtained.
Bridge Engineering
Subsoil Exploration: Detailed Investigation
Bridge Engineering
Subsoil Exploration: Detailed Investigation
Bridge Engineering
Subsoil Exploration: Detailed Investigation
Bridge Engineering
Topic of Discussion
Preliminary Drawings
Subsoil Exploration
Traffic Projection
Bridge Engineering
Traffic Projection
• The present traffic at the proposed bridge site can be
assessed by traffic survey.
Bridge Engineering
Traffic Projection
• The traffic forecast will be necessary in deciding the size of
the bridge, i.e., the number of lanes or tracks to be provided
and whether a footpath is necessary.
Bridge Engineering
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
Co. Pvt. Ltd.
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor
& Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
BRIDGE ENGINEERING
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Scour Depth
Linear Waterway
Economical Span
Scour Depth
Linear Waterway
Economical Span
Bridge Engineering
Determination of Design Discharge
The maximum discharge which a bridge across a natural stream
is to be designed to pass can be estimated by using:
Bridge Engineering
Determination of Design Discharge: Empirical Formulae
• Dicken’s Formula: Peak Discharge Q = CA3/4
Here A is catchment area in sq. km. and C is an empirical
constant. Constant C varies from 2.80-5.6 for plain catchments
and from 14-28 for mountainous regions. This formula is
applicable to catchments in Central and Northern India.
Bridge Engineering
Determination of Design Discharge: Rational Method
A rational method for flood discharge should incorporate the
intensity, distribution and duration of rainfall as well as the area,
shape, slope, permeability and initial wetness of the catchment.
Bridge Engineering
Determination of Design Discharge: Rational Method
A typical rational formula: Q = A × I0 × λ
where
Bridge Engineering
Determination of Design Discharge: Rational Method
L = Distance from the critical point to the bridge site in
kilometres.
Bridge Engineering
Determination of Design Discharge: Rational Method
Bridge Engineering
Determination of Design Discharge: Rational Method
Bridge Engineering
Determination of Design Discharge: Area-Velocity Method
This method derived based on the hydraulic characteristics of the
stream is probably the most reliable among the methods for
determining the flood discharge.
Q=A×V
where
Q = Discharge in m3/s
A = Wetted area in m2
Bridge Engineering
Determination of Design Discharge: Area-Velocity Method
𝟏
V = Velocity of flow in m/s = 𝐑𝟎.𝟔𝟕 𝐒 𝟎.𝟓
𝐧
n = Coefficient of roughness
Bridge Engineering
Determination of Design Discharge: Area-Velocity Method
Bridge Engineering
Determination of Design Discharge: Unit Hydrograph Method
• A hydrograph is the graphical representation of discharge in a
stream plotted against time due to a rain storm of specified
intensity, duration and areal pattern.
• For any given drainage basin, the hydrographs of run off due to
two rain storms will be similar and their ordinates will be
proportional to the intensity of rainfall.
Bridge Engineering
Determination of Design Discharge: Unit Hydrograph Method
• The area under a unit hydrograph represents the volume of
rainfall excess due to a rain of 1 mm over the entire basin.
• The base flow is then separated from the direct run off.
• The volume of direct run off basin gives the direct run off in
terms of depth of the flow d expressed in mm over the basin.
Bridge Engineering
Determination of Design Discharge: Unit Hydrograph Method
• The depth of runoff corresponding to the given storm can be
computed in proportion to the depth relating to the storm
hydrograph already plotted for deriving the unit hydrograph.
Bridge Engineering
Determination of Design Discharge: Unit Hydrograph Method
• This method assumes that the storm occurs uniformly over the
entire basin and the intensity of rainfall is constant for the
duration of the storm.
Bridge Engineering
Determination of Design Discharge: Flood Marks
• If flood marks can be observed on any structure near the
proposed bridge site, flood levels and subsequently, flood
discharge can be easily estimated using fundamental principles
of hydraulics.
Bridge Engineering
Determination of Design Discharge
• Design discharge can be estimated as the maximum discharge
obtained from at least two of the methods described.
• For rare floods, it is expected that the structure should not have
excessive damage.
Bridge Engineering
Topic of Discussion
Scour Depth
Linear Waterway
Economical Span
Bridge Engineering
Scour Depth
• If the bridge and its approaches do not constrict the natural flow,
scour will be small. On the other hand, on reduction of the
waterway, severe scour may occur, especially during high floods.
Bridge Engineering
Scour Depth
Bridge Engineering
Scour Depth
Bridge Engineering
Scour Depth
Bridge Engineering
Topic of Discussion
Scour Depth
Linear Waterway
Economical Span
Bridge Engineering
Linear Waterway
𝐖=𝐂 𝐐 where
W = Effective linear waterway in metres
Q = Designed maximum discharge in m3/s
C = Constant, usually taken as 4.8 for regime channels, but may
vary from 4.5 to 6.3 according to local conditions.
Bridge Engineering
Linear Waterway
• The effective linear waterway is the total width of the waterway
of the bridge minus the mean submerged width of the piers and
their foundation down to the mean scour level.
Bridge Engineering
Afflux
𝑽𝟐 𝑳𝟐
𝒙= −𝟏 where
𝟐𝒈 𝒄𝟐 𝑳𝟏 𝟐
𝒙 = Afflux
Bridge Engineering
Afflux
𝑳𝟏 = Linear waterway under the bridge
• The road formation level and top level of guide bunds are
dependent on the maximum water level on the upstream side
including afflux.
Bridge Engineering
Afflux
The increased velocity under the bridge should be kept below the
allowable safe velocity for the bed material.
Bridge Engineering
Topic of Discussion
Scour Depth
Linear Waterway
Economical Span
Bridge Engineering
Vertical Clearance above HFL
Bridge Engineering
Vertical Clearance above HFL
Bridge Engineering
Vertical Clearance and Freeboard
• For high level bridges, freeboard should not be less than 1750
mm.
Bridge Engineering
Topic of Discussion
Scour Depth
Linear Waterway
Economical Span
Bridge Engineering
Economical Span
• For a linear waterway, with increase in span length, total cost of
superstructure increases and total cost of substructure decreases.
Bridge Engineering
Economical Span
• Assuming cost of superstructure of one span is proportional to
square of the span length, total cost of superstructure = n k s2
where k is a constant.
Bridge Engineering
Topic of Discussion
Scour Depth
Linear Waterway
Economical Span
Bridge Engineering
Locations of Piers and Abutments
• Piers and abutments should be placed such that the best use of
the foundation conditions are available.
• The number of spans should be kept low as piers obstruct water
flow. An odd number of spans are generally preferred.
• Placing piers at the deepest portion of an active channel may be
avoided by suitably adjusting the number and length of span.
• The alignment of piers and abutments should be as far as
possible parallel to the mean direction of flow in the stream.
• If any temporary variation in the direction and velocity of the
stream current is anticipated, suitable protective works must be
provided to protect the substructure against harmful effects on
stability of the bridge.
Bridge Engineering
Topic of Discussion
Scour Depth
Linear Waterway
Economical Span
Bridge Engineering
Choice of Bridge Type
• The need to optimize the overall construction cost can be
achieved by combining the highway and railway requirements
together in the form of road-cum-rail bridge.
Bridge Engineering
Choice of Bridge Type
• A high-level structure with uninterrupted traffic as on a
National Highway and the need to reduce the number of piers
may necessitate a cantilever bridge, a cable stayed bridge or a
series of simply supported truss bridges.
Bridge Engineering
Choice of Bridge Type
• Shortage of funds may necessitate the adoption of a
submersible bridge in place of a high-level bridge on a road
with low traffic.
• The type of traffic may restrict the choice of bridge type. For
railway traffic, steel truss bridges or steel cantilever bridges
are preferable to suspension bridges.
Bridge Engineering
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
Co. Pvt. Ltd.
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor
& Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
BRIDGE ENGINEERING
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Live Load
Temperature Effects
Bridge Engineering
General Features: Carriageway Width
• The carriageway width required will depend on the intensity
and volume of traffic anticipated to use the bridge. The width
of carriageway is expressed in terms of traffic lanes.
• Except for minor village roads, all bridges must provide for at
least two-lane width.
Bridge Engineering
General Features: Carriageway Width
• Three-lane bridges should not be constructed, as these will
be conducive to the occurrence of accidents.
Bridge Engineering
General Features: Clearances
Bridge Engineering
General Features: Clearances
• The maximum width and depth of a moving vehicle are assumed
as 3300 mm and 4500 mm, respectively.
• The left half section of each diagram shows the main fixed
structure between end posts of/on arch ribs, whereas the right
half section shows the intermediate portions.
Bridge Engineering
General Features: Dead Load
• The dead load carried by a bridge member consists of its own
weight and the portions of the weight of the superstructure and
any fixed loads supported by the member.
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effects
Bridge Engineering
Live Load
• Live loads are those caused by vehicles which pass over the
bridge and are transient in nature.
Bridge Engineering
Live Load: Evolution of Standards across World
• The earliest bridge loading standards were formulated to
transport heavy military vehicles in UK and Europe and these
guidelines were generally specified by local authorities. Loading
consisted of steam rollers and traction engines.
• This resulted in introduction of the Ministry of transport’s first
‘Standard Loading Train’ in the United Kingdom in 1932 and
loading standards of many European Countries.
• In UK, these standards formed the basis for the present type HA
loading of BS: 153.
Bridge Engineering
Live Load: Evolution of Standards in India
• In India, the first loading standards were introduced nationally in
1937.
Bridge Engineering
Categories of Live Loads: IRC 6 (2014)
• Highway bridge decks are designed in India to withstand live
loads specified by IRC.
Bridge Engineering
IRC Class AA Loading: IRC 6 (2014)
• Two different types of vehicles are specified under this category
grouped as Tracked Vehicle and Wheeled Vehicle.
Bridge Engineering
IRC Class AA Loading: IRC 6 (2014)
Tracked Vehicle
Bridge Engineering
IRC Class AA Loading: IRC 6 (2014)
Wheeled Vehicle
Bridge Engineering
IRC Class 70R Loading: IRC 6 (2014)
• Three different types of vehicles are specified under this
category.
Bridge Engineering
IRC Class 70R Loading: IRC 6 (2014)
• The tracked vehicle is almost similar to that of Class AA, except
the loaded length being slightly more for Class 70R. The contact
length of the track is 4.57 m, the nose to tail length of the vehicle
is 7.92 m and the specified minimum spacing between
successive vehicles is 30 m.
• Wheeled vehicle is 15.22 m long and has seven axles with loads
of 1000 kN in total.
Bridge Engineering
IRC Class 70R Loading: IRC 6 (2014)
Tracked Vehicle
Bridge Engineering
IRC Class 70R Loading: IRC 6 (2014)
Bridge Engineering
IRC Class 70R Loading: IRC 6 (2014)
Wheeled Vehicle
Bridge Engineering
IRC Class A Loading: IRC 6 (2014)
• This type of loading consists of a wheel load train comprising a
truck with trailers of specified axle spacing and loads.
• The heavy duty truck with two trailers transmits loads from 8
axles varying from a minimum of 27 kN to a maximum of 114 kN.
Bridge Engineering
IRC Class B Loading: IRC 6 (2014)
• Class B type of loading is similar to Class A type of loading
except that the axle loads are comparatively of lesser magnitude.
Bridge Engineering
IRC Class A and B Loading: IRC 6 (2014)
Bridge Engineering
Live Load Combinations: IRC 6 (2014)
Bridge Engineering
Impact Factor: IRC 6 (2014)
Bridge Engineering
Impact Factor: IRC 6 (2014)
I = A/ (B + L)
Where
Bridge Engineering
Impact Factor: IRC 6 (2014)
• For deck span less than 3 m, impact factor is 0.5 for RC Bridges
and 0.545 for Steel Bridges.
Bridge Engineering
Impact Factor: IRC 6 (2014)
Bridge Engineering
Impact Factor: IRC 6 (2014)
Bridge Engineering
Categories of Live Loads: British Standard
I. HA Loading
II. HB Loading
Bridge Engineering
HA Loading: British Standard
Bridge Engineering
HA Loading: British Standard
Bridge Engineering
HA Loading: British Standard
Bridge Engineering
HB Loading: British Standard
• Only one lane is to be loaded with this type of loading, all other
lanes are required to be loaded with one-third of full lane HA
loading only if its presence causes worst effect.
Bridge Engineering
HB Loading: British Standard
Bridge Engineering
Impact Factor: British Standard
Bridge Engineering
AASHTO Loading on Road Bridges
Bridge Engineering
AASHTO Loading on Road Bridges
Bridge Engineering
AASHTO Loading on Road Bridges
Bridge Engineering
Impact Factor: AASHTO Standard
For shear due to truck loads, the span (L) is taken as loaded part
of the span from the point being considered to the reaction, except
for cantilever arms where impact allowance is 30%.
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effects
Bridge Engineering
Wind Load
Bridge Engineering
Wind Load
Bridge Engineering
Wind Load
Bridge Engineering
Wind Load
• When the wind velocity at deck level exceeds 130 km/h, no live
load need be considered to be acting on the bridge.
• The total assumed wind force shall not be less than 4.5 kN/m in
the plane of the loaded chord and 2.25 kN/m in the plane of the
unloaded chord on the through or half-through truss and not
less 4.5 kN/m on deck spans.
Bridge Engineering
Earthquake Load
• All bridges in Zone V and IV, and bridges of total length over
60m in Zones III and II should be designed for seismic forces.
Bridge Engineering
Earthquake Load
𝑭𝒆𝒒 = 𝑨𝒉 𝑮 + 𝑳𝒂 Where
𝒁/𝟐 𝑺𝒂 /𝒈
𝑨𝒉 = Horizontal seismic coefficient =
𝑹Τ𝑰
𝒁 = Zone factor taken as 0.36, 0.24, 0.16 and 0.10 for Zones V, IV, III,
and II, respectively.
𝑰 = Importance factor, taken as 1.5 for important bridges and as 1.0
for other bridges.
Bridge Engineering
Earthquake Load
Bridge Engineering
Earthquake Load
Bridge Engineering
Earthquake Load
Bridge Engineering
Seismic Zone Map of India
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effects
Bridge Engineering
Longitudinal Forces
Bridge Engineering
Longitudinal Forces: Braking effort
• Multi-lane bridge:
As in above for the first two lanes plus 5% of the loads on the
lanes in excess of two.
Bridge Engineering
Longitudinal Forces: Frictional Resistance
Bridge Engineering
Centrifugal Forces
𝑾𝑽𝟐
𝑪=
𝟏𝟐. 𝟗𝟓 𝑹
Where C = Centrifugal force in kN acting normally to the traffic; (a)
at the point of action of the wheel loads or (b) uniformly distributed
over every metre length on which the uniformly distributed load
act.
W = Live load (a) in kN for wheel loads and (b) in kN/m for
uniformly distributed live load.
Bridge Engineering
Centrifugal Forces
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effects
Bridge Engineering
Horizontal Forces Due to Water Currents
Bridge Engineering
Horizontal Forces Due to Water Currents
With the usual values of W and g, the earlier equation reduces to:
𝑷 = 𝟎. 𝟓𝑲𝑽𝟐
The values of 𝑽𝟐 is assumed to vary linearly from zero at the point
of deepest scour to the square of the maximum velocity at free
surface of water. If maximum mean velocity of current is taken as
𝒗, the maximum velocity at free surface of water is taken as 𝟐𝒗
Bridge Engineering
Buoyancy Effect
Bridge Engineering
Earth Pressure
𝒄𝒐𝒔𝒆𝒄𝜽×𝒔𝒊𝒏 𝜽−𝝋 𝟐
𝑷 = 𝟎. 𝟓 𝒘𝒉𝟐 𝒔𝒊𝒏 𝝋+𝒛 ×𝒔𝒊𝒏 𝝋−𝜹
Where
𝒔𝒊𝒏 𝜽+𝒛 +
𝒔𝒊𝒏 𝜽+𝜹
Bridge Engineering
Earth Pressure
Bridge Engineering
Earth Pressure
h = height of wall
θ = angle subtended by the earthside wall with the horizontal on
the earthside
φ = angle of internal friction on the earth fill
z = angle of the friction of the earthside wall with the earth
δ = inclination of the earth fill surface with the horizontal.
If θ equals 90° and z equals δ, the conditions conform to Rankine’s
theory, and the above equation reduces to the following form.
𝒄𝒐𝒔 𝜹− 𝒄𝒐𝒔𝟐 𝜹−𝒄𝒐𝒔𝟐 𝝋
𝑷 = 𝟎. 𝟓 𝒘𝒉𝟐 𝒄𝒐𝒔 𝜹 ×
𝒄𝒐𝒔 𝜹+ 𝒄𝒐𝒔𝟐 𝜹−𝒄𝒐𝒔𝟐 𝝋
Bridge Engineering
Earth Pressure
When the backfill is level, i.e. when δ equals zero, the above
equation further reduces to the form below.
𝟏−𝒔𝒊𝒏 𝝋 ∅
𝑷 = 𝟎. 𝟓 𝒘𝒉𝟐 = 𝟎. 𝟓 𝒘𝒉𝟐 tan𝟐 𝟒𝟓° −
𝟏+𝒔𝒊𝒏 𝝋 𝟐
All abutments and return walls should be designed for a live load
surcharge equivalent to 1.2 m height of earth fill.
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effects
Bridge Engineering
Barge/Ship Impact
Bridge Engineering
Vehicle Collision Loads
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effects
Bridge Engineering
Temperature Effect
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effects
Bridge Engineering
Deformation Stress
Bridge Engineering
Erection Stress
Bridge Engineering
Secondary Stress
Bridge Engineering
Secondary Stress
Bridge Engineering
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
Co. Pvt. Ltd.
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor
& Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
BRIDGE ENGINEERING
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Live Load
Temperature Effect
Earth Pressure
Bridge Engineering
General Features
• There are about 116000 bridges of all types and spans
constructed by Indian Railways, making an average of two
bridges per km route. Of them, nearly 20% are girder bridges,
19% are arch bridges and 25% are slab culverts.
Bridge Engineering
General Features
• Railways tracks are classified based on importance of traffic
as main and branch lines. Three types of gauges are used in
Indian Railways.
Bridge Engineering
General Features: Loads
IRS Bridge Rules suggests that the following loads are required to
be considered in design of bridges.
Bridge Engineering
Dead Load
Dead load is the self-weight of the structure itself coupled with the
permanent loads carried on the structure.
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effect
Earth Pressure
Bridge Engineering
Live Load
• Standard Axle and Train Loads:
Bridge Engineering
Live Load: Modified B.G. and M.G. Loading
Bridge Engineering
Live Load: Modified B.G. Loading
Bridge Engineering
Live Load
• Foot-Bridges and Footpaths on Bridges:
For the purpose of designing the main girder of the railway bridge,
the loading on the footpath may be taken as below, depending on
effective span L:
Bridge Engineering
Live Load
𝟒𝟎𝟎 𝟏𝟕−𝑩
c) For L greater than 30 m, 𝑷 = 𝟏𝟑𝟑 + ×
𝑳 𝟏𝟒𝟑
If the width of kerb is less than 600 mm, no other live loads on the
kerb need to be taken into account.
Bridge Engineering
Live Load
• Combined Rail-cum-Road Bridges:
b) Main girders: Where the railway and road decks are at different
levels or side by side, the main girders are to be designed for the
worst combination of live loads, with full allowance for impact on
train-loads only and no impact on roadway loads.
Bridge Engineering
Live Load
Where railway and road decks are common, the effect of roadway
and footpath loads on main girders is to be provided by a
minimum distributed load of 1.9 kN/m2 over the entire roadways
and footpaths not occupied by the train load.
If road and railway are both on the same alignment, the floor
members should be designed for the maximum effect of either
load.
Bridge Engineering
Live Load: Coefficient of Dynamic Augment
The augmentation in load due to dynamic effects are considered
by adding a load equivalent to a Coefficient of Dynamic Augment
(CDA) multiplied by the live load giving the maximum stress in the
member under consideration. CDA, applicable for speeds up to
160 km/hr in BG and 100 km/hr in MG, can be computed as follows.
Bridge Engineering
Live Load: Coefficient of Dynamic Augment
For main girders of double track spans with 2 girders, CDA as
calculated is multiplied by 0.72 with a maximum value of 0.72.
Bridge Engineering
Live Load: Coefficient of Dynamic Augment
c) Railway pipe culverts, arch bridges, concrete slabs and girders
of all gauges:
1) When the depth of fill d is less than 900 mm,
CDA = 0.5 × (2 – d/0.9) × [0.15 + 8/ (6 + L)]
2) When the depth of fill is 900 mm, CDA = 0.5 × [0.15 + 8/ (6 + L)]
3) When the depth of fill exceeds 900 mm, CDA should be
uniformly decreased to zero within the next 3 m of the fill.
Here, fill is the distance from the underside of the sleeper to the
crown of an arch or the top pf a slab or pipe.
d) Foot bridges:
No impact allowance is to be made.
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effect
Earth Pressure
Bridge Engineering
Wind Load
Wind is air in motion with respect to earth surface. The basic wind
pressure is to be obtained from the meteorological records.
Bridge Engineering
Wind Load: Basic Wind Pressure
Basic wind pressure is applied to the exposed area as below.
Bridge Engineering
Wind Load: Basic Wind Pressure
b) For loaded spans:
The area for the unloaded portion, plus the area of the
windward girder above and below the moving load plus the
horizontal projected area of the moving load.
For rail bridges, height of the moving load is the distance between
the top of the highest stack for which the bridge is designed and
the rail level, less than 600 mm. In case of foot-bridges, height of
the moving load is taken as 2 m throughout the span.
Bridge Engineering
Wind Load: Wind Pressure
The following effects of wind pressure are to be considered:
(i) Lateral effect on the top chords and wind bracing considered
as a horizontal girder.
(iii) The vertical loads on the main girders due to the overturning
effect of the wind on the span and on the live load.
Bridge Engineering
Earthquake Load: Seismic Zone Map of India
Bridge Engineering
Earthquake Load
𝑭𝒆𝒒 = 𝑨𝒉 𝑾 Where
𝒁 = Zone factor taken as 0.36, 0.24, 0.16 and 0.10 for Zones V, IV, III,
and II, respectively.
𝑰 = Importance factor
𝑹 = Response reduction factor
𝑺𝒂 /𝒈 = Average response acceleration coefficient for 5% damping
depending on T
Bridge Engineering
Earthquake Load: Importance Factor
Bridge Engineering
Earthquake Load: Importance Factor
Bridge Engineering
Earthquake Load: Importance Factor
Bridge Engineering
Earthquake Load: Response Reduction Factor
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effect
Earth Pressure
Bridge Engineering
Forces due to Curvature and Eccentricity of Track
Bridge Engineering
Forces due to Curvature and Eccentricity of Track
Design should consider both the horizontal force and the resulting
overturning moment.
Also, the extra loads on one girder due to the additional reaction
on one rail and to the lateral displacement of the track should be
considered under two different conditions.
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effect
Earth Pressure
Bridge Engineering
Temperature Effect
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effect
Earth Pressure
Bridge Engineering
Frictional Resistance
Bridge Engineering
Longitudinal Forces
Bridge Engineering
Longitudinal Forces
Bridge Engineering
Longitudinal Forces
(a) The length of one span, when considering the effect of the
longitudinal loads on the girders, stability of abutments and piers
under the condition of loaded span, or when piers carry one fixed
and one roller bearing.
Bridge Engineering
Longitudinal Forces
(d) Where the structure carries more than one track, the
longitudinal loads shall be considered to act simultaneously
on all tracks. For the maximum effect on any girder with more
than two tracks, a suitable reduction may be made on the
loads for the additional tracks beyond two.
Bridge Engineering
Racking Forces
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effect
Earth Pressure
Bridge Engineering
Earth Pressure
𝟏 𝒉+𝟑𝒉𝒔
𝒚= 𝒉 where
𝟑 𝒉+𝟐𝒉𝒔
Bridge Engineering
Earth Pressure
Bridge Engineering
Earth Pressure
𝟏−𝒔𝒊𝒏𝛟
𝑷𝟏 = 𝟎. 𝟓𝒘𝒉𝟐 .
𝟏+𝒔𝒊𝒏𝛟
𝑺.𝒉′ 𝟏−𝒔𝒊𝒏𝛟
𝑷𝟐 =
𝑩+𝟐𝑫 𝟏+𝒔𝒊𝒏𝛟
Bridge Engineering
Earth Pressure
S= surcharge load
Bridge Engineering
Topic of Discussion
Live Load
Temperature Effect
Earth Pressure
Bridge Engineering
Erection Load and Derailment Load
Bridge Engineering
Erection Load and Derailment Load
Bridge Engineering
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
Co. Pvt. Ltd.
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor
& Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Flexural Strength
E L
P T
N
Ø Shear Strength
Ø Control of Cracking
Ø Control of Deflection
Ø Design Example
Topic of Discussion
Ø General Features
Ø Flexural Strength
Ø Shear Strength
Ø Control of Cracking
E L
Ø Control of Deflection
P T
Ø Effective Width Method N
Ø Design Example
Bridge Engineering
Basic Features
•
E L
The deck slab is designed to be a one-way slab to support the
P T
dead loads and live loads inclusive of impact factors.
• N
The span of reinforced concrete slab bridges should not exceed
8 m in order to make the superstructure economical.
Bridge Engineering
Basic Features
N
fabrication of formwork, reinforcement detailing and placement
of concrete.
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Flexural Strength
Ø Shear Strength
Ø Control of Cracking
E L
Ø Control of Deflection
P T
Ø Effective Width Method N
Ø Design Example
Bridge Engineering
Flexural Strength
E L
structural elements subjected to flexure are well established.
P T
N
Most of the codes have specified idealized stress block
parameters for concrete in the compression zone.
Bridge Engineering
Flexural Strength: Basic Assumptions
a) Plane sections normal to the axis remain plane after bending.
E L
c) The relation between the compressive stress distribution and
P T
strain in concrete is assumed to be a rectangular parabola
N
which is in close agreement with the experimental results.
Bridge Engineering
Flexural Strength: Basic Assumptions
Bridge Engineering
Flexural Strength: Basic Assumptions
E L
P T
N
Bridge Engineering
Flexural Strength: Basic Assumptions
E L
P T
N
Bridge Engineering
Flexural Strength: Stress Blocks
0.002
E L
P T
N
Stress Block Parameters
Bridge Engineering
Flexural Strength: Stress Blocks
Bridge Engineering
Flexural Strength: Stress Blocks
𝒃 = Width of section
E L
T
Position of centre of compression from neutral axis = [0.17𝒇𝒄𝒌 × 𝒙𝒖
0.36𝒇𝒄𝒌 × 𝒙𝒖 × b = 0.58 𝒙𝒖 N P
× (3/5 × 0.57) × 𝒙𝒖 × b + 0.19𝒇𝒄𝒌 × 𝒙𝒖 × (0.43/2 + 0.57) × 𝒙𝒖 × b]/
Bridge Engineering
Balanced, Under Reinforced and Over Reinforced Sections
• When the sections are reinforced in such a way that the tension
steel reaches the yield strain εy = [(0.87fy)/Es+0.002] and
E L
simultaneously the concrete strain is εc = 0.0035, then the
section is termed as Balanced section.
P T
• N
In Under reinforced sections, the tension steel reaches yield
strain at loads lower than the load at which concrete reaches the
failure strain. There will be excessive deflections and cracking
with a clear indication of impending failure, when the steel yields
earlier than concrete.
Bridge Engineering
Balanced, Under Reinforced and Over Reinforced Sections
Bridge Engineering
Depth of Neutral Axis
E L
reinforcement Ast and neutral axis depth xu, for equilibrium of
forces at the limit state of collapse,
P T
Total tension T = Total compression C N
𝑨𝒔𝒕 . 𝟎. 𝟖𝟕𝒇𝒚 = 𝟎. 𝟑𝟔𝒇𝒄𝒌 . 𝒃. 𝒙𝒖
𝒙𝒖 𝟎.𝟖𝟕𝒇𝒚 𝑨𝒔𝒕
Or, =
𝒅 𝟎.𝟑𝟔𝒇𝒄𝒌 𝒃 𝒅
Bridge Engineering
Maximum Depth of Neutral Axis
L
𝑬𝒔
𝒙𝒖,𝒎𝒂𝒙
Here, is the limiting values of 𝒙𝒖/𝒅 to avoid compression
𝒅
failure i.e. brittle failure.
Bridge Engineering
Maximum Depth of Neutral Axis
𝒙𝒖,𝒎𝒂𝒙 𝟎.𝟎𝟎𝟑𝟓
= 𝟎.𝟖𝟕 𝒇𝒚
𝒅 𝟎.𝟎𝟎𝟓𝟓$ 𝑬
𝒔
E L
𝒇𝒚 (in MPa) Yield Strain ∈𝒔𝒖
P T𝒙𝒖,𝒎𝒂𝒙
N
𝒅
250 0.0031 0.53
415 0.0038 0.48
500 0.0042 0.46
Bridge Engineering
Moment of Resistance of Reinforced Concrete Sections
• Substituting 𝒙𝒖 =
𝟎.𝟖𝟕𝒇𝒚 𝑨𝒔𝒕
and 𝑻 = 𝟎. 𝟖𝟕𝒇𝒚 𝑨𝒔𝒕
E L
T
𝟎.𝟑𝟔𝒇𝒄𝒌 𝒃
𝒇𝒚 𝑨𝒔𝒕
• Simplifying and rearranging, 𝑴𝒖 = 𝟎. 𝟖𝟕 𝒇𝒚 𝑨𝒔𝒕 . 𝒅 ×[𝟏 − ]
𝒇𝒄𝒌 𝒃𝒅
𝟏𝟎𝟎𝑨𝒔𝒕 𝑴𝒖 𝒑 𝒇𝒚 𝒑
• Percentage of steel 𝒑 = ,
𝒃 𝒅 𝒃𝒅𝟐
= 𝟎. 𝟖𝟕𝒇𝒚 . 𝟏𝟎𝟎 ×[𝟏 − 𝒇𝒄𝒌
× 𝟏𝟎𝟎 ]
Bridge Engineering
Moment of Resistance of Reinforced Concrete Sections
𝑴𝒖 = 𝟎. 𝟑𝟔𝒇𝒄𝒌𝒃 𝒙𝒖 𝒅 − 𝟎. 𝟒𝟐𝒙𝒖
N
𝟏 − 𝟎. 𝟒𝟐
𝒅 𝒅
• Limiting values of Moment of resistance can be obtained by
𝒙𝒖 𝒙𝒖,𝒎𝒂𝒙
replacing with
𝒅 𝒅
𝒙𝒖,𝒎𝒂𝒙 𝒙𝒖,𝒎𝒂𝒙
𝑴𝒖,𝒎𝒂𝒙 = 𝟎. 𝟑𝟔𝒇𝒄𝒌 𝒃𝒅𝟐 𝟏 − 𝟎. 𝟒𝟐
𝒅 𝒅
Bridge Engineering
Moment of Resistance of Reinforced Concrete Sections
𝒙𝒖,𝒎𝒂𝒙
• Limiting Moment of Resistance for Limiting for Different
𝒅
Grades of Steel are shown below.
𝒙𝒖,𝒎𝒂𝒙
𝒇𝒚 (in MPa) 𝑴𝒖,𝒎𝒂𝒙
L
𝒅
250 0.53
T E
𝟎. 𝟏𝟒𝟗𝒇𝒄𝒌𝒃𝒅𝟐
415 0.48
NP 𝟎. 𝟏𝟑𝟖𝒇𝒄𝒌𝒃𝒅𝟐
500 0.46 𝟎. 𝟏𝟑𝟑𝒇𝒄𝒌𝒃𝒅𝟐
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Flexural Strength
Ø Shear Strength
Ø Control of Cracking
E L
Ø Control of Deflection
P T
Ø Effective Width Method N
Ø Design Example
Bridge Engineering
Shear Failures in Bridge Deck Slabs
Bridge Engineering
Shear Failures in Bridge Deck Slabs
E L
corresponding to a nominal shear stress that is higher than that
P T
applicable for beams of usual proportions.
• N
In the case of reinforced concrete slab decks, shear resistance
being high, failure due to shear is a rare phenomenon and shear
reinforcements are not generally provided in slabs.
Bridge Engineering
Shear Strength in Bridge Deck Slabs
E L
T
𝑨
𝝆𝟏 = 𝒔𝟏 ≤ 𝟎. 𝟎𝟐
𝒃𝒘 .𝒅
N P
Where 𝑨𝒔𝟏 = area of longitudinal reinforcement in the member
Bridge Engineering
Shear Strength in Bridge Deck Slabs
Bridge Engineering
Minimum and Maximum Reinforcements in Bridge Deck Slabs
𝒇𝒄𝒕𝒎
L
𝑨𝒔,𝒎𝒊𝒏 = 0.26 𝒃𝒕 𝐝 but not less than 0.0013𝒃𝒕 d
𝒇𝒚𝒌
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Flexural Strength
Ø Shear Strength
Ø Control of Cracking
E L
Ø Control of Deflection
P T
Ø Effective Width Method N
Ø Design Example
Bridge Engineering
Permissible Crack Widths
Bridge Engineering
Permissible Crack Widths
E L
(3) For these conditions of exposure, in addition, decompression
P T
should be checked under the quasi-permanent combination of
N
loads that include DL + SIDL + Prestress including secondary
effect + settlement + temperature effects.
(4) 0.2 applies to the parts of the member that do not have to be
checked for decompression.
Bridge Engineering
Control of Cracking
E L
cracking is restricted to specified values for different bar
P T
diameters and bar spacings corresponding to the width of
•
cracks.
N
The maximum bar diameters and spacings for control of crack
widths of 0.3 mm and 0.2 mm for different stress levels in steel
are presented in tabular forms.
Bridge Engineering
Control of Cracking
L
160 32 25
200 25
T 16E
240 16
N P 12
280 12 ─
320 10 ─
Bridge Engineering
Control of Cracking
L
160 300 200
200 250
T E
150
240 200
N P 100
280 150 50
320 100 ─
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Flexural Strength
Ø Shear Strength
Ø Control of Cracking
E L
Ø Control of Deflection
P T
Ø Effective Width Method N
Ø Design Example
Bridge Engineering
Control of Deflections in Bridge Decks
alone
N
Vehicular and Pedestrian or Pedestrian
Span/1000
Bridge Engineering
Control of Deflections in Bridge Decks
•
E L
The deflection limit of span/800 according to the IRC: 112-2011
P T
seems to be very conservative resulting in larger sizes of deck
N
elements with more reinforcements affecting the overall cost of
the deck structure.
• That is why the final deflection limit due to all loads including the
effects of temperature, creep and shrinkage is taken as span/250.
Bridge Engineering
Calculation of Deflections in Bridge Decks
L
• Long term deflections resulting from differential shrinkage and
creep due to sustained loading
T E
N P
In case of cracked members, appropriate value of cracked moment
of inertia should be used in the computations. If actual value of
cracked moment of inertia cannot be determined, the code permits
the use of 70 percent of the gross moment of inertia for
computations.
Bridge Engineering
Deflection due to Shrinkage in Bridge Decks
𝟏
Deflection due to Shrinkage acs = k L2
rcs
Where k is a constant dependent on the support conditions.
k = 0.5 for cantilever ends, 0.125 for simply supported ends,
0.086 for continuous at one end, 0.063 for fully continuous ends.
𝟏
= Shrinkage curvature = [εcsαe(S/I)]
E L
T
rcs
αe = Modular Ratio =
𝑬𝒔
𝑬𝒄
N P
𝑬𝒔 = Young’s Modulus of Steel
𝑬𝒄 = Young’s Modulus of Concrete
S = First Moment of Area of Reinforcement about Centroid of
Section
I = Second Moment of Area of the section
Bridge Engineering
Deflection due to Shrinkage in Bridge Decks
E L
Development of drying shrinkage strain with time εcd(t) = βds(t, ts) ×
kh εcd, unrestrained
P T
N
Where βds(t, ts) = [(t ‒ ts)/{(t ‒ ts) + 0.04√h03}]
h0 = Notional size of cross-section = 2Ac/u
Ac = Cross-sectional area of concrete
u = Perimeter of the cross-section exposed to drying shrinkage
t = Age of concrete in days at the time considered
Bridge Engineering
Deflection due to Shrinkage in Bridge Decks
E L
T
Table 6.7 of IRC: 112-2011 Table 6.8 of IRC: 112-2011
h0 (mm)
100
kh
1.0
fck
(MPa) N P
εcd, unrestrained (× 106)
Relative Humidity (%)
200 0.85 20 50 80
300 0.75 25 620 535 300
Bridge Engineering
Deflection due to Shrinkage in Bridge Decks
Bridge Engineering
Deflection due to Creep in Bridge Decks
Ec,eff = Ecm/(1 + ø)
where
E L
P T
N
Ecm = Secant Modulus of Elasticity of Concrete
Bridge Engineering
Deflection due to Creep in Bridge Decks
Table 6.9 of IRC: 112-2011
Creep Coefficient ø
Age at Notional Size 2Ac/u (mm)
Loading 50 150 600 50 150 600
t0 (days)
Dry atmospheric conditions (RH Humid atmospheric conditions (RH
L
50%) 80%)
1 5.50 4.60 3.70 3.60
T E
3.20 2.90
7
28
5.50
3.90
4.60
3.10
3.70
2.60
N
2.60
1.90 P 2.30
1.70
2.00
1.50
90 3.00 2.50 2.00 1.50 1.40 1.20
365 1.80 1.50 1.20 1.10 1.00 1.00
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Flexural Strength
Ø Shear Strength
Ø Control of Cracking
E L
Ø Control of Deflection
P T
Ø Effective Width Method N
Ø Design Example
Bridge Engineering
Wheel Loads on Concrete Slabs
L
and shear forces in steel plates subjected to concentrated
E
T
loads. However, this method is not applicable to concrete slabs.
P
•
N
Semi-empirical methods are applied for analysis of slabs
subjected to concentrated loads.
Bridge Engineering
Wheel Loads on Concrete Slabs
Bridge Engineering
Effective Width Method
• However, for very long slabs, they are supported on all four
edges.
•
E L
This method is based on the assumption that along with the
P T
strip of the slab, immediately below the load, a certain width of
N
the slab also participate in load sharing.
• The width of the slab over which the load transfer prevails is
termed as the effective width of dispersion of slab.
Bridge Engineering
Effective Width Method: Single Concentrated Load
in Direction of Span
E L
P T
N
Bridge Engineering
Effective Width Method: Single Concentrated Load
in Direction of Span
E L
P T
N
Bridge Engineering
Effective Width Method: Single Concentrated Load
in Direction of Span
E L
T
Where 𝒃𝒆 = Effective width of slab on which the load acts
𝑳 = Effective span
N P
𝒙 = Distance of centre of gravity of load from nearer support
𝒃𝒘 = breadth of concentration area of load, i.e. the dimension of the
tyre or track contact area over the road surface of the slab in a
direction at right angles to the span plus twice the thickness of the
wearing coat or surface finish above the structural slab.
Bridge Engineering
Effective Width Method: Single Concentrated Load
in Direction of Span
𝑩
𝑲 = A constant depending on the ratio 𝑳
where 𝑩 is width of the slab
E L
P T
N
Bridge Engineering
Effective Width Method: Single Concentrated Load
in Direction of Span
• The effective width shall not exceed the actual width of the slab.
L
above value plus the distance of the load from the unsupported
E
edge.
P T
N
Bridge Engineering
Effective Width Method: Two or More
Concentrated Loads in Direction of Span
• When two or more concentrated loads are positioned in a line in
the direction of span, the bending moment per unit width of slab
will be calculated separately for each load according to its
appropriate effective width of slab as specified under the single
concentrated load.
E L
P T
N
• When two or more concentrated loads are positioned not in line
in the direction of span and the effective width of slab for one
load overlaps the effective width of slab for an adjacent load, the
resultant effective width for two loads equals to the sum of the
effective widths for each load minus width of overlap, provided
that the slab design is checked for two loads acting separately.
Bridge Engineering
Effective Width Method: Solid Cantilever Slab
L
Where 𝒃𝒆 = Effective width of slab on which the load acts
E
P T
𝒙 = Distance of centre of gravity of load from the face of the
cantilever support
N
𝒃𝒘 = breadth of concentration area of load, i.e. the dimension of the
tyre or track contact area over the road surface of the slab in a
direction parallel to the supporting edge of the cantilever plus twice
the thickness of the wearing coat or surface finish above the
structural slab.
Bridge Engineering
Effective Width Method: Solid Cantilever Slab
E L
parallel to the support, the effective width should not exceed the
T
prescribed value, nor should it exceed half the above value plus
P
N
the distance of the concentrated load from the nearer extreme
end, measured in the direction parallel to the fixed edge.
Bridge Engineering
Effective Width Method: Solid Cantilever Slab
• When two or more loads act on the cantilever slab and the
effective width of slab for one load overlaps the effective width of
the adjacent load, the resultant effective width for two loads
should be taken as the sum of the respective effective widths for
each load minus the width of the overlap.
E L
P T
N
Bridge Engineering
Effective Width Method: Dispersion along Span
𝒗 = 𝒙 + 𝟐× 𝑫 + 𝑯
E L
P T
Where 𝒗 = Effective length of dispersion along the slab
N
𝒙 = Wheel load contact area along the span
𝑫 = Depth of the wearing coat
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Flexural Strength
Ø Shear Strength
Ø Control of Cracking
E L
Ø Control of Deflection
P T
Ø Effective Width Method N
Ø Design Example
Bridge Engineering
Numerical Example: Problem Statement
Design a Simply Supported RC Slab Culvert for a National Highway
crossing for IRC Class AA Tracked Vehicle Loading.
Bridge Engineering
Numerical Example: Problem Statement
E L
P T
N
Bridge Engineering
Numerical Example: Solution
1. Given Data:
Clear Span = 6 m; Width of Bearing = 400 mm
IRC Class AA Tracked Vehicle Loading
M25 Grade Concrete and Fe 415 Grade HYSD Bars
E L
T
2. Material Properties:
Concrete: fck = 25 N/mm2, Ec = 25 GPa
NP
Steel: fyk = 415 N/mm2, Es = 200 GPa
Bridge Engineering
Numerical Example: Solution
For L/d = 15, d = (span/15) = (6000/15) = 400 mm
For L/d = 12, d = (span/12) = (6000/12) = 500 mm
Bridge Engineering
Numerical Example: Solution
Effective Span is least of
(a) Clear Span + Effective Depth = (6 + 0.45) = 6.45 m
(b) Centre to Centre Distance of Bearings = (6 + 0.4) = 6.4 m
Hence, Effective Span = 6.4 m
E L
mm mm
P T mm
N
mm
Bridge Engineering
Numerical Example: Solution
4. Dead Load Bending Moments:
Self-Weight of RC Slab = (24 × 0.5) = 12 kN/m2
Self-Weight of Wearing Coat = (22 × 0.08) = 1.76 kN/m2
Total Dead Load = (12 + 1.76) = 13.76 kN/m2
E L
Bending Moment due to Dead Load = 13.76 × 6.42/8 = 70.45 kN-m
P T
5. Live Load Bending Moments:
N
For IRC Class AA Tracked Vehicles, Impact Factor is 25% of the
span for up to 5 m span decreasing linearly to 10% for span of 9 m.
Therefore, for 6.4 m span, Impact Factor = [25 ‒ (15/4) × (6.4 ‒ 5)] =
19.75%
Bridge Engineering
Numerical Example: Solution
Tracked Vehicle is placed symmetrically on the span.
Effective Length of Load = 3.6 + 2 × (0.08 + 0.5) = 4.76 m
mm
E L
T
mm
mm
N P
Position of Load for Maximum Bending Moment
Bridge Engineering
Numerical Example: Solution
mm mm mm
mm
Bridge Engineering
Numerical Example: Solution
E L
Maximum Bending Moment due to Live Load is given by Mmax =
P T
(23.622 × 4.76 × 6.4/4) ‒ (23.622 × 4.762/ 8) = 113 kN-m
N
Total Bending Moment M = (MDead + MLive) = (70.45 + 113) = 183.45
kN-m
Total Design Ultimate Bending Moment Mu = (1.35 × MDead + 1.5 ×
MLive) = (1.35 × 70.45 + 1.5 × 113) = 264.61 kN-m
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
E L
P T mm
mm mm N (5256/2) mm
7303 mm
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
L
The area of reinforcement required to resist the ultimate bending
E
T
moment can be computed using the following relation.
P
Mu = 0.87fy Ast [d ‒ (fy Ast / fckb)]
N
where area of tension steel is given by Ast
264.61 × 106 = 0.87 × 415 × Ast × [450 ‒ 415 × Ast / (25 × 1000)]
5.99 × Ast2 ‒ 162472.5 × Ast + 264.61 × 106 = 0
Ast = 1740.3 mm2
Bridge Engineering
Numerical Example: Solution
L
Area of steel provided = (1000 × 314/ 150) = 2093.33 mm2
E
P T
The distribution reinforcement should be designed to resist the
transverse moment.
N
Transverse Moment = (0.2 × Multimate Dead + 0.3 × Multimate Live) = (0.2 ×
1.35 × MDead + 0.3 × 1.5 × MLive) = (0.2 × 1.35 × 70.45 + 0.3 × 1.5 × 113)
= 69.87 kN-m
Bridge Engineering
Numerical Example: Solution
N
spacing S = (1000 ast/ Ast) = (1000 × 113/ 437.08) = 258.53 mm
12 mm diameter HYSD bars can be provided as distribution
reinforcement at a spacing of 200 mm.
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
Service
Stress (MPa)
Maximum Bar Size (mm)
Wk = 0.3 mm Wk = 0.2 mm
N
Service
Stress (MPa)
Maximum Bar Spacing (mm)
Wk = 0.3 mm Wk = 0.2 mm
160 32 25 160 300 200
200 25 16 200 250 150
240 16 12 240 200 100
280 12 ─ 280 150 50
320 10 ─ 320 100 ─
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
For stress in steel 211.54 MPa and permissible crack width of 0.3
mm, maximum bar diameter and maximum bar spacing given by
IRC:112-2011 are 22 mm and 235 mm.
The slab is reinforced with 20 mm diameter bars at 150 mm spacing.
L
Hence, the bar size and the spacing are within the safe limits for
E
control of cracking.
P T
11. Limit State of Deflection:
N
𝟏
a) Deflection due to Shrinkage acs = k L2
rcs
Where k is a constant dependent on the support conditions.
k = 0.125 for simply supported ends,
Bridge Engineering
Numerical Example: Solution
𝟏
= Shrinkage curvature = [εcsαe(S/I)]
rcs
𝑬𝒔
αe = Modular Ratio =
𝑬𝒄
𝑬𝒔 = Young’s Modulus of Steel
L
𝑬𝒄 = Young’s Modulus of Concrete
αe =
𝑬𝒔
= 200/25 = 8
T E
P
𝑬𝒄
N
S = First Moment of Area of Reinforcement about Centroid of
Section = 2093.33 × (250 – 40 – 20/2) = 418666 mm3
I = Second Moment of Area of the section = (1000 × 5003/12) = 10.42
× 109 mm4
S/I = 40.18 × 10‒6 /mm
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
εcd(t) = βds(t, ts) kh εcd, unrestrained = 0.43 × 0.70 × 535 × 10‒6 = 161.03 ×
10‒6
εca = 25 × 10‒6 for M25 Concrete
Table 6.6 of IRC: 112-2011
E L
M50 M60 M65
Autogenous Shrinkage Strain εca (× 106) 35 45
P T65 75 95 105
N
Total shrinkage strain εcs = εcd + εca = 161.03 × 10‒6 + 25 × 10‒6 =
186.03 × 10‒6
𝟏
Shrinkage curvature = [εcsαe(S/I)] = 186.03 × 10‒6 × 8 × 40.18 × 10‒6
rcs
= 59797.48 × 10‒12
Bridge Engineering
Numerical Example: Solution
𝟏
Deflection due to shrinkage acs = k L2 = 0.125 × 59797.48 × 10‒12 ×
rcs
64002 = 0.306 mm
L
5wdL4/384Ec,eff Ieff
Total Dead Load wd = 13.76 kN/m = 13.76 N/mm
T E
Effective Span L = 6.4 m = 6400 mm
N P
Effective Moment of Inertia Ieff = 0.7 I = 7.28 × 109 mm4
Modulus of Elasticity of Concrete Ec = 25 kN/mm2 = 25000 N/mm2
Effective Modulus of Elasticity for Concrete Ec,eff = Ec/(1 + ø)
Where ø is Creep Coefficient
Bridge Engineering
Numerical Example: Solution
Table 6.9 of IRC: 112-2011
Creep Coefficient ø
Age at
Loading Notional Size 2Ac/u (mm)
t0 50 150 600 50 150 600
(days)
Dry atmospheric conditions (RH 50%) Humid atmospheric conditions (RH 80%)
1 5.50 4.60 3.70 3.60 3.20 2.90
7 5.50 4.60 3.70 2.60
E L
2.30 2.00
28 3.90 3.10 2.60 1.90
P T 1.70 1.50
N
90 3.00 2.50 2.00 1.50 1.40 1.20
365 1.80 1.50 1.20 1.10 1.00 1.00
For relative humidity 50%, Notional Size 2Ac/u = 500 mm and Age at
loading = 28 days, Creep Coefficient ø = 2.71 by linear interpolation.
Ec,eff = Ec/(1 + ø) = (25000/3.71) = 6738.54 N/mm2
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
E L
P T
N
Bridge Engineering
Numerical Example: Reinforcement Detailing
E L
P T
N
Bridge Engineering
Numerical Example: Reinforcement Detailing
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
E
T
Co. Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor
& Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Courbon’s Method
Ø Guyon-Massonnet Method
Ø Hendry-Jaegar Method
Ø Design Example
Topic of Discussion
Ø General Features
Ø Load Distribution
Ø Courbon’s Method
E L
Ø Guyon-Massonnet Method
P T
Ø Hendry-Jaegar Method N
Ø Design Example
Bridge Engineering
General Features
•
E L
Longitudinal girders are generally spaced at 2-3 m intervals
T
while cross girders are placed at 4-5 m intervals.
P
• N
Reinforced concrete T-beam and slab bridges are ideally suited
for spans in the range of 10-25 m.
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features: Classifications
• Girder and Slab Type: Beams and slabs are cast monolithically
without any cross girders. Deck slab is designed as a one way
slab spanning between the girders. Decks do not possess
torsional rigidity. This configuration is no longer in use.
•
E L
Girder, Slab and Diaphragm Type: Beams and slabs are cast
P T
monolithically and diaphragms connecting the girders are
N
provided at supports and at few intermediate locations without
extending up to the deck slab. This configuration is marginally
better in load resistance due to its improved torsional rigidity in
comparison with the first one.
Bridge Engineering
General Features: Classifications
• Girder, Slab and Cross Beam Type: Girders, slab and cross
beams are cast monolithically to form an integrated bridge
deck possessing superior flexural and torsional rigidity. This
configuration is the most commonly used system in highway
L
bridge decks.
T E
N P
Bridge Engineering
General Features: Classifications
E L
P T
N
Bridge Engineering
General Features: Classifications
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Load Distribution
Ø Courbon’s Method
E L
Ø Guyon-Massonnet Method
P T
Ø Hendry-Jaegar Method N
Ø Design Example
Bridge Engineering
Pigeaud’s Coefficient Method
a) Deck Slab
b) Longitudinal Girders
E L
c) Cross Girders
P T
•
N
The deck slab supported on all the sides by longitudinal and
cross girders is designed by the moment coefficients proposed
by Pigeaud’s Coefficient Method.
Bridge Engineering
Pigeaud’s Coefficient Method
E L
P T
N
Load Dispersion
Bridge Engineering
Pigeaud’s Coefficient Method
Bridge Engineering
Pigeaud’s Coefficient Method
E L
The load dispersion may be assumed at 45° through the wearing
coat and the structural slab.
P T
N
Bridge Engineering
Pigeaud’s Coefficient Method
E L
P T
N
Bridge Engineering
Pigeaud’s Coefficient Method
E L
P T
N
Bridge Engineering
Pigeaud’s Coefficient Method
E L
P T
N
Bridge Engineering
Pigeaud’s Coefficient Method
E L
P T
N
Bridge Engineering
Pigeaud’s Coefficient Method
E L
P T
N
Bridge Engineering
Pigeaud’s Coefficient Method
E L
P T
N
Bridge Engineering
Pigeaud’s Coefficient Method
E L
P T
N
Coefficients m1 and m2 (× 100)
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Load Distribution
Ø Courbon’s Method
E L
Ø Guyon-Massonnet Method
P T
Ø Hendry-Jaegar Method N
Ø Design Example
Bridge Engineering
Load Distribution in Slab Girder Bridge
a) Courbon’s Method
E L
P T
b)
c)
Guyon-Massonnet Method
Hendry-Jaegar Method
N
Bridge Engineering
Load Distribution in Slab Girder Bridge
•
E L
The cross beams continuous over supports are designed to
P T
resist the maximum dead load and live load moments resulting
N
from the critical positioning of live loads.
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Load Distribution
Ø Courbon’s Method
E L
Ø Guyon-Massonnet Method
P T
Ø Hendry-Jaegar Method N
Ø Design Example
Bridge Engineering
Courbon’s Method
• When live loads are positioned near the kerb, centre of gravity
of live loads acts eccentrically with centre of gravity of the
girder system.
E L
increased or decreased depending on the position of girders.
P T
This is calculated by Courbon’s Theory by a reaction factor
given by
N
𝑹𝒙 = ∑ 𝑾⁄𝒏 × 𝟏 + ∑ 𝑰⁄∑ 𝒅𝟐𝒙 ×𝑰 ×𝒅𝒙 ×𝒆
Bridge Engineering
Courbon’s Method
Where
E L
𝒅𝒙 = Distance of the girder under consideration from the central
axis of the bridge
P T
∑ 𝑾 = Total concentrated load N
𝒏 = Number of longitudinal girders
Bridge Engineering
Courbon’s Method
E L
Clearance
b
P Tb
N
Bridge Engineering
Courbon’s Method: Assumptions
E L
a) Ratio of span to width of deck is greater than 2 but less than
4.
P T
N
b) Longitudinal girders are interconnected by at least 5
symmetrically spaced cross girders.
Bridge Engineering
Courbon’s Method: Numerical Example
E L
P T
N
Bridge Engineering
Courbon’s Method: Numerical Example
Where
Bridge Engineering
Courbon’s Method: Numerical Example
∑W = 2W1, n = 3 and ∑I = 3I
L
Distance between inner edge of the two wheels = 1.2 m
E
P T
Distance between central axis of the two wheels = (1.2 + 2 × 0.85/
2) m = 2.05 m
N
Distance between central axis of the left wheel and left edge of
deck = (1.2 + 0.85/ 2) m = 1.625 m
Distance between central axis of the left wheel and central axis
of Girder A = (1.625 − 1.25) m = 0.375 m
Bridge Engineering
Courbon’s Method: Numerical Example
Distance between central axis of the right wheel and central axis
of bridge = (2.5 − 0.375 − 2.05) m = 0.075 m
E L
P T
N
Bridge Engineering
Courbon’s Method: Numerical Example
= 1.107 W1
dx = 0 m ∑dx 2.I = 2I × 02 m2 =0
N
e = (2.05/2 + 0.075) m = (1.025 + 0.075) m = 1.1 m
Bridge Engineering
Courbon’s Method: Numerical Example
RA or RC = 1.107 W1 = 387.45 kN
RB = 0.667 W1 = 233.45 kN
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Load Distribution
Ø Courbon’s Method
E L
Ø Guyon-Massonnet Method
P T
Ø Hendry-Jaegar Method N
Ø Design Example
Bridge Engineering
Guyon-Massonnet Method
𝑴𝒎𝒆𝒂𝒏 = 𝑴⁄𝒏 N
Where 𝑴 = Total mean longitudinal bending moment
𝒏 = Number of girders
Bridge Engineering
Guyon-Massonnet Method
L
dependent on flexural and torsional parameters.
T E
The factor 1.10 is used to compensate for the error involved in
N P
using only the first term of the Fourier series in finding the
distribution coefficients as suggested by Rowe based on his
experiments.
Bridge Engineering
Guyon-Massonnet Method
Torsional Parameter 𝜶 = 𝑮 𝒊𝟎 + 𝒋𝟎 ⁄ 𝟐𝑬 𝒊𝒋
E L
Where 𝟐𝒂 = Span of the bridge
P T
N
𝟐𝒃 = Effective width of the bridge
𝒊 = Second moment of area per unit transverse width
𝒋 = Second moment of area per unit longitudinal width
𝑮 7 𝒊𝟎 = Torsional stiffness per unit width
𝑮 7 𝒋𝟎 = Torsional stiffness per unit length
Bridge Engineering
Guyon-Massonnet Method
Bridge Engineering
Guyon-Massonnet Method
Ref pt -b -3b/4 -b/2 -b/4 0 b/4 b/2 3b/4 b
Load at
𝑲𝟎
0 0.86 0.95 0.97 1.05 1.10 1.05 0.97 0.95 0.86
b/4 0.20 0.40 0.63 0.87 1.05 1.22 1.36 1.53 1.68
b/2 -0.54 -0.16 0.24 0.63 0.97 1.36 1.73 2.10 2.46
𝛉 = 0.30 3b/4 -1.15 -0.63 -0.16 0.40 0.95 1.53 2.10 2.73 3.31
b -1.79 -1.15 -0.54 0.20 0.86 1.68 2.46 3.31 4.10
𝑲𝟏
0 0.94 0.97 1.00 1.02 1.05 1.02 1.00 0.97 0.94
L
b/4 0.85 0.89 0.94 0.97 1.02 1.06 1.06 1.05 1.06
E
b/2 0.77 0.82 0.89 0.94 1.00 1.06 1.13 1.17 1.21
T
3b/4 0.70 0.75 0.82 0.89 0.97 1.05 1.17 1.29 1.38
P
b 0.63 0.70 0.77 0.85 0.94 1.06 1.21 1.38 1.59
N
Ref pt -b -3b/4 -b/2 -b/4 0 b/4 b/2 3b/4 b
Load at
𝑲𝟎
0 0.71 0.90 0.99 1.11 1.2 1.11 0.99 0.90 0.71
b/4 0.12 0.36 0.64 0.91 1.11 1.29 1.40 1.47 1.56
b/2 -0.55 -0.17 0.23 0.63 0.99 1.37 1.76 2.10 2.40
𝛉 = 0.40 3b/4 -1.07 -0.58 -0.17 0.36 0.90 1.47 2.10 2.77 3.38
b -1.65 -1.07 -0.55 0.12 0.71 1.56 2.40 3.38 4.30
𝑲𝟏
0 0.90 0.95 1.00 1.05 1.08 1.05 1.00 0.95 0.90
b/4 0.77 0.83 0.90 0.96 1.05 1.10 1.10 1.09 1.07
b/2 0.66 0.73 0.81 0.90 1.00 1.10 1.20 1.26 1.30
3b/4 0.58 0.65 0.73 0.83 0.95 1.09 1.26 1.41 1.55
b 0.50 0.58 0.66 0.77 0.90 1.07 1.30 1.55 1.88
Bridge Engineering
Guyon-Massonnet Method
Ref pt -b -3b/4 -b/2 -b/4 0 b/4 b/2 3b/4 b
Load at
𝑲𝟎
0 0.55 0.79 1.00 1.21 1.32 1.21 1.00 0.79 0.55
b/4 0.00 0.30 0.63 0.96 1.21 1.40 1.44 1.40 1.40
b/2 -0.54 -0.17 0.22 0.63 1.00 1.40 1.80 2.08 2.30
𝛉 = 0.50 3b/4 -1.96 -0.54 -0.17 0.30 0.79 1.40 2.08 2.84 3.50
b -1.43 -0.96 -0.54 0.0 0.55 1.40 2.30 3.50 4.80
𝑲𝟏
0 0.85 0.92 1.00 1.07 1.13 1.07 1.00 0.92 0.85
L
b/4 0.68 0.76 0.86 0.96 1.07 1.16 1.15 1.12 1.09
E
b/2 0.55 0.63 0.73 0.86 1.00 1.15 1.30 1.35 1.39
T
3b/4 0.45 0.53 0.63 0.76 0.92 1.12 1.35 1.58 1.76
b 0.38 0.45 0.55 0.68 0.85 1.09 1.39 1.76 2.15
Ref pt
Load at
0
-b
0.31
-3b/4
0.66
-b/2
1.02
-b/4
𝑲𝟎
1.35 N
0
1.50
P
b/4
1.35
b/2
1.02
3b/4
0.66
b
0.31
b/4 -0.17 0.21 0.62 1.02 1.35 1.53 1.47 1.31 1.03
b/2 -0.52 -0.18 0.20 0.62 1.02 1.47 1.87 2.06 2.19
𝛉 = 0.60 3b/4 -0.80 -0.47 -0.18 0.21 0.66 1.31 2.06 2.92 3.08
b -1.05 -0.80 -0.52 -0.20 0.31 1.10 2.19 3.08 5.45
𝑲𝟏
0 0.80 0.89 1.00 1.12 1.19 1.12 1.00 0.89 0.80
b/4 0.58 0.67 0.80 0.95 1.12 1.23 1.20 1.15 1.08
b/2 0.44 0.52 0.63 0.80 1.00 1.20 1.40 1.45 1.46
3b/4 0.34 0.41 0.52 0.67 0.89 1.15 1.45 1.75 1.96
b 0.28 0.34 0.44 0.58 0.80 1.08 1.46 1.96 2.50
Bridge Engineering
Guyon-Massonnet Method
Ref pt -b -3b/4 -b/2 -b/4 0 b/4 b/2 3b/4 b
Load at
𝑲𝟎
0 -0.04 0.53 1.03 1.52 1.68 1.51 1.03 0.53 -0.04
b/4 -0.37 0.11 0.00 1.06 1.51 1.70 1.55 1.21 0.67
b/2 -0.50 -0.19 0.18 0.60 1.03 1.55 1.96 2.05 2.03
𝛉 = 0.70 3b/4 -0.57 -0.40 -0.19 0.11 0.53 1.21 2.05 3.00 4.01
b -0.48 -0.57 -0.50 -0.37 -0.04 0.73 2.03 4.01 6.03
𝑲𝟏
0 0.71 0.83 0.98 1.17 1.28 1.17 0.98 0.83 0.71
L
b/4 0.50 0.59 0.74 0.94 1.17 1.33 1.27 1.15 1.04
E
b/2 0.33 0.43 0.55 0.74 0.98 1.27 1.51 1.55 1.52
T
3b/4 0.24 0.32 0.43 0.59 0.83 1.15 1.55 1.93 2.16
b 0.18 0.24 0.33 0.49 0.71 1.04 1.52 2.16 2.85
Ref pt
Load at
0
-b
-0.35
-3b/4
0.39
-b/2
1.02
-b/4
𝑲𝟎
N
0
1.66 1.88
P
b/4
1.66
b/2
1.02
3b/4
0.39
b
-0.35
b/4 -0.49 0.02 0.55 1.10 1.66 1.88 1.64 1.10 0.33
b/2 -0.48 -0.18 0.15 0.55 1.02 1.64 2.06 2.03 1.82
𝛉 = 0.80 3b/4 -0.34 -0.30 -0.18 0.02 0.39 1.10 2.03 3.10 4.02
b -0.16 -0.34 -0.48 -0.48 -0.35 0.39 1.82 4.02 7.02
𝑲𝟏
0 0.63 0.78 0.98 1.22 1.38 1.22 0.98 0.78 0.63
b/4 0.40 0.51 0.68 0.93 1.22 1.43 1.34 1.14 1.00
b/2 0.25 0.34 0.47 0.68 0.98 1.34 1.63 1.64 1.55
3b/4 0.16 0.23 0.34 0.51 0.78 1.14 1.64 2.10 2.33
b 0.12 0.16 0.25 0.40 0.63 0.98 1.55 2.33 3.20
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Load Distribution
Ø Courbon’s Method
E L
Ø Guyon-Massonnet Method
P T
Ø Hendry-Jaegar Method N
Ø Design Example
Bridge Engineering
Hendry-Jaegar Method
𝑪 = 𝑬𝑰𝟏 ⁄𝑬𝑰𝟐
Bridge Engineering
Hendry-Jaegar Method
L
EI = Flexural rigidity of one longitudinal girder
E
P T
GJ = Torsional rigidity of one longitudinal girder
N
EI1 and EI2 = Flexural rigidities of outer and inner
longitudinal girders respectively where these parameters
are different
EIr = Flexural rigidity of one cross girder
Bridge Engineering
Hendry-Jaegar Method
E L
the span of longitudinal girders and the ratio of torsional rigidity
P T
of longitudinal girder to flexural rigidity of cross girders. This
N
parameter is difficult to be evaluated due to uncertainties in
computations of torsional rigidity values.
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Load Distribution
Ø Courbon’s Method
E L
Ø Guyon-Massonnet Method
P T
Ø Hendry-Jaegar Method N
Ø Design Example
Bridge Engineering
Numerical Example: Problem Statement
Design the T-Beam and Slab Deck of RC T-Beam Bridge for IRC
Class AA Tracked Vehicle Loading using the following data.
Clear Width of Road way = 7.5 m
Bridge span = 16 m
Average Thickness of Wearing Coat = 80 mm
E L
S/W of Wearing Coat = 22 kN/m3
P T
M 25 Concrete; Fe 415 Steel Reinforcement , μConcrete = 0.15
Bridge Engineering
Numerical Example: Problem Statement
E L
P T
N
IRC Class AA
Tracked Vehicle
Loading
Bridge Engineering
Numerical Example: Solution
1. Deck Slab Panel Dimensions:
Long Span Length L = 4 m, Short Span Length B = 2.5 m
Slab Thickness H = 0.2 m.
Bridge Engineering
Numerical Example: Solution
For k = B/L = 2.5/4 = 0.625, m1 = 0.049 and m2 = 0.015
Moment in Short Span M1 due to Dead Load = W × (m1 + μm2)
= 65.6 × (0.049 + 0.15 × 0.015) = 3.362 kN-m
Moment in Long Span M2 due to Dead Load = W × (m2 + μm1)
= 65.6 × (0.015 + 0.15 × 0.049) = 1.466 kN-m
E L
P T
For continuous deck slab, Design Bending moment along Short
N
Span due to Dead Load = 0.8 × M1 = 2.69 kN-m
For continuous deck slab, Design Bending moment along Long
Span due to Dead Load = 0.8 × M2 = 1.173 kN-m
Shear Force due to Dead Load = 6.56 × (2.5 ‒ 0.3)/2 = 7.216 kN
Bridge Engineering
Numerical Example: Solution
3. Live Load Calculation:
Wheel Load Dispersion along Short Span
u = 0.85 + 2 × 0.08 = 1.01 m
Wheel Load Dispersion along Long Span
v = 3.6 + 2 × 0.08 = 3.76 m
E L
k = B/L = 2.5/4 = 0.625
P T
N
u/B = 1.01/2.5 = 0.404; v/L = 3.76/4 = 0.94
Therefore, m1 = 0.085 and m2 = 0.024
Maximum Live Load due to IRC Class AA
Tracked Vehicle Loading = 350 kN
Bridge Engineering
Numerical Example: Solution
Moment in Short Span M1 due to Live Load = W × (m1 + μm2)
= 350 × (0.085 + 0.15 × 0.024) = 31.01 kN-m
Moment in Long Span M2 due to Live Load = W × (m2 + μm1)
= 350 × (0.024 + 0.15 × 0.085) = 12.862 kN-m
E L
For continuous deck slab, Design Bending moment due to Live
P T
Load along Short Span (including Impact Factor) = 0.8 × M1 × 1.25 =
31.01 kN-m
N
For continuous deck slab, Design Bending moment due to Live
Load along Long Span (including Impact Factor) = 0.8 × M2 × 1.25 =
12.862 kN-m
Bridge Engineering
Numerical Example: Solution
Using Effective Width Method, Dispersion of Live Load in Direction
of Short Span = x + 2 × (D + H) = 0.85 + 2 × (0.08 + 0.2) = 1.41 m
For Maximum Shear in Deck Slab, the wheel load is placed such
that the centre of wheel is at 1.41/2 = 0.705 m distance from the
edge of the panel.
E L
Effective Span L = 2.5 ‒ 0.3 = 2.2 m
P T
Effective Breadth B = 4 ‒ 0.3 = 3.7 m N
For Span Ratio of Slab = 3.7/2.2 = 1.682, K = 2.55 for Continuous
Deck Slab.
Effective Width of Slab = Kx (1 ‒ x/L) + bw
Bridge Engineering
Numerical Example: Solution
bw = Wheel Contact Dimension in a direction perpendicular to Span
of Slab plus 2 times of the thickness of the wearing coat
= 3.6 + 2 × 0.08 = 3.76 m
x = 0.705 m
Effective Width of Slab = Kx (1 ‒ x/L) + bw
E L
P T
= 2.55 × 0.705 × (1 ‒ 0.705/ 2.2) + 3.76 = 4.982 m
N
Effective Length of Load = 3.6 + 2 × (0.08 + 0.2) = 4.16 m
Live Load/ metre width due to 350 kN Wheel Load = 350/ 4.982 =
70.253 kN
Bridge Engineering
Numerical Example: Solution
4. Design Moment and Shear Force:
Service Load Bending Moment in Slab from Dead Load and Live
Load in Short Span MB = 2.69 + 31.01 = 33.7 kN-m
Service Load Bending Moment in Slab from Dead Load and Live
E L
Load in Long Span ML = 1.173 + 12.862 = 14.035 kN-m
P T
Service Load Design Shear Force in Slab from Dead Load and Live
Load V = 7.216 + 59.675 = 66.891 kN N
Ultimate Design Bending Moment in Slab from Dead Load and Live
Load in Short Span Mult,B = 1.35 × 2.69 + 1.5 × 31.01 = 50.146 kN-m
Ultimate Design Bending Moment in Slab from Dead Load and Live
Load in Long Span Mult,L = 1.35 × 1.173 + 1.5 × 12.862 = 20.876 kN-m
Bridge Engineering
Numerical Example: Solution
Ultimate Design Shear Force in Slab from Dead Load and Live Load
Vult = 1.35 × 7.216 + 1.5 × 59.675 = 99.254 kN
5. Design of Slab:
Overall depth of slab = 200 mm.
E L
Assuming 40 mm clear cover and 16 mm diameter bars, effective
depth of slab = (200 ‒ 40 ‒ 8) = 152 mm
P T
N
Using M25 grade concrete and Fe 415 HYSD bars, Limiting moment
of resistance along short span for singly reinforced sections can be
expressed as: Mu,lim = 0.138 × fckbd2
Effective Depth of Slab required, dreqd = √(M/0.138 fckb) = √(50.146 ×
106)/(0.138 × 25 × 1000) = 120.561 mm ≈ 121 mm
Bridge Engineering
Numerical Example: Solution
Since Effective Depth of Slab provided d = 152 mm > 121 mm, the
section is under-reinforced.
The area of reinforcement required to resist the ultimate bending
moment can be computed using the following relation.
Mu = 0.87fy Ast [d ‒ (fy Ast / fckb)]
E L
where area of tension steel is given by Ast
P T
N
50.146 × 106 = 0.87 × 415 × Ast × [152 ‒ 415 × Ast / (25 × 1000)]
5.99 × Ast2 ‒ 54879.6 × Ast + 50.146 × 106 = 0
Ast = 1029.408 mm2
Bridge Engineering
Numerical Example: Solution
Using 16 mm diameter bars as main reinforcement, the spacing is
given by: S = (1000 ast/ Ast) = (1000 × 201/ 1029.408) = 195.258 mm
Therefore, 16 mm diameter HYSD bars can be provided along short
span at a spacing of 150 mm.
L
Area of steel provided = (1000 × 201/ 150) = 1340 mm2
E
P T
Similarly, using M25 grade concrete and Fe 415 HYSD bars, Limiting
N
moment of resistance along longer span for singly reinforced
sections is 20.876 kN-m
Mu = 0.87fy Ast [d ‒ (fy Ast / fckb)]
where area of tension steel is given by Ast
Bridge Engineering
Numerical Example: Solution
20.876 × 106 = 0.87 × 415 × Ast × [152 ‒ 415 × Ast / (25 × 1000)]
5.99 × Ast2 ‒ 54879.6 × Ast + 20.876 × 106 = 0
Ast = 397.656 mm2
Using 10 mm diameter bars as main reinforcement, the spacing is
E L
given by: S = (1000 ast/ Ast) = (1000 × 78.54/ 397.656) = 197.507 mm
P T
Therefore, 10 mm diameter HYSD bars can be provided along longer
span at a spacing of 150 mm.
N
Area of steel provided = (1000 × 78.54/ 150) = 523.6 mm2
Bridge Engineering
Numerical Example: Solution
6. Check for Ultimate Flexural Strength:
Ultimate Bending Moment of Deck Slab Mu = 0.87fy Ast [d ‒ (fy Ast /
fckb)] = 0.87 × 415 × 1340 × [152 ‒ 415 × 1340/(25 × 1000)]
= 62776861.09 N-mm = 62.777 kN-m > 50.146 kN-m (Hence, safe)
Bridge Engineering
Numerical Example: Solution
Using 16 mm diameter HYSD at a spacing of 120 mm, area of steel
provided = (1000 × 201/ 120) = 1675 mm2
ρ1 = Ast/bd = 1675/(1000 × 152) = 0.011
VRd,c = [0.12K(80 ρ1fck)0.33] bd = [0.12 × 2 × (80 × 0.011 × 25)0.33] × 1000
× 152 = 101170.597 N = 101.171 kN > 99.254 kN (safe)
E L
8. Limit State of Cracking:
P T
N
IRC 112: 2011 prescribes a permissible crack width of 0.3 mm in
reinforced concrete members under moderate exposure condition.
Tables 12.2 and 12.3 of IRC: 112-2011 outlines the maximum bar size
and maximum spacing for permissible crack width and service
stress in steel.
Bridge Engineering
Numerical Example: Solution
Table 12.2 of IRC: 112-2011 Table 12.3 of IRC: 112-2011
Service Maximum Bar Size (mm) Service Maximum Bar Spacing (mm)
Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm
160 32 25 160 300 200
200 25 16 200 250 150
L
240 16 12 240 200 100
280 12 ─ 280
T E150 50
P
320 10 ─ 320 100 ─
Bridge Engineering
Numerical Example: Solution
bx2/2 = (Es/Ec) × Ast × (d ‒ x)
500x2 = (200/25) × 1675 × (152 ‒ x)
500x2 + 13400x ‒ 2036800 = 0
x = 51.816 mm
E L
σs = M/[(d ‒ x/3)Ast] = 33700000/[(152 ‒ 51.816/3) × 1675] = 149.333
MPa
P T
N
For stress in steel 149.333 MPa and permissible crack width of 0.3
mm, maximum bar diameter and maximum bar spacing given by
IRC:112-2011 are 32 mm and 300 mm.
The slab is reinforced with 16 mm diameter bars at 120 mm spacing.
Hence, the bar size and the spacing are within the safe limits for
control of cracking.
Bridge Engineering
Numerical Example: Solution
L
k = 0.063 for continuous ends,
𝟏
= Shrinkage curvature = [εcsαe(S/I)]
T E
P
rcs
αe = Modular Ratio = 𝑬𝒔
𝑬
𝒄 N
𝑬𝒔 = Young’s Modulus of Steel
𝑬𝒄 = Young’s Modulus of Concrete
𝑬𝒔
αe = = 200/25 = 8
𝑬𝒄
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
εcd, unrestrained = 535 × 10‒6 for fck = 25 MPa and Relative Humidity 50%
Table 6.8 of IRC: 112-2011
kh = 0.85 for h0 = 200 mm
εcd, unrestrained (× 106)
fck
Table 6.7 of IRC: 112-2011 Relative Humidity (%)
(MPa)
h0 (mm) kh 20 50 80
100 1.0 25 620
E L 535 300
T
200 0.85 50 480 420 240
300
≥ 500
0.75
0.70
75
95
N P380
300
330
260
190
150
εcd(t) = βds(t, ts) kh εcd, unrestrained = 0.749 × 0.85 × 535 × 10‒6 = 340.608 ×
10‒6
Bridge Engineering
Numerical Example: Solution
E
Total shrinkage strain εcs = εcd + εca = 340.608 × 10‒6 + 25 × 10‒6 = L
365.608 × 10‒6
P T
Shrinkage curvature
rcs
𝟏 N
= [εcsαe(S/I)] = 365.608 × 10‒6 × 8 × 130.585 ×
10‒6 = 381943.365 × 10‒12
𝟏
Deflection due to shrinkage acs = k L2 = 0.063 × 381943.365 × 10‒12
rcs
× 25002 = 0.15 mm
Bridge Engineering
Numerical Example: Solution
E L
Effective Moment of Inertia Ieff = 0.7 I = 4.67 × 108 mm4
P T
Modulus of Elasticity of Concrete Ec = 25 kN/mm2 = 25000 N/mm2
N
Effective Modulus of Elasticity for Concrete Ec,eff = Ec/(1 + ø)
Where ø is Creep Coefficient
Bridge Engineering
Numerical Example: Solution
Table 6.9 of IRC: 112-2011
Creep Coefficient ø
Age at
Loading Notional Size 2Ac/u (mm)
t0 50 150 600 50 150 600
(days)
Dry atmospheric conditions (RH 50%) Humid atmospheric conditions (RH 80%)
L
1 5.50 4.60 3.70 3.60 3.20 2.90
E
7 5.50 4.60 3.70 2.60 2.30 2.00
28 3.90 3.10 2.60 1.90
P T 1.70 1.50
N
90 3.00 2.50 2.00 1.50 1.40 1.20
365 1.80 1.50 1.20 1.10 1.00 1.00
For relative humidity 50%, Notional Size 2Ac/u = 200 mm and Age at
loading = 28 days, Creep Coefficient ø = 3.04 by linear interpolation.
Ec,eff = Ec/(1 + ø) = (25000/3.04) = 8223.684 N/mm2
Bridge Engineering
Numerical Example: Solution
E L
Total Live Load wl = (350 × 1.25)/(4.982 × 4.16) = 21.11 kN/m2
Effective Span L = 2.5 m = 2500 mm
P T
N
Modulus of Elasticity of Concrete Ec = 25 kN/mm2 = 25000 N/mm2
Effective Moment of Inertia Ieff = 4.67 × 108 mm4
Maximum deflection due to live load al = 5wlL4/384EcIeff = (5 × 21.11 ×
25004) / (384 × 25000 × 4.67 × 108) = 0.92 mm ≤ Span/800 = (2500/800)
= 3.125 mm
Bridge Engineering
Numerical Example: Solution
E L
P T
N
Bridge Engineering
Numerical Example: Solution
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Where
Bridge Engineering
Numerical Example: Solution
∑W = 2W1, n = 3 and ∑I = 3I
L
Distance between inner edge of the two wheels = 1.2 m
E
P T
Distance between central axis of the two wheels = (1.2 + 2 × 0.85/ 2)
m = 2.05 m
N
Distance between central axis of the left wheel and left edge of deck
= (1.2 + 0.85/ 2) m = 1.625 m
Distance between central axis of the left wheel and central axis of
Girder A = (1.625 − 1.25) m = 0.375 m
Bridge Engineering
Numerical Example: Solution
Distance between central axis of the right wheel and central axis of
bridge = (2.5 − 0.375 − 2.05) m = 0.075 m
E L
P T
N
Bridge Engineering
Numerical Example: Solution
L
For Inner Girder B
∑W = 2W1, n = 3 and ∑I = 3I
T E
dx = 0 m ∑dx2.I = 2I × 02 m2 = 0 N P
e = (2.05/2 + 0.075) m = (1.025 + 0.075) m = 1.1 m
Bridge Engineering
Numerical Example: Solution
L
RB = 0.667 W1 = 0.667 × 0.5W = 0.3335 W = 233.45 kN
E
P T
N
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
E L
dimensions of main girder, weight of cross girder = 10.08 kN/m
P T
Total Dead Load on girder = (21.667 + 10.08) = 31.747 kN/m
N
Reaction on Main Girder = 10.08 × (2.5/2 + 2.5/2) = 25.2 kN
Maximum Dead Load Bending Moment at centre of span = (31.747 ×
162/8) + (25.2 × 2 × 16)/4 = 1217.504 kN-m
Maximum Dead Load Shear at support = (31.747 × 16/2) + (25.2 × 3/2)
= 291.776 kN
Bridge Engineering
Numerical Example: Solution
31.747
E L
T
Live Load in Girder
Span of Girder = 16 m
N P
Impact Factor on girder = 1.10
IRC Class AA Tracked Vehicle Load is placed centrally on span.
Maximum Bending Moment for Live Load = 350 × (8 ‒ 1.8) + (700/
3.6) × 3.62/8 = 2485 kN-m.
Bridge Engineering
Numerical Example: Solution
700 kN/ 3.6 m
16 m
8m 8m
1.8 m 1.8 m
E L
T
+ +
P
‒
N
‒
‒ 350 kN
Shear Force Diagram
+ 2485 kN-m
+ 2170 kN-m + 2170 kN-m
+
+ +
Bending Moment Diagram
Bridge Engineering
Numerical Example: Solution
E L
P T
N
Bridge Engineering
Numerical Example: Solution
L
Maximum Reaction in Girder B = (413 × 14.2)/16 = 366.537 kN
E
P T
Maximum Reaction in Girder A = (287 × 14.2)/16 = 254.712 kN
N
Maximum Live Load Shear with Impact Factor in Inner Girder =
(366.537 × 1.1) = 403.191 kN
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
E L
150 mm on tension side, effective depth = (1600 ‒ 150) = 1450 mm.
Parameters of the T-beam:
P T
N
bf = 2500 mm, fck = 25 MPa, fy = 415 MPa, d = 1450 mm, Df = 200 mm,
Mu = 3913.118 kN-m
xu = depth of Neutral Axis.
Bridge Engineering
Numerical Example: Solution
If the neutral axis lies within the flange depth (xu < Df), value of xu
can be determined by using the following equation.
E L
Or, 9450 xu2 ‒ 32625000 xu + 3913118000 = 0
P T
Or, xu = 124.427 mm < 200 mm
N
Hence, the neutral axis lies within the flange.
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
E L
T
Here, K = 1 + √(200/d) = 1 + √(200/1450) = 1.371 < 2
P
N
ρ1 = Ast/bwd = 7853.982 /(300 × 1450) = 0.018
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
18.28
N
Assuming the cross girders share the loading uniformly, reaction in
each cross girder = (18.28 × 5/3) = 30.467 kN
Maximum Dead Load Shear Force = 30.467 kN
Maximum Dead Load Bending Moment = 25.394 kN-m.
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
E L
Maximum Shear Force in Cross Girder due to Live Load including
P T
Impact Factor = 1.1 × 271.25 = 298.375 kN
N
Maximum Service Load Bending Moment in Cross Girder = (25.394
+ 293.402) = 318.796 kN-m.
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Solution
If the neutral axis lies within the flange depth (xu < Df), value of xu
can be determined by using the following equation.
E L
T
Or, 474385000 = 0.36 × 25 × 2500 × xu × (1450 ‒ 0.42xu)
P
Or, 9450 xu2 ‒ 32625000 xu + 474385000 = 0
N
Or, xu = 14.6 mm < 200 mm
Bridge Engineering
Numerical Example: Solution
E L
Or, 474385000 = 523522.5 × Ast ‒ 2.397 Ast2
P T
N
Or, 2.397 Ast2 ‒ 523522.5 × Ast + 474385000 = 0
Bridge Engineering
Numerical Example: Solution
E L
T
Here, K = 1 + √(200/d) = 1 + √(200/1450) = 1.371 < 2
P
N
ρ1 = Ast/bwd = 981.748/(300 × 1450) = 0.0023
Bridge Engineering
Numerical Example: Solution
Bridge Engineering
Numerical Example: Reinforcement Detailing
120
E L
120
P T
150
N
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
E
T
Co. Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor
& Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Bridge Engineering
Voided Slab Bridges
• Voided slab bridge has a typical span of 8-15 m for single span
as well as continuous bridges.
E L
P T
N
Bridge Engineering
Voided Slab Bridges
• In voided slab bridges, void ratio i.e. area of voids to the area of
L
solid slabs should not exceed 40% of the superstructure.
E
•
P T
Voided slab bridges are required to be analyzed for longitudinal
N
as well as transverse structural actions.
Bridge Engineering
Voided Slab Bridges
•
E L
Position of voids should be such that the void center lies in the
P
Neutral Axis where the stresses are zero.T
• N
Position of void centre can be eccentric with the neutral axis
only if the reinforcement present above and below the void can
bear the loads acting on the structure.
Bridge Engineering
Topic of Discussion
Bridge Engineering
Skew Bridges: Overview
L
the difference between the alignment of an intermediate or end
E
T
support and a line perpendicular to the longitudinal axis of the
P
bridge.
N
Bridge Engineering
Skew Bridges: Overview
Bridge Engineering
Skew Bridges: Overview
L
the centre line of the road way and the slab exhibits warped or
E
T
twisted deformational characteristics due to the passage of
P
•
wheel loads on the deck.
N
With increase in skew angle, the stress distribution in the skew
slab differs significantly in comparison with the straight slab.
Bridge Engineering
Skew Bridges: Overview
L
centre line of bridge and the deflection of such slab produces a
E
T
warped surface.
N P
Bridge Engineering
Skew Bridges: Observations
• The reactions at the obtuse angled end of the skew slab support
L
are 0-50% larger than the other end for skew angles 20°-50°.
E
•
P T
For skew bridges of short spans ranging between 4-6 m, when
N
the skew angle increases from 15° to 45°, the increase in shear
force is around 20%.
Bridge Engineering
Skew Bridges: Observations
L
the skew angle increases from 15° to 45°, the bending moment
E
increases by 10%.
P T
• N
The increase of torsional moment was similar to that of bending
moments. For skew angles exceeding 30 degrees, the torsional
moments are higher for short span bridges requiring larger
magnitude of reinforcements.
Bridge Engineering
Skew Bridges: Design
L
distance of the supports and parallel to the centre line of the
E
road way.
P T
• N
Distribution reinforcement of 0.2% of the effective cross-section
of the slab is placed parallel to the supports.
Bridge Engineering
Skew Bridges: Design
E L
P T
N
Bridge Engineering
Skew Bridges: Design
L
critical points of skew slabs under concentrated load placed
E
T
anywhere on the slabs for various span/width ratios and skew
P
•
angles in the range of 15-60°.
N
The Ministry of Surface Transport (Roads Wing) has prepared
standard designs (in tabular form) for skew bridge decks of clear
spans 5, 6 and 8 m and skew angles of 15°, 30°, 45° and 60° for
IRC loadings suitable for two lane traffic without footpaths on
national highways.
Bridge Engineering
Skew Bridges: Design
E L
P T
N
Bridge Engineering
Skew Bridges: Design
E L
P T
N
Bridge Engineering
Skew Bridges: Design
L
resisting the bending moment at the centre of the free edge due
E
T
to lack of anchorage. Therefore, extra steel reinforcement is
P
N
provided near the free edge parallel to the edges at a width
sufficient to provide anchorage for the main bars.
Bridge Engineering
Skew Bridges: Design
E L
P T
N
Bridge Engineering
Topic of Discussion
Bridge Engineering
Curved Bridges: Overview
E L
P T
N
Bridge Engineering
Curved Bridges: Overview
Bridge Engineering
Curved Bridges: Methods of Analysis
Bridge Engineering
Curved Bridges: Simple Beam Theory
E L
applied torque along the span and the radius of curvature of the
bridge deck.
P T
N
Warping and distortion are ignored in this method. Local bending
moments in the deck slab are determined from the influence
surfaces and the transverse moments around the girders by
moment distribution for the element.
Bridge Engineering
Curved Bridges: Analysis of Curved Girders
E L
P T
N
Bridge Engineering
Curved Bridges: Warping and Distortion
E L
P T
N
Warping Distortion
Bridge Engineering
Curved Bridges: Moment Distribution of Elements
Local bending moments in the deck slab are determined from the
influence surfaces and the transverse moments around the girders
by moment distribution for the element.
E L
P T
N
Bridge Engineering
Curved Bridges: Folded Plate Analysis
E L
edges are derived from classical plate theory and the overall
P T
stiffness matrix for edge loading of the structure assembled.
N
All points of the longitudinal edges have four degrees of freedom.
Based on the load position, the fixed end moments and forces are
determined and applied to the structure.
Bridge Engineering
Curved Bridges: Folded Plate Analysis
The solutions are obtained using Fourier series and the final
results are obtained by superposition of the results of each
harmonic loading. This method is ideally suited for curved simply
supported structures of constant cross-sections.
E L
Continuous structures are analyzed by considering the structure
P T
as simply supported in the first stage and then eliminating the
N
displacements at the interior supports as a second stage in the
analysis.
Bridge Engineering
Curved Bridges: Finite Strip Method
E L
as that for the folded plate method and the solution is based on the
superposition of loading harmonics.
P T
N
Bridge Engineering
Curved Bridges: Finite Element Method
E L
structures with its accuracy dependent on the nature and number
of elements.
P T
N
Bridge Engineering
Topic of Discussion
Bridge Engineering
Design of RC Skew Slab Culvert: Problem Statement
Design a Simply Supported RC Slab Culvert for a National Highway
crossing for IRC Class AA Tracked Vehicle Loading.
Bridge Engineering
Design of RC Skew Slab Culvert: Problem Statement
E L
P T
N
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
1. Given Data:
Clear Skew Span = 6 m
Width of Bearing = 370 mm
IRC Class AA Tracked Vehicle Loading
L
M20 Grade Concrete and Fe 415 Grade HYSD Bars
2. Material Properties:
T E
Concrete: fck = 20 N/mm2, Ec = 23 GPa
NP
Steel: fyk = 415 N/mm2, Es = 200 GPa
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
For L/d = 15, d = (span/15) = (6000/15) = 400 mm
For higher skew angled (>15°) deck slabs, the table prepared by
The Ministry of Surface Transport (Roads Wing) can be used.
E L
depth of slab can be adopted as 540 mm.
P T
Based on the Table, for clear span 6 m, skew angle 30°, overall
N
Using 20 mm diameter HYSD bars with clear cover of 40 mm,
Effective Depth of slab d = 540 ‒ (40 + 10) = 490 mm
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
E L
P T
N
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Effective Depth of slab d = 490 mm
Width of bearing = 370 mm
Effective Span is least of
• Clear Span + Effective Depth = (6 + 0.49) = 6.49 m
•
E L
Centre to Centre Distance of Bearings = (6 + 0.37) = 6.37 m
Hence, Effective Span = 6.37 m
P T
N
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
4. Dead Load Bending Moments:
Self-Weight of RC Slab = (24 × 0.54) = 12.96 kN/m2
Self-Weight of Wearing Coat = (22 × 0.08) = 1.76 kN/m2
Total Dead Load = (12.96 + 1.76) = 14.72 kN/m2
E L
Bending Moment due to Dead Load = 14.72 × 6.372/8 = 74.661 kN-m
P T
5. Live Load Bending Moments:
N
For IRC Class AA Tracked Vehicles, Impact Factor is 25% of the
span for up to 5 m span decreasing linearly to 10% for span of 9 m.
Therefore, for 6.37 m span, Impact Factor = [25 ‒ (15/4) × (6.37 ‒ 5)]
= 19.86%
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Tracked Vehicle is placed symmetrically on the span.
Effective Length of Load = 3.6 + 2 × (0.08 + 0.54) = 4.84 m
4840 mm
3185 mm
E L
6370 mm
P T
N
Position of Load for Maximum Bending Moment
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
x = 3.185 m, L = 6.37 m, B = 7.5 m and B/L = 1.18
For B/L = 1.18, K = 2.63
be = 2.63 × 3.185 × (1 ‒ 3.185/6.37) + 1.01 = 5.198 m
The tracked vehicle is placed close to the kerb with the required
minimum clearance of 1200 mm.
E L
mm mm mm mm
P T
N 540
mmmm
1625 mm mm (5198/2) mm
6274 mm
mm
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Net Effective Width of Dispersion = (1.625 + 2.05 + 5.198/2) = 6.274 m
E L
T
Maximum Bending Moment due to Live Load is given by Mmax =
P
(27.63 × 4.84 × 6.37/4) ‒ (27.63 × 4.842/ 8) = 132.057 kN-m
N
Total Service Load Bending Moment M = (MDead + MLive) = (74.661 +
132.057) = 206.718 kN-m
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
6. Shear Forces due to Dead Load and Live Load
Shear Force from Dead Load = 14.72 × 6.37/2 = 46.883 kN
For Maximum Shear Force at Support, IRC Class AA Tracked
Vehicle is arranged as follows.
4840 mm
mm
E L
mm
P T
N
x = 2420 mm
6370 mm
mm
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
x = 2.42 m, L = 6.37 m, B = 9.5 m and B/L = 1.18
For B/L = 1.18, K = 2.63
be = 2.63 × 2.42 × (1 ‒ 2.42/6.37) + 1.01 = 4.956 m
mm mm mm mm
E L
P T 540
mm
N
mm
1625 mm mm (4956/2) mm
6153 mm
mm
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Average Intensity of Load = 839.02/ (4.84 × 6.153) = 28.713 kN/m2
Maximum Shear Force = 28.713 × 4.84 × (6.37 ‒ 2.42)/ 6.37 = 86.175
kN
Total Service Load Shear Force V = (VDead + VLive) = (46.883 + 86.175)
= 133.058 kN
E L
T
Total Design Ultimate Shear Force = (1.35 × VDead + 1.5 × VLive) =
P
N
(1.35 × 46.883 + 1.5 × 86.175) = 192.554 kN
7. Design of Slab:
Using M20 grade concrete and Fe 415 HYSD bars, Limiting moment
of resistance for singly reinforced sections can be expressed as:
Mu,lim = 0.138 × fckbd2
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Effective Depth of Slab required, dreqd = √(M/0.138 fckb) = √(298.878 ×
106)/(0.138 × 20 × 1000) = 329.073 mm ≈ 330 mm
Since Effective Depth of Slab provided d = 490 mm > 330 mm, the
section is under-reinforced. The area of reinforcement required to
L
resist the ultimate bending moment can be computed using the
E
T
following relation.
Mu = 0.87fy Ast [d ‒ (fy Ast / fckb)]
N P
where area of tension steel is given by Ast
298.878 × 106 = 0.87 × 415 × Ast × [490 ‒ 415 × Ast / (20 × 1000)]
7.49 × Ast2 ‒ 176914.5 × Ast + 298.878 × 106 = 0
Ast = 1831.39 mm2
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Using 20 mm diameter bars as main reinforcement, the spacing is
given by: S = (1000 ast/ Ast) = (1000 × 314/ 1831.39) = 171.454 mm
E L
Area of steel provided = (1000 × 314/ 115) = 2730.435 mm2
P T
The distribution reinforcement should be designed to resist the
transverse moment. N
Transverse Moment = (0.2 × Multimate Dead + 0.3 × Multimate Live) = (0.2 ×
1.35 × MDead + 0.3 × 1.5 × MLive) = (0.2 × 1.35 × 74.661 + 0.3 × 1.5 ×
132.057) = 79.584 kN-m
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
The area of reinforcement required to resist the transverse moment
can be computed using the following relation.
Mu = 0.87fy Ast [d ‒ (fy Ast / fckb)]
where area of tension steel is given by Ast
E L
79.584 × 106 = 0.87 × 415 × Ast × [490 ‒ 415 × Ast / (20 × 1000)]
P
7.49 × Ast2 ‒ 176914.5 × Ast + 79.584 × 106 = 0 T
Ast = 458.754 mm2 N
Using 10 mm diameter bars as distribution reinforcement, the
spacing S = (1000 ast/ Ast) = (1000 × 78.54/ 458.754) = 171.203 mm
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
10 mm diameter HYSD bars can be provided as distribution
reinforcement at a spacing of 100 mm as part of the bottom
reinforcement. (Conforming to the Table)
N
reinforcement at a spacing of 260 mm as part of the top
reinforcement. (As per the Table)
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
8. Check for Ultimate Flexural Strength:
Ultimate Flexural Strength of Deck Slab Mu = 0.87fyAst [d ‒
(fyAst/fckb)]
= 0.87 × 415 × 2730.435 × [490 ‒ 415 × 2730.435/ (20 × 1000)]
E L
= 427200205 N-mm = 427.2 kN-m > 298.878 kN-m (Hence, safe)
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
VRd,c = [0.12K(80 ρ1fck)0.33] bd
= [0.12 × 1.639 × (80 × 0.0056 × 20)0.33] × 1000 × 490
= 198709 N = 198.709 kN > 192.554 kN (Hence, safe)
L
10. Limit State of Cracking:
T E
IRC 112: 2011 prescribes a permissible crack width of 0.3 mm in
N P
reinforced concrete members under moderate exposure condition.
Tables 12.2 and 12.3 of IRC: 112-2011 outlines the maximum bar
size and maximum spacing for permissible crack width and service
stress in steel.
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Table 12.2 of IRC: 112-2011 Table 12.3 of IRC: 112-2011
Service Maximum Bar Size (mm) Service Maximum Bar Spacing (mm)
Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm
160 32 25 160 300 200
200 25 16 200 250 150
L
240 16 12 240 200 100
280 12 ─ 280
T E150 50
P
320 10 ─ 320 100 ─
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
bx2/2 = (Es/Ec) × Ast × (d ‒ x)
500x2 = (200/23) × 2730.435 × (490 ‒ x)
500x2 + 23742.913x ‒ 11634027.39 = 0
x = 130.632 mm
E L
σs = M/ [(d ‒ x/3)Ast] = 206718000/ [(490 ‒ 130.632/3) × 2730.435]
= 169.578 MPa
P T
N
For stress in steel 169.578 MPa and permissible crack width of 0.3
mm, maximum bar diameter and maximum bar spacing given by
IRC:112-2011 are 30 mm and 288 mm.
The slab is reinforced with 20 mm diameter bars at 115 mm spacing.
Hence, the bar size and the spacing are within the safe limits for
control of cracking.
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
11. Limit State of Deflection:
𝟏
a) Deflection due to Shrinkage acs = k r L2
cs
L
k = 0.125 for simply supported ends
𝟏
= Shrinkage curvature = [εcsαe(S/I)]
T E
P
rcs
αe = Modular Ratio =
𝑬𝒔
𝑬𝒄
𝑬𝒔 = Young’s Modulus of Steel
N
𝑬𝒄 = Young’s Modulus of Concrete
𝑬𝒔
αe = = 200/23 = 8.696
𝑬𝒄
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
S = First Moment of Area of Reinforcement about Centroid of
Section = 2730.435 × (270 – 40 – 20/2) = 602895.7 mm3
I = Second Moment of Area of the section = (1000 × 5403/12) =
13.122 × 109 mm4
S/I = 45.952 × 10‒6 /mm
E L
εcs = Total shrinkage strain = (εcd + εca) where
P T
εcd = Drying shrinkage strain
εca = Autogenous shrinkage strain
N
Development of drying shrinkage strain with time εcd(t) = βds(t, ts) kh
εcd, unrestrained
Where βds(t, ts) = [(t ‒ ts)/{(t ‒ ts) + 0.04√h03}]
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
h0 = Notional size of cross-section = 2Ac/u
Ac = Cross-sectional area of concrete = 1000 × 540 = 540000 mm2
u = Perimeter of the cross-section exposed to drying shrinkage =
2000 mm
h0 = 2Ac/u = 2 × 540000/ 2000 = 540 mm
E L
P T
t = Age of concrete in days at the time considered = 365 days
N
ts = Age of concrete in days at the beginning of drying shrinkage,
normally at the end of curing i.e. 28 days
βds(t, ts) = [(t ‒ ts)/{(t ‒ ts) + 0.04√h03}]
= [(365 ‒ 28)/{(365 ‒ 28) + 0.04√5403}] = 0.402
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
εcd, unrestrained = 558 × 10‒6 for fck = 20 MPa and Relative Humidity 50%
Table 6.8 of IRC: 112-2011
kh = 0.70 for h0 = 540 mm εcd, unrestrained (× 106)
Table 6.7 of IRC: 112-2011 fck
Relative Humidity (%)
(MPa)
h0 (mm) kh
20 50 80
100 1.0
L
25 620 535 300
200 0.85
E
50 480 420 240
T
300 0.75
75 380 330 190
≥ 500 0.70
95
N P 300
εcd(t) = βds(t, ts) khεcd, unrestrained = 0.402 × 0.70 × 558 × 10‒6 = 157.021 ×
260 150
10‒6
εca = 15 × 10‒6 for M20 Concrete
Table 6.6 of IRC: 112-2011
Grade of Concrete M30 M35 M45 M50 M60 M65
Autogenous Shrinkage Strain εca (× 106) 35 45 65 75 95 105
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Total shrinkage strain εcs = εcd + εca = 157.021 × 10‒6 + 15 × 10‒6 =
172.021 × 10‒6
𝟏
Shrinkage curvature r = [εcsαe(S/I)] = 172.021 × 10‒6 × 8.696 × 45.952
cs
× 10‒6 = 68739.349 × 10‒12
Deflection due to shrinkage acs = k
𝟏
rcs
E L
L2 = 0.125 × 68739.349 × 10‒12
× 63702 = 0.349 mm
P T
N
b) Long term Deflection due to Sustained (Dead) Loads ad =
5wdL4/384Ec,eff Ieff
Total Dead Load wd = 14.72 kN/m = 14.72 N/mm
Effective Span L = 6.37 m = 6370 mm
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Effective Moment of Inertia Ieff = 0.7 I = 9.185 × 109 mm4
Modulus of Elasticity of Concrete Ec = 23 kN/mm2 = 23000 N/mm2
Effective Modulus of Elasticity for Concrete Ec,eff = Ec/(1 + ø)
Where ø is Creep Coefficient
Table 6.9 of IRC: 112-2011
E L
T
Creep Coefficient ø
P
Age at
Loading Notional Size 2Ac/u (mm)
t0
(days)
50 150 600
Dry atmospheric conditions (RH 50%)
N50 150 600
Humid atmospheric conditions (RH 80%)
1 5.50 4.60 3.70 3.60 3.20 2.90
7 5.50 4.60 3.70 2.60 2.30 2.00
28 3.90 3.10 2.60 1.90 1.70 1.50
90 3.00 2.50 2.00 1.50 1.40 1.20
365 1.80 1.50 1.20 1.10 1.00 1.00
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
For relative humidity 50%, Notional Size 2Ac/u = 540 mm and Age
at loading = 28 days, Creep Coefficient ø = 2.667 by linear
interpolation.
Ec,eff = Ec/(1 + ø) = (23000/3.667) = 6272.157 N/mm2
Maximum long term deflection due to dead load ad =
E L
T
5wdL4/384Ec,effIeff = (5 × 14.72 × 63704) / (384 × 6272.157 × 9.185 ×
P
109) = 5.478 mm
N
c) Deflection due to Live Loads al = 5wlL4/384EcIeff
Total Live Load wl = 27.63 kN/m2
Effective Span L = 6.37 m = 6370 mm
Bridge Engineering
Design of RC Skew Slab Culvert: Solution
Modulus of Elasticity of Concrete Ec = 23 kN/mm2 = 23000 N/mm2
Effective Moment of Inertia Ieff = 9.185 × 109 mm4
Maximum deflection due to live load al = 5wlL4/384EcIeff
= (5 × 27.63 × 63704) / (384 × 23000 × 9.185 × 109) = 2.804 mm <
Span/800 = (6370/800) = 7.962 mm
E L
P T
Total deflection = acs + ad + al = 0.349 + 5.478 + 2.804 = 8.631 mm <
Span/250 = (6370/250) = 25.48 mm
N
Hence the serviceability limit state of deflection is found within the
limits specified by IRC: 112 – 2011.
Bridge Engineering
Design of RC Skew Slab Culvert: Reinforcement Detailing
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
E
T
Co. Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor
& Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Loading Conditions
E L
Structural Design P T
Design Example
N
Topic of Discussion
General Features
Loading Conditions
Structural Design
Design Example
E L
P T
N
Bridge Engineering
General Features
L
• Reinforced Concrete rigid box culverts with square or
E
not more than 3 m. P T
rectangular openings are used for a span up to 4 m and height
Bridge Engineering
General Features
T
guide the flow of water in the stream through the box culvert.
P
N
Bridge Engineering
General Features
•
E L
For small discharge, single celled box culvert can be employed.
T
For larger flow, multi-celled box culvert may be adopted.
P
N
• The barrel of the box culvert should be of sufficient length to
support the entire width of the carriage way.
Bridge Engineering
General Features
L
generally fixed below the bottom of top slab allowing for a
E
vertical clearance.
P T
•
between 1:1 and 1.5:1.
N
In general, the ratio of span to height of the vent way lies
Bridge Engineering
Topic of Discussion
General Features
Loading Conditions
Structural Design
Design Example
E L
P T
N
Bridge Engineering
Loading Conditions in Box Culverts
Bridge Engineering
Loading Conditions in Box Culverts
E L
P T
Case 2: Uniformly distributed load
due to weight of deck slabs,
N
embankment and wearing coat and
track load.
Bridge Engineering
Loading Conditions in Box Culverts
E L
Case 4: When culvert is full with
P T
water, pressure distribution on side
wall is assumed to be triangular
N
with maximum pressure intensity p
= γwH where γw is density of water
and H is depth of flow.
Bridge Engineering
Loading Conditions in Box Culverts
Bridge Engineering
Loading Conditions in Box Culverts
L
• When top slab supports dead load and live load and the
E
culvert is empty.
P T
N
• When top slab supports dead load and live load and the
culvert is full.
• When sides of culvert do not carry the live load and the
culvert is full.
Bridge Engineering
Topic of Discussion
General Features
Loading Conditions
Structural Design
Design Example
E L
P T
N
Bridge Engineering
Structural Design of Box Culverts
Bridge Engineering
Structural Design of Box Culverts
Fixed end moments MA, MA', MD and MD' developed in the box
culvert for the six different loading conditions are as follows.
Here positive moment indicates tension on inside face.
For symmetry, MA = MA' and MD = MD'
E L
T
Load Fixed End Moments Fixed End Moments
P
Case MA = MA' MD = MD'
1
2
− 𝑾𝑾𝑾𝑾⁄𝟏𝟏𝟏𝟏 � 𝟐𝟐𝟐𝟐 + 𝟒𝟒. 𝟓𝟓 / 𝑲𝑲 + 𝟑𝟑 � 𝑲𝑲 + 𝟏𝟏
−𝒘𝒘𝑳𝑳𝟐𝟐 / 𝟏𝟏𝟏𝟏 � 𝑲𝑲 + 𝟏𝟏
N
− 𝑾𝑾𝑾𝑾⁄𝟐𝟐𝟐𝟐 � 𝑲𝑲 + 𝟔𝟔 / 𝑲𝑲 + 𝟑𝟑 � 𝑲𝑲 + 𝟏𝟏
−𝒘𝒘𝑳𝑳𝟐𝟐 / 𝟏𝟏𝟏𝟏 � 𝑲𝑲 + 𝟏𝟏
3 + 𝑾𝑾𝑾𝑾⁄𝟔𝟔 � 𝑲𝑲⁄ 𝑲𝑲 + 𝟑𝟑 + 𝑲𝑲 + 𝟏𝟏 − 𝑾𝑾𝑾𝑾⁄𝟔𝟔 � 𝟑𝟑 + 𝟐𝟐𝟐𝟐 ⁄ 𝑲𝑲 + 𝟑𝟑 + 𝑲𝑲 + 𝟏𝟏
Bridge Engineering
Structural Design of Box Culverts
Bridge Engineering
Structural Design of Box Culverts
L
M + 0.182 + 0.083 + 0.021 + 0.019 − 0.019 − 0.042
B1
N 0 0 0
T E
− 0.167 + 0.167 + 0.500
P
M − 0.068 + 0.042 + 0.021 + 0.019 − 0.019 − 0.042
1:1
A2 N
V
M
0
+ 0.500
− 0.068
0
+ 0.500
− 0.042
N 0
0
+ 0.021
− 0.167
0
+ 0.019
+ 0.167
0
− 0.019
− 0.500
0
− 0.042
A3 N 0 0 0 + 0.167 − 0.167 − 0.500
V 0 0 0 + 0.167 − 0.167 − 0.500
M − 0.052 − 0.042 − 0.042 − 0.043 − 0.043 + 0.083
E4
N + 0.500 + 0.500 + 0.500 0 0 0
Bridge Engineering
Structural Design of Box Culverts
L
M − 0.036 − 0.042 − 0.004 + 0.023 − 0.023 − 0.042
D5 N + 0.500 + 0.500 + 1.000
T E
− 0.333 + 0.333 0
P
V 0 0 0 0 0 + 0.500
1:1
D6
M
N
− 0.036
0
− 0.042
0 N
− 0.104
0
+ 0.023
0
− 0.023
0
− 0.042
+ 0.500
V − 0.500 − 0.500 − 1.000 − 0.333 + 0.333 0
M + 0.088 + 0.083 + 0.146 + 0.023 − 0.023 − 0.042
C7
N 0 0 0 − 0.333 + 0.333 0
Bridge Engineering
Structural Design of Box Culverts
L
M + 0.170 + 0.075 + 0.018 + 0.015 − 0.015 − 0.033
B1
N 0 0 0
T E
− 0.167 + 0.167 + 0.500
P
M − 0.079 − 0.050 + 0.018 + 0.015 − 0.015 − 0.033
1.5:1
A2 N
V
M
0
+ 0.500
− 0.079
0
+ 0.500
+ 0.050
N 0
0
+ 0.018
− 0.167
0
+ 0.015
+ 0.167
0
− 0.015
+ 0.500
0
− 0.033
A3 N + 0.500 + 0.500 0 0 0 0
V 0 0 0 + 0.167 − 0.167 − 0.500
M − 0.062 − 0.052 − 0.050 − 0.047 + 0.047 + 0.092
E4
N + 0.500 + 0.500 + 0.500 0 0 0
Bridge Engineering
Structural Design of Box Culverts
L
M − 0.045 − 0.050 − 0.118 + 0.018 + 0.018 − 0.033
D5 N + 0.500 + 0.500 + 0.100
T
0
E 0 0
P
V 0 0 0 − 0.333 + 0.333 + 0.500
1.5:1
D6
M
N
− 0.045
0
− 0.050
0 N
− 0.118
0
+ 0.018
− 0.033
− 0.018
+ 0.033
− 0.033
+ 0.500
V − 0.500 − 0.500 − 0.100 0 0 0
M − 0.079 − 0.075 − 0.132 − 0.018 − 0.018 − 0.033
C7
N 0 0 0 − 0.033 + 0.033 + 0.500
Bridge Engineering
Topic of Discussion
General Features
Loading Conditions
Structural Design
Design Example
E L
P T
N
Bridge Engineering
Design Example: Problem Statement
A RC box culvert has a clear vent way of 2.4 m height by 3.6 m
length according to IRC 112: 2011. Slab thickness = wall thickness =
360 mm. The box culvert is not carrying any vehicle. The
superimposed dead load on the culvert is 12 KN/m2. The live load is
30 KN/m2. The density of soil site is 18 KN/m3. Angle of repose is
E L
25°. Material grades are M20 Concrete and Fe415 HYSD bars.
P T
Sketch the critical sections of box culvert with proper notations.
N
Calculate the fixed end moments of the box culvert.
Determine the critical load combinations for the critical sections of
the box culvert.
Design the box culvert and draw the reinforcement detailing.
Bridge Engineering
Design Example: Solution
Fixed edges of the culvert are A, A', D and D'.
Bridge Engineering
Design Example: Solution
Material Properties:
Concrete: fck = 20 N/mm2, Ec = 23 GPa
Steel: fyk = 415 N/mm2, Es = 200 GPa
αe = Es/Ec = 200/23 = 8.696
Load Calculation:
Case 2: Self-Weight of RC Slab = (24 × 0.36) = T
L
EkN/m
P 8.64 2
Bridge Engineering
Design Example: Solution
Case 3: Weight of Vertical Side Walls W = (2.76 × 0.36 × 24) = 23.85
kN
Case 4: For complete-filled culvert, water pressure p = γw H = 10 ×
2.76 = 27.6 kN/m2
Case 5: Angle of repose φ = 25°
E L
Height of Soil fill H = 2.76 m
Soil pressure p = [γ H × (1 − sinφ)/ (1 +P
T
soil
sin25°)/(1 + sin25°)] = 20.16 kN/m2
N sinφ)] = [18 × 2.76 × (1 −
Bridge Engineering
Design Example: Solution
Case 6b: Uniform lateral pressure due to superimposed dead load
surcharge p = [12 × (1 − sin25°)/ (1 + sin25°)] = 4.87 kN/m2
Fixed end moments MA, MA', MD and MD' developed in the box
culvert for six different loading conditions are as follows.
For symmetry, MA = MA' and MD = MD'
E L
Load
Case
Fixed End Moments MA = MA'
T
Fixed End Moments MD = MD'
P
1
2
− 𝑾𝑾𝑾𝑾⁄𝟏𝟏𝟏𝟏 � 𝟐𝟐𝟐𝟐 + 𝟒𝟒. 𝟓𝟓 / 𝑲𝑲 + 𝟑𝟑 � 𝑲𝑲 + 𝟏𝟏
𝟐𝟐
−𝑾𝑾𝑳𝑳 / 𝟏𝟏𝟏𝟏 � 𝑲𝑲 + 𝟏𝟏
N
− 𝑾𝑾𝑾𝑾⁄𝟐𝟐𝟐𝟐 � 𝑲𝑲 + 𝟔𝟔 / 𝑲𝑲 + 𝟑𝟑 � 𝑲𝑲 + 𝟏𝟏
−𝑾𝑾𝑳𝑳𝟐𝟐 / 𝟏𝟏𝟏𝟏 � 𝑲𝑲 + 𝟏𝟏
3 + 𝑾𝑾𝑾𝑾⁄𝟔𝟔 � 𝑲𝑲⁄ 𝑲𝑲 + 𝟑𝟑 + 𝑲𝑲 + 𝟏𝟏 − 𝑾𝑾𝑾𝑾⁄𝟔𝟔 � 𝟑𝟑 + 𝟐𝟐𝟐𝟐 ⁄ 𝑲𝑲 + 𝟑𝟑 + 𝑲𝑲 + 𝟏𝟏
4 + 𝒑𝒑𝑯𝑯𝟐𝟐 ⁄𝟔𝟔𝟔𝟔 𝑲𝑲 � 𝟐𝟐𝟐𝟐 + 𝟕𝟕 ⁄ 𝑲𝑲 + 𝟑𝟑 � 𝑲𝑲 + 𝟏𝟏 + 𝒑𝒑𝑯𝑯𝟐𝟐 ⁄𝟔𝟔𝟔𝟔 𝑲𝑲 � 𝟑𝟑𝟑𝟑 + 𝟖𝟖 ⁄ 𝑲𝑲 + 𝟑𝟑 � 𝑲𝑲 + 𝟏𝟏
5 − 𝒑𝒑𝑯𝑯𝟐𝟐 ⁄𝟔𝟔𝟔𝟔 𝑲𝑲 � 𝟐𝟐𝟐𝟐 + 𝟕𝟕 ⁄ 𝑲𝑲 + 𝟑𝟑 � 𝑲𝑲 + 𝟏𝟏 − 𝒑𝒑𝑯𝑯𝟐𝟐 ⁄𝟔𝟔𝟔𝟔 𝑲𝑲 � 𝟑𝟑𝟑𝟑 + 𝟖𝟖 ⁄ 𝑲𝑲 + 𝟑𝟑 � 𝑲𝑲 + 𝟏𝟏
6 −𝒑𝒑 � 𝑲𝑲𝑯𝑯𝟐𝟐 / 𝟏𝟏𝟏𝟏 � 𝑲𝑲 + 𝟏𝟏 −𝒑𝒑 � 𝑲𝑲𝑯𝑯𝟐𝟐 / 𝟏𝟏𝟏𝟏 � 𝑲𝑲 + 𝟏𝟏
Bridge Engineering
Design Example: Solution
E L
5 − 2.391
P T − 2.875
N
6a − 4.457 − 4.457
6b − 1.273 − 1.273
Bridge Engineering
Design Example: Solution
The moments, shear forces and thrusts for different load cases
are calculated using coefficients summarized in a Table below.
Factor Load Cases
for 1 2 3 4 5 6
L:H Section M WL wL2 WL pL2 pL2 pL2
N W wL W
E
pL
L pL pL
V
M
W
+ 0.170
wL
+ 0.075
W
P
+ 0.018 T pL
+ 0.015
pL
− 0.015
pL
− 0.033
B1
N
M
0
− 0.079
0
− 0.050
N 0
+ 0.018
− 0.167
+ 0.015
+ 0.167
− 0.015
+ 0.500
− 0.033
A2 N 0 0 0 − 0.167 + 0.167 + 0.500
1.5:1
V + 0.500 + 0.500 0 0 0 0
M − 0.079 + 0.050 + 0.018 + 0.015 − 0.015 − 0.033
A3 N + 0.500 + 0.500 0 0 0 0
V 0 0 0 + 0.167 − 0.167 − 0.500
Bridge Engineering
Design Example: Solution
E4
M − 0.062 − 0.052 − 0.050
L
− 0.047
E
+ 0.047 + 0.092
T
N + 0.500 + 0.500 + 0.500 0 0 0
D5
M
N
V
− 0.045
+ 0.500
0
− 0.050
+ 0.500
0 N P
− 0.118
+ 0.100
0
+ 0.018
0
− 0.333
+ 0.018
0
+ 0.333
− 0.033
0
+ 0.500
1.5:1
M − 0.045 − 0.050 − 0.118 + 0.018 − 0.018 − 0.033
D6 N 0 0 0 − 0.033 + 0.033 + 0.500
V − 0.500 − 0.500 − 0.100 0 0 0
M − 0.079 − 0.075 − 0.132 − 0.018 − 0.018 − 0.033
C7
N 0 0 0 − 0.033 + 0.033 + 0.500
Bridge Engineering
Design Example: Solution
Point LC2 LC3 LC4 LC5 LC6a LC6b
M (kN-m) 59.56 1.70 6.49 - 4.75 − 8.82 − 2.52
B1
N (kN) 0 0 − 18.25 13.34 33.76 9.64
M (kN-m) − 39.71 1.70 6.49 - 4.75 − 8.82 − 2.52
A2 N (kN) 0 0 − 18.25 13.33 33.76 9.64
V (kN) 100.27 0 0 0
E L
0 0
T
M (kN-m) 39.71 1.70 6.49 - 4.75 − 8.82 − 2.52
A3 N (kN)
V (kN)
100.27
0
0
0
0
18.25
N P 0
− 13.33
0
− 33.76
0
− 9.64
M (kN-m) − 41.29 − 4.72 − 20.34 14.86 24.60 7.03
E4
N (kN) 100.27 11.92 0 0 0 0
M (kN-m) − 39.71 − 11.14 7.79 5.69 − 8.82 − 2.52
D5 N (kN) 100.27 2.38 0 0 0 0
V (kN) 0 0 − 36.40 26.58 33.76 9.64
Bridge Engineering
Design Example: Solution
Point LC2 LC3 LC4 LC5 LC6a LC6b
M (kN-m) − 39.71 − 11.14 7.79 − 5.69 − 8.82 − 2.52
D6 N (kN) 0 0 − 3.61 2.63 33.76 9.64
V (kN) − 100.27 − 2.38 0 0 0 0
M (kN-m) − 59.56 − 12.47 − 7.79 − 5.69 −8.82 −2.52
L
C7
E
N (kN) 0 0 − 3.61 2.63 33.76 9.64
•
N on inside face.
Bridge Engineering
Design Example: Solution
Section
Loading Moment
E L
Thrust Shear Force
Combinations
P T
M (kN-m) N (kN) V (kN)
N
Bottom Support D6 2+3+5+6a − 65.36 36.39 ‒102.65
Top Support A2 2+3+5+6a – 51.58 47.09 100.27
Mid Point of Top Slab B1 2+3+4+5+6b 60.51 4.73 0
Mid Point of Bottom Slab C7 2+3+4+5+6a − 94.33 32.78 0
Mid Point of Vertical Wall E4 2+3+4+5+6b ‒ 44.46 112.19 0
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
Subsequently, the critical sections of the box culvert can be
P T
designed using SP-16: 1980, IS 456: 2000 and IRC 112: 2011.
N
Bridge Engineering
Design Example: Solution
E L
T
Ultimate Thrust Nu = 1.5 × 32.78 = 49.17 kN (Compression)
P
N
Nu/fckbD = (49.17 × 1000)/(20 × 1000 × 360) = 0.0068
Mu/fckbD2 = (141.49 × 1000000)/(20 × 1000 × 3602) = 0.0546
Adopting effective cover of 40 mm, D = 360 mm and d´ = 40 mm,
(d´/D) = (40/360) = 0.111, Effective depth d = (360 − 40) = 320 mm
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
N
Using 16 mm diameter bars as main reinforcement, the spacing is
given by: S = (1000 ast/ Ast) = (1000 × 201)/ (2560/2) = 157 mm
16 mm diameter bars can be provided at 150 mm spacing as main
reinforcement. Ast, provided = 2 × (1000 × 201)/150 = 2680 mm2
Bridge Engineering
Design Example: Solution
L
Tables 12.2 and 12.3 of IRC: 112-2011 outlines the maximum bar
E
T
size and maximum spacing for permissible crack width and
P
service stress in steel.
N
Service Load Bending Moment M = 94.33 kN-m
The stress in steel at working load σs = M/ [(d ‒ x/3)Ast]
Here x is Neutral Axis Depth.
Bridge Engineering
Design Example: Solution
Table 12.2 of IRC: 112-2011 Table 12.3 of IRC: 112-2011
Service Maximum Bar Size (mm) Service Maximum Bar Spacing (mm)
Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm
160 32 25 160 300 200
200 25 16 200 250 150
L
240 16 12 240 200 100
280 12 ─ 280
T E150 50
P
320 10 ─ 320 100 ─
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
T
Ultimate Thrust Nu = 1.5 × 36.39 = 54.58 kN (Compression)
P
N
Nu/fckbD = (54.58 × 1000)/(20 × 1000 × 360) = 0.0076
Mu/fckbD2 = (98.04 × 1000000)/(20 × 1000 × 3602) = 0.0378
Adopting effective cover of 40 mm, D = 360 mm and d´ = 40 mm,
(d´/D) = (40/360) = 0.111, Effective depth d = (360 − 40) = 320 mm
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
N
Using 12 mm diameter bars as main reinforcement, the spacing is
given by: S = (1000 ast/ Ast) = (1000 × 113)/ (1280/2) = 177 mm
12 mm diameter bars can be provided at 150 mm spacing as main
reinforcement. Ast, provided = 2 × (1000 × 113)/150 = 1507 mm2
Bridge Engineering
Design Example: Solution
L
Tables 12.2 and 12.3 of IRC: 112-2011 outlines the maximum bar
E
T
size and maximum spacing for permissible crack width and
P
service stress in steel.
N
Service Load Bending Moment M = 65.36 kN-m
The stress in steel at working load σs = M/ [(d ‒ x/3)Ast]
Here x is Neutral Axis Depth.
Bridge Engineering
Design Example: Solution
Table 12.2 of IRC: 112-2011 Table 12.3 of IRC: 112-2011
Service Maximum Bar Size (mm) Service Maximum Bar Spacing (mm)
Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm
160 32 25 160 300 200
200 25 16 200 250 150
L
240 16 12 240 200 100
280 12 ─ 280
T E150 50
P
320 10 ─ 320 100 ─
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
T
Ultimate Thrust Nu = 1.5 × 112.19 = 168.28 kN (Compression)
P
N
Nu/fckbD = (168.28 × 1000)/(20 × 1000 × 360) = 0.023
Mu/fckbD2 = (66.69 × 1000000)/(20 × 1000 × 3602) = 0.026
Adopting effective cover of 40 mm, D = 360 mm and d´ = 40 mm,
(d´/D) = (40/360) = 0.111, Effective depth d = (360 − 40) = 320 mm
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
L
Tables 12.2 and 12.3 of IRC: 112-2011 outlines the maximum bar
E
T
size and maximum spacing for permissible crack width and
P
service stress in steel.
N
Service Load Bending Moment M = 44.46 kN-m
The stress in steel at working load σs = M/ [(d ‒ x/3)Ast]
Here x is Neutral Axis Depth.
Bridge Engineering
Design Example: Solution
Table 12.2 of IRC: 112-2011 Table 12.3 of IRC: 112-2011
Service Maximum Bar Size (mm) Service Maximum Bar Spacing (mm)
Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm
160 32 25 160 300 200
200 25 16 200 250 150
L
240 16 12 240 200 100
280 12 ─ 280
T E150 50
P
320 10 ─ 320 100 ─
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Reinforcement Detailing
3600
mm
E L
2400
P T
N
mm
360 mm
360 mm
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
E
T
Co. Pvt. Ltd.
N P
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor
& Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Classification of Pipes
E L
Design Principle P T
Design Example
N
Topic of Discussion
General Features
Classification of Pipes
Design Principle
Design Example
E L
P T
N
Bridge Engineering
General Features
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
• When the earth fill over the pipe is small, return type wing walls
L
are provided at the ends of the road formation width to retain
E
the earth.
P T
N
• If the earth fill is large, the length of the pipe culvert is
increased so that embankment with its natural side slopes is
retained by the splayed type wing walls.
Bridge Engineering
General Features
L
pipes by spinning process has reduced the costs and also
E
T
significantly improved the structural quality of reinforced
P
•
concrete pipes.
N
For the last few decades, concrete pipes have more or less
replaced steel pipes due to their superior durability and
reduction in costs.
Bridge Engineering
General Features
L
• Prestressed concrete pipes have been used for water supply
E
T
systems of metropolitan areas in many countries.
P
N
• Reinforced concrete hume pipes have been used for culverts of
bridges and for drainage of storm water at city road crossings.
Bridge Engineering
Topic of Discussion
General Features
Classification of Pipes
Design Principle
Design Example
E L
P T
N
Bridge Engineering
Classification of Pipes
NP-2
pressure pipe carrying light traffic L
Reinforced concrete light duty non For drainage and irrigation use for culverts
E
NP-3
pressure pipe
P T
Reinforced concrete medium duty non For drainage and irrigation use for culverts
carrying heavy traffic
NP-4
Reinforced concrete heavy duty non
pressure pipe
N
For drainage and irrigation use for culverts
carrying very heavy traffic such as Railway
loadings
RC pressure pipes tested to a hydraulic For use in gravity mains, the design pressure not
P-1
pressure of 0.2 N/mm2 exceeding 2/3 of test pressure
RC pressure pipes tested to a hydraulic For use in pumping mains, the design pressure
P-2
pressure of 0.4 N/mm2 (40 m head) not exceeding half the test pressure
RC pressure pipes tested to a hydraulic For use in gravity mains, the design pressure not
P-3
pressure of 0.6 N/mm2 (60 m head) exceeding half the test pressure
Bridge Engineering
Pipes for Culverts
L
specified for different classes of pipes in IS:458-2003.
E
•
for pipes of classes NP-2, NP-3 andP
T
Typical reinforcement, design and strength test requirements
Bridge Engineering
Reinforced Concrete Light Duty NP2 Pipes
E L
P T
N
Bridge Engineering
Reinforced Concrete Medium Duty NP3 Pipes
E L
P T
N
Bridge Engineering
Reinforced Concrete Heavy Duty NP4 Pipes
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Classification of Pipes
Design Principle
Design Example
E L
P T
N
Bridge Engineering
Design Principle of Pipe Culverts
The cross sectional area of the pipe depends on the amount of flow
in the stream crossing the road way.
E L
𝒗𝒗 = Velocity of flow
P T
𝒅𝒅 = Diameter of the pipe
N
𝑸𝑸 𝝅𝝅𝒅𝒅𝟐𝟐
𝑨𝑨 = = and 𝒅𝒅 = (𝟒𝟒𝟒𝟒/(𝝅𝝅𝝅𝝅)
𝒗𝒗 𝟒𝟒
Bridge Engineering
Design Principle of Pipe Culverts
L
• The load on pipe due to a surface concentrated live load
E
T
associated with a strength factor generally taken as 1.5.
P
N
Bridge Engineering
Design Principle of Pipe Culverts
The type of non-pressure pipe and bedding are chosen such that a
factor of safety of 1.5 is available even under the worst combination
of field loading, as given by the equation below,
P T
=�
𝐋𝐋𝐋𝐋𝐋𝐋𝐋𝐋 𝐖𝐖 𝐨𝐨𝐨𝐨 𝐩𝐩𝐩𝐩𝐩𝐩𝐩𝐩 𝐝𝐝𝐝𝐝𝐝𝐝 𝐭𝐭𝐭𝐭 𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄
𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂 𝐒𝐒𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭 𝐅𝐅𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚 N
𝐋𝐋𝐋𝐋𝐋𝐋𝐋𝐋 𝐖𝐖 𝐨𝐨𝐨𝐨 𝐩𝐩𝐩𝐩𝐩𝐩𝐩𝐩 𝐝𝐝𝐝𝐝𝐝𝐝 𝐭𝐭𝐭𝐭 𝐒𝐒𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮 𝐋𝐋𝐨𝐨𝐨𝐨𝐨𝐨
+ �
𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒 𝐅𝐅𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚 (𝟏𝟏. 𝟓𝟓)
Bridge Engineering
Design Principle of Pipe Culverts
Bridge Engineering
Design Principle of Pipe Culverts
E L
P T
N
Bridge Engineering
Design Principle of Pipe Culverts
The load on the pipe due to a concentrated highway wheel load ‘P’
is obtained from the equation below.
𝑾𝑾 = 𝟒𝟒. 𝑪𝑪𝒔𝒔 . 𝑰𝑰. 𝑷𝑷
Where, 𝑾𝑾 = Vertical external load in kN/m due to concentrated
surface load.
E L
P T
𝑪𝑪𝒔𝒔 = Influence coefficient dependent on D and H
N
𝑯𝑯 = Vertical depth of top of pipe below the surface (m)
D = External diameter of pipe (m)
𝑷𝑷 = Concentrated wheel load (kN)
𝑰𝑰 = Impact factor (1.5 for highways)
Bridge Engineering
Design Principle of Pipe Culverts
E L
P T
N
Bridge Engineering
Design Principle of Pipe Culverts
Bridge Engineering
Design Principle of Pipe Culverts
E L
P T
𝑫𝑫 = Outside diameter of the pipe in m for broad gauge loading,
the equation reduces to
N
𝑾𝑾 = 𝟑𝟑𝟑𝟑𝟑𝟑. 𝑪𝑪 . 𝑫𝑫
𝒔𝒔
Bridge Engineering
Design Principle of Pipe Culverts
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Classification of Pipes
Design Principle
Design Example
E L
P T
N
Bridge Engineering
Design Example: Problem Statement
Design a suitable R.C.C. pipe culvert to suit the following data:
Discharge through pipe culvert = 1.57 m3/s
Velocity of flow through pipe = 2 m/s
Width of road (two lane) = 7.5 m
Top width of embankment = 1.5:1
E L
Bed level of stream = 100.00
P T
Top of embankment = 103.00 N
Loading = IRC class AA wheeled vehicle with a maximum wheel load
of 62.5 kN
Draw the longitudinal section, plan and end view of the pipe culvert.
Bridge Engineering
Design Example: Solution
1. Diameter of Pipe Culvert:
Discharge through pipe culvert 𝑸𝑸 = 𝑨𝑨 × 𝒗𝒗 = 1.57 m3/s
E L
If 𝒅𝒅 = Internal diameter of the pipe, 𝑨𝑨 =
P T
𝝅𝝅𝒅𝒅𝟐𝟐 /4
= 0.785 𝒎𝒎 𝟐𝟐
So, 𝒅𝒅 = 1 m N
We can adopt NP-3 medium duty RC non-pressure pipe for carrying
heavy road traffic.
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
2. Load due to Earth fill:
Height of embankment over pipe H = 2 m
E L
P T
N
Bridge Engineering
Design Example: Solution
3. Load due to IRC Class AA Wheeled Vehicle:
Assuming IRC Class A wheel load of 62.5 kN to be directly above the
pipe, Loading on pipe 𝑾𝑾 = 𝟒𝟒. 𝑪𝑪𝒔𝒔 . 𝑰𝑰. 𝑷𝑷
Where, 𝑪𝑪𝒔𝒔 = Influence coefficient dependent on D and H = 0.032
E L
P T
N
Bridge Engineering
Design Example: Solution
𝑷𝑷 = Concentrated wheel load = 62.5 kN
𝑰𝑰 = Impact factor = 1.5 for highways
Loading on pipe 𝑾𝑾 = 𝟒𝟒. 𝑪𝑪𝒔𝒔 . 𝑰𝑰. 𝑷𝑷 = 4 × 0.032 × 1.5 × 62.5 = 12 kN/m
E L
The type of non-pressure pipe and bedding should be so chosen
P T
N
that under the worst combination of field loading, a factor of safety
of 1.5 is available. This is computed as follows:
𝐓𝐓𝐓𝐓𝐓𝐓𝐓𝐓𝐓𝐓 𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞 𝐁𝐁𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞 𝐒𝐒𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭 𝐋𝐋𝐋𝐋𝐋𝐋𝐋𝐋 𝐖𝐖 𝐨𝐨𝐨𝐨 𝐩𝐩𝐩𝐩𝐩𝐩𝐩𝐩 𝐝𝐝𝐝𝐝𝐝𝐝 𝐭𝐭𝐭𝐭 𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄𝐄 𝐋𝐋𝐋𝐋𝐋𝐋𝐋𝐋 𝐖𝐖 𝐨𝐨𝐨𝐨 𝐩𝐩𝐩𝐩𝐩𝐩𝐩𝐩 𝐝𝐝𝐝𝐝𝐝𝐝 𝐭𝐭𝐭𝐭 𝐒𝐒𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮 𝐋𝐋𝐨𝐨𝐨𝐨𝐨𝐨
= +
𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅 𝐨𝐨𝐨𝐨 𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬 (𝟏𝟏. 𝟓𝟓) 𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂 𝐒𝐒𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭 𝐅𝐅𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚 𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒 𝐅𝐅𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚 (𝟏𝟏. 𝟓𝟓)
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
From IS: 458-2003, Three-edge bearing strength for NP3 medium
duty pipes of 1000 mm internal diameter pipe is 71.85 kN/m
E L
𝐁𝐁𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞𝐞 𝐒𝐒𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭
𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅𝐅 𝐨𝐨𝐨𝐨 𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬𝐬 (𝟏𝟏. 𝟓𝟓)
=
𝐖𝐖 𝐝𝐝𝐝𝐝𝐝𝐝 𝐭𝐭𝐭𝐭 𝐅𝐅𝐢𝐢𝐢𝐢𝐢𝐢𝐢𝐢𝐢𝐢𝐢𝐢 𝐌𝐌𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚
P T +
𝐖𝐖 𝐝𝐝𝐝𝐝𝐝𝐝 𝐭𝐭𝐭𝐭 𝐒𝐒𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮𝐮 𝐋𝐋𝐨𝐨𝐨𝐨𝐨𝐨
𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂𝐂 𝐒𝐒𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭𝐭 𝐅𝐅𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚 𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒𝐒 𝐅𝐅𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚𝐚 (𝟏𝟏. 𝟓𝟓)
Bridge Engineering
Design Example: Solution
The strength factor for first class bedding is 2.3 while the strength
factor for concrete cradle bedding is 3.7. Any of these two
beddings can be provided for the pipe culvert as shown in Figure.
E L
P T
N
First Class Bedding Concrete Cradle Bending
Bridge Engineering
Design Example: Solution
5. Reinforcements in pipe:
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
Using 12 mm diameter bars at 60 mm centres as spiral
reinforcement, Average diameter of spiral = 1.1 m
E L
Weight of one spiral of 12 mm diameter = (π × 1.1 × 0.888) = 3.069 kg
P T
Number of spirals in 1 m = (1000/ 60) = 16.667 ≈ 17
N
Weight of spiral reinforcement per meter length of pipe = (3.069 ×
17) = 52.173 kg/m
Bridge Engineering
Design Example: Solution
Considering 6 mm diameter hard drawn steel bars as longitudinal
reinforcement, weight of each bar = (π/4 × 0.0062) × 7850 = 0.222
kg/m
Minimum number of bars required = (4.729/0.222) = 21.302 ≈ 22
For symmetry, 24 bars can be provided
E L
as longitudinal
reinforcement.
P T
N
The quantity of longitudinal steel provided is greater the minimum
of 12 as specified in the code. Hence, it is okay to proceed with the
reinforcement.
Spacing = (π x 1100/ 24) = 144 mm
We can adopt 130 mm spacing for the longitudinal reinforcements.
Bridge Engineering
Design Example: Reinforecement Layout
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing
E
T
Co. Pvt. Ltd.
N P
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor
& Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas
Telford Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Types of Trusses
E L
P T
N
Ø Design Principle
Ø General Features
Ø Types of Trusses
Ø Design Principle
Bridge Engineering
General Features
• Steel truss bridges are generally preferred for long span railway
bridges.
E L
P T
N
Bridge Engineering
General Features
• The construction
E L
of steel trussed
P T
bridge is faster
due to lightness
N
of members and
fabrication of
joints at site.
Bridge Engineering
General Features
• In addition, steel
bridges should
E L
be provided with
P T
rocker and roller
bearings which
N
need periodical
inspection and
maintenance.
Bridge Engineering
General Features
• The flooring is
either made up of
steel plates or
E L
reinforced concrete
P T
slab which
generally adopted
is
N
due to its rigidity.
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Types of Trusses
Ø Design Principle
Bridge Engineering
Types for Trusses
• The most common type of steel truss used for bridges is the
Warren truss.
•
E L
Different configurations of the Warren trusses can be used in
P T
steel truss bridges as shown in the next slide.
N
Bridge Engineering
Types for Trusses
E L
P T
N
Bridge Engineering
Types for Trusses
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Types of Trusses
Ø Design Principle
Bridge Engineering
Design Principle of Truss Bridges
E L
P T
N
Bridge Engineering
Design Principle of Truss Bridges
• The cross girders are designed as plate girders to resist the load
transmitted by the stringer beams.
Bridge Engineering
Design Principle of Truss Bridges
• The panel length is selected such that the slope of the diagonals
is not less than 45 degrees with the horizontal.
E L
P T
N
Bridge Engineering
Design Principle of Truss Bridges
E L
Design strength of a member under axial tension due to yielding of
gross section, Tdg = (Ag × fy)/ γm0
P T
Where fy = yield stress of the material, N
Ag = gross area of cross-section,
Bridge Engineering
Design Principle of Truss Bridges
N
connections by taking an appropriate section in the member around
the end weld, which can shear off as a block.
Bridge Engineering
Design Principle of Truss Bridges
L
Design compressive stress, fcd of axially loaded compression
E
members can be calculated as follows.
P T
fcd = (fy/ γm0)/[φ + (φ2 – λ2)0.5]
N
Where φ = 0.5 × [1 + α × (λ – 0.2) + λ2]
Bridge Engineering
Design Principle of Truss Bridges
Bridge Engineering
Design Principle of Truss Bridges
E
Where Ze = Elastic Section Modulus of Cross-sectionL
P T
fy = Yield Stress of Material
Bridge Engineering
Design Principle of Truss Bridges
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Types of Trusses
Ø Design Principle
Bridge Engineering
Influence Line Diagram
• An influence line represents variation of reaction, shear or
moment at a specific point in a member as a concentrated load
moves over the member.
L
point can be calculated using the ordinates of the influence-line
E
diagram.
P T
N
Bridge Engineering
Influence Line Diagram for Truss Bridges
• In truss bridges, loading on bridge deck is transmitted to
stringers which in turn transmit the loading to floor beams and
then to joints along the bottom cord.
Bridge Engineering
Influence Line Diagram for Truss Bridges
• The datasets indicating ‘unit load at joint’ and ‘force in member’
once obtained, can be summarized in tabular form.
Bridge Engineering
Influence Line Diagram for Truss Bridges
Numerical Example: Problem Statement
Draw the influence line for the force in member GB of the truss
bridge for a unit load moving from joint A to B, C, D and E.
E L
P T
N
Bridge Engineering
Influence Line Diagram for Truss Bridges
Numerical Example: Solution
Each successive joint at the bottom cord is loaded with a unit
load and the support reaction at E is computed using equations of
equilibrium. The force in member GB is then calculated using the
method of sections.
E L
P T
N
Bridge Engineering
Influence Line Diagram for Truss Bridges
Since the influence line extends over the entire span of truss,
member GB is referred to as a primary member.
This means that GB is subjected to a force regardless of where
the bridge deck is loaded.
E L
P T
N
Bridge Engineering
Influence Line Diagram for Truss Bridges
The magnitudes of support reaction at E when unit load is at Joint
A, B, C, D or E are summarized in this table below.
1 kN Support
Load at Reaction
Joint at E, RE
(kN)
E L
A 0
P T
B
C
0.25
0.5 N
D 0.75
E 1
Bridge Engineering
Influence Line Diagram for Truss Bridges
The force in member GB, FGB is calculated using the method of
sections.
Bridge Engineering
Influence Line Diagram for Truss Bridges
For unit load at C, D and E, the force in member GB, FGB can be
calculated as follows.
Bridge Engineering
Influence Line Diagram for Truss Bridges
Support
1 kN Load Force in member GB, FGB
Reaction at
at Joint (kN)
E, RE (kN)
A 0
FGB = √2 RE
E L
0
B 0.25
P T
0.354
C
D
0.5
0.75
FGB =
N
√2 × (RE − 1)
– 0.707
– 0.354
E 1 0
Bridge Engineering
Influence Line Diagram for Truss Bridges
E L
P T
N
Influence Line Diagram for Member Force FGB
Bridge Engineering
E L
P T
N
Bridge Engineering
v R.C. Hibbeler, Structural Analysis, Pearson Education Limited.
L
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
E
T
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI Learning
Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
E L
P T
N
Design Example: Problem Statement
Effective span = 30 m
Kerbs: 600 mm
E L
Loading: IRC Class AA Tracked Vehicle
P T
N
Materials: a) M-25 Grade concrete and Fe-415 HYSD bars for deck
slab.
Bridge Engineering
Design Example: Solution
1. Given Data:
Effective span = 30 m
Kerbs: 600 mm
E L
Loading: IRC Class AA Tracked Vehicle
P T
N
Materials: a) M-25 Grade concrete and Fe-415 HYSD bars for deck
slab.
Bridge Engineering
Design Example: Solution
2. Arrangement of Members:
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
P T
N
Stringer Beams
Steel Truss
Bridge Engineering
Design Example: Solution
3. Dead Load:
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
T
= 65.625 × (0.009 + 0.15 × 0.045) = 1.034 kN-m
N P
For continuous deck slab, Design Bending moment along Short
Span due to Dead Load = 0.8 × M1 = 2.434 kN-m
Bridge Engineering
Design Example: Solution
4. Live Load:
L = 5 m, B = 1.875 m,
Bridge Engineering
Design Example: Solution
E L
L = 5 m, B = 1.875 m,
P T
k = B/L = 1.875/5 = 0.375 ≈ 0.4
N
u/B = 1.05/1.875 = 0.56
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
T
For continuous deck slab, Design Bending moment due to Live
P
N
Load along Short Span (including Impact Factor) = 0.8 × M1 × 1.25 =
29.995 kN-m
Bridge Engineering
Design Example: Solution
For Maximum Shear in Deck Slab, the wheel load is placed such
that the centre of wheel is at 1.45/2 = 0.725 m distance from the
edge of the panel.
E L
Effective Span L = 1.875 ‒ 0.01 = 1.865 m
P T
Effective Breadth B = 5 ‒ 0.01 = 4.99 mN
Span Ratio of Slab = 4.99/1.865 = 2.676
Bridge Engineering
Design Example: Solution
𝑩
𝑲 = A constant depending on the ratio 𝑳
where 𝑩 is width of the slab
E L
P T
N
Bridge Engineering
Design Example: Solution
For Span Ratio of Slab = 2.676, K = 2.60 for Continuous Deck Slab.
E L
x = 0.725 m
P T
N
Effective Width of Slab = Kx (1 ‒ x/L) + bw
Bridge Engineering
Design Example: Solution
Live Load/ metre width due to 350 kN Wheel Load = 350/ 4.952 =
70.678 kN
E L
Service Load Bending Moment in Slab from Dead Load and Live
P T
Load in Short Span MB = 2.434 + 29.995 = 32.429 kN-m
N
Service Load Bending Moment in Slab from Dead Load and Live
Load in Long Span ML = 0.827 + 10.657 = 11.484 kN-m
Service Load Design Shear Force in Slab from Dead Load and Live
Load V = 6.527 + 54.003 = 60.853 kN
Bridge Engineering
Design Example: Solution
Ultimate Design Bending Moment in Slab from Dead Load and Live
Load in Short Span Mult,B = 1.35 × 2.434 + 1.5 × 29.995 = 48.278 kN-
m
Ultimate Design Bending Moment in Slab from Dead Load and Live
E L
Load in Long Span Mult,L = 1.35 × 0.827 + 1.5 × 10.657 = 17.102 kN-
m
P T
N
Ultimate Design Shear Force in Slab from Dead Load and Live
Load Vult = 1.35 × 6.527 + 1.5 × 54.003 = 89.816 kN
Bridge Engineering
Design Example: Solution
5. Design of Slab:
Overall depth of slab = 200 mm.
E L
T
Using M25 grade concrete and Fe 415 HYSD bars, Limiting
N P
moment of resistance along short span for singly reinforced
sections can be expressed as: Mu,lim = 0.138 × fckbd2
Bridge Engineering
Design Example: Solution
Since Effective Depth of Slab provided d = 154 mm > 119 mm, the
section is under-reinforced.
Bridge Engineering
Design Example: Solution
E L
Area of steel provided = (1000 × 113.097/ 100) = 1131 mm2
P T
N
Similarly, using M25 grade concrete and Fe 415 HYSD bars,
Limiting moment of resistance along longer span for singly
reinforced sections is 17.102 kN-m
Bridge Engineering
Design Example: Solution
17.102 × 106 = 0.87 × 415 × Ast × [154 ‒ 415 × Ast / (25 × 1000)]
5.99 × Ast2 ‒ 55601.7 × Ast + 17.102 × 106 = 0
Ast = 318.51 mm2
E L
given by: S = (1000 ast/ Ast) = (1000 × 78.54/ 318.51) = 246.586 mm
P T
N
Therefore, 10 mm diameter HYSD bars can be provided along
longer span at a spacing of 150 mm.
Bridge Engineering
Design Example: Solution
E L
Check for Ultimate Shear Strength:
P T
N
Ultimate Shear Strength of Deck Slab VRd,c = [0.12K (80 ρ1fck)0.33] bd
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
Tables 12.2 and 12.3 of IRC: 112-2011 outlines the maximum bar
size and maximum spacing for permissible crack width and
service stress in steel.
Table 12.2 of IRC: 112-2011 Table 12.3 of IRC: 112-2011
L
Service Maximum Bar Size (mm) Service Maximum Bar Spacing (mm)
Stress (MPa) Wk = 0.3 mm Wk = 0.2 mm Stress (MPa)
T E
Wk = 0.3 mm Wk = 0.2 mm
P
160 32 25 160 300 200
200
240
25
16
16
12 N
200
240
250
200
150
100
280 12 ─ 280 150 50
320 10 ─ 320 100 ─
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
For stress in steel 186.324 MPa and permissible crack width of 0.3
mm, maximum bar diameter and maximum bar spacing given by
IRC:112-2011 are 27 mm and 267 mm.
E L
Hence, the bar size and the spacing are within the safe limits for
control of cracking.
P T
N
Bridge Engineering
Design Example: Solution
E L
T
Total Dead Load on Stringer = (13.125 + 1) = 14.125 kN/m
N P
Maximum Bending Moment due to Dead Load = (14.125 × 52)/ 8 =
44.141 kN-m
Bridge Engineering
Design Example: Solution
E L
Maximum Bending Moment due to Live Load = [(0.5 × 350 × 2.5) −
(0.5 × 350 × 0.25 × 3.6)] = 280 kN-m
P T
N
Bridge Engineering
Design Example: Solution
E L
Maximum Shear Force due to Live Load = (350 × 3.2)/ 5 = 224 kN
P T
N
Bridge Engineering
Design Example: Solution
Ultimate Design Bending Moment from Dead Load and Live Load
M = (1.5 × 44.141 + 1.5 × 350) = 591.212 kN-m
E L
Ultimate Design Shear Force from Dead Load and Live Load V =
(1.5 × 35.312 + 1.5 × 280) = 472.968 kN
P T
N
For Compact Sections under Simply Supported boundary
conditions, Design Bending Strength Md = (1.2 × Ze × fy)/ γm0 ≥
Design Bending Moment M
Bridge Engineering
Design Example: Solution
E L
T
Design Bending Strength Md = (1.2 × Ze × fy)/ γm0 = (1.2 × 2720 ×
P
N
250)/ 1.1 = 741818.18 N-mm = 741.818 kN-m > Design Bending
Moment M = 591.212 kN-m. (Hence, safe).
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
L
Dead load due to Stringer Beams = (1.125 × 5) = 5.625 kN
E
Load due to Connectors = 0.375 kN
P T
Total Dead Load = 6.00 kN N
Self-weight of cross girder = (0.2 L + 1) kN/m = (0.2 × 8.7 + 1) =
2.74 kN/m ≈ 3 kN/m
Bridge Engineering
Design Example: Solution
E L
P T
N
Position of Dead Load for Maximum Bending Moment
Bridge Engineering
Design Example: Solution
E L
Load are spaced symmetrically from the centre of cross girder.
P T
N
Position of Live Load for Maximum Bending Moment
Bridge Engineering
Design Example: Solution
E L
Maximum Shear Force due to Live Load occurs when one of the
P T
edges of the left wheel is 1.2 m from the kerb.
N
This means that the centre line of the left wheel is at (0.6 + 1.2 +
0.85/2) = 2.225 m from the nearest (left) support and (8.7 – 2.225)
= 6.475 m from the farthest (right) support.
Bridge Engineering
Design Example: Solution
E L
Maximum Shear Force due to Live Load including Impact Factor
= (1.40 × 438.506) = 613.908 kN.
P T
N
Ultimate Design Bending Moment from Dead Load and Live Load
M = (1.5 × 391.028 + 1.5 × 1629.25) = 3030.417 kN-m
Ultimate Design Shear Force from Dead Load and Live Load V =
(1.5 × 180.3 + 1.5 × 613.908) = 1191.312 kN
Bridge Engineering
Design Example: Solution
E L
T
Substituting, d = [(3030.417 × 106 × 180)/250]0.33 = 1207.301 mm
N P
Optimum web thickness of plate girder tw = (M/fyk2)0.33
Bridge Engineering
Design Example: Solution
E L
T
Where γm0 = Partial Safety Factor
N P
Substituting, d = 1200 mm, γm0 = 1.1 and fy = 250 N/mm2
Bridge Engineering
Design Example: Solution
E L
Overall depth of plate girder D = d + 2 tf = 1200 + 2 × 30 = 1260
mm
P T
Classification of Flanges: N
Outstand of flange b = (bf − tw)/2 = (400 − 10)/2 = 195 mm
Bridge Engineering
Design Example: Solution
E L
3354545455 N-mm = 3354.545 kN-m > Ultimate Design Bending
Moment M = 3030.417 kN-m
P T
Hence, the section is safe. N
Shear Capacity of Web:
d/ tw = 1200/10 = 120 < 200
Elastic critical shear stress τcr,e = Kvπ2E/ [12 × (1 − μ2) × (d/ tw)2]
Bridge Engineering
Design Example: Solution
Elastic critical shear stress τcr,e = Kvπ2E/ [12 × (1 − μ2) × (d/ tw)2] =
E L
(5.35 × π2 × 2 × 105)/ [12 × (1 − 0.32) × 1202] = 67.158 N/mm2
P T
N
Non-dimensional web slenderness ratio for shear buckling stress
λw = √[fyw/(√3 × τcr,e)] = √[250/(√3 × 67.158)] = 1.466 ≈ 1.4 > 1.20
Bridge Engineering
Design Example: Solution
Hence, it is unsafe.
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
T
qw = (V × Af × ӯ)/ 2Iz = [1191.312 × (400 × 30) × (600 + 30/2)]/ (2 ×
1.081 × 1010) = 0.406 kN/mm
N P
Let us provide weld of size S = 6 mm. KS = 0.7 × 6 = 4.2 mm
Strength of weld per unit length fwd = (4.2 × 250 × 10-3)/(√3 × 1.25)
= 0.485 kN/mm > 0.406 kN/mm
Bridge Engineering
Design Example: Solution
30
12
E L
P T
1200
Bridge Engineering
Design Example: Solution
Intermediate Stiffeners:
Since the ratio of (d/t) = (1200/12) = 100 > 85, vertical stiffeners
are required.
E L
T
Greater unsupported panel dimension of the web = 1000 mm <
270 tw < (270 × 12) = 3240 mm
N P
The Intermediate stiffeners are designed to have a minimum
moment of inertia specified as I = 1.5d3t3/c2 = 1.5 × 12003 ×
123/10002 = 4478976 mm4
Bridge Engineering
Design Example: Solution
E L
Connections of Vertical Stiffener to Web
P T
N
Shear on welds connecting stiffener to web = (126t2/h)
Bridge Engineering
Design Example: Solution
Effective Length of weld should be not less than 10t = (10 × 12) =
120 mm
E L
P T
N
Provide 120 mm long, 5 mm fillet welds alternately on either side.
Bridge Engineering
Design Example: Solution
E L
T
Dead loads due to deck slab, wearing coat, stringer beams and
P
N
cross girders acting at each node = 180.3 kN ≈ 181 kN
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
T
Average uniformly distributed loading = (483/3.6) = 134.17 kN/m ≈
P
N
135 kN/m
Bridge Engineering
Design Example: Solution
E L
P T U0U1
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
I. Member L0L1
N
Using the influence line diagram, force due to dead loads
Force due to live loads = [0.5 × (0.416 + 0.366) × 3.6 × 135] = 190
kN (Tension)
Bridge Engineering
Design Example: Solution
N
Using the influence line diagram, force due to dead loads
Force due to live loads = [0.5 × (0.88 + 0.94) × 3.6 × 135] = 442 kN
(Tension)
Bridge Engineering
Design Example: Solution
L
Influence line ordinate at L2 = (1.46 × 10)/12.5 = 1.17
E
P T
Influence line ordinate at L3 = (1.13 × 15)/17.5 = 1.26
N
Using the influence line diagram, force due to dead loads
Force due to live loads = [0.5 × (1.13 +1.11) × 3.6 × 135] = 544 kN
(Tension)
Bridge Engineering
Design Example: Solution
= (5 × 25)/(30 × 5) = 0.833
L
Using the influence line diagram, force due to dead loads
E
P T
= 231 × (0.833 + 0.67 + 0.5 + 0.33 + 0.17) = 578 kN (Compression)
N
Force due to live loads = [0.5 × (0.735 + 0.883) × 3.6 × 135] = 381
kN (Compression)
Bridge Engineering
Design Example: Solution
V. Member U1U2
L
Using the influence line diagram, force due to dead loads
E
P T
= 231 × (0.66 + 1.33 + 1.0 + 0.66 + 0.33) = 920 kN (Compression)
N
Force due to live loads = [0.5 × (1.17 + 1.33) × 3.6 × 135] = 608 kN
(Compression)
Bridge Engineering
Design Example: Solution
L
Using the influence line diagram, force due to dead loads
E
P T
= 231 × (0.5 + 1 + 1.5 + 1 + 0.5) = 1040 kN (Compression)
N
Force due to live loads = [0.5 × (1.5 + 1.32) × 3.6 × 135] = 686 kN
(Compression)
Bridge Engineering
Design Example: Solution
E L
T
Using the influence line diagram, force due to dead loads
P
N
= 231 × (0.94 + 0.75 + 0.56 + 0.37 + 0.19) = 650 kN (Compression)
Force due to live loads = [0.5 × (0.94 + 0.8) × 3.6 × 135] = 423 kN
(Compression)
Bridge Engineering
Design Example: Solution
L
Influence line ordinate at L1 = [(30 - 5)/30] secθ = (25/30) × 1.13 =
E
0.94
P T
N
Using the influence line diagram, force due to dead loads
Force due to live loads = [0.5 × (0.94 + 0.8) × 3.6 × 135] = 423 kN
(Tension)
Bridge Engineering
Design Example: Solution
L
Using the influence line diagram, force due to dead loads
E
T
= 231 × (– 0.19 + 0.75 + 0.56 + 0.375 + 0.187) = 389 kN (Compression)
P
Force due to live loads: N
Maximum compressive force = (0.5 × 0.72 × 3.6 × 135) = 175 kN
Maximum tensile force = (0.5 × 0.19 × 1.22 × 135) + 0.5 × (0.09 + 0.19)
× (2.38 × 135) = 61 kN
Bridge Engineering
Design Example: Solution
X. Member U1L2
L
Influence line ordinate at L1 = (5/30) secθ = (5/30) × 1.13 = 0.19
E
T
Using the influence line diagram, force due to dead loads
P
N
= 231 × (– 0.19 + 0.75 + 0.56 + 0.375 + 0.187) = 389 kN (Tension)
Bridge Engineering
Design Example: Solution
L
Influence line ordinate at L3 = (15/30) secθ = (15/30) × 1.13 = 0.565
E
P T
Using the influence line diagram, force due to dead loads
N
= 231 × (– 0.377 – 0.189 + 0.565 + 0.376 + 0.188) = 130 kN
(Compression)
Bridge Engineering
Design Example: Solution
E L
T
Force in U2L3 is governed by the shear force in panel L2L3
P
N
Influence line ordinate at L2 = (10/30) secθ = (10/30) × 1.13 = 0.377
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
Design Forces in Truss Members:
Due to Live Load (kN) Due to Dead Load (kN) Combined Load (kN) Critical Load
Member
Compression Tension Compression Tension Maximum Minimum (kN)
L0L1 ----- 190 ----- 286 – 476 – 286 – 476
L1 L2 ----- 442 ----- 751 – 1193 – 751 – 1193
L2L3 ----- 544 ----- 986 – 1530 – 986 – 1530
U0U1 381 ----- 578 ----- + 959
L
+ 578
E
+ 959
T
U1U2 608 ----- 920 ----- + 1528 + 920 + 1528
P
U2U3 686 ----- 1040 ----- + 1726 + 1040 + 1726
N
U0L0 423 ----- 650 ----- + 1073 + 650 + 1073
U0L1 ----- 423 ----- 650 – 1073 – 650 – 1073
– 61
U1L1 175 61 389 ----- + 564 – 61
+ 564
– 564
U1L2 61 175 ----- 389 – 564 + 61
+ 61
+ 290
U2L2 160 126 130 ----- + 290 – 126
– 126
– 290
U2L3 126 160 ----- 130 – 290 + 126
+ 126
Bridge Engineering
Design Example: Solution
a) Member L2L3
E L
Let’s try a section as follows.
P T
N
2 plates of 350 × 12 mm with a cross sectional area = 8400 mm2
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
b) Member U2U3
E L
T
1 top flange (500 × 8) with an area = 4000 mm2
P
N
2 ISMC 350 with an area = (2 × 5366) = 10732 mm2
Bridge Engineering
Design Example: Solution
E L
T
λ = Non-dimensional effective slenderness ratio = √[fy ×
P
N
(KL/r)2/π2E]
α = Imperfection factor
Bridge Engineering
Design Example: Solution
N
For tf = 8 mm i.e. ≤ 40 mm and buckling class b,
α = Imperfection factor = 0.34
Bridge Engineering
Design Example: Solution
E L
Pd = Ac × fcd = (14732 × 216.47) = 3189036 N = 3189 kN > Factored
design compression force P = 2589 kN
P T
Hence, the design is safe. N
Bridge Engineering
Design Example: Solution
E L
T
1 plate of 280 × 15 mm with a cross sectional area = 4200 mm2
P
N
4 angles of 75 × 75 × 10 mm with a cross sectional area = 5608 mm2
Bridge Engineering
Design Example: Solution
E L
T
Design rupture strength of critical section Tdn = (0.9An × fu)/ γm1
P
N
An = Net root area at the threaded section = 9808 mm2
Bridge Engineering
Design Example: Solution
Tdn = (0.9An × fu)/ γm1 = (0.9 × 9808 × 400)/ 1.25 = 2824704 N = 2825
kN
Bridge Engineering
Design Example: Solution
E L
T
1 top flange (280 × 10) with an area = 2800 mm2
P
N
4 angles of 100 × 100 × 12 mm with a cross sectional area = (4 ×
2106) = 9036 mm2
Bridge Engineering
Design Example: Solution
E L
T
λ = Non-dimensional effective slenderness ratio = √[fy ×
P
N
(KL/r)2/π2E]
α = Imperfection factor
Bridge Engineering
Design Example: Solution
N
For tf = 10 mm i.e. ≤ 40 mm and buckling class c,
α = Imperfection factor = 0.49
Bridge Engineering
Design Example: Solution
E L
Pd = Ac × fcd = (11836 × 72.91) = 862963 N = 862.96 kN > Factored
design compression force P = 846 kN
P T
Hence, the design is safe. N
The detailed drawings of the truss consisting of the cross
sectional details at the typical junctions of the members are
shown in subsequent figures.
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
P T
Clear Roadway Width 7.5 m
400 x 1200
Cross-section of Steel Truss Bridge
Bridge Engineering
E L
P T
N
Bridge Engineering
v R.C. Hibbeler, Structural Analysis, Pearson Education Limited.
L
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
E
T
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI Learning
Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Structural Configurations
E L
P T
N
Ø Design Principle
Topic of Discussion
Ø General Features
Ø Structural Configurations
Ø Design Principle
E L
P T
N
Bridge Engineering
General Features
• Plate girder bridges are the most common type of steel bridges
generally used for railway and high way crossings since late
18th century.
E L
bridges due to their simplicity and elegant aesthetics.
P T
N
Bridge Engineering
General Features
•
E L
For short span less than 10 m, plate girder bridges are
P T
uneconomical due to higher connection cost. Rolled I-sections
N
are preferred for short span steel beam bridges.
• Plate girder bridges are built up using two flange plates and a
web plate to form an I-shaped cross section.
Bridge Engineering
General Features
Bridge Engineering
General Features
• However, maintenance
costs of steel plate girder
E L
bridges are quite high
P T
due to their susceptibility
to corrosion damages,
N
especially in coastal
areas, due to aggressive
exposure conditions.
Bridge Engineering
General Features
Bridge Engineering
General Features
Bridge Engineering
General Features
E L
Ø Erection is faster and cheaper than trusses
P T
N
Ø Require small vertical clearances than trusses
Bridge Engineering
General Features
L
Ø Low torsional stiffness (box girder provides better torsional
E
stiffness)
P T
N
Ø Susceptibility to stability problems of the compression flange
during erection
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Structural Configurations
Ø Design Principle
E L
P T
N
Bridge Engineering
Structural Configurations
Three types of plate girders are generally used in railway and high
way crossings.
Bridge Engineering
Structural Configurations
Three types of plate girders are generally used in railway and high
way crossings.
Bridge Engineering
Structural Configurations
Three types of plate girders are generally used in railway and high
way crossings.
Bridge Engineering
Structural Configurations
• Plate girders used for longer span lengths require deeper web
plates.
Bridge Engineering
Structural Configurations
L
• Flange angles: Rolled steel angles sections with or without
E
flange plates connected through rivets/bolts at the top and
T
• N P
bottom of the web plate, used in earlier time
Bridge Engineering
Structural Configurations
E L
function of this stiffener is to improve the buckling strength of
a slender web due to shear.
P T
• N
Load carrying stiffener: The function of this stiffener is to
prevent local buckling of the web due to concentrated loading.
Bridge Engineering
Structural Configurations
•
E L
Tension stiffener: The function of this stiffener is to transmit
P T
tensile forces applied to a web through a flange
N
Bridge Engineering
Structural Configurations
L
the flange element spliced shall coincide, as nearly as possible.
E
•
T
Web Splices: Splices and cutouts for service ducts in the webs
P
N
should preferably not be located at points of maximum shear
force and heavy concentrated loads. Splices in the webs of the
plate girders shall be designed to resist the shear force and
moments at the spliced section.
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Structural Configurations
Ø Design Principle
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Bridge Engineering
Design Principle of Plate Girder Bridges
E L
P T
Bending Stress Distribution (left) and Shear Stress
N
Distribution (right) in an I-section
Bridge Engineering
Design Principle of Plate Girder Bridges
•
E
Thicker web can be provided in high shear zone. L
P T
•
N
Hybrid girder an be constructed by utilizing plates of different
strengths for flanges and web, matching the strength
requirements of the structure.
Bridge Engineering
Design Principle of Plate Girder Bridges
Bridge Engineering
Design Principle of Plate Girder Bridges
L
• Slender web is prone to buckling at low values of applied shear,
E
necessitating provision of intermediate stiffeners.
T
•
N P
Web plate thickness should not be less than 6 mm if painted and
8 mm if unpainted.
Bridge Engineering
Design Principle of Plate Girder Bridges
The thickness of the web of a plate girder section should meet the
following serviceability and compression flange buckling criteria.
L
• Serviceability Criteria:
T E
w
N P
w
Bridge Engineering
Design Principle of Plate Girder Bridges
• Serviceability Criteria:
E L
P T
N
Here, c = spacing of transverse stiffener
d = depth of web, tw = thickness of web
εw = yield stress ratio of web = √(250/fyw), fyw = yield stress of web
Bridge Engineering
Design Principle of Plate Girder Bridges
• Serviceability Criteria:
E L
P T
N
Here, c = spacing of transverse stiffener
d = depth of web, tw = thickness of web
εw = yield stress ratio of web = √(250/fyw), fyw = yield stress of web
Bridge Engineering
Design Principle of Plate Girder Bridges
• Serviceability Criteria:
E L
Here,
P T
d = depth of web, N tw = thickness of web
εw = yield stress ratio of web = √(250/fyw), fyw = yield stress of web
Bridge Engineering
Design Principle of Plate Girder Bridges
L
the web thickness shall satisfy the following.
T E
N P
Here, d = depth of web,
tw = thickness of web,
εf = yield stress ratio of the compression flange = √(250/fyf),
fyf = yield stress of the compression flange
Bridge Engineering
Design Principle of Plate Girder Bridges
E L
P T
Here, d = depth of web, N
tw = thickness of web,
c = spacing of the transverse stiffener,
εf = yield stress ratio of the compression flange = √(250/fyf),
fyf = yield stress of the compression flange
Bridge Engineering
Design Principle of Plate Girder Bridges
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
E L
P T
N
For trial girder section d/tw ratio of the web may be considered
somewhere between 135 and 240.
Bridge Engineering
Design Principle of Plate Girder Bridges
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
E L
P T
N
The optimum depth of the plate girder is determined based on the
area of steel used is minimum. It is desirable to know the optimum
depth for economy so that even if it cannot be adopted, it will serve
as a guide. Normally, a depth less than the optimum depth is
provided in case of design of plate girder.
Bridge Engineering
Design Principle of Plate Girder Bridges
Shear Strength:
•
E L
The shear capacity of the web has two components, namely,
P T
shear strength before onset of buckling and shear strength at
post-buckling stage. N
• Prior to buckling, shear stress can be deduced from the simple
beam theory.
• Thin unstiffened web plate does not carry much load after
buckling.
Bridge Engineering
Design Principle of Plate Girder Bridges
Shear Strength:
Bridge Engineering
Design Principle of Plate Girder Bridges
Shear Strength:
Bridge Engineering
Design Principle of Plate Girder Bridges
Shear Strength:
• At this stage the girder acts like a N-type Pratt truss with the
compression forces being carried by the flanges and the
intermediate stiffeners. The buckled web resists the tension
E L
forces. This additional reserve strength is termed as tension field
action.
P T
• N
If no intermediate stiffeners are present or their spacing is large,
it is not possible for tension field action to take place. Then, the
shear capacity is restricted to the shear strength before
buckling.
Bridge Engineering
Design Principle of Plate Girder Bridges
Shear Strength:
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
• Pre-buckling Behavior:
L
shear stresses are developed to satisfy equilibrium of the plate.
E
As a consequence, the plate develops diagonal tension and
T
diagonal compression.
N P
Critical elastic shear stress:
It is the shear stress τcr,e beyond which the
plate can not take any further compressive
stress along diagonal AC. V1 = t cr ,e dt w
Bridge Engineering
Design Principle of Plate Girder Bridges
Bridge Engineering
Design Principle of Plate Girder Bridges
E L
P T
Where d = Depth of web,
tw = Thickness of web
N
Kv = Shear buckling Coefficient
ε = Yield stress ratio = √(250/fy)
Bridge Engineering
Design Principle of Plate Girder Bridges
Bridge Engineering
Design Principle of Plate Girder Bridges
= d tw tb
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
• Tension field method
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
• Tension field method
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
• Tension field method
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Outstand of Web Stiffeners:
L
be on the basis of a core section with an outstand of 14 tqε where tq
E
T
is thickness of the stiffener and ε is yield stress ratio = √(250/fy)
P
Eccentricity:
N
Where a load or reaction is applied eccentric to the centreline of the
web or where the centroid of the stiffener does not lie on the
centreline of the web, the resulting eccentricity of loading should
be accounted for in the design of the stiffener.
Bridge Engineering
Design Principle of Plate Girder Bridges
Stiff Bearing Length:
The stiff bearing length of any element b1, is that length which
cannot deform appreciably in bending. To determine b1, the
dispersion of load through a steel bearing element should be taken
L
as 45° through solid material, such as bearing plates, flange plates,
E
etc.
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Buckling Resistance of Stiffeners:
E L
• The effective section is the full area or core area of the stiffener
P T
together with an effective length of web on each side of the
N
centre line of the stiffeners, limited to 20 times the web
thickness.
Bridge Engineering
Design Principle of Plate Girder Bridges
• The effective length for intermediate transverse stiffeners used
in calculating the buckling resistance, Fqd should be taken as 0.7
times the length L of the stiffener.
L
calculating the buckling resistance Fxd assumes that the flange
E
T
through which the load or reaction is applied is effectively
P
N
restrained against lateral movement relative to the other flange,
and should be taken as:
a) KL = 0.7 L, when flange is restrained against rotation in the
plane of the stiffener (by other structural elements)
Bridge Engineering
Design Principle of Plate Girder Bridges
Intermediate Transverse Stiffener:
E L
T
• It must be sufficiently stiff so as to not deform appreciably as
the web tends to buckle.
N P
• It must be sufficiently strong to withstand the shear transmitted
by the web.
Bridge Engineering
Design Principle of Plate Girder Bridges
Intermediate Transverse Stiffener:
• Minimum Stiffeners:
E L
line of the web, if stiffeners are on both sides of the web; and about
P T
the face of the web, if single stiffener on only one side of the web is
used such that:
N
Where d = Depth of web, tw = Minimum required web thickness,
c = actual stiffener spacing
Bridge Engineering
Design Principle of Plate Girder Bridges
Intermediate Transverse Stiffener:
• Buckling Check:
This check is required only for intermediate stiffeners in webs
when tension field action is utilized. Stiffeners not subjected to
E L
external loads or moments should be checked for a stiffener force:
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Intermediate Transverse Stiffener:
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Intermediate Transverse Stiffener:
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Intermediate Longitudinal Stiffener:
E L
to transverse stiffeners when the web is subjected to bending
P T
• It consists of angle section for a riveted/ bolted plate girder and
N
plate section for a welded plate girder.
Bridge Engineering
Design Principle of Plate Girder Bridges
Intermediate Longitudinal Stiffener:
E L
P T
• It can be extended between the vertical stiffeners, however, it is
not required to be continuous over the vertical stiffeners.
•
N
Intermediate longitudinal stiffeners can be provided in pairs on
each side of the web, or single located on one side of the web.
Bridge Engineering
Design Principle of Plate Girder Bridges
Load Carrying Stiffener:
•
E L
The design compressive strength Fcdw, of a member = Acdw × fcdw
•
P T
The area of cross section Acdw is taken as (b1 + n1) tw where
tw = thickness of web
N
b1 = stiff bearing length
Bridge Engineering
Design Principle of Plate Girder Bridges
Load Carrying Stiffener:
E L
Where φ = 0.5 × [1 + α × (λ – 0.2) + λ2]
P T
N
λ = Non-dimensional effective slenderness ratio = √[fy × (KL/r)2/π2E]
Bridge Engineering
Design Principle of Plate Girder Bridges
Load Carrying Stiffener:
The effective length of the web for evaluating the slenderness ratio
is calculated as follows.
E L
P T
a) KL = 0.7 L, when flange is restrained against rotation in the
N
plane of the stiffener (by other structural elements)
Bridge Engineering
Design Principle of Plate Girder Bridges
Load Carrying Stiffener:
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Bearing Stiffener:
• This is required when the web has insufficient strength for any
E L
of the limit states of web yielding, web crippling, or side sway
web buckling.
P T
• N
Where the web and the stiffener materials are of different
strengths the lesser value should be assumed to calculate the
capacity of the web and the stiffener.
Bridge Engineering
Design Principle of Plate Girder Bridges
Bearing Stiffener:
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Bearing Stiffener:
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Torsion Stiffeners:
E L
reaction less the local capacity of the web, Fw given by
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Torsion Stiffeners:
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Diagonal Stiffeners:
•
E L
Where the web and the stiffener materials are of different
P T
strengths the lesser value should be assumed to calculate the
N
capacity of the web and the stiffener.
Bridge Engineering
Design Principle of Plate Girder Bridges
Tension Stiffeners:
E L
P T
N
Bridge Engineering
Design Principle of Plate Girder Bridges
Tension Stiffeners:
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Subramanian, Design of Steel Structures: Limit States Method, Oxford
L
University Press.
T E
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
N P
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co. Pvt. Ltd.
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI Learning Pvt.
Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
E L
P T
N
Design Example: Problem Statement
The cross-section of a stream is as shown in the Figure. Design a
plate girder bridge as railway crossing using the following data.
Effective Span L = 30 m; Material Grade Fe250
Broad Gauge rail track of gauge length = 1676 mm, Main Line,
Single Track. Dead load of track = 7.5 kN/m
Each rail is supported by a plate girder withE
L
P T cross bracings at
intervals of 6 m.
N
Cross-Section of Stream
Bridge Engineering
Design Example: Solution
1. Given Data:
Effective Span L = 30 m.
Material Grade Fe 250 of yield strength 250 MPa
Broad Gauge rail track of gauge length = 1676 mm, Main Line,
Single Track.
E L
Dead load of track = 7.5 kN/m
P T
N
Each rail is supported by a plate girder with cross bracings at
intervals of 6 m.
The total loading is resisted by twin plate girders.
Bridge Engineering
Design Example: Solution
2. Dead Loads:
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
Equivalent Total live load for Shear Force per Broad Gauge track
for 30 m span = 2997 kN
Bridge Engineering
Design Example: Solution
L
Bending Moment due to Impact of Live Loads = (1.372 × 5113.25) =
E
7015.379 kN.m
P T
Design Bending Moment due to Dead Load
N
1631.25 + 1.5 × 7015.379) = 12969.943 kN.m
and Live Load = (1.5 ×
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
T
Substituting, d = [(12969.943 × 106 × 180)/250]0.33 = 1950.695 mm
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
Overall depth of plate girder D = d + 2 tf = 1800 + 2 × 50 = 1900 mm
Classification of Flanges: P T
N
Outstand of flange b = (bf − tw)/2 = (750 − 14)/2 = 368 mm
Bridge Engineering
Design Example: Solution
750
50
950
900
1800
E L
P T
14
N
50
Bridge Engineering
Design Example: Solution
E L
15767045450 N-mm = 15767.045 kN-m > Ultimate Design Bending
Moment M = 12969.943 kN-m
P T
Hence, the section is safe. N
9. Check for Shear Strength:
d/ tw = 1800/14 = 128.57 < 200
Elastic critical shear stress τcr,e = Kvπ2E/ [12 × (1 − μ2) × (d/ tw)2]
Bridge Engineering
Design Example: Solution
d/ tw = 1800/14 = 128.57
Bridge Engineering
Design Example: Solution
Elastic critical shear stress τcr,e = Kvπ2E/ [12 × (1 − μ2) × (d/ tw)2] =
(9.35 × π2 × 2 × 105)/ [12 × (1 − 0.32) × 128.572] = 102.244 N/mm2
E L
P T
N
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
Maximum shear force at the junction of web and flange is given by
qw = (V × Af × ӯ)/ 2Iz
P T
N
Iz = (bf − tw) × d3/ 12 = (750 − 14) × 18003/ 12 = 35.77 × 1010 mm4
Bridge Engineering
Design Example: Solution
Strength of weld per unit length fwd = (4.2 × 250 × 10-3)/(√3 × 1.25) =
0.485 kN/mm > 0.091 kN/mm
E L
Since the ratio of (d/tw) = (1800/14) = 128.57 > 85, vertical stiffeners
are required.
P T
N
Adopting the spacing of stiffeners c = 1500 mm
Bridge Engineering
Design Example: Solution
E L
Using 12 mm thick plate, outstand of stiffener should not be
greater than 12 t = (12 × 12) = 144 mm
P T
N
We can adopt a plate of 12 mm × 140 mm with I = (12 × 1403)/3 =
10976000 mm4 which is greater than Is = 10668672 mm4
Bridge Engineering
Design Example: Solution
L
Shear on welds connecting stiffener to web = (126t2/h) = (126 × 142)/
E
140 = 176.4 N/mm
P T
N
Size of weld s = [176.4/ (0.7 × 158)] = 1.59 mm
Effective Length of weld should be not less than 10t = (10 × 14) =
140 mm
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
L
Design compressive stress fcd of axially loaded compression
E
P
10, buckling class c and fy = 250 MPa as 227 MPaT
members can be calculated from Table 9.3 of IS 800: 2007 for KL/r =
N
The design compressive strength P , of a member = A
d × fcd = c
(23190 × 227) = 5264130 N ≈ 5264 kN > Factored design
compression force P = 1868.206 kN
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
both sides. P T
We can use 6 mm fillet welds of 160 mm length intermittently on
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
(177 + 106.875) = 283.875 kN ≈ 284 kN P T
Total lateral load on cross bracing due to wind and racking force =
N
This load is shared equally by 2 diagonal cross bracings.
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
T
The design compressive strength Pd, of a member = Ac × fcd
P
N
Design compressive stress, f of axially
members can be calculated as follows.
cd loaded compression
Bridge Engineering
Design Example: Solution
α = Imperfection factor
E L
P T
γm0 = Partial Safety Factor for material strength = 1.1
N
For ISA 80 × 80 × 8 section, Radius of gyration r = 24.4 mm
Bridge Engineering
Design Example: Solution
E L
λ = √[fy × (KL/r)2/π2E] = √[(250 × 48.082)/(π2 × 2 × 105)] = 0.54
P T
φ = 0.5 × [1 + α × (λ – 0.2) + λ2] = 0.5 × [1 + 0.54 × (0.54 – 0.2) +
0.542] = 0.74 N
fcd = (fy/ γm0)/[φ + (φ2 – λ2)0.5] = (250/ 1.1)/[0.74 + (0.742 – 0.542)0.5] =
182.41 MPa
Bridge Engineering
Design Example: Solution
E L
Design of Diagonal Member:
P T
(Tension)
N
Factored Design force P = 1.5 × 221.18 kN = 331.77 kN ≈ 332 kN
Let’s try ISA 100 × 100 × 8 with a cross sectional area Ag = 1540
mm2.
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
E L
443.520 kN P T
Tdn = (0.9An × fu)/ γm1 = (0.9 × 1540 × 400)/ 1.25 = 443520 N =
N
The design strength of a member under axial tension T = 350 kN
d
> Factored design tension force T = 332 kN
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
Let’s try ISA 100 × 100 × 8 with a cross sectional area Ag = 1540
mm2.
E L
P T
The design strength of a member under axial tension Td is the
N
lowest of the design strength due to yielding of gross section,
Tdg, rupture strength of critical section Tdn, and block shear Tdb.
Bridge Engineering
Design Example: Solution
L
An = Net root area at the threaded section = 1540 mm2
E
m1
P T
γ = Partial safety factor for failure governed by ultimate stress
= 1.25
N
fu = Ultimate stress of the material = 400 MPa (assumed)
Bridge Engineering
Design Example: Solution
E L
shown in the subsequent figures. P T
Details of the plate girder, lateral bracings and stiffeners are
Bridge Engineering
Design Example: Solution
ISA 100 ×
100 × 8
End
stiffeners
1800 with
E L
T
66 stiffeners
280
280 N P ISA 80 ×
80 × 8
280 750
560 × 25 800
Bridge Engineering
Design Example: Solution
End Bearing Stiffener 750 750
12
Intermediate
Stiffener 140
750
14 mm 140 140
ISA 80 ×
E L
T
ISA 80 ×
80 × 8 80 × 8
NP
140 750 750
750
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Subramanian, Design of Steel Structures: Limit States Method, Oxford
L
University Press.
E
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
T
N P
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co. Pvt. Ltd.
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI Learning Pvt.
Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Structural Configurations
E L
Design Principle P T
Design Example
N
Topic of Discussion
General Features
Structural Configurations
Design Principle
Design Example
E L
P T
N
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
• The arch ring is the major load carrying member of the bridge.
Bridge Engineering
General Features
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Design Principle
Design Example
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
• End Connectors:
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
Bridge Engineering
Structural Configurations
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Design Principle
Design Example
E L
P T
N
Bridge Engineering
Design Principle of Masonry Arch Bridges
E L
P T
N
Bridge Engineering
Design Principle of Masonry Arch Bridges
• Rise of Arch:
Rise of an arch is decided based on rise to span ratio. Too large rise
results in big headroom and too small rise results in increased
lateral thrust.
L
Thus, the rise of the arch varies from 1/2 - 1/10 of spans. For
E
T
segmental arches, a rise of 1/3 to 1/4 of the span is found to be
P
strong and economical.
N
Bridge Engineering
Design Principle of Masonry Arch Bridges
• Radius of Arch:
Radius of an arch is calculated based on the geometry of the circle.
The radius R of the intrados is given by the following equation.
R = (S2 + 4r2)/ 8r
Where
E L
S = Span of the arch and r = Rise of the arch
P T
N
Bridge Engineering
Design Principle of Masonry Arch Bridges
E L
For large spans more than 15 m, thickness of the arch ring at the
P T
springing level should be 25-50% higher than the crown level
(usually 1/3 rd of the span).
N
For arches made of brick masonry, thickness calculated must be
increased by 35%.
Bridge Engineering
Design Principle of Masonry Arch Bridges
E L
The filing is done tangential to the arch extrados or laid in a slope of
1 in 6.
P T
N
Sometimes, this filling is taken up to the crown level.
This filling serves dual purpose, i.e. it serves as an additional
weight and provides a working platform for construction of face
wall.
Bridge Engineering
Design Principle of Masonry Arch Bridges
• Abutment:
The top width of abutment is empirically calculated based on
Trautwyne’s formula.
a = 0.6 + 0.2 R + 0.1 r
The back batter is given by b = S/ 24r
E L
P T
The length of the abutment should match with the width of the
superstructure. N
Length of Abutment = Road Width + 2 × Kerb Width
Bridge Engineering
Design Principle of Masonry Arch Bridges
• Pier:
The top width of pier should not be less than twice of width of the
bearings or arch skewbacks, with clearance between them.
The following thumb rules are available for calculating top width of
pier.
E L
P T
Top width = Higher of (2t + 0.3) or (1/6 to 1/7 of span)
N
Straight sections without batter may be provided for heights less
than 3 m.
For heights more than 3 m, a side batter of 1 in 12 to 1 in 30 may be
given for stability and aesthetics purposes.
Length of Pier = Road Width + 2 × Kerb Width
Bridge Engineering
Design Principle of Masonry Arch Bridges
Bridge Engineering
Design Principle of Masonry Arch Bridges
• Splayed type Wing Wall:
Top Width of Splayed Type Wing Wall
can be assumed as 0.5 m in general.
Bottom/ Base Width of Wing Wall =
0.4 × Height of Wing Wall = 0.4 ×
E L
(Distance between Springing Level
P T
and Bed Level)
Length of Wing Wall L = Height of
N
Embankment × Slope = (Distance
between Formation Level and
Springing Level) × Slope
Wing Wall ends up at pedestal or newel of size 0.5-1 m.
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Design Principle
Design Example
E L
P T
N
Bridge Engineering
Design Example: Problem Statement
Design a masonry arch bridge and it’s components for the following
design particulars. While designing end connectors, design both
return type and splayed type wing walls.
Span Length = 10 m; No of Spans = 2; Rise to Span Ratio = 1 : 4
L
HFL of Stream = 108 m; Stream Bund Top Level = 108.75 m
E
Bed Level = 105 m; Springing Level = 109 m
Road Top Level = 113 m; Formation Level =P
T
Slope of Formation Embankment = 2 : 1
N 112 m
Bridge Engineering
Design Example: Solution
Design of Superstructure
Span of the Arch S = 10 m
Rise of the Arch Intrados r = Span/ 4 = 10/4 = 2.5 m
Radius of the Arch Intrados R = (S2 + 4r2)/8r = (102 + 4 × 2.52)/(8 ×
2.5) = 6.25 m
E L
P T
Thickness of the Arch by Trautwyne’s formula t = [√(R + 0.5S)]/7 +
N
0.06 = [√(6.25 + 0.5 × 10)]/7 + 0.06 = 0.539 m ≈ 0.55 m
Depth of Haunch Filling d = (r + t)/2 = (2.5 + 0.55)/2 = 1.525 m ≈ 1.6 m
The filling is made tangential to the arch extrados.
Bridge Engineering
Design Example: Solution
Design of Abutment
Top Width of the Abutment by Trautwyne’s formula a = 0.6 + 0.2 R +
0.1 r = 0.6 + 0.2 × 6.25 + 0.1 × 2.5 = 2.1 m
The front face of the abutment is kept vertical and the back face is
provided with a batter.
E L
Back Batter b = S/ 24r = 10/ (24 × 2.5) = 1/6
Height of the Abutment = (109 ‒ 105) = 4 m P
T
N
Base Width of the Abutment at the Bed Level = Top Width + (1/6) ×
Height of the Abutment = 2.1 + (1/6) × (109 ‒ 105) = 2.77 m ≈ 2.8 m
Length of Abutment = Road Width + 2 × Kerb Width = 7.5 + 2 × 0.6 =
8.7 m
Bridge Engineering
Design Example: Solution
Design of Pier
Top Width of the Pier = 1/7 of the Span = (1/7) × 10 = 1.429 m ≈ 1.5 m
Height of the Pier = (109 ‒ 105) = 4 m
Since height of the pier is more than 3 m, a batter of 1 in 24 is
provided to both sides of the pier.
E L
Side Batter of the Pier = 1/24
P T
N
Bottom Width of the Pier = 1.5 + 2 × (1/24) × 4 = 1.83 m ≈ 1.9 m
Length of Pier = Road Width + 2 × Kerb Width = 7.5 + 2 × 0.6 = 8.7 m
Bridge Engineering
Design Example: Solution
Design of End Connectors (Return Type Wing Wall)
Top Width of Return Type Wing Wall = 0.5 m
Bottom Width of Wing Wall = 0.25 × Height of Wing Wall = 0.25 ×
(Distance between Road Top Level and Bed Level)
= 0.25 × (113 ‒ 105) = 2 m
E L
P T
Return Length of Wing Wall L = Projected Width of Stream Bund +
Clearance + Projected Length of Road Bund
N
= (108.75 ‒ 105) × 1 + 1 + (113 ‒ 108.75) × 2 = 13.25 m
1 m clearance is provided in return length calculation of wing wall.
Bridge Engineering
Design Example: Solution
Design of End Connectors (Splayed Type Wing Wall)
Top Width of Splayed Type Wing Wall = 0.5 m
Bottom/ Base Width of Wing Wall = 0.4 × Height of Wing Wall = 0.4 ×
(Distance between Springing Level and Bed Level)
= 0.4 × (109 ‒ 105) = 1.6 m
E L
P T
Length of Wing Wall L = Height of Embankment × Slope = (Distance
N
between Formation Level and Springing Level) × Slope
= (112 ‒ 109) × 2 = 6 m
Wing Wall ends up at pedestal or newel of size 1 m.
Bridge Engineering
Design Example: Solution
0.5 m 0.5 m
0.55 m 2.5 m 0.55 m
1.6 m 2.5 m
1.6 m Radius 6.25 m Radius 6.25 m 1.6 m
1.5 m
10 m 10 m
2.1 m
L
2.1 m
Springing Level 109 m
T E
2.8 m
Bed Level 105 m
1.9 m N P 2.8 m
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Structural Configurations
E L
Analysis Methodology P T
Numerical Example
N
Topic of Discussion
General Features
Structural Configurations
Analysis Methodology
Numerical Example
E L
P T
N
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
Bridge Engineering
General Features
L
• On the other hand, arches experience positive bending moment
E
T
due to external loading and negative bending moment from the
P
•
N
horizontal thrusts to balance the positive moment.
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features: Circular Arch
Bridge Engineering
General Features: Circular Arch
Bridge Engineering
General Features: Parabolic Arch
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Analysis Methodology
Numerical Example
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Components of Reinforced Concrete Arch Bridges
Bridge Engineering
Structural Configurations
L
To achieve economy, the centre of pressure under external
E
T
loading should coincide with the centre line of the arch.
P
N
Bridge Engineering
Structural Configurations
M = M1 ‒ H × y
E L
T
H = Horizontal Force at the Springing Level;
P
Springing Level.
N
y = Vertical Ordinate of the arch centre at section x from the
Assuming M = 0, y = M1/ H
Bridge Engineering
Structural Configurations
E L
•
P T
The horizontal forces produce negative moments at all the
sections of the arches and reduce
N the positive moments
resulting in reduced cross-sectional dimensions of arches in
comparison with girders.
Bridge Engineering
Structural Configurations
•
E L
In fixed arches, forces and moments are generated both due
T
to rotation and displacement of the supports. So, fixed arches
P
N
are constructed in places where absolute unyielding foundation
conditions can be achieved.
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Analysis Methodology
Numerical Example
E L
P T
N
Bridge Engineering
Forces and Moments of RC Arch Bridges
Bridge Engineering
Forces and Moments of RC Arch Bridges
Bridge Engineering
Forces and Moments of RC Arch Bridges
E L
Shrinkage of concrete is maximum at the initial stage and this
P T
phenomena reduces with elapse of time when concrete is hardened.
N
Shrinkage can be minimized by adopting high grade concrete in
arches.
Bridge Engineering
Forces and Moments of RC Arch Bridges
E L
stage and this phenomena reduces with elapse of time.
P T
N
Plastic flow of concrete causes pull and additional moments in the
hinged and fixed arches.
Bridge Engineering
Analysis of RC Arch Bridges
E L
From statics, three
equations of equilibrium
P T
can be employed i.e. ∑H = N
0, ∑V = 0 and ∑M = 0.
Bridge Engineering
Analysis of RC Arch Bridges
From ∑H = 0, HA + HB = 0 Or, HA = ‒ HB = H
From ∑V = 0, VA + VB ‒ W = 0 Or, VA + VB = W
Bridge Engineering
Analysis of RC Arch Bridges
Bridge Engineering
Analysis of RC Arch Bridges
E L
T
L
Or, δU/ δH = ∫0 (M1 ‒ Hy)(‒ y)/EI ds = 0
Or, H = ∫0L [(M1 yds)/EI ‒ δ]/∫0L [(y2ds)/EI] = ∫0L (M1yds ‒ EIδ)/∫0L (y2ds)
Bridge Engineering
Analysis of RC Arch Bridges
E L
From statics, three
equations of equilibrium P T
can be employed i.e., N
∑H = 0, ∑V = 0 and ∑M = 0.
Bridge Engineering
Analysis of RC Arch Bridges
From ∑V = 0, VA + VB ‒ W = 0
E L
Or, VA + VB = W
P T
From ∑M = 0 about point A,
N
VB × L ‒ W × a = 0 Or, VB = Wa/L
Bridge Engineering
Analysis of RC Arch Bridges
MC = M1 ‒ Hr = 0
Or, H = M1/r
E L
Here r is rise of the arch.
P T
Where N
M1 = VA × L/2 ‒ W × (L/2 ‒ a)
Bridge Engineering
Analysis of RC Arch Bridges
Bridge Engineering
Analysis of RC Arch Bridges
E L
T
b) No vertical displacement of the abutments:
P
δU/ δV = (1/EI) ∫0L M. (δM/δV) ds = 0
N
c) No rotation of the abutments:
Bridge Engineering
Analysis of RC Arch Bridges
E L
Due to external loading, the
springing level of the arch tends P T
to move in outward direction N
which is prevented by the tie
partially.
Bridge Engineering
Analysis of RC Arch Bridges
E L
T
For the stability of the tied
arches, one end of the arch is
provided with a hinge and the N P
other end with a roller.
Bridge Engineering
Analysis of RC Arch Bridges
Bridge Engineering
Analysis of RC Arch Bridges
Bridge Engineering
Analysis of RC Arch Bridges
L
Also, Horizontal increase in span δL of the arch due to temperature
E
change δL = Lαt
P T
Hence, we can write:
Bridge Engineering
Analysis of RC Arch Bridges
Bridge Engineering
Analysis of RC Arch Bridges
L
a
L
N
Now, ‒∫ H ds/AE = ∫ (M ‒ H y)(‒ y)/EI ds
1 a
0 0
Or, Ha = ∫0L (M1 yds/ EI)/ [∫0L (y2ds / EI) + ∫0L (ds/AE)]
Bridge Engineering
Analysis of RC Arch Bridges
Bridge Engineering
Analysis of RC Arch Bridges
E L
temperature variation and shrinkage including plastic flow.
P T
N
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Analysis Methodology
Numerical Example
E L
P T
N
Bridge Engineering
Numerical Example: Problem Statement
A two hinged parabolic arch of 40 m span is loaded with 120 kN load
at 10 m interval, as shown in figure. Rise of the arch is 5 m. Find the
forces and moments considering the effect of temperature variation,
arch shortening, shrinkage and plastic flow of concrete.
L
α = 11.7 × 10‒6/ ºC, Cs = 4 × 10‒4, E = 31.2 × 104 kg/cm2, t = 18ºC, A =
E
30 cm × 150 cm, I = 8.5 × 106 cm4.
P T
N
Bridge Engineering
Numerical Example: Problem Statement
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Equation of parabolic arch rib is y = 4rx/L2 (L ‒ x)
E L
P T
N
Bridge Engineering
Numerical Example: Solution
For 0 < x < 10 m, Moment from A to C = 180x kNm
E L
P T
N
Bridge Engineering
Numerical Example: Solution
For 0 < x < 30 m, Moment from D to E = 180x ‒ 120(x ‒ 10) ‒ 120(x ‒
20) = (3600 ‒ 60x) kNm
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Horizontal Thrust H = ∫0L (Mydx)/ ∫0L (y2dx)
Section A to C:
∫ (Mydx) = ∫010180x × (x/80) × (40 ‒ x) dx = ∫010(90x2 ‒ 9x3/4) dx = (30x3 ‒
9x4/16) 010 = 24375 kN-m3
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Section C to D:
∫ (Mydx) = ∫1020 (60x + 1200) × (x/80) × (40 ‒ x) dx = ∫1020(30x2 ‒ 3x3/4 +
600x ‒ 15x2) dx = ∫1020(15x2 ‒ 3x3/4 + 600x) dx
= (5x3 ‒ 3x4/16 + 300x2) 1020 = 96875 kN-m3
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Section D to E:
∫ (Mydx) = ∫2030 (3600 ‒ 60x) × (x/80) × (40 ‒ x) dx = ∫2030(1800x ‒ 45x2 ‒
30x2 + 3x3/4) dx = ∫2030(1800x ‒ 75x2 + 3x3/4) dx = (900x2 ‒ 25x3 +
3x4/16) 2030 = 96875 kN-m3
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Section E to B:
∫ (Mydx) = ∫3040 (7200 ‒ 180x) × (x/80) × (40 ‒ x) dx = ∫3040(3600x ‒ 90x2
‒ 90x2 + 9x3/4) dx = ∫3040(3600x ‒ 180x2 + 9x3/4) dx = (1800x2 ‒ 60x3 +
9x4/16) 3040 = 24375 kN-m3
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Total ∫0L (Mydx) = (24375 + 96875 + 96875 + 24375) = 242500 kN-m3
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Horizontal Thrust H = ∫0L (Mydx)/ ∫0L (y2dx) = 242500 kN-m3 / 533.33 m3
= 454.69 kN
Moment at A = Moment at B = 0
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Moment at C = Moment at E = (VA × x ‒ HA × y) = (180 × 10) ‒ (454.69
× 3.75) = 94.91 kN-m
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Effective temperature variation = 2/3rd of the actual temperature
variation = 2/3 × ± 18 = ±12º C
Bridge Engineering
Numerical Example: Solution
I = 8.5 × 106 cm4 = 0.085 m4
Bridge Engineering
Numerical Example: Solution
Effect of Plastic Flow of Concrete can be incorporated by modifying
E to half of the instantaneous value in calculation of thrust due to
temperature variation and shrinkage including plastic flow.
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Summary of Results
Horizontal Thrust due to external loads, H = 454.69 kN
H = 39.01 kN (‒ ve)
s
N
Horizontal Thrust due to shrinkage including plastic flow = 50% of
Bridge Engineering
Numerical Example: Solution
Maximum Horizontal Thrust inclusive of temperature variation, arch
rib shortening, shrinkage and plastic flow = Hmax = 448.34 kN ‒ 39.01
kN + 13.69 kN = 423.02 kN
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Minimum Horizontal Thrust inclusive of temperature variation, arch
rib shortening, shrinkage and plastic flow = Hmin = 448.34 kN ‒ 39.01
kN ‒ 13.69 kN = 395.64 kN
Moment at A = Moment at B = 0
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Maximum Moment at C = Maximum Moment at E = (VA × x ‒ Hmin × y)
= (180 × 10) ‒ (395.64 × 3.75) = 316.35 kN-m
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Structural Configurations
E L
Aerodynamic Instability P T
Cable Sag and Cable Tension
N
Numerical Example
Topic of Discussion
General Features
Structural Configurations
Aerodynamic Instability
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
• Two groups of cables run from one end of the bridge to the
L
other passing over two towers. The ends of the cables are
E
anchored into the ground.
P T
N
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Aerodynamic Instability
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations
Bridge Engineering
Structural Configurations
• Foundations, either
E L
separate or combined
P T
is provided below the
towers for ultimate
N
transfer of the loads to
the soil strata beneath.
Bridge Engineering
Structural Configurations
• Stiffening truss stiffens the deck and distribute the deck live
loads to the cables otherwise the cables would have subjected
to local sag due to concentrated live load causing local angle
change in deck system. Stiffening trusses are hinged at the
L
towers and suspended at node points from suspenders.
E
P T
N
Bridge Engineering
Structural Configurations
Bridge Engineering
Structural Configurations
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Aerodynamic Instability
Bridge Engineering
Aerodynamic Instability
L
as 350, which used to be around 90 during that time. Span to
E
T
deck width ratio was 72 against the conventional value of 35.
P
•
N
The bridge became extremely flexible as a result.
Use of solid yet shallow plate girders for stiffening the deck for
visual enhancement, rendered the bridge aerodynamically
unstable.
Bridge Engineering
Aerodynamic Instability
E L
P T
N
Bridge Engineering
Aerodynamic Instability
E L
P T
N
Bridge Engineering
Aerodynamic Instability
E L
a) Lift and Drag Forces: Lift force acts perpendicular to the wind
P T
direction while drag force acts parallel to the wind direction.
N
b) Vortex formation: Vortices can be described as a swirling air
mass with an annular cylindrical shape. The rotary speed at
the periphery is at its minimal, but the rotary speed increases
inversely with the radius so that its speed near the centre is at
maximum.
Bridge Engineering
Aerodynamic Instability
Bridge Engineering
Aerodynamic Instability
L
e) Cable vibrations: Cables of long span suspension bridges are
E
T
vulnerable to wind-induced vibrations. This can be mitigated
P
N
by increasing the damping at the cable ends, by altering the
natural frequency of the cables by reducing cable lengths with
use of spacers or cross cables and by changing the cable
characteristics by increasing the surface roughness.
Bridge Engineering
Aerodynamic Instability
L
and artificial damping devices may be installed in the structure.
E
P T
• Additionally, increase in the depth of stiffening truss and width
N
of the deck have also been found effective in this regard.
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Aerodynamic Instability
Bridge Engineering
Cable Sag
• If the unit cost of towers and hangers is higher than the unit
L
cost of cables, smaller cable sag is adopted and vice versa.
E
P T
N
Bridge Engineering
Cable Sag
E L
P T
N
Bridge Engineering
Cable Sag
L
At x = L/2, y = yc i.e. the cable sag at centre of main span.
E
Therefore, y = (4yc/L2) x (L ‒ x)
P T
N
Bridge Engineering
Cable Tension
The cable being flexible can not take any moment and thus,
moment at mid span of the cable is zero.
E L
P T
N
Bridge Engineering
Cable Tension
E L
P T
N
Bridge Engineering
Back-Stay Cable
L
thus termed as “anchor cable” or “back-stay cable”.
E
cables over the towers from the main P
T
• There are two arrangements generally made for passing the
b) Roller Support
Bridge Engineering
Back-Stay Cable
E L
Vertical reaction on the
P T
tower due to cable tension
RT = T cosα + T cosθ
N
Horizontal force on the
top of the tower H = T sinα
– T sinθ
Bridge Engineering
Back-Stay Cable
b) Roller Support: The main cable and the anchor cable are
attached to a saddle supported on rollers placed at the top of
the tower. Since the saddle is at rest, the horizontal force
component of both the main and anchor cables must be the
same.
E L
Horizontal force on the
P T
top of the tower H = T1
sinα = T2 sinθ
N
Vertical reaction on the
tower due to cable tension
RT = T1 cosα + T2 cosθ
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Aerodynamic Instability
Bridge Engineering
Numerical Example: Problem Statement
A suspension bridge having a main span of 100 meters has a cable
sag of 10 metres at centre. Angle of anchor cable α = 60°.
Calculate the maximum tension in the cables when the deck is
carrying a uniformly distributed loading in the main span of 50 kN
per meter length.
E L
P T
Find the vertical reaction on the tower (a) if the cable passes over a
on rollers. N
friction less pulley and (b) if the cable passes over a saddle resting
Bridge Engineering
Numerical Example: Solution
1. Given Data:
Main span length L = 100 m
Cable sag at center yc = 10 m
Uniformly distributed loading in the main span w = 50 kN/m
Angle of anchor cable α = 60°
E L
P T
N
Bridge Engineering
Numerical Example: Solution
2. Maximum Cable Tension:
Vertical reaction on tower RB = RD = R = wL/2 = R = (50 × 100)/2 =
2500 kN
Let us consider the horizontal pull on the cables as H.
L
The cable being flexible can not take any moment and thus,
E
moment at mid span of the cable is zero.
P T
N
Bridge Engineering
Numerical Example: Solution
Considering moment of the forces in the left hand side about C,
RB × L/2 = H × yc + wL/2 × L/4
Or, H = wL2/8yc = (50 × 1002)/(8 × 10) = 6250 kN
Maximum tension in cable at T = √(H2 + R2) = √(62502 + 25002) =
6731.46 kN
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Case (a) The cable passes over a frictionless pulley i.e. for Guide
Pulley Support:
Vertical reaction on the tower due to cable
tension RT = T cosα + T cosθ = T cosα + R
= 6731.46 cos60° + 2500 = 5865.73 kN
E L
P T
N
Bridge Engineering
Numerical Example: Solution
Case (b) The cable passes over a saddle on rollers i.e. for Roller
Support:
Horizontal force on the top of the tower H
= T1 sinα = T1 sin60°
Horizontal force on the top of the tower H
E L
= 6250 kN
P T
N
Bridge Engineering
Numerical Example: Solution
So, T1 = H/ sinα = 6250/ sin60° = 7216.88 kN
Vertical reaction on the tower due to cable
tension RT = T1 cosα + T2 cosθ = T1 cosα +
R = 7216.88 cos60° + 2500 = 6108.44 kN
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Structural Configurations
E L
Aerodynamic Instability P T
Optimum Cable Inclination
N
Topic of Discussion
General Features
Structural Configurations
Aerodynamic Instability
Bridge Engineering
General Features
E L
P T
N
Cable Stayed Bridges
Bridge Engineering
General Features
Bridge Engineering
Advantages
E L
P T
• The ratio of maximum bending moment in the cable stayed
girder is nearly 1/10th of that of the conventional continuous
girder system. N
• In addition, the moments can be controlled to make them more
uniformly distributed along the girder length resulting in
efficient material utilization even with a very low depth to span
ratio of 1/90.
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Aerodynamic Instability
Bridge Engineering
Structural Configurations
E L
P T
N
Bridge Engineering
Structural Configurations: Towers or Pylons
Bridge Engineering
Structural Configurations: Towers or Pylons
E L
P T
N
Transverse arrangement of Pylons with one axial
layer of cable stays
Bridge Engineering
Structural Configurations: Towers or Pylons
E L
P T
N
Transverse arrangement of Pylons with two axial
layer of cable stays
Bridge Engineering
Structural Configurations: Towers or Pylons
b) The cable stays fixed to the top of the tower may cross each
other inside the pylon.
E L
P T
c) A relay device incorporated into the top of the tower
N
connecting the upper anchorages of the associated cable
stays.
Bridge Engineering
Structural Configurations: Towers or Pylons
E L
P T
N
Bridge Engineering
Structural Configurations: Cable Stays
The cable stays are made up of high tensile steel of different types
with an ultimate tensile strength in the range of 1500 to 2000
N/mm2.
Bridge Engineering
Structural Configurations: Cable Stays
E L
P T
N
Twisted Parallel Wires Parallel Strands
Cable Stay Cable Stay Cable Stay
Bridge Engineering
Structural Configurations: Cable Stays
E L
P T
N
Locked Coil Cable Stay Freyssinet Cable Stay
Bridge Engineering
Structural Configurations: Freyssinet Cable Stay
• The latest types of cable stay, i.e., Freyssinet cable stay
comprises a bundle of parallel strands of 15 mm diameter
which are enclosed in a polyethylene tube.
Bridge Engineering
Structural Configurations: Freyssinet Cable Stay
E L
P T
N
Bridge Engineering
Structural Configurations: Longitudinal Cable
Arrangement
• The arrangement of cables on the longitudinal direction
depends upon several factors such as clear span, tower
height, spacing of towers and level of approach roads.
L
• The choice of the longitudinal cable arrangement is
E
T
influenced by span, type of loading, number of roadway
P
N
lanes, height of towers, economy and aesthetic
considerations.
Bridge Engineering
Structural Configurations: Longitudinal Cable
Arrangement
• Basically there are four types of cable configurations
generally used and they are classified as
Bridge Engineering
Structural Configurations: Fan Type Cable
Arrangement
E L
P T
N
Bridge Engineering
Structural Configurations: Fan Type Cable
Arrangement
• Fan type arrangement is more aesthetic and as a rule the
most economical for a pylon of slenderness ratio (h/L) ≤ 0.3.
N
point at the top of the tower posing problems of anchoring
arrangement and any subsequent stay replacement is
difficult.
Bridge Engineering
Structural Configurations: Harp Type Cable
Arrangement
E L
P T
N
Bridge Engineering
Structural Configurations: Harp Type Cable
Arrangement
• Harp type arrangement is preferred in a double plane system
as it minimizes the intersection of cables when viewed from
an oblique angle.
L
• The motorist may find the harp system more attractive. In the
E
T
harp system the cable connections are distributed
P
N
throughout the height of the tower and hence results in an
efficient tower design in comparison with the fan type.
Bridge Engineering
Structural Configurations: Mixed Type Cable
Arrangement
E L
P T
N
Bridge Engineering
Structural Configurations: Mixed Type Cable
Arrangement
• Fan type arrangement increases buckling problems due to
greater effective strut length while harp type arrangement
increases bending moments.
L
• The mixed type arrangement represents a compromise
E
T
between the extremes of the harp and the fan type
P
N
arrangements and it is useful when it becomes difficult to
accommodate all cables at the top of the tower.
Bridge Engineering
Structural Configurations: Star Type Cable
Arrangement
E L
P T
N
• Star type arrangement may be preferred due to its unique
aesthetic appearance.
Bridge Engineering
Structural Configurations: Anchorage System
Bridge Engineering
Structural Configurations: Anchorage System
E L
centre of main span to maximum compression near the towers.
P T
N
Bridge Engineering
Structural Configurations: Anchorage System
E L
the towers to a maximum value at the centre of span.
P T
N
Bridge Engineering
Structural Configurations: Anchorage System
E L
joints or expansion joints provided only in the end spans.
P T
N
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Aerodynamic Instability
Bridge Engineering
Dynamic Behaviour
• The deflection under live loads are extremely small because the
effective depth of the large cantilever truss formed by the
cables is much larger than for beam girders.
E L
P T
• The main advantage of the multi-cable system being that the
N
increase of amplitude due to resonance oscillation is prevented
by system damping caused by the interference of the multi-
cable system.
Bridge Engineering
Aerodynamic Instability
a) B ≥ 10H
Bridge Engineering
Aerodynamic Instability
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Aerodynamic Instability
Bridge Engineering
Approximate Structural Analysis
E L
• The deflections of the basic system under applied loads may be
P T
determined by applying the classical theory of structures by
N
neglecting the deformations of the system when formulating
the equilibrium conditions.
Bridge Engineering
Approximate Structural Analysis
L
• If Hooke’s law is assumed to be valid, linear superposition
E
T
applies also to the displacements and therefore to the
P
N
determination of the stresses of the cable stayed bridge
systems. The design process for a cable stayed bridge system
with accepted geometrical layout may be divided into the
following stages.
Bridge Engineering
Approximate Structural Analysis
L
Stresses and displacements under the given loads on the system
E
T
are determined and compared with the maximum unit stresses
P
N
and maximum displacement span ratios allowed by the
specifications.
Bridge Engineering
Approximate Structural Analysis
E L
P T
N
Bridge Engineering
Approximate Structural Analysis
• Cable forces
E L
• Approximate weight of stiffening girders
P T
• Self-weight of cables
N
• Degree of redundancy
Bridge Engineering
Approximate Structural Analysis
E L
• However, the reduction of the girder’s depth is limited because
P T
of the connection of the cable to the girder.
N
• Technically it is certainly convenient to have the minimum
number of cable connections to reduce the number of
anchorages and for regulation of forces in the cables.
Bridge Engineering
Approximate Structural Analysis
(2)
E L
For the smaller central spans, the panels should be in the
range of 15 to 17 m.
P T
(3) N
For central spans longer than 170 m, panels should be 30
m in length.
Bridge Engineering
Approximate Structural Analysis
E L
P T
N
Bridge Engineering
Optimum Cable Inclination
Bridge Engineering
Optimum Cable Inclination
E
values indicate the cable nearest to the tower. L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Structural Configurations
E L
Articulations P T
Arrangement of Spans
N
Shear Variation in Variable Depth Girders
Topic of Discussion
General Features
Structural Configurations
Articulations
Arrangement of Spans
E L
P T
Shear Variation in Variable Depth Girders
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
Bridge Engineering
General Features
Advantages:
L
• Balanced cantilever design requires only one bearing at every
E
the width of the pier can be smaller. P T
pier while simply supported design needs two bearings. Hence,
•
N
Fewer expansion bearings are required for the entire structure
resulting in lower initial and maintenance cost.
Bridge Engineering
General Features
Diasadvantages:
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Articulations
Arrangement of Spans
E L
P T
Shear Variation in Variable Depth Girders
Bridge Engineering
Structural Configurations
truss.
E L
cantilever ends and it acts as a simply supported beam or
P T
N
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Articulations
Arrangement of Spans
E L
P T
Shear Variation in Variable Depth Girders
Bridge Engineering
Articulations
E L
• The bearings at articulations are normally comprised of the
P T
roller-rocker arrangement, sliding plates or elastomeric bearings.
N
Bridge Engineering
Articulations
• The hinges are positioned in the vicinity of low and zero bending
moments under dead load.
L
continuous decks of same shape and similar loading conditions.
E
P T
• Heavy loads are transmitted at articulations resulting in
N
development of tension forces and bending moments.
Bridge Engineering
Articulations
E L
P T
N
Bridge Engineering
Articulations
E L
P T
N
Bridge Engineering
Articulations
E L
P T
N
Bridge Engineering
Articulations
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Articulations
Arrangement of Spans
E L
P T
Shear Variation in Variable Depth Girders
Bridge Engineering
Arrangement of Spans
E L
P T
•
N
For economy, the main criterion is that the maximum moments
in the beams are the least.
Bridge Engineering
Arrangement of Spans
E L
P T
•
N
Under normal loading conditions, the ratio of (x/y) should be in
between 4 to 5.
Bridge Engineering
Arrangement of Spans
E L
P T
•
N
The central span can be upto 30 m.
Bridge Engineering
Arrangement of Spans
E L
P T
•
N
Normally the deck consists of main girders of the tee beam and
slab and the spacing between the beams being arranged
depending on the lanes of the traffic.
Bridge Engineering
Topic of Discussion
General Features
Structural Configurations
Articulations
Arrangement of Spans
E L
P T
Shear Variation in Variable Depth Girders
Bridge Engineering
Shear Variation in Variable Depth Girders
L
• The carriageway width is determined based on the traffic lanes
E
T
on the high way and the cross-sectional details are finalized by
P
•
N
selecting the number of main girders spaced at 1.5 – 2.5 m.
Bridge Engineering
Shear Variation in Variable Depth Girders
𝑴𝑴𝒖𝒖
𝑽𝑽𝒖𝒖.𝒏𝒏𝒏𝒏𝒏𝒏 = 𝑽𝑽𝒖𝒖 ∓ tan 𝜷𝜷
𝒅𝒅
where 𝑽𝑽𝒖𝒖 = Shear force at the support
E L
𝑴𝑴𝒖𝒖 = Bending moment at the section
P T
𝒅𝒅 = Effective depth at the section
N
𝜷𝜷 = Angle between the top and bottom edges of the beam
Bridge Engineering
Shear Variation in Variable Depth Girders
𝑴𝑴𝒖𝒖
Net shear force at the section 𝑽𝑽𝒖𝒖.𝒏𝒏𝒏𝒏𝒏𝒏 = 𝑽𝑽𝒖𝒖 ∓ tan 𝜷𝜷
𝒅𝒅
E L
P T
N
Bridge Engineering
Shear Variation in Variable Depth Girders
𝑴𝑴𝒖𝒖
Net shear force at the section 𝑽𝑽𝒖𝒖.𝒏𝒏𝒏𝒏𝒏𝒏 = 𝑽𝑽𝒖𝒖 ∓ tan 𝜷𝜷
𝒅𝒅
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Important Terminology
E L
Structural Configurations P T
Design Example
N
Topic of Discussion
General Features
Important Terminology
Structural Configurations
Design Example
E L
P T
N
Bridge Engineering
General Features
L
• In reinforced concrete members, the pre-stress is commonly
E
T
introduced by tensioning the steel reinforcement known as
P
•
tendons.
N
Art of prestressing in ancient time: wooden barrel construction
by force-fitting of metal bands and shrink-fitting of metal tyres
on wooden wheels.
Bridge Engineering
General Features: Evolution
L
strains of steel and concrete was perhaps the starting point in
E
T
the development of a new material like Prestressed Concrete.
P
N
• In 1904, Eugene Freyssinet from France introduced
permanently acting forces in concrete to sustain the elastic
forces developed under loads and this scheme was later
named as prestressing.
Bridge Engineering
General Features
L
superior durability and ease of maintenance in comparison with
E
T
steel with its basic disadvantages of corrosion under
P
•
N
aggressive environmental conditions and inhibitive costs.
Bridge Engineering
General Features
• Tee beam slab decks are suitable for spans in the range of 20 to
40 m.
E L
• Single or multicell
P T
box girders are
preferred for N
larger spans of
the order of 30 to
70 m.
Bridge Engineering
General Features
• The use of high strength concrete and high tensile steel results
in slender sections which are aesthetically superior coupled
with overall economy.
E L
P T
• Prestressed concrete bridges can be designed as class 1 type
N
structures without any tensile stresses under service loads
resulting in a crack free structure.
Bridge Engineering
General Features
L
• Post tensioned prestressed concrete finds extensive
E
T
applications in long span continuous girder bridges of variable
P
N
cross section resulting in sleek structures and with
considerable savings in the overall cost of construction.
Bridge Engineering
General Features
L
• The normal loss of stress in steel is generally about 100 to 240
E
T
MPa and it is apparent that if this loss of stress is to be a small
P
N
portion of the initial stress, the stress in steel in the initial
stages must be very high, about 1200 to 2000 MPa which is
possible only with the use of high-strength steel.
Bridge Engineering
General Features
L
has a higher modulus of elasticity and smaller ultimate creep
E
T
strain, resulting in a smaller loss of prestress in steel.
P
N
• High-strength concrete results in a reduction in the cross-
sectional dimensions of prestressed concrete structural
elements.
Bridge Engineering
Topic of Discussion
General Features
Important Terminology
Structural Configurations
Design Example
E L
P T
N
Bridge Engineering
Important Terminology
L
maintain prestress in the concrete. Commonly used
E
T
anchorages are the Freyssinet, Magnel Blaton, Gifford-Udall,
P
N
Leonhatdt-Baur, LeeMcCall, Dywidag, Roebling and BBRV
systems.
Bridge Engineering
Important Terminology
L
by having sufficiently high prestress in the members.
E
P T
• Limited or partial prestressing: The degree of prestress applied
N
to concrete in which tensile stresses to a limited degree are
permitted in concrete under working loads. In this case, in
addition to tensioned steel, a considerable proportion of
untensioned reinforcement is generally used to limit the width
of cracks developed under service loads.
Bridge Engineering
Important Terminology
L
In case of post-tensioned beam, after the tendons are
E
P T
tensioned, the grouting (a mixture of cement, water and
admixture injected with pressure) is done. Thus, the bond is
N
obtained after tensioning the wires.
Bridge Engineering
Important Terminology
L
eccentric to the centroid, resulting in a triangular or trapezoidal
E
compressive stress distribution.
P T
N
• Linear prestressing: Application of prestressing in straight
elements. This kind of application is done in beams, slabs,
columns and piles.
Bridge Engineering
Important Terminology
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Important Terminology
Structural Configurations
Design Example
E L
P T
N
Bridge Engineering
Structural Configurations
Bridge Engineering
Structural Configurations
E L
P T
N
Typical Cross-Sections of Pre-tensioned Prestressed
Concrete Bridge Decks
Bridge Engineering
Structural Configurations
E L
P T
N
Typical Cross-Sections of Pre-tensioned Prestressed
Concrete Bridge Decks
Bridge Engineering
Structural Configurations
E L
type or box type in conjunction with cast in-situ slab is
P T
commonly adopted for spans exceeding 30 m.
N
• Post tensioning facilitates the use of curved cables which
improve the shear resistance of the girders.
Bridge Engineering
Structural Configurations
E L
• Segmental construction is ideally suited for post tensioning
P T
work. In this method a number of segments can be combined by
N
prestressing, resulting in an integrated structure.
Bridge Engineering
Structural Configurations
E L
P T
N
Typical Cross-Sections of Post-tensioned Prestressed
Concrete Bridge Decks
Bridge Engineering
Structural Configurations
E L
P T
N
Typical Cross-Sections of Post-tensioned Prestressed
Concrete Bridge Decks
Bridge Engineering
Topic of Discussion
General Features
Important Terminology
Structural Configurations
Design Example
E L
P T
N
Bridge Engineering
Design Example: Problem Statement
Design a post tensioned prestressed concrete slab bridge deck for a National
Highway crossing to suit the following data.
Clear span 10 m
Width of bearing 400 mm
Clear width of Road way 7.5 m with 1 m footpath on either side
Kerbs 600 mm wide by 300 mm deep
Thickness of wearing coat 80 mm
E L
Live load
Type of structure
IRC Class AA tracked vehicle
Class 1 type
P T
Materials
N
M-40 Grade concrete and 7 mm diameter high tensile wires with an
ultimate tensile strength of 1500 MPa housed in cables with 12 wires and
anchored by Freyssinet anchorages of 150 mm diameter.
Bridge Engineering
Design Example: Solution
1. Maximum Permissible Stresses in Concrete and Steel:
L
The permissible compressive stresses in concrete at transfer and
E
T
service loads as recommended in IS 1343: 2012 are as follows:
P
N
Assuming that the compressive stresses are not likely to increase
(Zone-I) (Post tensioned work), Compressive stress at transfer f =
ct
15 N/mm2 < 0.50 fci = (0.50 × 35) = 17.5 N/mm2
Compressive stress at service loads fcw = 12 N/mm2 < 0.39 fck = (0.39
× 40) = 15.6 N/mm2
Bridge Engineering
Design Example: Solution
Permissible tensile stress (Class 1 type structure) = ftt = ftw = 0
Bridge Engineering
Design Example: Solution
Width of bearing = 400 m
Bridge Engineering
Design Example: Solution
3. Dead Load Bending Moments:
Bridge Engineering
Design Example: Solution
Impact factor for Class AA tracked vehicle is 25% for 5 m span,
decreasing linearly to 10% for 9 m span.
E L
P T
N
Position of load for maximum bending moment
Bridge Engineering
Design Example: Solution
Effective width of slab perpendicular to span 𝒃𝒃𝒆𝒆 = 𝒌𝒌. 𝒙𝒙 𝟏𝟏 − 𝒙𝒙/𝑳𝑳 + 𝒃𝒃𝒘𝒘
𝒙𝒙 = 𝟓𝟓. 𝟐𝟐 𝒎𝒎, 𝑳𝑳 = 𝟏𝟏𝟏𝟏. 𝟒𝟒 𝒎𝒎, 𝑩𝑩 = 𝟗𝟗. 𝟓𝟓 𝒎𝒎
𝑩𝑩/𝑳𝑳 = 𝟗𝟗. 𝟓𝟓/𝟏𝟏𝟎𝟎. 𝟒𝟒 = 𝟎𝟎. 𝟗𝟗𝟗𝟗𝟗𝟗
𝒃𝒃𝒘𝒘 = 𝟎𝟎. 𝟖𝟖𝟖𝟖 + 𝟐𝟐 × 𝟎𝟎. 𝟎𝟎𝟎𝟎 = 𝟏𝟏. 𝟎𝟎𝟎𝟎 𝒎𝒎
For 𝑩𝑩/𝑳𝑳 = 𝟎𝟎. 𝟗𝟗𝟗𝟗𝟗𝟗, simply supported slabs, 𝒌𝒌 = 𝟐𝟐. 𝟑𝟑𝟑𝟑
E L
P T
𝒃𝒃𝒆𝒆 = 𝟐𝟐. 𝟑𝟑𝟑𝟑 × 𝟓𝟓. 𝟐𝟐 × 𝟏𝟏 − 𝟓𝟓. 𝟐𝟐/𝟏𝟏𝟏𝟏. 𝟒𝟒 + 𝟏𝟏. 𝟎𝟎𝟎𝟎 = 𝟕𝟕. 𝟏𝟏𝟏𝟏𝟏𝟏 𝒎𝒎
N
The tracked vehicle is placed close to the kerb with the required
minimum clearance as shown in Figure.
Total load of two tracks with impact = 𝟕𝟕𝟕𝟕𝟕𝟕 × 𝟏𝟏. 𝟏𝟏𝟏𝟏 = 770 kN
Bridge Engineering
Design Example: Solution
E L
Net effective width of dispersion
P T
Net effective width of dispersion = 8.261 m N
Average intensity of load = 𝟕𝟕𝟕𝟕𝟕𝟕/ 𝟒𝟒. 𝟕𝟕𝟕𝟕 × 𝟖𝟖. 𝟐𝟐𝟐𝟐𝟐𝟐 = 19.58 kN/m2
Maximum bending moment due to live load 𝑴𝑴𝒒𝒒 = �(𝟏𝟏𝟏𝟏. 𝟓𝟓𝟓𝟓 × 𝟒𝟒. 𝟕𝟕𝟕𝟕 ×
𝟓𝟓. 𝟐𝟐/𝟐𝟐) − 𝟏𝟏𝟏𝟏. 𝟓𝟓𝟓𝟓 × 𝟒𝟒. 𝟕𝟕𝟕𝟕𝟐𝟐 /𝟖𝟖 � = 𝟏𝟏𝟏𝟏𝟏𝟏. 𝟖𝟖𝟖𝟖 𝒌𝒌𝒌𝒌𝒌𝒌
Bridge Engineering
Design Example: Solution
5. Shear due to Class AA Tracked Vehicle:
E L
P T
N
Position of load for maximum shear
where 𝒙𝒙 = 𝟐𝟐. 𝟑𝟑𝟑𝟑 𝒎𝒎, 𝑳𝑳 = 𝟏𝟏𝟏𝟏. 𝟒𝟒 𝒎𝒎, 𝑩𝑩 = 𝟗𝟗. 𝟓𝟓 𝒎𝒎, 𝒃𝒃𝒘𝒘 = 𝟏𝟏. 𝟎𝟎𝟎𝟎 𝒎𝒎
Bridge Engineering
Design Example: Solution
𝑩𝑩/𝑳𝑳 = 𝟗𝟗. 𝟓𝟓/𝟏𝟏𝟏𝟏. 𝟒𝟒 = 𝟎𝟎. 𝟗𝟗𝟗𝟗𝟗𝟗
For 𝑩𝑩/𝑳𝑳 = 𝟎𝟎. 𝟗𝟗𝟗𝟗𝟗𝟗, the value of 𝒌𝒌 = 𝟐𝟐. 𝟑𝟑𝟑𝟑
𝒃𝒃𝒆𝒆 = 𝟐𝟐. 𝟑𝟑𝟑𝟑 × 𝟐𝟐. 𝟑𝟑𝟑𝟑 × 𝟏𝟏 − 𝟐𝟐. 𝟑𝟑𝟑𝟑/𝟏𝟏𝟏𝟏. 𝟒𝟒 + 𝟏𝟏. 𝟎𝟎𝟎𝟎 = 𝟓𝟓. 𝟑𝟑𝟑𝟑 𝒎𝒎
E L
P T
N (5360/2)
7355
Bridge Engineering
Design Example: Solution
Intensity of live load = 𝟕𝟕𝟕𝟕𝟕𝟕/ 𝟒𝟒. 𝟕𝟕𝟕𝟕 × 𝟕𝟕. 𝟑𝟑𝟑𝟑𝟑𝟑 = 𝟐𝟐𝟐𝟐 𝒌𝒌𝒌𝒌/𝒎𝒎𝟐𝟐
𝟏𝟏𝟏𝟏.𝟒𝟒−𝟐𝟐.𝟑𝟑𝟑𝟑
Live Load Shear force 𝑽𝑽𝑨𝑨 = 𝟐𝟐𝟐𝟐 × 𝟒𝟒. 𝟕𝟕𝟕𝟕 × = 𝟖𝟖𝟖𝟖. 𝟕𝟕𝟕𝟕 𝒌𝒌𝒌𝒌
𝟏𝟏𝟏𝟏.𝟒𝟒
Dead load shear = 𝟎𝟎. 𝟓𝟓 × 𝟏𝟏𝟏𝟏. 𝟕𝟕𝟕𝟕 × 𝟏𝟏𝟏𝟏. 𝟒𝟒 = 𝟕𝟕𝟕𝟕. 𝟓𝟓𝟓𝟓 𝒌𝒌𝒌𝒌
Bridge Engineering
Design Example: Solution
The permissible stresses in concrete at transfer can be obtained as
𝒇𝒇𝒄𝒄𝒄𝒄 = 𝟏𝟏𝟏𝟏. 𝟎𝟎 N/mm2, 𝒇𝒇𝒄𝒄𝒄𝒄 = 𝟏𝟏𝟏𝟏. 𝟎𝟎 N/mm2, 𝒇𝒇𝒕𝒕𝒕𝒕 = 𝟎𝟎,
𝜼𝜼 = Loss Ratio = 0.8, 𝒇𝒇𝒃𝒃𝒃𝒃 = 𝜼𝜼𝒇𝒇𝒄𝒄𝒄𝒄 − 𝒇𝒇𝒕𝒕𝒘𝒘 = 𝟎𝟎. 𝟖𝟖 × 𝟏𝟏𝟏𝟏 − 𝟎𝟎 = 𝟏𝟏𝟏𝟏. 𝟎𝟎
N/mm2
P T 𝒇𝒇𝒃𝒃𝒃𝒃
≥
𝟏𝟏𝟏𝟏
N
𝟏𝟏𝟏𝟏𝟔𝟔. 𝟖𝟖𝟖𝟖 × 𝟏𝟏𝟏𝟏𝟔𝟔 + 𝟏𝟏 − 𝟎𝟎. 𝟖𝟖 × 186.04 × 𝟏𝟏𝟏𝟏𝟔𝟔
Bridge Engineering
Design Example: Solution
7. Minimum Prestressing Force:
The minimum prestressing force required is computed using the
𝑨𝑨 𝒇𝒇𝒊𝒊𝒊𝒊𝒊𝒊 .𝒛𝒛𝒃𝒃 +𝒇𝒇𝒔𝒔𝒔𝒔𝒔𝒔 .𝒛𝒛𝒕𝒕
relation 𝑷𝑷 =
𝒛𝒛𝒃𝒃 +𝒛𝒛𝒕𝒕
E L
= −𝟒𝟒. 𝟒𝟒𝟔𝟔 N/mm2
𝒛𝒛𝒕𝒕 𝟒𝟒𝟒𝟒.𝟔𝟔𝟔𝟔×𝟏𝟏𝟏𝟏𝟔𝟔
T
P= 𝟏𝟏𝟏𝟏. 𝟏𝟏𝟏𝟏 N/mm
N
𝟏𝟏𝟏𝟏𝟔𝟔.𝟖𝟖𝟖𝟖+𝟏𝟏𝟏𝟏𝟏𝟏.𝟎𝟎𝟎𝟎 ×𝟏𝟏𝟏𝟏𝟔𝟔
𝒇𝒇𝒕𝒕𝒕𝒕 𝑴𝑴𝒒𝒒 +𝑴𝑴𝒈𝒈
𝒇𝒇𝒊𝒊𝒊𝒊𝒊𝒊 = + = 𝟎𝟎 + 2
𝜼𝜼 𝜼𝜼𝒛𝒛𝒃𝒃 𝟎𝟎.𝟖𝟖×𝟒𝟒𝟒𝟒.𝟔𝟔𝟔𝟔×𝟏𝟏𝟏𝟏𝟔𝟔
Bridge Engineering
Design Example: Solution
Using Freyssinet cables containing 12 wires 7 mm diameter
stressed to 1200 N/mm2, force in each cable = �𝟏𝟏𝟏𝟏 × 𝝅𝝅/𝟒𝟒 × 𝟕𝟕𝟐𝟐 ×
𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏�/𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏 = 𝟓𝟓𝟓𝟓𝟓𝟓 𝒌𝒌𝒌𝒌
𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏×𝟓𝟓𝟓𝟓𝟓𝟓
So, Spacing of cables = = 𝟑𝟑𝟑𝟑𝟑𝟑 𝒎𝒎𝒎𝒎
L
𝟏𝟏𝟏𝟏𝟏𝟏𝟐𝟐.𝟓𝟓
8. Eccentricity of Cables:
T E
Eccentricity of the cables at the centre of span is obtained as: 𝒆𝒆 =
N P
𝒛𝒛𝒕𝒕 𝒛𝒛𝒃𝒃 𝒇𝒇𝒊𝒊𝒊𝒊𝒊𝒊 −𝒇𝒇𝒔𝒔𝒔𝒔𝒔𝒔 𝟒𝟒𝟒𝟒.𝟔𝟔𝟔𝟔 𝟐𝟐 ×𝟏𝟏𝟏𝟏𝟏𝟏𝟐𝟐 × 𝟏𝟏𝟏𝟏.𝟏𝟏𝟏𝟏+𝟒𝟒.𝟒𝟒𝟔𝟔
= = 𝟏𝟏𝟏𝟏𝟏𝟏 𝒎𝒎𝒎𝒎
𝑨𝑨 𝒇𝒇𝒔𝒔𝒔𝒔𝒔𝒔 𝒛𝒛𝒕𝒕 +𝒇𝒇𝒊𝒊𝒊𝒊𝒊𝒊 𝒛𝒛𝒃𝒃 𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏×𝟓𝟓𝟓𝟓𝟓𝟓×𝟒𝟒𝟒𝟒.𝟔𝟔𝟔𝟔×𝟏𝟏𝟏𝟏𝟔𝟔 × −𝟒𝟒.𝟒𝟒𝟔𝟔+𝟏𝟏𝟏𝟏.𝟑𝟑𝟑𝟑
Bridge Engineering
Design Example: Solution
9. Check for Stresses at Service Loads:
N P
(𝑷𝑷/𝑨𝑨) = (𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏. 𝟓𝟓 × 𝟏𝟏𝟏𝟏𝟑𝟑 /𝟓𝟓 × 𝟏𝟏𝟏𝟏𝟓𝟓 ) = 𝟑𝟑. 𝟑𝟑𝟑𝟑𝟑𝟑 N/mm2
𝟑𝟑 𝟔𝟔
𝑷𝑷𝑷𝑷/𝒁𝒁 = 𝟏𝟏𝟏𝟏𝟏𝟏𝟐𝟐. 𝟓𝟓 × 𝟏𝟏𝟏𝟏 × 𝟏𝟏𝟏𝟏𝟎𝟎/𝟒𝟒𝟒𝟒. 𝟔𝟔𝟔𝟔 × 𝟏𝟏𝟏𝟏 = 𝟕𝟕. 𝟔𝟔𝟔𝟔𝟔𝟔 N/mm 2
𝑴𝑴𝒈𝒈 /𝒁𝒁 = 𝟏𝟏𝟖𝟖𝟖𝟖. 𝟎𝟎𝟎𝟎 × 𝟏𝟏𝟏𝟏𝟔𝟔 /𝟒𝟒𝟒𝟒. 𝟔𝟔𝟔𝟔 × 𝟏𝟏𝟏𝟏𝟔𝟔 = 𝟒𝟒. 𝟒𝟒𝟔𝟔𝟓𝟓 N/mm2
𝑴𝑴𝒒𝒒 /𝒁𝒁 = 𝟏𝟏𝟏𝟏𝟔𝟔. 𝟖𝟖𝟖𝟖 × 𝟏𝟏𝟏𝟏𝟔𝟔 /𝟒𝟒𝟒𝟒. 𝟔𝟔𝟔𝟔 × 𝟏𝟏𝟏𝟏𝟔𝟔 = 𝟒𝟒. 𝟒𝟒𝟒𝟒𝟒𝟒 N/mm2
Bridge Engineering
Design Example: Solution
Stress at transfer:
Bridge Engineering
Design Example: Solution
10. Check for Ultimate Flexural Strength:
E L
𝒇𝒇𝒑𝒑𝒑𝒑 = effective prestress in tendons
P T
N
𝑨𝑨𝒑𝒑𝒑𝒑 = area of prestressing tendons in the tension zone
Bridge Engineering
Design Example: Solution
For pretensioned and post tensioned members with effective bond,
the values of 𝒇𝒇𝒑𝒑𝒑𝒑 and 𝒙𝒙𝒖𝒖 are interpolated using the values given in
Table 11 of IS: 1343-2012.
Bridge Engineering
Design Example: Solution
Table 11 of IS: 1343-2012
E L
P T
N
Bridge Engineering
Design Example: Solution
𝒇𝒇𝒑𝒑𝒑𝒑
By linear interpolation, the values of the ratios and 𝒙𝒙𝒖𝒖 /𝒅𝒅 can
𝟎𝟎.𝟖𝟖𝟖𝟖𝒇𝒇𝒑𝒑𝒑𝒑
𝒇𝒇𝒑𝒑𝒑𝒑
be obtained as = 𝟏𝟏. 𝟎𝟎 and 𝒙𝒙𝒖𝒖 /𝒅𝒅 = 𝟎𝟎. 𝟐𝟐𝟐𝟐𝟐𝟐
𝟎𝟎.𝟖𝟖𝟖𝟖𝒇𝒇𝒑𝒑𝒑𝒑
Bridge Engineering
Design Example: Solution
Hence the ultimate moment capacity of the designed section is
greater than the required ultimate moment.
𝑰𝑰.𝒃𝒃𝒘𝒘 𝟐𝟐
N
𝑽𝑽𝑹𝑹𝑹𝑹.𝒄𝒄 = 𝒇𝒇𝒄𝒄𝒄𝒄𝒄𝒄 ∓ 𝒌𝒌𝟏𝟏 𝝈𝝈𝒄𝒄𝒄𝒄 𝒇𝒇𝒄𝒄𝒄𝒄𝒄𝒄 + 𝜼𝜼𝜼𝜼𝜼𝜼𝜼𝜼𝜼𝜼𝜼𝜼
𝒔𝒔
Bridge Engineering
Design Example: Solution
𝑺𝑺 = First moment of area between centroidal axis and compression
fibre about centroidal axis
𝜼𝜼 = loss ratio
N
𝑷𝑷 = prestressing force
Bridge Engineering
Design Example: Solution
𝒃𝒃𝑫𝑫𝟑𝟑 𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏×𝟓𝟓𝟓𝟓𝟓𝟓𝟑𝟑
𝑰𝑰 = = = 𝟏𝟏𝟏𝟏. 𝟒𝟒𝟒𝟒 × 𝟏𝟏𝟏𝟏𝟗𝟗 mm4
𝟏𝟏𝟏𝟏 𝟏𝟏𝟏𝟏
𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏×𝟐𝟐𝟐𝟐𝟐𝟐×𝟐𝟐𝟐𝟐𝟐𝟐
𝑺𝑺 = = 𝟑𝟑𝟑𝟑. 𝟐𝟐𝟐𝟐 × 𝟏𝟏𝟏𝟏𝟔𝟔 mm3
𝟐𝟐
𝒇𝒇𝒄𝒄𝒄𝒄𝒄𝒄 = 𝒇𝒇𝒄𝒄𝒄𝒄 /𝜸𝜸𝒎𝒎 = 𝟑𝟑/𝟏𝟏. 𝟓𝟓 = 𝟐𝟐 since 𝒇𝒇𝒄𝒄𝒄𝒄 = 𝟑𝟑 N/mm2 for 𝒇𝒇𝒄𝒄𝒄𝒄 = 𝟒𝟒𝟒𝟒 MPa
= 𝟎𝟎.P
T
𝜽𝜽 = 𝟒𝟒𝟒𝟒/𝑳𝑳 = 𝟒𝟒 × 𝟏𝟏𝟏𝟏𝟏𝟏 / 𝟏𝟏𝟏𝟏. 𝟒𝟒 × 𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏
N 𝟎𝟎𝟎𝟎𝟎𝟎
Bridge Engineering
Design Example: Solution
The shear resistance of the support section is greater than the
required ultimate shear force.
Bridge Engineering
Design Example: Solution
Using 10 mm diameter Fe-415 HYSD bars at the top and bottom
faces of the slab, the spacing S = (1000 ast/ Ast) = (2 × 1000 × 78.54/
836) = 187.89 mm
L
180 mm both at the top and bottom faces of the slab in the
E
longitudinal and transverse direction.
P T
N
13. Check for Serviceability Limit States:
Bridge Engineering
Design Example: Solution
Dead load 𝐠𝐠 = 𝟏𝟏𝟏𝟏. 𝟕𝟕𝟕𝟕 kN/m = 0.014 kN/mm
E
Effective prestressing force after losses 𝜼𝜼𝑷𝑷 = 𝟎𝟎. 𝟖𝟖 × 𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏. 𝟓𝟓 = L
𝟏𝟏𝟏𝟏𝟏𝟏𝟔𝟔 kN
P T
𝑬𝑬𝒄𝒄 = 𝟑𝟑𝟑𝟑 kN/mm2 N
𝑰𝑰 = 𝟏𝟏𝟏𝟏. 𝟒𝟒𝟒𝟒 × 𝟏𝟏𝟏𝟏𝟗𝟗 mm4
𝟓𝟓𝟓𝟓𝟓𝟓𝑳𝑳𝟐𝟐
Upward deflection due to prestressing force 𝒂𝒂𝒑𝒑 = =
𝟒𝟒𝟒𝟒𝑬𝑬𝒄𝒄 𝑰𝑰
𝟓𝟓×𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏×𝟏𝟏𝟏𝟏𝟏𝟏×𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟐𝟐
= 𝟖𝟖. 𝟑𝟑𝟑𝟑 mm (upwards)
𝟒𝟒𝟒𝟒×𝟑𝟑𝟑𝟑× 𝟏𝟏𝟏𝟏.𝟒𝟒𝟒𝟒×𝟏𝟏𝟏𝟏𝟗𝟗
Bridge Engineering
Design Example: Solution
𝟓𝟓𝒈𝒈𝑳𝑳𝟒𝟒
Downward deflection due to dead load 𝒂𝒂𝒈𝒈 = =
𝟑𝟑𝟑𝟑𝟑𝟑𝑬𝑬𝒄𝒄 𝑰𝑰
𝟓𝟓×𝟎𝟎.𝟎𝟎𝟎𝟎𝟎𝟎×𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟒𝟒
= 𝟔𝟔. 𝟐𝟐 mm (downwards)
𝟑𝟑𝟖𝟖𝟖𝟖×𝟑𝟑𝟑𝟑× 𝟏𝟏𝟏𝟏.𝟒𝟒𝟒𝟒×𝟏𝟏𝟏𝟏𝟗𝟗
𝑸𝑸𝑳𝑳𝟑𝟑
Downward deflection due to live load 𝒂𝒂𝒒𝒒 = =
𝟒𝟒𝟒𝟒𝑬𝑬𝒄𝒄 𝑰𝑰
L
𝟗𝟗𝟗𝟗.𝟐𝟐×𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟑𝟑
= 𝟔𝟔. 𝟑𝟑𝟑𝟑 mm (downwards)
𝟒𝟒𝟒𝟒×𝟑𝟑𝟑𝟑× 𝟏𝟏𝟏𝟏.𝟒𝟒𝟒𝟒×𝟏𝟏𝟏𝟏𝟗𝟗
T E
N P
Maximum deflection due to prestress + self weight + live loads
𝒂𝒂𝒓𝒓 = 𝒂𝒂𝒑𝒑 + 𝒂𝒂𝒈𝒈 + 𝒂𝒂𝑸𝑸 = −𝟖𝟖. 𝟑𝟑𝟑𝟑 + 𝟔𝟔. 𝟐𝟐 + 𝟔𝟔. 𝟑𝟑𝟑𝟑 = 𝟒𝟒. 𝟏𝟏𝟕𝟕 mm
𝒔𝒔𝒔𝒔𝒔𝒔𝒔𝒔
Maximum permissible deflection due to live loads only = =
𝟖𝟖𝟖𝟖𝟖𝟖
𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏
= 𝟏𝟏𝟏𝟏 mm > 6.35 mm
𝟖𝟖𝟖𝟖𝟖𝟖
Bridge Engineering
Design Example: Solution
L
Table 6.9 of IRC: 112-2011
Age at
Creep Coefficient ø
T E
P
Loading Notional Size 2Ac/u (mm)
t0
(days)
50 150 600
Dry atmospheric conditions (RH 50%) N
50 150 600
Humid atmospheric conditions (RH 80%)
1 5.50 4.60 3.70 3.60 3.20 2.90
7 5.50 4.60 3.70 2.60 2.30 2.00
28 3.90 3.10 2.60 1.90 1.70 1.50
90 3.00 2.50 2.00 1.50 1.40 1.20
365 1.80 1.50 1.20 1.10 1.00 1.00
Bridge Engineering
Design Example: Solution
For the notional size of 500 mm at relative humidity of 50% and age
at loading of 28 days, the final creep coefficient 𝜱𝜱 can be
interpolated from Table 6.9 of IRC 112 and obtained as 2.71.
𝑬𝑬𝒄𝒄
Effective modulus of elasticity of concrete = 𝑬𝑬𝒄𝒄,𝒆𝒆𝒆𝒆𝒆𝒆 = =
E L 𝟏𝟏+𝜱𝜱
T
𝑬𝑬𝒄𝒄 𝑬𝑬𝒄𝒄
=
P
𝟏𝟏+𝟐𝟐.𝟕𝟕𝟕𝟕 𝟑𝟑.𝟕𝟕𝟕𝟕
Bridge Engineering
Design Example: Solution
E L
Hence the slab is safe regarding the serviceability limit state of
P T
deflection and cracking according to the specifications of IRC: 112-
2011. N
Bridge Engineering
Design Example: Solution
The end block has to be designed for bursting tension due to the
anchorage force.
E L
P T
N
The bursting tensile force is computed using the Table 13.1 of IRC:
112-2011.
𝐘𝐘𝐩𝐩𝒐𝒐 /𝐘𝐘𝐨𝐨 0.3 0.4 0.5 0.6 0.7
𝐅𝐅𝐛𝐛𝐛𝐛𝐛𝐛 /𝐏𝐏𝐤𝐤 0.26 0.23 0.19 0.16 0.12
Bridge Engineering
Design Example: Solution
E L
Interpolating the value of 𝑭𝑭𝒃𝒃𝒃𝒃𝒃𝒃 /𝑷𝑷𝒌𝒌 for 𝒀𝒀𝒑𝒑𝒑𝒑 /𝒀𝒀𝒐𝒐 = 𝟎𝟎. 𝟒𝟒𝟒𝟒𝟒𝟒 from Table
13.1 of IRC: 112-2011, 𝑭𝑭𝒃𝒃𝒃𝒃𝒃𝒃 /𝑷𝑷𝒌𝒌 = 𝟎𝟎. 𝟐𝟐𝟐𝟐𝟐𝟐
P T
𝑭𝑭𝒃𝒃𝒃𝒃𝒃𝒃 = 𝟎𝟎. 𝟐𝟐𝟐𝟐𝟐𝟐 × 𝟓𝟓𝟓𝟓𝟓𝟓 = 𝟏𝟏𝟏𝟏𝟒𝟒. 𝟔𝟔𝟔𝟔 kN N
Using 10 mm diameter Fe-415 HYSD bars as end block
𝟏𝟏𝟏𝟏𝟏𝟏.𝟔𝟔𝟔𝟔×𝟏𝟏𝟏𝟏𝟑𝟑
reinforcement, Area of steel required = = 𝟑𝟑𝟑𝟑𝟑𝟑 mm2
𝟎𝟎.𝟖𝟖𝟖𝟖×𝟒𝟒𝟒𝟒𝟒𝟒
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Reinforcement Detailing
#10-180 c/c
190 mm
E L
P T
N
329 329
#10-180 c/c
Bridge Engineering
Design Example: Reinforcement Detailing
#10-180 c/c
L
190 mm
#10-180 c/c
T E
N P
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Shear Connectors
E L
P T
N
Ø Design Example
Topic of Discussion
Ø General Features
Ø Shear Connectors
Ø Design Example
E L
P T
N
Bridge Engineering
General Features
E L
reduces the construction time considerably and facilities early
resumption of traffic on the high way.
P T
• N
In a composite bridge deck comprising steel and reinforced
concrete, the individual materials are utilized efficiently since
concrete is strong in compression and steel is strong in
tension.
Bridge Engineering
General Features
E L
leads to savings in lengths of bridge approaches in the case of
embankments.
P T
• N
The flexural stiffness of a composite beam will be about 2 to 4
times that for a corresponding steel beam resulting in reduced
deflections and vibrations under moving loads.
Bridge Engineering
General Features
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Shear Connectors
Ø Design Example
E L
P T
N
Bridge Engineering
Shear Connectors
E L
separation between the steel girder and the in-situ concrete
T
slab by transferring the horizontal shear force along the
P
•
contact surface with slip.
N
In case of composite girder decks, the deflections are
comparatively less than that of non-composite girder decks
due to the increased moment of inertia of the composite
section.
Bridge Engineering
Shear Connectors
Bridge Engineering
Shear Connectors
E L
P T
N
Bridge Engineering
Shear Connectors
E L
P T
N
Bridge Engineering
Shear Connectors
E L
P T
N
Bridge Engineering
Shear Connectors
E L
tensile steel connectors is computed by empirical relations
T
specified in the code depending upon the type of connectors.
P
N
Bridge Engineering
Shear Connectors
For mild steel shear connectors, the safe shear resisted by each
connector is computed by the following empirical relation.
E L
T
𝐐 = 𝟏𝟎𝟕(𝒉𝒇 +0.5t)𝑳 𝒇𝒄𝒌
•
N P
For welded stud connectors of mild steel with 𝒇𝒖= 420 N/𝒎𝒎𝟐
and 𝒇𝒚 = 350 N/𝒎𝒎𝟐 and having a ratio of (h/d) less than 4.2.
𝐐 = 48𝒉𝒅 𝒇𝒄𝒌
Bridge Engineering
Shear Connectors
𝐐 = 196𝒅𝟐 𝒇𝒄𝒌
Where
E L
𝐐 = Safe shear resistance of one shear connector (N)
T
𝒇𝒄𝒌 = Characteristic compressive cube strength of
P
concrete (N/𝒎𝒎𝟐 )
N
𝒉𝒇 = Maximum thickness of flange measured at the
faces of the web (mm)
Bridge Engineering
Shear Connectors
L
• When anchorage type shear connectors are used to connect
E
T
the concrete the concrete slab deck with precast prestressed
P
N
concrete girders, the ultimate shear resistance of one
connector is given by the empirical relation,
𝑸𝒖= 𝑨𝒔 . 𝝈𝒖 . 𝟏𝟎+𝟑
Bridge Engineering
Shear Connectors
E L
T
The ultimate bond stress at the interface should not exceed 2.1
P
N
N/ 𝐦𝐦𝟐 and the interface should be roughened for effective
bonding.
Bridge Engineering
Shear Connectors
∑𝐐 ∑ 𝐐𝐮
𝐩=( ) or( )
𝐕𝐋 𝐕𝐋𝐮
E L
𝑸 = Safe shear resistance of one connector (kN)
P T
N
𝑸𝒖= Ultimate shear resistance of one connector (kN)
Bridge Engineering
Shear Connectors
L
is effective and working live load with impact.
T E
𝑽𝒖 = Vertical shear due to ultimate loads computed with load
N P
factors of 1.5 for dead load and 2.5 for live load.
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Shear Connectors
Ø Design Example
E L
P T
N
Bridge Engineering
Design Example: Problem Statement
Design the shear connectors of a composite road bridge consisting
of reinforced concrete slab and steel plate girders.
Span length is 18 m.
Depth of slab is 300 mm.
Total shear force at the junction is 204 kN.
E L
Horizontal shear per unit length is 408 N/mm.
P T
N
Bridge Engineering
Design Example: Solution
Total shear force at junction = 204000N
𝑸 = 𝟏𝟗𝟔 𝒅𝟐 𝒇𝒄𝒌
E L
T
Where Height of the stud 𝑯 = 𝟓𝒅 = (5 × 20) = 100 mm for 𝒅 = 20 mm
P
𝒇𝒄𝒌 = 20 N/𝒎𝒎𝟐
N
𝑸 = 𝟏𝟗𝟔×𝟐𝟎𝟐 𝟐𝟎 = 350615 N
Bridge Engineering
Design Example: Solution
Pitch of shear connectors 𝒑 = [𝑵𝑸/(𝑭𝝉)]
Bridge Engineering
Design Example: Solution
Maximum permissible pitch is the least of
N
The arrangement of shear connectors is shown in the schematic
diagram.
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
T
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Advantages
E L
Design Criteria P T
N
Topic of Discussion
General Features
Advantages
Design Criteria
E L
P T
N
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
• The use of double barrel type rigid frames eliminate the use of
separate central pillars since the central column serves as a
median between the up and down traffic lanes.
E L
P T
N
Bridge Engineering
General Features
E L
P T
N
Typical Structural Elements of a Solid Barrel
type Rigid Frame Bridge
Bridge Engineering
General Features
E L
P T
N
Typical Structural Elements of a Beam and
Slab type Rigid Frame Bridge
Bridge Engineering
Topic of Discussion
General Features
Advantages
Design Criteria
E L
P T
N
Bridge Engineering
Advantages
L
monolithic structure, eliminates the use of separate abutments.
E
T
The vertical sides of the rigid frame serve as retaining walls to
P
•
N
retain earth in road crossings of embankments.
Slab type rigid frame bridges can be easily cast in-situ since
plain moving form work can be used for rapid construction
work.
Bridge Engineering
Advantages
E L
P T
N
Bridge Engineering
Advantages
• Rigid frame bridges do not require any separate bearings since
hinged supports can be provided to serve requisite structural
functions.
L
less quantity of materials compared to R.C.C beam and slab
E
T
bridges due to variable depth of the members.
P
N
Bridge Engineering
Topic of Discussion
General Features
Advantages
Design Criteria
E L
P T
N
Bridge Engineering
Design Criteria
E L
The typical dimensions at the crown and junction of horizontal and
P T
vertical members can be expressed in terms of the clear span. The
N
Figure shown in next slide presents the rigid frame bridge with the
salient dimensions expressed in terms of the clear span.
Bridge Engineering
Design Criteria
E L
P T
N
Bridge Engineering
Design Criteria
ds = Length of elements
Bridge Engineering
Design Criteria
E L
The value of ∑ (MF.y.ds/I) is computed for the entire frame,
P T
Where MF = Bending moment due to unit load at the centroids of
the various elements N
Bridge Engineering
Design Criteria
The influence line ordinates for the horizontal thrust at the hinged
support is computed by the relation,
𝐇𝐇 =
∑(𝑴𝑴𝑭𝑭 .𝐲𝐲.𝐝𝐝𝐝𝐝/𝐈𝐈)
𝒚𝒚𝟐𝟐 .
𝒅𝒅𝒅𝒅 𝑳𝑳
E L
T
+
𝑰𝑰 𝑨𝑨𝒄𝒄
NP
The influence line diagram for horizontal thrust will be useful in
computing the horizontal thrust developed due to the dead and live
loads.
Bridge Engineering
Design Criteria
The earth pressure developed due to earth filling against the sides
of the columns is computed by assuming a suitable distribution of
earth pressure which depends upon the density of soil, height of
filling and the angle of internal friction.
E L
P T
N
Bridge Engineering
Design Criteria
E
The magnitude of the horizontal thrust induced is given by the L
relation,
P T
N
𝐇𝐇 = 𝛂𝛂 𝐭𝐭. 𝐋𝐋. 𝑬𝑬 �∫ 𝒚𝒚𝟐𝟐. 𝐝𝐝 𝒔𝒔⁄𝑰𝑰
Bridge Engineering
Design Criteria
Bridge Engineering
Design Criteria
Bridge Engineering
Design Criteria
Bridge Engineering
Design Criteria
Design of Sections:
E L
P T
N
Bridge Engineering
Design Criteria
E L
Suitable curved mating surfaces are provided at the junction of the
P T
column and footing to facilitate rotation at the column ends.
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø General Features
Bridge Engineering
General Features
E L
beam or box girders continuous over several spans.
P T
N
Bridge Engineering
General Features
Bridge Engineering
General Features
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
•
E L
In continuous girder bridges extending over several spans, it is
P T
important to provide for movements of the super structure due
to temperature changes.
N
• To facilitate the movements suitable bearings are invariably
provided at the supports.
Bridge Engineering
General Features
E L
spans. The three span continuous bridge is the most common
P T
type generally adopted for highway bridges.
Bridge Engineering
Topic of Discussion
Ø General Features
Bridge Engineering
Advantages
•
E L
The ultimate moment capacity of continuous bridge deck is
T
greater than that of simply supported decks due to the
P
N
phenomenon of redistribution of moments in continuous
structures.
Bridge Engineering
Advantages
E L
so that the moment of inertia of the girder section is
T
proportional to the bending moments developed at the section.
P
N
Bridge Engineering
Disadvantages
•
E L
Continuous bridge deck being a statically indeterminate
P T
structure, the analysis is more complicated than the simply
supported beams. N
Bridge Engineering
Topic of Discussion
Ø General Features
Bridge Engineering
Selection of spans and profile of girders
Bridge Engineering
Selection of spans and profile of girders
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø General Features
Bridge Engineering
Analysis and Design Principle
•
E L
The dead load moments are computed using the influence lines
P T
and the dead loads of the member divided into a number of
parts along the span. N
• The service load moments comprising the dead and live loads
are determined for all the critical sections like the supports and
the mid sections.
Bridge Engineering
Analysis and Design Principle
E L
P T
N
Bridge Engineering
Analysis and Design Principle
The procedure for drawing the influence line for bending moment
and shear at a given section of the girder is outlined as follows:
L
• For the continuous girder ABCD shown in Fig 1, the carry over
E
factors 𝑪𝑨𝑩, 𝑪𝑩𝑨, 𝑪𝑩𝑪 𝐚𝐧𝐝 𝑪𝑪𝑩 etc. are read out from the curves
T
shown in Fig 2.
N P
• The distribution factors 𝑫𝑩𝑨, 𝑫𝑩𝑪 𝐚𝐧𝐝 𝑫𝑪𝑩 etc. are computed
using the relationship 𝐃 = (𝐊/ ∑ 𝑲) = (𝐤. 𝑰𝒄 /𝐋)/ ∑(𝐤. 𝑰𝒄 )𝐄)/𝐋
Bridge Engineering
Analysis and Design Principle
N
the load in the span is read out form Fig 4 to 12.
Bridge Engineering
Analysis and Design Principle
E L
P T
N
Bridge Engineering
Analysis and Design Principle
E L
P T
N
Bridge Engineering
Analysis and Design Principle
E L
P T
N
Bridge Engineering
Analysis and Design Principle
E L
P T
N
Bridge Engineering
Analysis and Design Principle
E L
P T
N
Bridge Engineering
Analysis and Design Principle
E L
P T
N
Bridge Engineering
Analysis and Design Principle
Bridge Engineering
Analysis and Design Principle
L
Using these notations, the support moments 𝑴𝑩and 𝑴𝑪 in a three
E
T
span continuous beam for loads in different spans are given by the
P
relations:
𝑴𝑪 = [𝑽/(𝟏 − 𝑼)] 𝑴𝟏
Bridge Engineering
Analysis and Design Principle
Bridge Engineering
Analysis and Design Principle
E L
influence line for moment at any other section within the span by
the method of superposition.
P T
N
• For continuous beam ABCD of three spans shown in Fig 13
below the influence line for the support moment 𝑴𝑩 is first
drawn.
Bridge Engineering
Analysis and Design Principle
E L
P T
N
Bridge Engineering
Analysis and Design Principle
• The influence line for bending moment at 𝑷, ‘𝒙𝑳’ far from A can
be obtained by superposition.
𝑴𝑷 = 𝑴𝑺 + (𝑴𝑩/𝑳)(𝒙𝑳)
L
Where 𝑴𝑺 = simple bending moment at the section due to unit load
located anywhere in span AB.
T E
N P
If the load crosses the span AB, the bending moment at the section
P is obtained as 𝑴𝑷= (𝑴𝑩/𝑳)(𝒙𝑳).
Bridge Engineering
Analysis and Design Principle
Bridge Engineering
Analysis and Design Principle
E L
• The dead load moments are computed using the influence lines
P T
and the dead load of the member divided into a number of parts
between the sections. N
• The live load and dead load moments and shear force are
combined to obtain the design moments and shears at each of
the sections.
Bridge Engineering
Analysis and Design Principle
•
E L
The designed sections should conform to the limit state of
ultimate strength and serviceability.
P T
• N
Using the given grade of concrete and type of steel
reinforcements, the empirically assumed depths at critical
sections are checked for flexural and shear strength.
Bridge Engineering
Analysis and Design Principle
L
• The sections are checked for ultimate shear strength and
E
sufficient shear reinforcements are designed comprising of two
T
or four legged stirrups.
N P
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
T
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
E L
P T
N
Design Example: Problem Statement
Bridge Engineering
Design Example: Problem Statement
L
Design the bridge deck and draw typical sections showing the
E
T
details of reinforcement in the deck slab and girders. The design
2011. N P
should conform to the specification of IRC 6-2014 and IRC 112-
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 1: Longitudinal Elevation of Main Girder
Bridge Engineering
Design Example: Solution
𝒓=𝟐
E L
P T
N
Figure 1: Longitudinal Elevation of Main Girder
Bridge Engineering
Design Example: Solution
N
Cross girders are provided at 4 m intervals in end spans and 6 m
intervals in central span.
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
𝐮 = 𝟎. 𝟖𝟓 + 𝟐 × 𝟎. 𝟎𝟖 = 𝟏. 𝟎𝟏 𝐦
𝐯 = 𝟑. 𝟔 + 𝟐 × 𝟎. 𝟎𝟖 = 𝟑. 𝟕𝟔 𝐦
N
𝑴𝑩 = 𝑾×(𝒎𝟏 + 𝟎. 𝟏𝟓 𝒎𝟐 ) = 350 × (0.09 + 0.15 × 0.035) = 33.32 kN-m
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
T
Total load on one panel = (4 × 2.9 × 7.76) = 90 kN
P
N
(𝐮/𝐁) = (𝐯/𝐋) = 1 as panel has uniformly distributed dead load
𝑲 = (𝑩/𝑳) = (2.9/4.0) = 0.725
From Pigeaud’s curves, 𝒎𝟏 = 0.048 and 𝒎𝟐 = 0.025
𝑴𝑩 = 90 × (0.048 + 0.15 × 0.025) = 4.65 kN-m
Bridge Engineering
Design Example: Solution
N
load factors to the service load moments as per principles of limit
state design and IRC Code specifications.
Bridge Engineering
Design Example: Solution
c) Design of Section
L
𝑴𝒖 𝟒𝟓 × 𝟏𝟎𝟔
Effective depth of slab required = 𝒅 = = =
E
𝟎.𝟏𝟑𝟖 .𝒇𝐜𝐤 .𝒃
T
𝟎.𝟏𝟑𝟖 × 𝟐𝟎 × 𝟏𝟎𝟎𝟎
P
127.6 mm
N
Adopt effective depth 𝒅 = 200 mm and overall depth D = 250 mm
𝑴𝒖 𝟒𝟓 × 𝟏𝟎𝟔
For short span, = = 1.12, using M-20 grade concrete
𝐛𝒅𝟐 𝟏𝟎𝟎𝟎 × 𝟐𝟎𝟎𝟐
and Fe-415 HYSD bars
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
𝟏𝟎𝟎𝑨𝒔𝒕
From Table 2 of SP 16: 1980 Design Aids, 𝒑𝒕 = 0.335 =
𝒃𝒅
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
Referring to Figure 1, the values of 𝒓𝑩 and 𝒓𝑪 = 2.0, 𝒓𝑨= 𝒓𝑫= 0.
P T
N
Figure 1: Longitudinal Elevation of Main Girder
Bridge Engineering
Design Example: Solution
Carry over factors are, 𝑪𝑨𝑩 = – 1.01, 𝑪𝑩𝑪 = – 0.78 𝑪𝑪𝑫 = – 0.40
E L
𝑪𝑨𝑩 = – 0.40, 𝑪𝑩𝑪 = – 0.78 𝑪𝑪𝑫 = – 1.01
P T
N
The end A is simply supported. Hence the stiffness factor 𝑲𝑩𝑨 is
modified by using the equation,
Bridge Engineering
Design Example: Solution
E L
𝑫𝑩𝑪 = (1 – 0.3468) = 0.6532 = 𝑫𝑪𝑩
P T
N
Bridge Engineering
Design Example: Solution
E L
𝑴𝑩 = [(𝟏 − 𝑫𝑩𝑨 − 𝑼)/(𝟏 − 𝑼]× 𝑴𝟏
P T
N
Where 𝐔 = 𝑪𝑩𝑪. 𝑪𝑪𝑩. 𝑫𝑩𝑪. 𝑫𝑪𝑩 = (– 0.78) × (– 0.78) × 0.6532 × 0.6532 =
0.2595
𝑴𝑪 = [𝑽/(𝟏 − 𝑼)] × 𝑴𝟏
Bridge Engineering
Design Example: Solution
E L
T
𝑴𝑩 = [(𝑫𝑩𝑨. 𝑴𝑩𝑪 − 𝑾. 𝑴𝑪𝑩)/(𝟏 − 𝑼)]
N P
𝐖 = 𝑪𝑪𝑩. 𝑫𝑪𝑩. 𝑫𝑩𝑨 = (− 0.78 × 0.6532 × 0.3468) = − 0.1766
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
N
𝐌𝐀𝐁 𝐌𝐁𝐀 𝐌𝟏 𝐌𝐁𝐂 𝐌𝐂𝐁 𝐌𝐂𝐃 𝐌𝐃𝐂
𝐌𝟑
position span AB 𝐌𝐁 span BC 𝐌𝐁 span CD 𝐌𝐁
0.1 -0.0755L -0.0230L -0.0990L -0.0950L -0.0040L -0.0970L -0.0010L -0.0980L -0.0526𝐋𝟏 -0.0453𝐋𝟐 +0.0233𝐋𝟑
0.2 -0.1100L -0.0800L -0.1910L -0.1740L -0.0200L -0.1840L -0.060L -0.1900L -0.1015𝐋𝟏 -0.086𝐋𝟐 +0.0452𝐋𝟑
0.3 -0.1120L -0.1550L -0.268L -0.2220L -0.0550L -0.2500L -0.0160L -0.2660L -0.1424𝐋𝟏 -0.1170𝐋𝟐 +0.0634𝐋𝟑
0.4 -0.0950L -0.2250L -0.3240L -0.2250L -0.1120L -0.2805L -0.0380L -0.3230L -0.1722𝐋𝟏 -0.1320𝐋𝟐 +0.0770𝐋𝟑
0.5 -0.0660L -0.2750L -0.3410L -0.1810L -0.1810L -0.2750L -0.0660L -0.3410 -0.1812𝐋𝟏 -0.1278𝐋𝟐 +0.0812𝐋𝟑
0.6 -0.0380L -0.2850L -0.3230L -0.1120L -0.2250 -0.2250L -0.0950L -0.3200 -0.1717𝐋𝟏 -1060𝐋𝟐 +0.0762𝐋𝟑
0.7 -0.0180L -0.2510L -0.2690L -0.0550L -0.2220L -0.1550L -0.1150 -2700 -0.1430𝐋𝟏 -0.0770𝐋𝟐 +0.0643𝐋𝟑
0.8 -0.0052L -0.1840L -0.1890L -0.0200L -0.1740L -0.0820L -0.1100L -0.1920L -0.1004𝐋𝟏 -0.057𝐋𝟐 +0.0457𝐋𝟑
0.9 -0.0010L -0.0970L -0.0980L -0.0040L -0.0950L -0.0230L -0.0755L -0.098L -0.0520𝐋𝟏 -0.0244𝐋𝟐 +0.0233𝐋𝟑
Bridge Engineering
Design Example: Solution
In this table the coefficients are in terms of the length ‘L’. The span
lengths of the design problem, 𝑳𝟏 = 20 m, 𝑳𝟐 = 30 m, 𝑳𝟑 = 20 m. The
coefficients for M are multiplied by the respective span lengths
depending upon the position of the load on span and influence line
coefficients are derived.
E L
T
The influence line ordinates for bending moment at support B is
P
N
derived by multiplying the respective lengths of the spans𝑳𝟏 , 𝑳𝟐
and 𝑳𝟑 depending upon the load position from 0.1 to 3.0. The
influence line ordinates are compiled in Table 2 and the influence
line plotted on the span is shown in Figure 5.
Bridge Engineering
Design Example: Solution
Table 2. Influence Line Ordinates for Bending
Moment at support B
Load Position Influence Line Coefficient Influence Line Ordinate
0.1 -0.0526𝐋𝟏 -1.052
0.2 -0.1015𝐋𝟏 -2.030
L
0.3 -0.1424𝐋𝟏 -2.848
E
0.4 -0.1722𝐋𝟏 -3.444
T
0.5 -0.1812𝐋𝟏 -3.624
P
0.6 -0.1717𝐋𝟏 -3.434
N
0.7 -0.1430𝐋𝟏 -2.860
0.8 -0.1004𝐋𝟏 -2.008
0.9 -0.0520𝐋𝟏 -1.040
1.0 0.0 0.0
1.1 -0.0453𝐋𝟐 -1.359
1.2 -0.0861𝐋𝟐 -2.583
1.3 -0.1170𝐋𝟐 -3.510
1.4 -0.1320𝐋𝟐 -3.960
1.5 -0.1278𝐋𝟐 -3.834
(Contd.)
Bridge Engineering
Design Example: Solution
Table 2. Influence Line Ordinates for Bending
Moment at support B
Load Position Influence Line Coefficient Influence Line Ordinate
1.6 -0.1060𝐋𝟐 -3.180
1.7 -0.0770𝐋𝟐 -2.310
L
1.8 -0.0507𝐋𝟐 -1.521
E
1.9 -0.0244𝐋𝟐 -0.732
T
2.0 0.0 0
P
2.1 +0.0233𝐋𝟑 +0.466
N
2.2 +0.0452𝐋𝟑 +0.904
2.3 +0.0634𝐋𝟑 +1.268
2.4 +0.0770𝐋𝟑 +1.540
2.5 +0.0812𝐋𝟑 +1.624
2.6 +0.0762𝐋𝟑 +1.524
2.7 +0.0643𝐋𝟑 +1.286
2.8 +0.0457𝐋𝟑 +0.914
2.9 +0.0233𝐋𝟑 +0.466
3.0 0 0
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
The influence line ordinates for these various sections are shown
in Figures 6 to 13.
P T
N
Similarly, influence line ordinates for shear force at support
sections A and B are compiled in Tables 11 and 12.
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 7. Influence line for bending moment at section 0.4L
(8 m from support A)
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 8. Influence line for bending moment at section 0.5L
(10 m from support A)
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 9. Influence line for bending moment at section 0.6L
(12 m from support A)
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 10. Influence line for bending moment at section
0.8L (16 m from support A)
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 11. Influence line for bending moment at section
1.2L (6 m from support B)
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 12. Influence line for bending moment at section
1.4L (12 m from support B)
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 13. Influence line for bending moment at section
1.5L (15 m from support B)
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 14. Influence line ordinates for shear force
at support A
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 15. Influence line ordinates for shear force
at support B
Bridge Engineering
Design Example: Solution
Table 3. Influence line ordinates for Bending
Moment at section 0.2L (4 m from Support A)
L
0.2 0.16 -0.0203 +0.1397 +2.7940
E
0.3 0.14 -0.0284 +0.1116 +2.2320
T
0.4 0.12 -0.0344 +0.0856 +1.7120
P
0.5 0.08 -0.0362 +0.0638 +1.2760
N
0.6 0.06 -0.0343 +0.0457 +0.9140
0.7 0.04 -0.0286 +0.0314 +0.6280
0.8 0.02 -0.0200 +0.0200 +0.4000
0.9 0 -0.0104 +0.0096 +0.1920
1.0 - 0 0 0
1.1 - -0.0090 -0.0090 -0.2700
1.2 - -0.0172 -0.0172 -0.5160
1.3 - -0.0234 -0.0234 -0.7020
1.4 - -0.0264 -0.0264 -0.7920
1.5 - -0.0255 -0.0255 -0.7650
(Contd.)
Bridge Engineering
Design Example: Solution
Table 3. Influence line ordinates for Bending
Moment at section 0.2L (4 m from Support A)
L
1.7 - -0.0154 -0.0154 -0.4620
E
1.8 - -0.0101 -0.0101 -0.3030
T
1.9 - -0.0048 -0.0048 -0.1440
P
2.0 - 0 0 0
N
2.1 - +0.0046 +0.0046 +0.0920
2.2 - +0.0090 +0.0090 +0.1800
2.3 - +0.0126 +0.0126 +0.2520
2.4 - +0.0154 +0.0154 +0.3080
2.5 - +0.0162 +0.0162 +0.3240
2.6 - +0.0152 +0.0152 +0.3040
2.7 - +0.0128 +0.0128 +0.2560
2.8 - +0.0091 +0.0091 +0.1820
2.9 - +0.0046 +0.0046 +0.0920
3.0 - 0 0 0
Bridge Engineering
Design Example: Solution
Table 4. Influence line ordinates for Bending
Moment at section 0.4L (8 m from Support A)
L
0.2 0.12 -0.0406 +0.0794 +1.5880
E
0.3 0.18 -0.0569 +0.1231 +2.4620
T
0.4 0.24 -0.0688 +0.1712 +3.4240
P
0.5 0.20 -0.0724 +0.1276 +2.5520
N
0.6 0.16 -0.0686 +0.0914 +1.8280
0.7 0.12 -0.0572 +0.0628 +1.2560
0.8 0.08 -0.0401 +0.0399 +0.7980
0.9 0.04 -0.0208 +0.0192 +0.3840
1.0 0 0 0 0
1.1 - -0.0181 -0.0181 -0.5430
1.2 - -0.0344 -0.0344 -1.0320
1.3 - -0.0468 -0.0468 -1.4040
1.4 - -0.0528 -0.0528 -1.5840
1.5 - -0.0511 -0.0511 -1.5330
(Contd.)
Bridge Engineering
Design Example: Solution
Table 4. Influence line ordinates for Bending
Moment at section 0.4L (8 m from Support A)
L
1.7 - -0.0308 -0.0308 -0.9240
E
1.8 - -0.0202 -0.0202 -0.6060
T
1.9 - -0.0097 -0.0097 -0.2910
P
2.0 - 0 0 0
N
2.1 - +0.0093 +0.0093 +0.1860
2.2 - +0.0180 +0.0180 +0.3600
2.3 - +0.0253 +0.0253 +0.5060
2.4 - +0.0308 +0.0308 +0.6100
2.5 - +0.0324 +0.0324 +0.6480
2.6 - +0.0304 +0.0304 +0.6080
2.7 - +0.0257 +0.0257 +0.5140
2.8 - +0.0182 +0.0182 +0.3640
2.9 - +0.0093 +0.0093 +0.1860
3.0 - 0 0 0
Bridge Engineering
Design Example: Solution
Table 5. Influence line ordinates for Bending
Moment at section 0.5L (10 m from Support A)
L
0.2 0.10 -0.0507 +0.0493 +0.986
E
0.3 0.15 -0.0712 +0.0788 +1.576
T
0.4 0.20 -0.0861 +0.1139 +2.278
P
0.5 0.25 -0.0906 +0.1594 +3.188
N
0.6 0.20 -0.0858 +0.1142 +2.284
0.7 0.15 -0.0715 +0.0785 +1.570
0.8 0.10 -0.0502 +0.0498 +0.996
0.9 0.05 -0.0026 +0.0024 +0.048
1.0 0 0 0 0
1.1 - -0.0226 -0.0226 -0.678
1.2 - -0.0430 -0.0430 -1.290
1.3 - -0.0585 -0.0585 -1.755
1.4 - -0.0660 -0.0660 -1.980
1.5 - -0.0639 -0.0639 -1.917
(Contd.)
Bridge Engineering
Design Example: Solution
Table 5. Influence line ordinates for Bending
Moment at section 0.5L (10 m from Support A)
L
1.7 - -0.0385 -0.0385 -1.155
E
1.8 - -0.0253 -0.0253 -0.759
T
1.9 - -0.0122 -0.0122 -0.366
P
2.0 - 0 0 0
N
2.1 - +0.0116 +0.0116 +0.232
2.2 - +0.0226 +0.0226 +0.452
2.3 - +0.0317 +0.0317 +0.634
2.4 - +0.0385 +0.0385 +0.770
2.5 - +0.0406 +0.0406 +0.812
2.6 - +0.0381 +0.0381 +0.762
2.7 - +0.0321 +0.0321 +0.642
2.8 - +0.0229 +0.0229 +0.458
2.9 - +0.0117 +0.0117 +0.234
3.0 - 0 0 0
Bridge Engineering
Design Example: Solution
Table 6. Influence line ordinates for Bending
Moment at section 0.6L (12 m from Support A)
L
0.2 0.08 -0.0609 +0.0191 +0.382
E
0.3 0.12 -0.0854 +0.0346 +0.692
T
0.4 0.16 -0.1033 +0.5067 +1.134
P
0.5 0.20 -0.1087 +0.0913 +1.826
N
0.6 0.24 -0.1030 +0.1370 +2.740
0.7 0.18 -0.0858 +0.0942 +1.884
0.8 0.12 -0.0602 +0.0598 +1.196
0.9 0.06 -0.0312 +0.0288 +0.576
1.0 0 0 0 0
1.1 - -0.0271 -0.0271 -0.813
1.2 - -0.0516 -0.0516 -1.548
1.3 - -0.0702 -0.0702 -2.106
1.4 - -0.0792 -0.0792 -2.376
1.5 - -0.0766 -0.0766 -2.298
(Contd.)
Bridge Engineering
Design Example: Solution
Table 6. Influence line ordinates for Bending
Moment at section 0.6L (12 m from Support A)
L
1.7 - -1.0462 -0.0462 -1.386
E
1.8 - -0.0304 -0.0304 -0.912
T
1.9 - -0.0146 -0.0146 -0.438
P
2.0 - 0 0 0
N
2.1 - +0.0139 +0.0139 +0.278
2.2 - +0.0271 +0.0271 +0.542
2.3 - +0.0380 +0.0380 +0.760
2.4 - +0.0462 +0.0462 +0.924
2.5 - +0.0487 +0.0487 +0.974
2.6 - +0.0457 +0.0457 +0.914
2.7 - +0.0385 +0.0385 +0.770
2.8 - +0.0274 +0.0274 +0.548
2.9 - +0.0139 +0.0139 +0.278
3.0 - 0 0 0
Bridge Engineering
Design Example: Solution
Table 7. Influence line ordinates for Bending
Moment at section 0.8L (16 m from Support A)
L
0.2 0.04 -0.0812 -0.0412 -0.824
E
0.3 0.06 -0.1139 -0.0539 -1.078
T
0.4 0.08 -0.1377 -0.0577 -1.154
P
0.5 0.10 -1.1449 -0.0449 -0.898
N
0.6 0.12 -0.1373 -0.0173 -0.346
0.7 0.14 -0.1144 +0.0256 +0.512
0.8 0.16 -0.0803 +0.0797 +1.594
0.9 0.80 -0.0416 +0.0384 +0.768
1.0 0 0 0 0
1.1 - -0.0362 -0.0362 -1.086
1.2 - -0.0688 -0.0688 -2.064
1.3 - -0.0936 -0.0936 -2.808
1.4 - -0.1056 -0.1056 -3.168
1.5 - -0.1022 -0.1022 -3.066
(Contd.)
Bridge Engineering
Design Example: Solution
Table 7. Influence line ordinates for Bending
Moment at section 0.8L (16 m from Support A)
L
1.7 - -.0.0616 -0.0616 -1.848
E
1.8 - -0.0405 -0.0405 -1.215
T
1.9 - -0.0195 -0.0195 -0.585
P
2.0 - 0 0 0
N
2.1 - +0.0186 +0.0186 +0.372
2.2 - +0.0361 +0.0361 +0.0722
2.3 - +0.0507 +0.0507 +1.014
2.4 - +0.0616 +0.0616 +1.232
2.5 - +0.0649 +0.0649 +1.298
2.6 - +0.0609 +0.0609 +1.218
2.7 - +0.0514 +0.0514 +1.028
2.8 - +0.0365 +0.0365 +0.730
2.9 - +0.0186 +0.0186 +0.372
3.0 - 0 0 0
Bridge Engineering
Design Example: Solution
Table 8. Influence line ordinates for Bending
Moment at section 1.2L (6 m from Support B)
Load Coefficient Coefficient Coefficient Influence Line
(𝜇 + 𝑀! + 𝑀# )
Position 𝜇 𝑀! 𝑀𝐂 Ordinate
0.1 - -0.0420 +0.0046 -0.0374 -0.748
L
0.2 - -0.0812 +0.0091 -0.0721 -1.442
E
0.3 - -0.1139 +0.0128 -0.1011 -2.022
T
0.4 - -0.1377 +0.0152 -0.1225 -2.450
P
0.5 - -1.1449 +0.0162 -0.1287 -2.574
N
0.6 - -0.1373 +0.0154 -0.1219 -2.438
0.7 - -0.1144 +0.0126 -0.1018 -2.036
0.8 - -0.0803 +0.0090 -0.0713 -1.426
0.9 - -0.0416 +0.0046 -0.0370 -0.7400
1.0 0 0 0 0 0
1.1 0.08 -0.0362 -0.0048 +0.0390 +1.170
1.2 0.16 -0.0688 -0.0101 +0.0811 +2.433
1.3 0.14 -0.0936 -0.0154 +0.0310 +0.930
1.4 0.12 -0.1056 -0.0212 -0.0068 -0.204
1.5 0.10 -0.1022 -0.0255 -0.0277 -0.831
(Contd.)
Bridge Engineering
Design Example: Solution
Table 8. Influence line ordinates for Bending
Moment at section 1.2L (6 m from Support B)
Load Coefficient Coefficient Coefficient Influence Line
(𝜇 + 𝑀! + 𝑀# )
Position 𝜇 𝑀! 𝑀𝑪 Ordinate
1.6 0.08 -0.0848 -0.0264 -0.0312 -0.936
L
1.7 0.06 -.0.0616 -0.0234 -0.0250 -0.750
E
1.8 0.04 -0.0405 -0.0172 -0.0177 -0.531
T
1.9 0.02 -0.0195 -0.0090 -0.0085 -0.255
P
2.0 0 0 0 0 0
N
2.1 - +0.0186 -0.0104 +0.0082 +0.164
2.2 - +0.0361 -0.0200 +0.0161 +0.322
2.3 - +0.0507 -0.0286 +0.0221 +0.442
2.4 - +0.0616 -0.0343 +0.0273 +0.546
2.5 - +0.0649 -0.0362 +0.0287 +0.574
2.6 - +0.0609 -0.0344 +0.0265 +0.530
2.7 - +0.0514 -0.0284 +0.0230 +0.460
2.8 - +0.0365 -0.0203 +0.01620 +0.324
2.9 - +0.0186 -0.0105 +0.0081 +0.162
3.0 - 0 0 0 0
Bridge Engineering
Design Example: Solution
Table 9. Influence line ordinates for Bending
Moment at section 1.4L (12 m from Support B)
Load Coefficient Coefficient Coefficient Influence Line
(𝜇 + 𝑀! + 𝑀# )
Position 𝜇 𝑀! 𝑀𝐂 Ordinate
0.1 - -0.0315 +0.0093 -0.0222 -0.444
L
0.2 - -0.0609 +0.0182 -0.0427 -0.854
E
0.3 - -0.0854 +0.0257 -0.0597 -1.194
T
0.4 - -0.1033 +0.0304 -0.0729 -1.458
P
0.5 - -0.1087 +0.0324 -0.0763 -1.526
N
0.6 - -0.1030 +0.0308 -0.0722 -1.444
0.7 - -0.0858 +0.0253 -0.0605 -1.210
0.8 - -0.0602 +0.0180 -0.0402 -0.844
0.9 - -0.0312 +0.0093 -0.0219 -0.438
1.0 0 0 0 0 0
1.1 0.06 -0.0271 -0.0097 +0.0232 +0.696
1.2 0.12 -0.0516 -0.0202 +0.0482 +1.446
1.3 0.18 -0.0702 -0.0308 +0.0790 +2.370
1.4 0.24 -0.0792 -0.0424 +0.1184 +3.552
1.5 0.20 -0.0766 -0.0511 +0.0723 +2.169
(Contd.)
Bridge Engineering
Design Example: Solution
Table 9. Influence line ordinates for Bending
Moment at section 1.4L (12 m from Support B)
Load Coefficient Coefficient Coefficient Influence Line
(𝜇 + 𝑀! + 𝑀# )
Position 𝜇 𝑀! 𝑀𝑪 Ordinate
1.6 0.16 -0.0636 -0.0528 +0.0436 +1.308
L
1.7 0.12 -0.0462 -0.0468 +0.0270 +0.810
E
1.8 0.08 -0.0304 -0.0344 +0.0152 +0.456
T
1.9 0.04 -0.0146 -0.0181 +0.0073 +0.219
P
2.0 0 0 0 0 0
N
2.1 - +0.0139 -0.0208 -0.0069 -0.138
2.2 - +0.0271 -0.0401 -0.0130 -0.260
2.3 - +0.0380 -0.0572 -0.0192 -0.384
2.4 - +0.0462 -0.0686 -0.0244 -0.448
2.5 - +0.0487 -0.0724 -0.0237 -0.474
2.6 - +0.0457 -0.0688 -0.0231 -0.462
2.7 - +0.0385 -0.0569 -0.0184 -0.368
2.8 - +0.0274 -0.0406 -0.0132 -0.264
2.9 - +0.0139 -0.0210 -0.0071 -0.142
3.0 - 0 0 0 0
Bridge Engineering
Design Example: Solution
Table 10. Influence line ordinates for Bending
Moment at section 1.5L (15 m from Support B)
Load Coefficient Coefficient Coefficient Influence Line
(𝜇 + 𝑀! + 𝑀# )
Position 𝜇 𝑀! 𝑀𝑪 Ordinate
0.1 - -0.0263 +0.0117 -0.0146 -0.292
L
0.2 - -0.0507 +0.0229 -0.0278 -0.556
E
0.3 - -0.0712 +0.0321 -0.0391 -0.782
T
0.4 - -0.0861 +0.0381 -0.0048 -0.960
P
0.5 - -0.0906 +0.0406 -0.0554 -1.108
N
0.6 - -0.0858 +0.0385 -0.0473 -0.946
0.7 - -0.0715 +0.0317 -0.0398 -0.796
0.8 - -0.0502 +0.0226 -0.0276 -0.552
0.9 - -0.0026 +0.0116 -0.0144 -0.288
1.0 0 0 0 0 0
1.1 0.05 -0.0226 -0.0122 +0.0152 +0.456
1.2 0.10 -0.0430 -0.0253 +0.0317 +0.951
1.3 0.15 -0.0585 -0.0385 +0.0530 +1.590
1.4 0.20 -0.0660 -0.0530 +0.0081 +2.430
1.5 0.25 -0.0639 -0.0639 +0.1222 +3.660
(Contd.)
Bridge Engineering
Design Example: Solution
Table 10. Influence line ordinates for Bending
Moment at section 1.5L (15 m from Support B)
Load Coefficient Coefficient Coefficient Influence Line
(𝜇 + 𝑀! + 𝑀# )
Position 𝜇 𝑀! 𝑀𝑪 Ordinate
1.6 0.20 -0.0530 -0.066 +0.0081 +2.430
L
1.7 0.15 -0.0385 -0.0585 +0.0530 +1.590
E
1.8 0.10 -0.0253 +0.0430 +0.0317 +0.951
T
1.9 0.05 -0.0122 -0.0226 +0.0152 +0.456
P
2.0 0 0 0 0 0
N
2.1 - +0.0116 -0.0260 -0.0144 -0.288
2.2 - +0.0226 -0.0502 -0.0276 -0.552
2.3 - +0.0317 -0.0715 -0.0398 -0.796
2.4 - +0.0385 -0.0858 -0.0473 -0.946
2.5 - +0.0406 -0.0906 -0.0050 -0.108
2.6 - +0.0381 -0.0861 -0.0048 -0.960
2.7 - +0.0321 -0.0712 -0.0391 -0.782
2.8 - +0.0229 -0.0507 -0.0278 -0.556
2.9 - +0.0117 -0.0263 -0.0146 -0.292
3.0 - 0 0 0 0
Bridge Engineering
Design Example: Solution
Table 11. Influence line ordinates for shear force at
support A
𝑀!
Load Position Coefficient 𝜇 (𝑀! ⁄𝐋𝟏 ) (𝜇 + 𝑀! ⁄𝐋𝟏 )
A 1.0 0 0 +1.0000
L
0.1 1.0 0 0 +1.0000
E
0.2 0.9 -1.052 -0.0526 +0.8474
T
0.3 0.8 -2.030 -0.1015 +0.6985
P
0.4 0.7 -2.848 -0.1424 +0.5576
N
0.5 0.6 -3.444 -0.1722 +0.4278
0.6 0.5 -3.624 -0.1812 +0.3188
0.7 0.4 -3.434 -0.1717 +0.2283
0.8 0.3 -2.860 -0.1430 +0.1570
0.9 0.2 -2.008 -0.1004 +0.0996
1.0 0.1 -1.040 -0.052 +0.0480
1.1 0 0 0 0
1.2 - -1.359 -0.0679 -0.0679
1.3 - -3.510 -0.1755 -0.1755
1.4 - -3.960 -0.1980 -0.1980
1.5 - -3.834 -0.1917 -0.1917
(Contd.)
Bridge Engineering
Design Example: Solution
Table 11. Influence line ordinates for shear force at
support A
𝑀!
Load Position Coefficient 𝜇 (𝑀! ⁄𝐋𝟏 ) (𝜇 + 𝑀! ⁄𝐋𝟏 )
L
1.7 - -2.310 -0.1155 -0.1155
E
1.8 - -1.521 -0.0760 -0.0760
T
1.9 - -0.732 -0.0366 -0.0366
P
2.0 - 0 0 0
N
2.1 - +0.446 +0.0233 +0.0233
2.2 - +0.904 +0.0452 +0.0452
2.3 - +1.268 +0.0634 +0.0634
2.4 - +1.540 +0.0077 +0.0077
2.5 - +1.624 +0.0081 +0.0081
2.6 - +1.524 +0.0076 +0.0076
2.7 - +1.286 +0.0064 +0.0064
2.8 - +0.914 +0.0457 +0.0457
2.9 - +0.466 +0.0233 +0.0233
3.0 - 0 0 0
Bridge Engineering
Design Example: Solution
Table 12. Influence line ordinates for shear force at
support B
𝑀!
Load Position Coefficient 𝜇 (𝑀! ⁄𝐋𝟏 ) (𝜇 + 𝑀! ⁄𝐋𝟏 )
A 0 0 0 0
L
0.1 -0.1 -1.052 -0.0526 -0.1526
E
0.2 -0.2 -2.030 -0.1015 -0.3015
T
0.3 -0.3 -2.848 -0.1424 -0.4424
P
0.4 -0.4 -3.444 -0.1722 -0.5722
N
0.5 -0.5 -3.624 -0.1812 -0.6812
0.6 -0.6 -3.434 -0.1717 -0.7717
0.7 -0.7 -2.860 -0.1430 -0.8430
0.8 -0.8 -2.008 -0.1004 -0.9004
0.9 -0.9 -1.040 -0.0520 -0.9520
1.0 -1.0 0 0 0
1.1 - -1.359 -0.0679 -0.0679
1.2 - -2.583 -0.1291 -0.1291
1.3 - -3.510 -0.1755 -0.1755
1.4 - -3.960 -0.1980 -0.1980
1.5 - -3.834 -0.1917 -0.1917
(Contd.)
Bridge Engineering
Design Example: Solution
Table 12. Influence line ordinates for shear force at
support B
𝑀!
Load Position Coefficient 𝜇 (𝑀! ⁄𝐋𝟏 ) (𝜇 + 𝑀! ⁄𝐋𝟏 )
L
1.7 - -2.310 -0.1155 -0.1155
E
1.8 - -1.521 -0.0760 -0.0760
T
1.9 - -0.732 -0.0366 -0.0366
P
2.0 - 0 0 0
N
2.1 - +0.446 +0.0233 +0.0233
2.2 - +0.904 +0.0452 +0.0452
2.3 - +1.268 +0.0634 +0.0634
2.4 - +1.540 +0.0077 +0.0077
2.5 - +1.624 +0.0081 +0.0081
2.6 - +1.524 +0.0076 +0.0076
2.7 - +1.286 +0.0064 +0.0064
2.8 - +0.914 +0.0457 +0.0457
2.9 - +0.466 +0.0233 +0.0233
3.0 - 0 0 0
Bridge Engineering
Design Example: Solution
Total dead load of deck slab and wearing coat = 7.76 kN/𝐦𝟐
Load due to kerb, R.C posts etc. = 0.24 kN/𝐦𝟐
E L
Total load = 8 kN/𝐦𝟐
P T
N
Loads transmitted to girders at 0.1L sections are as follows:
In span AB = (8 x 2.9 x 2) = 47 kN
In span BC = (8 x 2.9 x 3) = 70 kN
Load transmitted at A = (8 x 2.9 x1) = 23.5 kN
Load transmitted at A = (8 x 2.9 x 2.5) = 58.0 kN
Bridge Engineering
Design Example: Solution
The main girders are of varying depth and constant width of 500
mm.
E L
P T
N
The depth of main girder at various sections is shown in Figure 16.
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 16: Depth of main girder at various sections
Bridge Engineering
Design Example: Solution
Table 13. Self-weight of Main girder at various
sections
E L
26.4
31.2
0.4
0.5
(0.5 x 1.4 x 2 x 24)
(0.5 x 1.5 x 2 x 24)
P T 33.6
36.0
N
0.6 (0.5 x 1.7 x 2 x 24) 40.8
0.7 (0.5 x 1.9 x 2 x 24) 45.6
0.8 (0.5 x 2.1 x 2 x 24) 50.4
0.9 (0.5 x 2.5 x 2 x 24) 60.0
1.0 (0.5 x 3.0 x 2.5 x 24) 90.0
1.1 (0.5 x 2.2 x 3 x 24) 79.2
1.2 (0.5 x 1.8 x 3 x 24) 64.8
1.3 (0.5 x 1.3 x 3 x 24) 46.8
1.4 (0.5 x 1.1 x 3 x 24) 39.6
1.5 (0.5 x 1 x 3 x 14) 72.0
Bridge Engineering
Design Example: Solution
Cross girders have the same depth as that of main girders and they
are spaced at 4 m intervals in end spans and 6 m intervals in
central span. Width of cross-girder = 300 mm. The self-weight of
E
cross girder acting at various sections is compiled in Table 14.
L
P T
Table 14. Self-weight of Cross girder at various sections
Section
A
Load Calculations
(0.3 x 1 x 2.9 x 24)
N Load (kN)
20.9
0.2 (0.3 x 1.1 x 2.9 x 24) 22.9
0.4 (0.3 x 1.4 x 2.9 x 24) 29.2
0.6 (0.3 x 1.7 x 2.9 x 24) 35.5
0.8 (0.3 x 2.1 x 2.9 x 24) 43.8
1.0 (0.3 x 3 x 2.9 x 24) 62.6
1.2 (0.3 x 1.8 x 2.9 x 24) 37.6
1.4 (0.3 x 1.1 x 2.9 x 24) 22.9
Bridge Engineering
Design Example: Solution
L
Section Load due to Deck Slab Load due to Main Girder Load due to Cross girder Total Load (kN)
E
A 23.5 12.0 20.9 57
T
0.1 47.0 25.2 - 72
0.2 47.0 26.4 22.9 96
0.3
0.4
0.5
0.6
47.0
47.0
47.0
47.0
31.2
33.6
36.0
40.8 N P -
29.2
-
35.5
78
110
83
123
0.7 47.0 45.6 - 93
0.8 47.0 50.4 43.8 141
0.9 47.0 60.0 - 107
1.0 58.0 90.0 62.6 211
1.1 70.0 79.2 - 149
1.2 70.0 64.8 37.6 173
1.3 70.0 46.8 - 117
1.4 70.0 39.6 22.9 133
1.5 70.0 72.0 - 142
Bridge Engineering
Design Example: Solution
E L
(0.194 + 0.308) + 93 × (0.628 + 0.252) + 141 × (0.400 + 0.18) + 107 ×
T
(0.192 + 0.092) – [149 × (0.270 + 0.144) + 173 × (0.516 + 0.303) + 117
P
N
× (0.702 + 0.462) + 133 × (0.792 + 0.636) + 142 × (0.765)] = 647 kN.m
Bridge Engineering
Design Example: Solution
E L
93 × (1.256 + 0.506) + 141 × (0.798 + 0.360) + 107 × (0.384 + 0.186)-
T
[149 × (0.543 + 0.291) + 173 × (1.032 + 0.606) + 117 × (1.404 + 0.924) +
P
N
113 × (1.584 + 1.272) + 142 × (1.533)] = 660 kN.m
Bridge Engineering
Design Example: Solution
E L
93 × (1.57 + 0.634) + 141 × (0.996 + 0.452) + 107 × (0.480 + 0.232)] -
T
[149 × (0.678 + 0.366) + 173 × (1.29 + 0.759) + 117 × (1.755 + 0.155) +
P
N
133 × (1.980 + 1.590) + 142 × (1.917)] = 293 kN.m
Bridge Engineering
Design Example: Solution
E L
× (1.884 + 0.760) + 141 × (1.196 + 0.542) + 107 × (0.576 + 0278)] - [149
T
× (0.813 + 0.438) + 173 × (1.548 + 0.912) + 117 × (2.106 + 1.386) + 133
P
N
× (2.376 + 1.908) + 142 × (2.298)] = -190 kN.m
Bridge Engineering
Design Example: Solution
E L
+ (93 × 1.014) + (141 × 0.722) + (107 × 0.372)] - [(72 × 0.444) + (96 ×
T
0.824) + (78 × 1.078) + (110 × 1.154) + (83 × 0.898) + (123 × 0.346)
P
N
+149 × (1.086 + 0.585) + 173 × (2.064 + 1.215) + 117 × (2.88 + 1.848) +
133 × (3.168 + 2.544) + (142 × 3.066)] = -1835 kN.m
Bridge Engineering
Design Example: Solution
E L
3.434) + 93 × (1.268 - 2.860) + 141 × (0.904 - 2.008) + 107 × (0.466 -
T
1.040)] - [(149 × (1.359 + 0.732) + 173 × (2.583 + 1.521) + 117 × (3.510
P
N
+ 2.31) + 133 × (3.96 + 3.18) + 142 × (3.834)] = -4443 kN.m
Bridge Engineering
Design Example: Solution
E L
2.438) + 93 × (0.442 - 2.036) + 141 × (0.322 - 1.426) + 107 × (0.164 -
T
0.74) + 117 × (0.930 - 0.750) – (133 × 0.204) – (142 × 0.831) – (133 ×
P
0.836)] = -1030 kN.m
N
Bridge Engineering
Design Example: Solution
E L
1.444 - 0.448) + 93 × (- 1.210 - 0.384) + 141 × (- 0.844 - 0.260) + 107 ×
T
(- 0.438 - 0.138)] + [149 × (0.696 + 0.219) + 173 × (1.446 + 0.456) + 117
P
N
× (2.370 + 0.810) + 133 × (3.552 + 1.308) + (142 × 2.169)] = 545 kN.m
Bridge Engineering
Design Example: Solution
E L
0.796) + 141 × (-2 × 0.552) + 107 × (-2 × 0.288)] + [149 × (2 × 0.456) +
T
173 × (2 × 0.951) + 117 × (2 × 1.590) + 133 × (2 × 2.430) + (142 ×
P
3.660)] = 1740 kN.m
N
Bridge Engineering
Design Example: Solution
a) Reaction Factors:
The main girders are connected rigidly by cross girders and deck
slab. Hence Courbon’s theory for the load distribution is adopted.
E L
T
The IRC Class AA tracked vehicle is arranged for maximum
P
N
eccentricity as shown in Fig 17.
Reaction factor for outer girder 𝑹𝑨 = (𝟐𝑾𝟏 /3) × [1 + (37 × 2.9 × 1.1)/
(27 × 𝟐𝟗𝟐 )] = 1.045 𝑾𝟏
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
L
Impact factor for Class AA Tracked Vehicle is 10% for a span up to
E
40 m.
P T
N
The influence lines shown in Figs. 6 to 15, are used to compute the
maximum live load bending moments at various sections.
Bridge Engineering
Design Example: Solution
P T
outer girder (R.F. = 0.5225)
1015
(R.F. = 0.3335)
648
N
0.2
-(1.1 x 700)[(0.792 + 0.765)/2] = 599.4 313 200
+(1.1 x 700) [(3.424 + 2.552)/2] = 2300 1202 768
0.4
-(1.1 x 700)[(1.584 + 1.533)/2] = 1200 627 400
+(1.1 x 700) [(3.188 + 2.284)/2] = 2107 1101 703
0.5
-(1.1 x 700)[(1.980 + 1.917)/2] = 1500 784 500
(Contd.)
Bridge Engineering
Design Example: Solution
L
-(1.1 x 700)[(2.376 + 2.298)/2] = 1800 940 600
+(1.1 x 700) [(1.594 + 0.768)/2] = 909 475 303
0.8
-(1.1 x 700)[(3.168 + 3.066)/2] = 2400
T E1254 800
P
+(1.1 x 700) [(1.624 + 1.540)/2] = 1218 636 406
N
1.0(B)
-(1.1 x 700)[(3.960 + 3.834)/2] = 3000 1567 1000
+(1.1 x 700) [(2.433 + 1.170)/2] = 1387 725 463
1.2
-(1.1 x 700)[(2.574+ 2.450)/2] = 1934 1010 645
+(1.1 x 700) [(3.552 + 2.370)/2] = 2280 1191 760
1.4
-(1.1 x 700)[(0.526 + 1.444)/2] = 1143 597 381
+(1.1 x 700) [(3.660 + 2.430)/2] = 2345 1225 782
1.5
-(1.1 x 700)[(1.108 + 0.968)/2] = 800 418 267
Bridge Engineering
Design Example: Solution
The live load and dead load bending moments at various sections
are compiled in Table 17.
E L
load and live load moment for inner and outer girders.
P T
N
Bridge Engineering
Design Example: Solution
L
0.4 1202 627 768 400 660 - 1862 627 1428 400
0.5 1101 784 703 500 293 - 1394
P
0.6 930 940 594 600 - 190 930 1130 594 790
N
0.8 475 1254 303 800 - 1835 475 3089 303 2635
1.0 636 1567 406 1000 - 4443 636 6010 406 5443
1.2 725 1010 463 645 - 1030 725 2040 463 1675
1.4 1191 597 760 381 545 - 1736 597 1305 381
1.5 1225 418 782 267 1740 - 295 418 2522 267
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
The dead load shear force is computed using the influence lines.
E L
(0.099 + 0.045) + 107 × (0.048 + 0.023)] – [(149 × (0.067 + 0.036) + 173
T
× (0.129 + 0.076) + 117 × (0.175 + 0.115) + 133 × (0.198 + 0.159) + 142
P
× (0.191)] = 255 kN
N
Bridge Engineering
Design Example: Solution
L
(0.129 + 0.076) + 117 × (0.175 + 0.115) + 133 × (0.198 + 0.159) + 142 ×
E
T
(0.191)] = -705 kN
N P
Design shear force at support A, 𝑽𝑨 = (live load shear + dead load
shear) = (423 + 255) = 678 kN
Design shear force at support B, 𝑽𝑩= (live load shear + dead load
shear) = (- 423 - 705) = 1178 kN
Bridge Engineering
Design Example: Solution
i) Bending Moments:
E L
a) Outer Girder:
P T
N
𝑴𝑼 = [(1.35 𝑴𝒈 + 1.5𝑴𝒒 )] = [(1.35 × 293) + (1.5 × 1101)] = +2407 kN.m
b) Inner Girder:
𝑴𝑼= [(1.35 𝑴𝒈+ 1.5𝑴𝒒 )] = [(1.35 × 293) + (1.5 × 703)] = +1450 kN.m
Bridge Engineering
Design Example: Solution
2) At section 1 (Support B)
a) Outer Girder
b) Inner Girder
E L
P T
𝑴𝑼= [(1.35 𝑴𝒈+1.5𝑴𝒒 )] = [(1.35 × 4443) + (1.5 × 1000)] = -7498 kN.m
N
Bridge Engineering
Design Example: Solution
a) Outer Girder
𝑴𝑼= [(1.35 𝑴𝒈+ 1.5𝑴𝒒 )] = [(1.35 × 1740) + (1.5 × 1225)] = +4186 kN.m
b) Inner Girder
E L
P T
𝑴𝑼= [(1.35 𝑴𝒈+ 1.5𝑴𝒒 )] = [(1.35 × 1740) + (1.5 × 782)] = +3522 kN.m
N
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
L
Overall depth = D = 1500 mm
Effective depth = d = 1350 mm
T E
Width of beam = b = 500 mm
N P
𝑴𝑼= + 2047 kN.m
𝑴𝒖 𝟐𝟎𝟒𝟕 × 𝟏𝟎𝟔
Effective depth required d = 𝟎.𝟏𝟑𝟖 𝒇𝒄𝒌 .𝒃
= 𝟎.𝟏𝟑𝟖 × 𝟐𝟎× 𝟓𝟎𝟎
= 1217 mm <
1350 mm
Bridge Engineering
Design Example: Solution
𝐌𝐮 𝟐𝟎𝟒𝟕 × 𝟏𝟎𝟔
=[ ] = 2.2,
𝐛𝐝𝟐 𝟓𝟎𝟎 𝐱 𝟏𝟑𝟓𝟎𝟐
Using M-20 grade concrete and Fe-415 HYSD bars, from Table 2 of
SP: 16 Design Aids,
𝒑𝒕 = 0.717 =
𝟏𝟎𝟎𝐀𝐬𝐭
E L
T
𝐛𝐝
Solving, 𝑨𝒔𝒕 =
𝟎.𝟕𝟏𝟕 × 𝟓𝟎𝟎 × 𝟏𝟑𝟓𝟎
𝟏𝟎𝟎
N P
= 4840 𝐦𝐦𝟐
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
𝐌𝐮 𝟖𝟑𝟒𝟖 × 𝟏𝟎𝟔
= = 2.0,
𝐛𝐝𝟐 𝟓𝟎𝟎 × 𝟐𝟖𝟓𝟎𝟐
Using M-20 grade concrete and Fe-415 HYSD bars, from Table 2 of
SP: 16 Design Aids,
𝒑𝒕 = 0.640 =
𝟏𝟎𝟎𝐀𝐬𝐭
E L
T
𝐛𝐝
Solving, 𝑨𝒔𝒕 =
𝟎.𝟔𝟒𝟎 × 𝟓𝟎𝟎 ×𝟐𝟖𝟓𝟎
𝟏𝟎𝟎 NP
= 9120 𝐦𝐦𝟐
Bridge Engineering
Design Example: Solution
𝑽𝒖 𝟏𝟓𝟖𝟔 ×𝟏𝟎𝟔
Nominal shear stress = 𝝉𝒗 = = = 1.11 < 𝝉𝐜 𝒎𝒂𝒙 = 2.8
𝒃𝐰.𝒅 𝟓𝟎𝟎 × 𝟐𝟖𝟓𝟎
N/𝒎𝒎𝟐
L
𝒃𝒅 (𝟓𝟎𝟎 × 𝟐𝟖𝟓𝟎)
T
For 𝒑𝒕 = 0.67, interpolate 𝝉𝒄 from Table 19 of IS: 456-2000 as 𝝉𝒄 = E
0.52 N/𝒎𝒎𝟐
N P
Since 𝑽𝑼 > 𝑽𝑪, shear reinforcements are required.
Bridge Engineering
Design Example: Solution
Bridge Engineering
Design Example: Solution
𝑴𝑼 = 4186 kN.m, 𝐛𝐰 = 500 mm, 𝐛𝐟. = 2900 mm, 𝑫 = 1000 mm, 𝒅 = 850
mm, 𝐃𝐟. = 250 mm
E L
P T
N
The ultimate moment capacity of the flange section alone is
computed assuming 𝒙𝑼 = 250 mm
Bridge Engineering
Design Example: Solution
E L
T
Steel required to resist this moment is computed as (assuming 𝒙𝒖=
𝑫𝒇 )
N P
𝐌𝐮 = 𝟎. 𝟖𝟕×𝐟𝐲 ×𝑨𝒔𝒕 (𝒅 − 𝟎. 𝟒𝟐 𝐱 𝐮)
Bridge Engineering
Design Example: Solution
L
spacing of 300 mm are provided throughout the span.
T E
N P
Bridge Engineering
Design Example: Solution
• Cross Girders:
E L
diameter 4-legged stirrups are provided in the cross girders to
P T
improve the structural integrity of the bridge deck.
•
N
Details of Reinforcements in Bridge Deck:
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
Design Example: Solution
E L
P T
N
Figure 20: Reinforcement detailing in central span
Bridge Engineering
Design Example: Solution
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
T
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Types of Piers
E L
Design of Piers P T
Stability Analysis of Piers
N
Topic of Discussion
General Features
Types of Piers
Design of Piers
Bridge Engineering
General Features
L
substructure which in turn rests on the foundation located
E
below the ground level.
P T
• N
The piers and abutments generally built up of brick, stone
masonry or concrete are supported on foundations like spread
footings, piles, wells or caissons.
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
Bed Block:
•
E L
The bed block is generally cast with M15 grade concrete.
• P T
The bed block is reinforced with steel bars of area equal to
N
0.3% of the cross-sectional dimensions and distributed as
mesh reinforcement near the top and bottom surfaces of the
bed block.
Bridge Engineering
General Features
Bed Block:
E L
P T
N
Bridge Engineering
General Features
•
N
Brick masonry in cement mortar of proportions 1:6.
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Types of Piers
Design of Piers
Bridge Engineering
Types of Piers
E L
• Hammer-Head Type Pier
P T
• Cellular Type Pier
N
• Framed Type Pier
Bridge Engineering
Types of Piers
This type of pier with cut and ease water is widely used for river
bridges.
E L
P T
N
Bridge Engineering
Types of Piers
Bridge Engineering
Types of Piers
E L
This type of pier is generally suitable for elevated roadways and
P T
when used in river bridges, there is minimum restriction of
waterway. N
Bridge Engineering
Types of Piers
E L
P T
• Cellular Type Pier: N
Bridge Engineering
Types of Piers
E L
However, cellular piers require costly shuttering and additional
labour of placing of reinforcements.
P T
N
For tall piers, slip forming work can be adopted for rapid
construction.
Bridge Engineering
Types of Piers
E L
This type of piers are ideally suited to reduce the span length of
P T
main girders on either side of the centre line of the piers resulting
N
in savings in the cost of superstructure.
Bridge Engineering
Types of Piers
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Types of Piers
Design of Piers
Bridge Engineering
Design of Piers
Bridge Engineering
Design of Piers
Bridge Engineering
Design of Piers
• Height
The top level of pier is fixed at 1-1.5 m above the highest flood
level. Depending on depth of water on the upstream side, sufficient
gap between the highest flood level and the top of the pier is
L
essential to protect the bridge bearings from flooding.
E
P T
• Pier Width
N
The top width of pier should be sufficient to accommodate the two
bearings. It is usually kept at a minimum distance of 600 mm more
than the outer to outer distance of the bearings.
Bridge Engineering
Design of Piers
• Pier Batter
Bridge Engineering
Design of Piers
The pier ends are shaped for streamlining the passage of water.
Normally, the cut and ease waters are either shaped circular or
triangular.
E L
Semi-circular Ends
P T
N
Angular Ends
Bridge Engineering
Topic of Discussion
General Features
Types of Piers
Design of Piers
Bridge Engineering
Stability Analysis of Piers
E L
P T
N
Bridge Engineering
Stability Analysis of Piers: Numerical Example
E L
P T
N
Bridge Engineering
Stability Analysis of Piers: Numerical Example
Bridge Engineering
Stability Analysis of Piers: Numerical Example
Calculate the stress developed at the base of the pier due to the
following cases:
E L
(3) Due to eccentricity of live load
P T
(4) Due to longitudinal braking forces
N
(5) Due to wind pressure
Bridge Engineering
Stability Analysis of Piers: Numerical Example
Design Computations:
L
Self-weight of pier = 8.5 × 0.5 × (2 + 3) × 10 × 24 = 5100 kN
E
Total Direct load = (4000 + 5100) = 9100 kN
P T
Compressive stress at base of pier = N
𝟗𝟗𝟗𝟗𝟗𝟗𝟗𝟗
𝟖𝟖.𝟓𝟓 × 𝟑𝟑
= 356.86 kN/m2
Bridge Engineering
Stability Analysis of Piers: Numerical Example
Bridge Engineering
Stability Analysis of Piers: Numerical Example
E L
Section modulus Z =
𝟖𝟖.𝟓𝟓 × 𝟑𝟑𝟐𝟐
= 12.75 m3
P T
N
𝟔𝟔
Bridge Engineering
Stability Analysis of Piers: Numerical Example
Stresses at base = ±
𝑴𝑴
=±
𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏
= ± 109.8 kN/m2
E L
T
𝒁𝒁 𝟏𝟏𝟏𝟏.𝟕𝟕𝟕𝟕
N P
Bridge Engineering
Stability Analysis of Piers: Numerical Example
𝑴𝑴 𝟑𝟑𝟑𝟑𝟑𝟑
Stress developed at base due to wind loads ± =± = ± 8.30
𝒁𝒁 𝟑𝟑𝟑𝟑.𝟏𝟏𝟏𝟏𝟓𝟓
kN/m2
Bridge Engineering
Stability Analysis of Piers: Numerical Example
Sl Stress (kN/m2)
Type of Load
No When Dry During Floods
1 Dead Load and Self-Weight + 356.80
E L + 356.8
2 Buoyancy –
P T – 75
N
3 Eccentric Live Load + 78.40 + 78.4
4 Braking Forces ± 109.80 ± 109.8
5 Wind Pressure + 8.30 + 8.30
Maximum Stress 553.30 478.30
Minimum Stress 333.70 258.70
Bridge Engineering
Stability Analysis of Piers: Numerical Example
The material of the pier being 1:3:6 cement concrete, the maximum
permissible compressive stress in concrete is 2 N/mm2 or 2000
kN/m2.
Hence, the stresses developed at the base of the pier are within
safe permissible limits.
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Components of Abutments
E L
Design of Abutments P T
Stability Analysis of Abutments
N
Wing Walls and Approaches
Topic of Discussion
General Features
Components of Abutments
Design of Abutments
Bridge Engineering
General Features
L
substructure which in turn rests on the foundation located
E
below the ground level.
P T
N
• The piers and abutments generally built up of brick, stone
masonry or concrete are supported on foundations like spread
footings, piles, wells or caissons.
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
General Features
Bridge Engineering
General Features
•
N
Brick masonry in cement mortar of proportions 1:6.
Bridge Engineering
General Features
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Components of Abutments
Design of Abutments
Bridge Engineering
Components of Abutments
Bed Block:
E L
• The bed block is generally cast with M15 grade concrete.
P T
• The bed block is reinforced with steel bars of area equal to
N
0.3% of the cross-sectional dimensions and distributed as
mesh reinforcement near the top and bottom surfaces of the
bed block.
Bridge Engineering
Components of Abutments
Bed Block:
E L
P T
N
Bridge Engineering
Components of Abutments
• The breast wall which directly supports the dead and live loads
of the superstructure and retains the earth filling on the rear
side.
E L
• The wing walls which act as extensions of the breast wall,
P T
retains the earth fill without resisting any loads from the
superstructure. N
• The back wall is a small retaining wall located just behind the
bridge seat and it prevents the earth fill from flowing into the
bridge seat and bearings.
Bridge Engineering
Components of Abutments
E L
P T
N
Bridge Engineering
Components of Abutments
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Components of Abutments
Design of Abutments
Bridge Engineering
Design of Abutments
E L
Self-weight of the abutment
Bridge Engineering
Design of Abutments
E L
P T
N Sv
Bridge Engineering
Typical Forces
Design of Abutments
• Height
Bridge Engineering
Design of Abutments
• Abutment Batter
E L
• Length of Abutment
P T
the bridge.
N
The length of the abutment must be at least equal to the width of
• Abutment Cap:
The bed block over the abutment is similar to the pier cap with a
thickness of 450 to 600 mm.
Bridge Engineering
Topic of Discussion
General Features
Components of Abutments
Design of Abutments
Bridge Engineering
Stability Analysis of Abutments
E L
P T
N
Bridge Engineering
Stability Analysis of Abutments: Numerical Example
E L
P T
N
Bridge Engineering
Stability Analysis of Abutments: Numerical Example
L
Compute the stresses developed at the base and check for the
E
stability of the abutment.
P T
N
Bridge Engineering
Stability Analysis of Abutments: Numerical Example
Analysis of forces
Bridge Engineering
Stability Analysis of Abutments: Numerical Example
E L
𝑴𝑴 = (95 × 0.5) + (37.5 ×
P T
1.33) + (15 × 1.67) – (20 × 1)
= 102.43 kN-m N
Bridge Engineering
Stability Analysis of Abutments: Numerical Example
𝒃𝒃
Eccentricity 𝒆𝒆 = – z
L
𝟐𝟐
= (1 – 0.695) = 0.305 m
T E
But (b/6) = (2/6) = 0.33 m
N P
Since e < (b/6), the stresses are compressive at both heel and toe,
𝑾𝑾 𝟔𝟔𝟔𝟔
Maximum and Minimum stress = × (1 ± )
𝒃𝒃 𝒃𝒃
𝟏𝟏𝟏𝟏𝟏𝟏.𝟓𝟓 𝟔𝟔×𝟎𝟎.𝟑𝟑𝟑𝟑𝟑𝟑
= × (1 ± ) = 73.75 × [1 ± 0.915]
𝟐𝟐 ×𝟏𝟏 𝟐𝟐
Bridge Engineering
Stability Analysis of Abutments: Numerical Example
𝑾𝑾 𝟔𝟔𝟔𝟔
Maximum and Minimum stress = × (1 ± )
𝒃𝒃 𝒃𝒃
𝟏𝟏𝟏𝟏𝟏𝟏.𝟓𝟓 𝟔𝟔×𝟎𝟎.𝟑𝟑𝟑𝟑𝟑𝟑
= × (1 ± )
𝟐𝟐 × 𝟏𝟏 𝟐𝟐
= 73.75 × [1 ± 0.915]
Bridge Engineering
Stability Analysis of Abutments: Numerical Example
Factor of safety =
𝟕𝟕𝟕𝟕.𝟕𝟕𝟕𝟕
= 3.69 > 2.00
E L
T
𝟐𝟐𝟐𝟐
P
Hence, the abutment has sufficient factor of safety against sliding.
N
Bridge Engineering
Topic of Discussion
General Features
Components of Abutments
Design of Abutments
Bridge Engineering
Wing Walls
E L
• The wing wall dimensions are generally fixed as follows.
P T
Thickness at top = 0.5 m
Thickness at bottom = 0.45 to 0.5 h
N
Where h = height of the wing wall
Face batter = 1 in 12
Back batter = 1 in 6
Bridge Engineering
Wing Walls
Bridge Engineering
Wing Walls
E L
P T
N
Bridge Engineering
Wing Walls
E L
junction of the abutment and gradually reduces to 300-500 mm
towards the bottom of the embankment.
P T
N
The splayed type wing walls prevent the flow of soil towards the
vent way under the bridge.
Bridge Engineering
Wing Walls
E L
P T
N
Bridge Engineering
Approaches
E L
the visibility of the vehicles approaching from the opposite side
is not affected.
P T
N
• Preferably the approaches should be in line with the longitudinal
centre line of the bridge and in no case, they should be curved
at the entrance and exit of the bridge structure.
Bridge Engineering
Approaches
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Types of Foundations
E L
Pile Foundations P T
N
Pile Foundations: Numerical Example
Topic of Discussion
General Features
Types of Foundations
Pile Foundations
Bridge Engineering
General Features
Bridge Engineering
Topic of Discussion
General Features
Types of Foundations
Pile Foundations
Bridge Engineering
Types of Foundations
E L
small span bridges constructed on hard gravelly soil and rocky
strata.
P T
N
• Shallow foundations transfer the load from the superstructure
and sub-structure to the ground by bearing at the bottom of
foundations.
Bridge Engineering
Types of Foundations
Bridge Engineering
Topic of Discussion
General Features
Types of Foundations
Pile Foundations
Bridge Engineering
Pile Foundations
Bridge Engineering
Pile Foundations
Bridge Engineering
Pile Foundations
Bridge Engineering
Pile Foundations
• Precast piles can be cast to various shapes such as: (i) circular,
(ii) square (iii) rectangular and (iv) octagonal.
E L
P T
• Generally square and circular section piles are preferred to
other shapes. N
Bridge Engineering
Pile Foundations
Bridge Engineering
Pile Foundations
Bridge Engineering
Pile Foundations
E L
P T
N
Bridge Engineering
Pile Foundations
E L
P T
N
Bridge Engineering
Pile Foundations
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Types of Foundations
Pile Foundations
Bridge Engineering
Pile Foundations: Numerical Example
E L
Size of piles = 300 mm by 300 mm, Spacing of piles = 1.5 m
P T
N
Materials: M-20 Grade concrete and Fe-415 HYSD bars.
Bridge Engineering
Pile Foundations: Numerical Example
E L
P T
N
Bridge Engineering
Pile Foundations: Numerical Example
2. Pile Reinforcement
Bridge Engineering
Pile Foundations: Numerical Example
Bridge Engineering
Pile Foundations: Numerical Example
If 𝒑𝒑 = pitch of the ties, volume of pile per pitch length = (300 × 300 ×
p) = 90000 p mm3
Bridge Engineering
Pile Foundations: Numerical Example
Or, 𝒑𝒑 = 244.44 mm
L
Hence, we can provide 8 mm diameter ties at 150 mm centres as
E
lateral reinforcement in the pile.
P T
N
(c) Lateral Reinforcement near Pile Head
Bridge Engineering
Pile Foundations: Numerical Example
E L
T
𝟓𝟓𝟓𝟓𝟓𝟓
Bridge Engineering
Pile Foundations: Numerical Example
𝝅𝝅×𝟏𝟏𝟏𝟏𝟏𝟏×𝟓𝟓𝟓𝟓
𝒑𝒑 = = 50 mm
𝟓𝟓𝟒𝟒𝟎𝟎
Bridge Engineering
Pile Foundations: Numerical Example
L
Volume of piles per pitch length = (300 × 300 × p) = 90000 p
E
44000 = (
𝟎𝟎.𝟔𝟔
× 90000 p)
P T
Or, p = 81.48 mm
𝟏𝟏𝟏𝟏𝟏𝟏
N
We can adopt 8 mm diameter ties at 80 mm centres for a length of
900 mm from the ends of the pile both at top and bottom.
Bridge Engineering
Pile Foundations: Numerical Example
E L
P T
N
Bridge Engineering
Pile Foundations: Numerical Example
3. Pile Cap
E L
P T
N
Bridge Engineering
Pile Foundations: Numerical Example
𝟒𝟒𝟒𝟒𝟒𝟒 × 𝟏𝟏𝟏𝟏𝟔𝟔
𝑨𝑨𝒔𝒔𝒔𝒔 = = 3623 mm2 per 1.5 m width
𝟐𝟐𝟐𝟐𝟐𝟐 × 𝟎𝟎.𝟗𝟗 × 𝟔𝟔𝟔𝟔𝟔𝟔
Bridge Engineering
Pile Foundations: Numerical Example
𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏 × 𝟒𝟒𝟒𝟒𝟒𝟒
Using 25 mm diameter bars, spacing 𝒔𝒔 = = 203 mm
𝟑𝟑𝟑𝟑𝟑𝟑𝟑𝟑
𝑽𝑽 𝟔𝟔𝟔𝟔𝟔𝟔 × 𝟏𝟏𝟏𝟏𝟑𝟑
Shear stress 𝝉𝝉𝒗𝒗 = = = 0.667 N/mm2
𝒃𝒃 𝒅𝒅 𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏 × 𝟔𝟔𝟔𝟔𝟔𝟔
Bridge Engineering
Pile Foundations: Numerical Example
Bridge Engineering
Pile Foundations: Numerical Example
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Types of Foundations
E L
Well Foundations P T
N
Well Foundations: Numerical Example
General Features
Types of Foundations
Well Foundations
Bridge Engineering
General Features
Bridge Engineering
Topic of Discussion
General Features
Types of Foundations
Well Foundations
Bridge Engineering
Types of Foundations
E L
small span bridges constructed on hard gravelly soil and rocky
strata.
P T
N
• Shallow foundations transfer the load from the superstructure
and sub-structure to the ground by bearing at the bottom of
foundations.
Bridge Engineering
Types of Foundations
Bridge Engineering
Topic of Discussion
General Features
Types of Foundations
Well Foundations
Bridge Engineering
Well Foundations
L
• The foundation comprises of singles large diameter well or a
E
T
group of smaller wells of circular shape or double-D, square or
P
•
rectangular shapes.
N
The circular shaped well is generally preferred due to its
simplicity for construction and sinking operations.
Bridge Engineering
Well Foundations
E L
P T
N
Bridge Engineering
Well Foundations
E L
P T
N
Bridge Engineering
Well Foundations
L
• The dredge holes should be large enough to permit easy
E
T
dredging. According to IRC: 78-1983, the minimum dimension of
P
N
a dredge hole should not less than 2 m.
Bridge Engineering
Well Foundations
(1) Steining
(2) Well Curb
(3) Bottom and Top Plugs
E L
(4) Well Cap
P T
(5) Sand filling N
(6) Cutting Edge
Bridge Engineering
Well Foundations
E L
P T
N
Typical well foundation with its
various structural components
Bridge Engineering
Well Foundations
L
𝒉𝒉 = 𝑲𝑲 𝒅𝒅𝒄𝒄 𝑳𝑳
Bridge Engineering
Well Foundations
E
Single Circular or Dumb-bell type
Cement
concrete
P
0.030
T 0.033
0.039
0.052
0.043
concrete
Twin D-type Wells Brick Masonry 0.062 0.068
Bridge Engineering
Well Foundations
Bridge Engineering
Well Foundations
E L
shaped with the grade of concrete not leaner than M-20.
P T
N
Minimum reinforcement in curb = 72 kg/m3 excluding bond rods.
Bridge Engineering
Well Foundations
The bottom plug of concrete is provided with its top not lower than
300 mm in the centre above the top of the curb.
Bridge Engineering
Well Foundations
Bridge Engineering
Well Foundations
Bridge Engineering
Well Foundations
E L
(6) Cutting Edge
P T
N
A cutting edge comprising of mild steel angle firmly anchored to
the curb is generally provided to facilitate sinking of the well
through the soil strata. The quantity of steel in the cutting edge
should preferably be not less than 40 kg.
Bridge Engineering
Topic of Discussion
General Features
Types of Foundations
Well Foundations
Bridge Engineering
Well Foundations: Numerical Example
E L
Depth of well = 25 m below bed level
P T
Materials: M-20 Grade Concrete
N
Fe-415 Grade HYSD bars
Bridge Engineering
Well Foundations: Numerical Example
E L
𝒉𝒉 = Thickness of steining
P T
L = Length of steining
𝑲𝑲 = Constant for Clayee soil = 0.033
N
𝒉𝒉 = 𝟎𝟎. 𝟎𝟎𝟎𝟎𝟎𝟎 × 𝟐𝟐. 𝟓𝟓 + 𝟐𝟐 𝒉𝒉 𝟐𝟐𝟐𝟐
Solving 𝒉𝒉 = 0.558 m = 558 mm
We can adopt a steining of 600 mm.
Bridge Engineering
Well Foundations: Numerical Example
=
𝟎𝟎.𝟐𝟐
×
𝝅𝝅
× (𝟑𝟑. 𝟕𝟕𝟐𝟐 – 𝟐𝟐. 𝟓𝟓𝟐𝟐 ) × 𝟏𝟏𝟏𝟏𝟔𝟔
E L
T
𝟏𝟏𝟏𝟏𝟏𝟏 𝟒𝟒
Bridge Engineering
Well Foundations: Numerical Example
≮ 0.002337 𝐦𝐦𝟑𝟑 /m
Bridge Engineering
Well Foundations: Numerical Example
𝟏𝟏𝟏𝟏.𝟖𝟖
Number of one hoops per metre = = 2.8
𝟔𝟔
𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏
Spacings of hoops = = 357 mm
𝟐𝟐.𝟖𝟖
E L
(3) Well Curb
P T
Minimum reinforcement = 72 kg/𝐦𝐦𝟑𝟑 N
We can provide a curb, 1000 mm deep with a bottom and inside width
of 150 mm.
Bridge Engineering
Well Foundations: Numerical Example
𝝅𝝅
Volume of concrete in curb = × (𝟑𝟑. 𝟕𝟕𝟐𝟐 – 𝟐𝟐. 𝟓𝟓𝟐𝟐 ) – (0.5 × 0.45 × 0.85 𝝅𝝅 ×
𝟒𝟒
2.65) = 4.25 𝐦𝐦𝟑𝟑
𝟑𝟑. 𝟏𝟏E
Weight of one hoop of 20 mm diameter = 𝝅𝝅 × T
L
Weight of one hoop of 16 mm diameter N
P × 𝟐𝟐. 𝟒𝟒𝟒𝟒 = 𝟐𝟐𝟐𝟐 𝒌𝒌𝒌𝒌
Bridge Engineering
Well Foundations: Numerical Example
Bridge Engineering
Well Foundations: Numerical Example
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Types of Foundations
Well Foundations
Bridge Engineering
Pneumatic Caisson Foundations
Bridge Engineering
Pneumatic Caisson Foundations
Bridge Engineering
Pneumatic Caisson Foundations
E L
P T
N
Bridge Engineering
Pneumatic Caisson Foundations
Bridge Engineering
Pneumatic Caisson Foundations
E L
P T
N
Bridge Engineering
Topic of Discussion
General Features
Types of Foundations
Well Foundations
Bridge Engineering
Differential Support Settlement
Bridge Engineering
Differential Support Settlement
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Types of Bearings
E L
P T
N
Ø Design Principles of Bearings
Ø General Features
Ø Types of Bearings
Bridge Engineering
General Features
•
E L
The main function of the bearings is to accommodate the
movements of the superstructure.
P T
N
Bridge Engineering
General Features
Bridge Engineering
General Features
Bridge Engineering
General Features
Bridge Engineering
General Features
Bridge Engineering
General Features
•
E L
To allow free movement in the longitudinal direction (expansion
P T
and contraction) due to change in temperature and stresses
• N
To allow rotations at the ends when the bridge girders are
loaded and deflections take place
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Types of Bearings
Bridge Engineering
Types of Bearings
•
L
Fixed bearings permit rotations while, preventing expansion.
E
•
P T
Expansion bearings accommodate both horizontal movements
and rotations.
N
• The type of bearing to be selected depends upon the type of
super structure, type of supports and also the span length.
Bridge Engineering
Types of Bearings
E L
the central support and expansion bearings at the end
supports.
P T
• N
In the case of major bridges, the cost of bearings are in the
range of 10 to 15 percent of the total cost of the bridge.
Bridge Engineering
Types of Bearings
•
E L
In the case of girder bridges, different types of bearings are
invariably adopted.
P T
N
Bridge Engineering
Types of Bearings
Bridge Engineering
Types of Bearings
When the contact surfaces are flat, Teflon coating should be used
E L
to prevent the development of frictional resistant and to facilitate
smooth movement due to expansion.
P T
N
The current practice is to provide a curved shape to the top plate
to reduce the contact area and frictional resistance.
Bridge Engineering
Types of Bearings
E L
P T
N
Bridge Engineering
Types of Bearings
Bridge Engineering
Types of Bearings
E L
P T
N
Bridge Engineering
Types of Bearings
For long span bearings cast steel roller bearings are generally
used.
E L
P T
N
Rollers of diameter 100 to 150 mm are generally preferred.
Bridge Engineering
Types of Bearings
E L
P T
N
Bridge Engineering
Types of Bearings
E L
RC rocker bearings are less expensive in comparison with steel
rocker bearings.
P T
N
A typical RC rocker cum roller bearing comprises of rigid
reinforced concrete block with lead sheets provided at the top and
bottom of the pedestal.
Bridge Engineering
Types of Bearings
The length of the lead sheet coincides with that of the girder width
while its breadth should be sufficient to limit the stresses on the
sheet within permissible limits.
E L
RC pedestal is designed as short column to support the reaction
from the girder.
P T
N
Mild steel dowel bars are used to resist the shear forces. The lead
sheet permits the girder to rotate.
Bridge Engineering
Types of Bearings
For rotation, the girder compresses the lead sheet along the
inside edge and the block tilts inside.
E L
along the outside edge making the block tilt inside.
P T
N
If the height of the concrete rocker is more, a smaller angular
compressive load is sufficient to accommodate the desired
longitudinal expansion.
Bridge Engineering
Types of Bearings
E L
P T
N
Bridge Engineering
Types of Bearings
• Elastomeric Bearing
E L
Elastomeric bearings occupy a smaller space and are easy to
maintain and to replace when damaged.
P T
N
Chloroprene rubber termed as Neoprene is the most commonly
used elastomer in elastomeric pad and pot bearings.
Bridge Engineering
Types of Bearings
E L
P T
N
Bridge Engineering
Types of Bearings
E L
P T
N
Bridge Engineering
Types of Bearings
E L
curved contact surface rocking over the bottom plate which has
flat contact surface.
P T
N
The rocker pin is designed to resist the horizontal shear.
Bridge Engineering
Types of Bearings
E L
P T
N
Bridge Engineering
Types of Bearings
E L
require proper detailing and care during construction.
P T
N
This type of bearing permits large rotations if constructed
properly and accurately with correct design dimensions.
This type of bearing is usually built in with the super and sub
structure and require no maintenance and has a long life.
Bridge Engineering
Types of Bearings
E L
This region of confined concrete in the throat can resist
P T
compressive stresses nearly 7 times that of standard 28 day
N
strength of concrete since the concrete in the throat is in a state
of triaxial compression.
Bridge Engineering
Types of Bearings
Bridge Engineering
Types of Bearings
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Types of Bearings
Bridge Engineering
Design Principles of Bearings
E L
The permissible stresses in the various structural parts of the
P T
metallic bearings specified in the code are compiled in the Table 1.
N
Bridge Engineering
Design Principles of Bearings
Table 1. Permissible stresses in Steel (IRC: 83-1982)
No Description Mild Steel High Tensile
(N/𝐦𝐦𝟐 ) Steel (N/𝐦𝐦𝟐 )
1 Part in bending (tensile or compression) on effective
sectional area for extreme fiber stress.
(a) For plates, flats, rounds, square and similar sections. 160 200
(b) For pins.
E
205
L 295
2 Parts in Shear
P T
N
(a) maximum shear stress on plates. 105 140
(b) Maximum shear stress for turned and fitted bolts and 100 0.43𝐟𝐲 where 𝐟𝐲
pins. is the yield stress
(c) Maximum shear stress in black bolts and rocker pins 85 0.37𝐟𝐲
3 Parts in Bearings
(a) On flat surface 185 240
(b) Knuckle pin and black bolts 200 0.87𝐟𝐲
Bridge Engineering
Design Principles of Bearings
L
(i) Single and double rollers, 8𝒅𝟏 N per mm length.
T
(ii) Three or more rollers, 5𝒅𝟏 N per mm length. E
(b) For High tensile steel
N P
(i) Single and Double rollers, 10𝒅𝟏 N per mm length.
Bridge Engineering
Design Principles of Bearings
The minimum diameter of the roller shall not be less than 75 mm.
The ratio of the length of the roller to its diameter shall normally be
not more than 6, but not more than 10 in any case.
L
The gap between the rollers shall not be less than 50 mm in the
case of multiple full rollers.
T E
N P
Bridge Engineering
Design Principles of Bearings
E L
These type of bearings are widely used for bridges due to their
economy and negligible maintenance costs.
P T
N
Neoprene pad bearings are compact, weather and fire resistant.
Hence, now a days elastomeric bearings have more or less
completely replaced the metallic bearings.
Bridge Engineering
Design Principles of Bearings
E L
P T
N
Bridge Engineering
Design Principles of Bearings
The elastomer used for the bearings pads should have the
following properties:
•
E L
This scale extends from 0 to 10. Hardness values for an eraser
is 30 and for a car tyre is 60.
P T
• N
The minimum ultimate tensile strain at failure should not be less
than 400 percent.
Bridge Engineering
Design Principles of Bearings
E L
P T
N
Bridge Engineering
Design Principles of Bearings
Bridge Engineering
Design Principles of Bearings
Table 2. Standard plan dimensions for Elastomeric Bearings (IRC: 83-part II- 1987)
Size 𝐛𝐨 𝐋𝐨 𝐀. 𝟏𝟎"𝟒 𝐍𝐦𝐚𝐱 𝐍𝐦𝐢𝐧 𝐡𝐢 𝐧𝐦𝐚𝐱 𝐧𝐦𝐢𝐧 𝐡𝐦𝐚𝐱 𝐡𝐦𝐢𝐧 𝛂𝐛𝐢.𝒎𝒂𝒙
Index (𝐦𝐦) (𝐦𝐦)
No (𝒎𝒎𝟐 ) kN kN (mm) x 𝟏𝟎"𝟑
E
40
L 24 3.5
T
10 4 2 50 30 3.0
P
5 250 400 9.2 920 180
12 3 1 48 24 3.5
Bridge Engineering
Design Principles of Bearings
E L
6. The thickness of the internal layer of elastomer 𝒉𝒊 , the thickness
P T
of the laminate 𝒉𝒔 , and the elastomer cover at the top and
N
bottom 𝒉𝒆 should correspond to the following dimensions:
𝒉𝒊 (mm) 8 10 12 16
𝒉𝒔 (mm) 3 3 4 6
𝒉𝒆 (mm) 4 5 6 6
Bridge Engineering
Design Principles of Bearings
E L
less than 0.7. In the absence of more accurate analysis,
P T
The shear strain ∆𝒃𝒅 due to creep, shrinkage and temperature can
N
be computed assuming a total strain of 5 × 𝟏𝟎)𝟒 for common
reinforced bridge decks.
9. The shape factor S should be greater than 6 and less than 12.
Bridge Engineering
Design Principles of Bearings
𝜷 = (𝝈𝒎)/( 𝝈𝒎𝒂𝒙)
10 N/𝐦𝐦𝟐 ≥ 𝝈𝒎 ≥ 2 N/𝐦𝐦𝟐
Bridge Engineering
Design Principles of Bearings
12. The total shear stress due to normal and horizontal loads and
rotation should be less than 5 N/𝐦𝐦𝟐
E L
T
Shear stress due to rotation 𝝉𝜶 = 0.5 (b/𝒉𝒊 ) 𝜶𝒃𝒊 N/𝐦𝐦𝟐
P
N
13. Standard plan dimensions and design data specified in IRC: 83
is compiled in Table 2.
Bridge Engineering
Design Principles of Bearings
L
These type of bearing permit large translations and rotations
E
associated with heavy loads and aggressive temperature
T
variations.
N P
Freyssinet spherical bearings (tetron type S-3 type range) are
available in the form of fixed and sliding bearings.
Bridge Engineering
Design Principles of Bearings
The Indian Roads Congress code IRC: 83-2002 (Part III) covers the
specifications of various types of Pot, Pot cum PTFE, Pin and
Metallic guide bearings for use in Bridges.
E L
(a) Tetron S-3 bases and rockers made of maintenance free
aluminium alloy.
P T
N
(b) Sliding plates are made of mild steel faced with high quality
stainless steel.
(c) Sliding surfaces are lined with PTFE conforming to BS: 3784-
specifications
Bridge Engineering
Design Principles of Bearings
(d) Pins for side restraints are special spring steel with minimum
yield strength of 1100 N/𝒎𝒎𝟐 .
Bridge Engineering
Design Principles of Bearings
E L
P T
N
Bridge Engineering
Design Principles of Bearings
Table 3. Details of Tetron D3T Fixed Type Pot Bearing
Bearing Principal Dimensions (mm) Maximum Maximum
Type Vertical Horizontal
Load (kN) Load (kN)
A B C D E F G K
D3T-50 58 235 170 195 120 170 130 M12 500 100
L
D3T-80 75 340 235 280 155 235 175 M20 800 150
T
M20
E 1000 150
D3T-120
D3T-160
83
92
375
395
270
290
315
335
190
210
270
290
NP
210
230
M20
M20
1250
1600
190
220
D3T-200 97 460 335 385 240 335 260 M20 2000 250
D3T-250 97 485 360 410 270 360 285 M20 2500 280
D3T-325 116 575 410 475 280 410 310 M20 3250 300
D3T-400 127 615 450 515 330 450 350 M24 4000 360
(Contd.)
Bridge Engineering
Design Principles of Bearings
Table 3. Details of Tetron D3T Fixed Type Pot Bearing
Bearing Principal Dimensions (mm) Maximum Maximum
Type Vertical Horizontal
Load (kN) Load (kN)
A B C D E F G K
D3T-500 132 680 515 580 390 515 410 M30 5000 500
L
D3T-650 141 770 570 645 420 570 440 M30 6500 600
T
510 M30
E 8000 650
D3T-1000
D3T-1250
175
179
950
1015
710
785
805
870
540
620
710
785
N P
560
640
M30
M30
10000
12500
700
900
D3T-1600 203 1140 870 970 680 870 700 M30 16000 1000
D3T-2000 203 1260 985 1090 780 985 800 M36 20000 1300
D3T-2500 232 1425 1100 1220 875 1100 895 M42 25000 1600
D3T-3000 257 1550 1230 1350 1000 1230 1030 M42 30000 2000
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Types of Bearing
Bridge Engineering
Design Example of Steel Rocker Bearings
E L
Permissible compressive stress in concrete bed block = 4 N/𝐦𝐦𝟐
P T
Permissible bending stress in steel plate = 150 N/𝐦𝐦𝟐
N
Permissible bearing stress in steel plate = 185 N/𝐦𝐦𝟐
Bridge Engineering
Design Example of Steel Rocker Bearings
1. Bed plate
N
top plate of overall size 400 × 600 × 40 mm.
2. Rocker Diameter
Bridge Engineering
Design Example of Steel Rocker Bearings
𝟏𝟕𝟎 𝑹𝟐 𝝈𝒖 𝟑
Vertical design load per unit length ≯
𝑬𝟐
Solving, R = 152 mm
Bridge Engineering
Design Example of Steel Rocker Bearings
3. Rocker Pin
E L
If 𝒅 = diameter of rocker pin,
P T
𝝅𝒅𝟐
𝟒
× 105 = 50 × 𝟏𝟎𝟑 N
𝒅 = 24.6 mm
Bridge Engineering
Design Example of Steel Rocker Bearings
L
If 𝒕 = thickness of base plate required,
𝟔𝐌 𝟔 × 𝟓 ×𝟏𝟎𝟕
𝐭= = = 55.47 mm
𝐛𝛔𝐭 𝟔𝟓𝟎 × 𝟏𝟓𝟎
Bridge Engineering
Design Example of Steel Rocker Bearings
𝟏𝟎𝟎𝟎 × 𝟏𝟎𝟑
Bearing stress = = 15.38 N/𝐦𝐦𝟐 < 185 N/𝐦𝐦𝟐
𝟔𝟓𝟎 × 𝟏𝟎𝟎
Bridge Engineering
Design Example of Steel Rocker Bearings
E L
P T
N
Bridge Engineering
Design Example of Steel Rocker-Roller Bearings
E L
Permissible compressive stress in concrete bed block = 4 N/𝐦𝐦𝟐
P T
Permissible shear stress in steel = 105
N
N/𝐦𝐦𝟐
Bridge Engineering
Design Example of Steel Rocker Bearings
1. Bed plate
N
top plate of overall size 400 × 600 × 40 mm.
Bridge Engineering
Design Example of Steel Rocker Bearings
2. Rocker Pin
E L
If 𝒅 = diameter of rocker pin,
P T
𝝅𝒅𝟐
𝟒
× 105 = 50 × 𝟏𝟎𝟑 N
𝒅 = 24.6 mm
Bridge Engineering
Design Example of Steel Rocker Bearings
L
If 𝒕 = thickness of base plate required,
𝟔𝐌 𝟔 × 𝟓 ×𝟏𝟎𝟕
𝐭= = = 55.47 mm
𝐛𝛔𝐭 𝟔𝟓𝟎 × 𝟏𝟓𝟎
Bridge Engineering
Design Example of Steel Rocker Bearings
4. Roller Diameter
E L
Load taken by rollers = 8 × 𝑳 × Diameter
P T
(1000 × 𝟏𝟎𝟑 ) = (8 × 𝑳 × 200)
N
Solving 𝑳 = 625 mm
Bridge Engineering
Design Example of Steel Rocker Bearings
E L
P T
N
Bridge Engineering
Design Example of Reinforced Concrete Rocker Bearings
E L
T
Sketch the details of reinforcements in the rocker bearing.
P
N
Bridge Engineering
Design Example of Reinforced Concrete Rocker Bearings
Area of lead sheet over concrete bearing block = (600 × 𝟏𝟎𝟑 )/8 =
75000 𝒎𝒎𝟐 .
L
Length of lead sheet = (75000/200) = 375 mm.
T E
We can adopt a lead sheet at the top and bottom of bearing of size
N P
200 mm by 400 mm and concrete block of size 250 mm by 400 mm
with a height of 450 mm.
Bridge Engineering
Design Example of Reinforced Concrete Rocker Bearings
L
The load being small, minimum longitudinal reinforcement of 0.8
E
percent of the cross-sectional area is provided with hoop
T
reinforcement to resisting bursting tension.
𝟎.𝟖 N P
Vertical reinforcement = ( × 250 × 400) = 800 𝒎𝒎𝟐
𝟏𝟎𝟎
Bridge Engineering
Design Example of Reinforced Concrete Rocker Bearings
𝟐𝟎𝟎 × 𝟏𝟎𝟑
= ( ) = 869.56 𝒎𝒎𝟐
𝟐𝟑𝟎
Bridge Engineering
Design Example of Reinforced Concrete Rocker Bearings
E L
P T
N
Bridge Engineering
Design Example of Elastomeric Pad Bearings
E L
T
Longitudinal force due to friction per bearing = 45 kN
P
Effective span of the girder = 16 m
N
Rotation at bearing due to dead and live loads = 0.02 radians
Bridge Engineering
Design Example of Elastomeric Pad Bearings
L
Referring to Table 2, select plan dimensions of bearing pad of size
E
320 mm by 500 mm.
P T
Loaded area 𝑨𝟐 = 16 × 𝟏𝟎)𝟒 𝐦𝐦𝟐
N
𝑨𝟏
According to IRC: 83 Allowable contact pressure = 0.25 𝒇𝒄 J𝑨𝟐
Bridge Engineering
Design Example of Elastomeric Pad Bearings
Hence, it is safe.
N
Bearing stress 𝜶𝒎= [(1000 × 𝟏𝟎𝟑 )/ (15 × 𝟏𝟎𝟒 )] = 6.67 N/𝐦𝐦𝟐
Bridge Engineering
Design Example of Elastomeric Pad Bearings
Referring to Table 2,
Bridge Engineering
Design Example of Elastomeric Pad Bearings
2. Shape factor
Shape factor =
𝐋𝐨𝐚𝐝𝐞𝐝 𝐬𝐮𝐫𝐟𝐚𝐜𝐞 𝐚𝐫𝐞𝐚 𝐨𝐟 𝐚𝐧 𝐢𝐧𝐭𝐞𝐫𝐧𝐚𝐥 𝐥𝐚𝐲𝐞𝐫 𝐨𝐟 𝐞𝐥𝐚𝐬𝐭𝐨𝐦𝐞𝐫 (𝐞𝐱𝐜𝐥𝐮𝐝𝐢𝐧𝐠 𝐬𝐢𝐝𝐞 𝐜𝐨𝐯𝐞𝐫𝐬)
𝐒𝐮𝐫𝐟𝐚𝐜𝐞 𝐚𝐫𝐞𝐚 𝐟𝐫𝐞𝐞 𝐭𝐨 𝐛𝐮𝐥𝐠𝐞
=
𝟓𝟎𝟎)𝟏𝟐 ×(𝟑𝟐𝟎)𝟏𝟐)
= 9.16
E L
𝟐×𝟏𝟎 ×(𝟓𝟎𝟎]𝟑𝟐𝟎)
P T
Here, 6 < Shape Factor 9.16 < 12. (Hence safe).
3. Shear strain
N
Shear strain due to creep, shrinkage and temperature per bearing =
(0.5 × 6 × 𝟏𝟎)𝟒 ) = 3 × 𝟏𝟎)𝟒
Bridge Engineering
Design Example of Elastomeric Pad Bearings
L
𝟑 ×𝟏𝟎8𝟒 ×𝟏𝟔×𝟏𝟎𝟑 𝟒𝟓×𝟏𝟎𝟑
= + = (0.123 + 0.3) = 0.423 < 0.7
𝟑𝟗 𝟏𝟓×𝟏𝟎𝟒
T E
Hence, safe.
4. Permissible rotation N P
𝝈𝒎.𝒎𝒂𝒙= 10 N/𝐦𝐦𝟐 (assumed)
Bridge Engineering
Design Example of Elastomeric Pad Bearings
Hence, safe.
Bridge Engineering
Design Example of Elastomeric Pad Bearings
5. Friction
Bridge Engineering
Design Example of Elastomeric Pad Bearings
= 1.5 × (6.67/9.16)
= 1.09 N/𝐦𝐦𝟐
E L
P T
Shear stress due to horizontal deformation 𝝉𝒓 = 𝜸𝒅 = 0.423 N/𝐦𝐦𝟐
as per computation due to translation.
N
Shear stress due to rotation = 0.5(𝐛/ 𝒉𝒊 )𝟐 𝜶𝒃𝒊
= 0.915 N/𝐦𝐦𝟐
Bridge Engineering
Design Example of Elastomeric Pad Bearings
Hence, safe.
L
We can adopt an elastomeric pad bearing with overall dimensions
E
of 320 mm by 500 mm with a total thickness of 39 mm having two
T
N P
internal elastomeric layers of 10 mm thickness and three steel
laminates of thickness 3 mm, having bottom and top covers of 5
mm.
Bridge Engineering
Design Example of Elastomeric Pad Bearings
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
T
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Types of Joints
E L
P T
N
Ø Construction Joints
Ø Expansion Joints
Topic of Discussion
Ø General Features
Ø Types of Joints
Ø Construction Joints
Ø Expansion Joints
E L
P T
N
Bridge Engineering
General Features
E L
concrete edges at the joint to deterioration of pier caps.
•
P T
With the extremely high density of traffic occurring on most
N
major bridges, maintenance work on the bridge should be
restricted to a minimum length of time.
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Types of Joints
Ø Construction Joints
Ø Expansion Joints
E L
P T
N
Bridge Engineering
Types of Joints
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Types of Joints
Ø Construction Joints
Ø Expansion Joints
E L
P T
N
Bridge Engineering
Construction Joints
E L
sometimes be unexpected, if it is due to failure of machinery
such as concrete mixer, vibrator, etc.
P T
• N
But often, it may be scheduled to facilitate addition of
reinforcements for a top portion, as in the case of the stem of a
retaining wall.
Bridge Engineering
Construction Joints
E L
of discontinuity on the durability, structural integrity and
appearance of structure.
P T
• N
Joints should be located away from regions of maximum stress
caused by loading, particularly where shear and bond stresses
are high.
Bridge Engineering
Construction Joints
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Types of Joints
Ø Construction Joints
Ø Expansion Joints
E L
P T
N
Bridge Engineering
Expansion Joints
• The difference between the two types in the depth of the joint
and also in the width.
•
E L
Contraction joints, where provided, will be only for a part of the
P T
depth of the slab and will often be of smaller width.
• N
Expansion joints will be for the full depth of the member.
Bridge Engineering
Expansion Joints
L
2) Creep or Inelastic deformations
Bridge Engineering
Expansion Joints
Bridge Engineering
Expansion Joints
• Leakage of water from the deck at the joints have in the past led
to deterioration of bearings and substructure.
•
E L
Satisfactory long-term performance and durability of expansion
P T
joint systems require diligent design, quality fabrication,
N
competent construction, adequate inspection and meticulous
maintenance.
Bridge Engineering
Expansion Joints
E L
while they would be quite oblivious of the seriousness of the
P
correct design of the expansion joints.
T
• N
Thus even in prestressed concrete bridges of advanced design,
expansion joints have been unsatisfactory.
Bridge Engineering
Expansion Joints
•
E L
Trouble-free lifetime performance and durability of expansion
P T
joint systems depend on the application of appropriate design,
N
high-quality fabrication, correct construction practices,
systematic inspection and proper maintenance.
Bridge Engineering
Expansion Joints
Sl Expected Service
Type of Joint Suitability Special Considerations
no Life, Years
Simply supported spans Only for decks with bituminous/
1 Buried Joint 10
with movement up to 10 mm asphaltic wearing course
L
Simply supported spans Joint filler may need replacement if
E
2 Filler Joint 10
with movement up to 10 mm found damaged
3
Single Strip
Seal Joint
Movement up to 80 mm 25
4
Modular Strip/
Box Seal Joint
Movement over 80 mm 25
N Elastomeric seal may need
replacement during service life
Bridge Engineering
Expansion Joints
•
E L
Guidelines and specifications for expansion joints are available
in IRC: SP: 69-2005.
P T
N
Bridge Engineering
Expansion Joints
•
E L
A steel plate 200 mm wide and 12 mm thick of wieldable
P T
structural steel as per IS:2062 is placed symmetrical to the
N
centreline of the joint to bridge the gap resting freely over the
top surface of the deck concrete.
Bridge Engineering
Expansion Joints
L
• A copper sheet 2 mm thick is bent to form a bulb in the middle
E
with a plan width of 220 mm and laid integral with the deck slab
T
and adjoining deck slab/ approach slab.
N P
• The gap above this sheet is filled with a premoulded resilient
joint filler. This arrangement would allow movement up to 10
mm.
Bridge Engineering
Expansion Joints
E L
P T
N
Bridge Engineering
Expansion Joints
E L
P T
N
Bridge Engineering
Expansion Joints
Bridge Engineering
Expansion Joints
Bridge Engineering
Expansion Joints
E L
P T
N
Bridge Engineering
Expansion Joints
E L
anchored either to the steel supports or directly to the concrete
deck.
P T
• N
Satisfactory performance of the joint is governed by the correct
setting of the expansion gap with reference to the theoretical
requirement at a specified reference temperature, corrected for
the actual temperature prevailing at the time of concrete
placement.
Bridge Engineering
Expansion Joints
• Further, the installation of the joint should ensure that the rating
of the seal is consistent with the expansion gap.
Bridge Engineering
Expansion Joints
E L
P T
N
Bridge Engineering
Expansion Joints
L
• The fingers have been made prismatic with rectangular cross-
E
section and square ends at the free ends for convenience in
T
manufacture.
N P
• While these joints should function well under ideal conditions,
there is potential difficulty due to slight rotation of the decks on
both sides.
Bridge Engineering
Expansion Joints
E L
P T
N
Bridge Engineering
Expansion Joints
E L
P T
N
Bridge Engineering
Expansion Joints
•
E L
For example, a maximum movement of 2.85 m had to be
P T
accommodated in the suspension bridge over Tagus with
N
modular units splitting movement and dilations into tolerable
widths and using neoprene joint seals.
Bridge Engineering
Expansion Joints
E L
There are different types of standard compression seals. Single
P T
compression seal is used for small movements and novel modular
N
joint system using several seals is preferred to accommodate larger
movements.
Bridge Engineering
Expansion Joints
E L
P T
N
Bridge Engineering
Expansion Joints
An effective joint sealing system for a long span bridge must satisfy
the following performance criteria.
L
particular bridge, e.g. straight distance change between the joint
E
T
interfaces, racking distortion from the many variations of skews,
P
N
horizontal, angular, vertical and articulation motion patterns,
differential vibration of slab ends, impact and warping.
(ii) It must seal out the entry of all foreign material with a potential for
producing restraint. It should guarantee that bearing seats, pier caps
and bends so not receive accumulations of these materials along with
chemicals deleterious to the performance life of steel or concrete.
Bridge Engineering
Expansion Joints
E L
(v) With respect to the riding surface of the sealing system, it must be
P T
constructed of materials which have a capability to withstand wear
N
and impact from repetitive and heavy traffic loadings, besides
durability against petroleum products, and weather.
(vi) It should have a long service life. Ideally equal to the life of the
bridge. Short lived sealing solutions should have provision for simple
and easy replacement with minimum cost.
Bridge Engineering
Expansion Joints
E L
estimation, this movement can be taken approximately as 1 mm per m
in a temperature gap of 50 degree centigrade.
P T
N
(ii) Racking movements of skewed joints, magnitude and complexity
varying with the angle of skew.
Bridge Engineering
Expansion Joints
(v) Slab end rotation, which may be temporary due to heavy traffic
loading at mid span or permanent due to progressive increase in dead
load calculation.
E L
Whether the movement at a joint is as small as 25 mm in the case of a
P T
simply supported T-beam bridge of 20 m span or large as 1.8 m, the
N
movement must be accounted for in the design of the joint and
sealing system with an additional provision for some margin of safety.
Bridge Engineering
Expansion Joints
E L
which provide watertight wheel load transfer across expansion
P T
joint openings. Several systems of modular joints are available.
• N
A typical four-module expansion joint is shown schematically in
Figure.
Bridge Engineering
Expansion Joints
E L
P T
N
Bridge Engineering
Expansion Joints
•
E L
The support bars are suspended over the joint openings by sliding
P T
elastomeric bearings mounted within support boxes, which rest on
N
cast-in-place concrete installed into a preformed block out.
Bridge Engineering
Expansion Joints
Bridge Engineering
Expansion Joints
•
E L
Modern designs of multi-span bridges in these countries tend to
P T
minimize the number of joints by favouring continuity and to
N
discourage suspended decks of balanced cantilever bridges.
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
T
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Handrails
E L
P T
N
Ø Footpaths
Ø Drainage Arrangements
Ø Wearing Course
Ø Approach Slab
Ø General Features
Ø Handrails
Ø Footpaths
Ø Drainage Arrangements
E L
Ø Wearing Course
P T
Ø Approach Slab N
Ø River Training Works
Bridge Engineering
General Features
•
E L
The major appurtenances include: handrails, parapets,
T
footpaths on bridges, drainage sprouts, wearing course over
P
N
the deck, river training works, embankments for approaches,
approach slab and crash barriers.
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Handrails
Ø Footpaths
Ø Drainage Arrangements
E L
Ø Wearing Course
P T
Ø Approach Slab N
Ø River Training Works
Bridge Engineering
Handrails
E L
bridges, handrails are adopted for longer bridges.
•
P T
Since these are the parts prominently visible in the
N
neighbourhood, the design should be such as to enhance the
aesthetics of the bridge.
Bridge Engineering
Handrails
•
E L
The posts are spaced at suitable intervals of less than 1.8 m
and cast monolithic with the kerb.
P T
• N
The rails are of rectangular shape and are precast.
Bridge Engineering
Handrails
E L
P T
N
Bridge Engineering
Handrails
•
E L
One end of the handrail is fixed and the other end is freely
supported as shown in figure.
P T
• N
Considerable research has been undertaken in developed
countries to evolve a handrail system which would be strong to
prevent a colliding vehicle from falling over to the valley.
Bridge Engineering
Handrails
E L
way that on hitting a kerb the vehicle will be deflected to move
parallel to the road.
P T
• N
Crash barriers with cold formed steel sections supported at
intervals by short steel pedestals anchored by bolts cast with
the deck are used at the kerbs.
Bridge Engineering
Handrails
E L
should be collapsible during floods, so as to minimise
T
obstruction to flow of water and passage of floating debris.
P
• N
It is, however, preferable to provide perforated kerbs along with
diamond shaped guide posts as shown in Figure.
Bridge Engineering
Handrails
E L
P T
N
Bridge Engineering
Handrails
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Handrails
Ø Footpaths
Ø Drainage Arrangements
E L
Ø Wearing Course
P T
Ø Approach Slab N
Ø River Training Works
Bridge Engineering
Footpaths
• Water/ sewerage pipes are not to be carried over any part of the
superstructure.
Bridge Engineering
Footpaths
E L
duct are often found to have unsatisfactory performance in
P T
service with regard to level and durability.
• N
An alternate design has been proposed recently, in which the
footpath is formed by filling the space between the road edge
kerb and the bridge kerb with concrete.
Bridge Engineering
Footpaths
E L
P T
N
Bridge Engineering
Footpaths
E L
P T
N
Bridge Engineering
Footpaths
L
• This design permits the provision of chequered tiles on the
footpath in urban areas.
T E
N P
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Handrails
Ø Footpaths
Ø Drainage Arrangements
E L
Ø Wearing Course
P T
Ø Approach Slab N
Ø River Training Works
Bridge Engineering
Drainage Arrangements
E L
Figure should be provided at spacing not more than 10 m apart.
•
P T
The drainage spout should be galvanized after welding the
plates and flats together. N
• Such spouts should be extended well below the soffit of the
deck structure to avoid damage to concrete due to spray of salt-
laden water.
Bridge Engineering
Drainage Arrangements
E L
P T
N
Bridge Engineering
Drainage Arrangements
• External piping down the sides of the deck to the piers may look
ugly.
E L
•
P T
It may be desirable to use concealed internal lateral connecting
N
drains from kerb gullies to drains in concealed slots in piers.
Bridge Engineering
Drainage Arrangements
E L
slab at about 160 mm from the fascia parallel to the roadway to
P T
prevent rain water from flowing down from fascia to the beams.
• N
This groove should be stopped 900 mm from the face of the
abutment to prevent moisture accumulating on the bed block
over the abutment.
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Handrails
Ø Footpaths
Ø Drainage Arrangements
E L
Ø Wearing Course
P T
Ø Approach Slab N
Ø River Training Works
Bridge Engineering
Wearing Course
•
E L
The wearing course may be of asphaltic concrete or cement
concrete.
P T
• N
Asphaltic concrete wearing course is currently the preferred
option as this permits the use of buried expansion joint for short
spans facilitating a smooth transition between the bridge and
the approaches for the riding surface.
Bridge Engineering
Wearing Course
• The thickness of the wearing course is kept uniform and the top
of the deck slab is adjusted to facilitate the cross camber for
surface drainage.
E L
Asphaltic wearing course of 56 mm uniform thickness is desirable
P T
when the road pavement on the approach on either side of the
bridge is of asphaltic concrete. N
Bridge Engineering
Wearing Course
(i) A coat of mastic asphalt 6 mm thick with a prime coat over the
deck slab;
L
(ii) 50 mm thick asphaltic concrete wearing course in two layers of
25 mm each.
T E
(b) Cement Concrete Wearing Course:
N P
Cement concrete wearing course of 75 mm uniform thickness in
M30 concrete over concrete deck slab may be adopted in case of
isolated bridges where use of asphaltic concrete is inconvenient.
Bridge Engineering
Wearing Course
E L
The free ends of the reinforcement at panel joints should be
P T
bent down to protect the ends of the joints.
• N
The cement concrete wearing course should be laid in two
longitudinal strips with casting of alternate panels of equal
length in each strip.
Bridge Engineering
Wearing Course
•
E L
Shuttering will have to be provided at the free ends for ensuring
P T
vertical face and also to attain good compaction.
N
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Handrails
Ø Footpaths
Ø Drainage Arrangements
E L
Ø Wearing Course
P T
Ø Approach Slab N
Ø River Training Works
Bridge Engineering
Approach Slab
•
E L
The slab serves to minimize bumps to traffic and the resulting
P T
impact to abutment due to potential differential settlement
•
N
between the approach embankment and the abutment.
The slab should cover the full width of the roadway and should
extend for a length of not less than 3.5 m into approach.
Bridge Engineering
Approach Slab
• The slab has minimum thickness of 300 mm at the ends with the
maximum thickness adjusted to suit the cross camber.
Bridge Engineering
Approach Slab
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø General Features
Ø Handrails
Ø Footpaths
Ø Drainage Arrangements
E L
Ø Wearing Course
P T
Ø Approach Slab N
Ø River Training Works
Bridge Engineering
River Training Works
E L
the river towards the ventway of the bridge and to afford
P T
protection to the road embankment from flange attack during
•
floods.
N
Spurs are provided for training the river along a desired course
attracting, deflecting or repelling the flow a channel.
Bridge Engineering
River Training Works
•
E L
Typical details of an elliptical bund are shown in Figure.
P T
•
N
Elliptical bund results in more uniform flow through the bridge
as compared to straight guide bund.
Bridge Engineering
River Training Works
𝒕 = 𝟎. 𝟎𝟔 𝑸𝟎.𝟑𝟑 N
Where t = thickness of pitching in m.
Bridge Engineering
River Training Works
𝒅 = 𝟎. 𝟎𝟒𝟐 𝒗𝟐
Bridge Engineering
River Training Works
𝒅 = 𝟎. 𝟎𝟒𝟐 𝒗𝟐
Bridge Engineering
River Training Works
•
L
The width of launching apron is generally taken as 1.5 d, where
E
T
d is the maximum anticipated scour depth below the bed level.
P
•
N
The thickness of the apron is kept at 1.5 t at the inner end and at
2.25 t at the outer end, as shown in Figure.
Bridge Engineering
River Training Works
E L
P T
N
Bridge Engineering
River Training Works
E L
P T
N
Bridge Engineering
River Training Works
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
T
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Construction Materials
E L
P T
N
Ø Construction Techniques
Ø Quality Assurance
Ø Introduction
Ø Construction Materials
Ø Construction Techniques
Bridge Engineering
Introduction
E L
•
T
The modern approach in construction management involves
P
N
several diverse functionaries like structural designers,
estimators, construction engineers, field supervisors, financial
managers, etc. working under professional managers.
Bridge Engineering
Introduction
• Contract negotiations
E L
• Developing liaison with clients
P T
•
N
Mobilizing financial resources for the project
• Work planning
• Supervision of work
Bridge Engineering
Introduction
Bridge Engineering
Introduction
E L
preparation of working drawings, work scheduling, material
T
and labour management, controlling the various activities of
P
N
the project and updating tasks have been simplified and these
works can be efficiently handled with less paper work.
Bridge Engineering
Introduction
• But the labour cost does not lend itself to exact analysis.
Bridge Engineering
Introduction
•
E
The suitable techniques of construction of bridge
L
T
superstructure will vary from site to site and will depend on the
P
N
spans and length of the bridge, type of bridge, materials used
and site conditions.
Bridge Engineering
Introduction
E L
as possible and to use precast or prefabricated components to
the maximum extent.
P T
• N
Construction machinery, such as cranes and launching girders
are getting wide usage.
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Construction Materials
Ø Construction Techniques
Bridge Engineering
Construction Materials
E L
•
T
High performance concrete grade for reinforced concrete
P
N
bridges according to IRC 112: 2011 is specified as M30 and M35
for moderate and severe exposure conditions respectively
when used with prestressed concrete or those with length
exceeding 60 m.
Bridge Engineering
Construction Materials
E L
concrete specified according to IS 1343: 2012 is M35 and M40
T
for moderate and severe exposure conditions respectively.
P
• N
Design mix concrete should be used to ensure the desired
strength and durability. Design of concrete mixes for specified
strength, workability and durability using the locally available
cements, fine and coarse aggregates must be performed.
Bridge Engineering
Construction Materials
E L
ratio which adversely affects the strength of concrete.
•
P T
Bridge deck concrete deposited in slabs and beams should be
N
compacted by mechanical vibration using vibrators with
frequencies in the range of at least 3200 to 3600 cycles per
minute which ensures good compaction.
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Construction Materials
Ø Construction Techniques
Bridge Engineering
Construction Techniques
Cantilever Method
Staging Method
E L
P T
N
Progressive Placement Method
Bridge Engineering
Cantilever Construction Techniques
E L
pier extending in both sides. This method eliminates use of
P T
expensive formwork and scaffolding resulting in faster rate of
•
N
work progress coupled with overall economy.
Bridge Engineering
Cantilever Construction Techniques
E L
P T
N
Bridge Engineering
Cantilever Construction Techniques
Bridge Engineering
Cantilever Construction Techniques
•
E L
The gantry systems proceed in a systematic manner from
P T
section to section on either side of the pier after the
N
prestressing of the segment last cast.
Bridge Engineering
Cantilever Construction Techniques
Bridge Engineering
Cantilever Construction Techniques
Bridge Engineering
Cantilever Construction Techniques
Bridge Engineering
Staging Method of Construction
Bridge Engineering
Staging Method of Construction
E L
P T
N
Bridge Engineering
Staging Method of Construction
E L
P T
N
Bridge Engineering
Progressive Placement Method of Construction
•
E L
The main feature of this method comprises a moveable
P T
temporary stay arrangement to limit the cantilever stresses to a
•
N
reasonable level during construction.
Bridge Engineering
Progressive Placement Method of Construction
E L
P T
N
Bridge Engineering
Progressive Placement Method of Construction
•
E L
The segments are held in position by temporary external ties
P T
and by two stays passing through a tower located over the
•
preceeding pier.
N
The stays are anchored to the top flanges of the box girder
segments so that the tension in the stays can be adjusted by
light jacks.
Bridge Engineering
Incremental Launching Method of Construction
•
E L
Each unit is cast directly against the previous unit.
•
P T
After sufficient concrete strength is achieved, the new unit is
N
post-tensioned to the previous one by post-tensioning.
Bridge Engineering
Incremental Launching Method of Construction
E L
P T
N
Bridge Engineering
Incremental Launching Method of Construction
Bridge Engineering
Incremental Launching Method of Construction
•
E L
If the spans are large, they can be sub-divided by temporary
P T
piers to control the magnitude of bending moments within the
safe limits.
N
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Construction Materials
Ø Construction Techniques
Bridge Engineering
Formwork and Falsework
•
E L
It is designed to resist the fluid pressure of plastic concrete and
additional pressure caused by vibrators.
P T
• N
It can be removed when the concrete hardens.
Bridge Engineering
Formwork and Falsework
•
E L
Scaffolding denotes any temporary elevated platform and its
P T
supporting structure used for supporting workmen and
•
materials during construction.
N
Scaffolding may be constructed of sawn timber, wooden poles
(e.g. casurina) or steel or aluminium tubes.
Bridge Engineering
Formwork and Falsework
•
E L
While great care is bestowed on the design calculations for the
P T
permanent structure, relatively scant attention is being paid to
N
the design and erection of formwork and falsework.
Bridge Engineering
Formwork and Falsework
•
E L
Proper coordination and communication among the design,
P T
construction and supervision agencies should be ensured in
respect of all aspects of formwork. N
• Timber forms are usually manufactured in the carpentry shop at
the bridge site.
Bridge Engineering
Formwork and Falsework
• The forms are erected first approximately to line and level; then
they are correctly aligned, levelled with wedges and kept firmly
intact by tightening the braces and ties.
•
E L
The forms should be leak proof, as leaky forms result in
honeycombed concrete.
P T
• N
Stripping should be done carefully to avoid injury to concrete or
damage to the forms.
Bridge Engineering
Formwork and Falsework
• The form bolts, nuts and washers should be cleaned and kept in
buckets for reuse.
L
• Proper organisation of stripping operations would lead to
reduction of wastage.
T E
•
N P
Inspection of formwork just prior to and during concreting is
very important.
Bridge Engineering
Formwork and Falsework
• The lines must be true; and bulges and sags must be prevented.
•
E L
The time interval between casting and removal of forms
P T
depends on many conditions, including the ambient
N
temperature of the air, the setting time for the cement used,
nature of stresses induced in the member and span.
Bridge Engineering
Formwork and Falsework
Days
14
Bridge Engineering
Formwork and Falsework
(a) Strength:
E L
P T
•
N
The formwork should be capable of carrying the pressure of
concrete and the weight of labour and plant engaged in its
placement and compaction.
Bridge Engineering
Formwork and Falsework
L
reinforcement details and stiffness of the formwork structure.
E
•
P T
In the absence of detailed calculations, the pressure can be
N
calculated as that due to a liquid weighing 26 kN/m3 for
horizontal surfaces and for vertical surfaces up to depth of 1.8
m.
Bridge Engineering
Formwork and Falsework
(b) Stiffness:
E L
P T
N
• The forms should be rigid enough to ensure that deflection of
the completed work should not exceed 0.003 of the span and
that the deflection of the form itself in any one span should not
be more than 3 mm.
Bridge Engineering
Formwork and Falsework
(c) Repetition:
•
E L
Since formwork cost is a considerable part of the total cost of
P T
concrete work, this aspect requires careful analysis.
(d) Durability: N
• In order to ensure maximum economy, it is essential to provide
for repetitive uses of the formwork.
Bridge Engineering
Formwork and Falsework
E
about ten repetitive uses without major repair.L
•
P T
Many more reuses should be possible with steel forms.
(e) Strippability: N
• The ease of stripping without damage to the concrete or the
forms is a requirement deserving special attention.
Bridge Engineering
Formwork and Falsework
•
E L
Unless easy stripping is ensured, the gains due to repetitive use
of forms may be lost in costly repairs.
P T
(f) Cost: N
• The final cost of forming an area of concrete is the sum of the
cost of materials for the forms, the cost of labour in erecting,
stripping, cleaning and carrying forward to next use, and the
cost of expandable material such as form ties.
Bridge Engineering
Formwork and Falsework
• With the universal rise in prices and wages, it would be well for
L
a contractor to study the labour content of the formwork cost.
•
T E
Innovative designs for formwork for bridge components lead to
economical and efficient construction.
N P
• Falsework may be defined as the temporary support work
necessary to support a portion of a permanent structure during
erection until it is capable of supporting itself.
Bridge Engineering
Formwork and Falsework
•
E L
Conventional systems use falsework constructed of sawn or
P T
round timber, steel joists, scaffold tubing and include also
temporary piles. N
• Special provision should be made to facilitate easy dismantling
after the completion of the permanent structures.
Bridge Engineering
Formwork and Falsework
N
construction dead and live loads, the dead load due to the
permanent structure, wind load and water pressure, if
applicable.
Bridge Engineering
Formwork and Falsework
E L
very efficient, it is desirable to use stresses lower than those for
permanent construction.
P T
• N
Props supporting formwork should be checked for verticality by
plumbing, and no prop should be erected more than 10 mm (1 in
40) out of plumb.
Bridge Engineering
Formwork and Falsework
•
E L
The centering for an arch is a load carrying structure and the
P T
success of an arch bridge constriction depends on the design,
N
construction and stripping of the centering.
Bridge Engineering
Formwork and Falsework
E L
P T
N
Bridge Engineering
Formwork and Falsework
• N
In high arches, the costs may be fan shaped with support at a
height to avoid long inclined members.
Bridge Engineering
Formwork and Falsework
•
E L
Trussed centres must be designed and executed under
P T
competent supervision of an experienced engineer.
• N
The foundations for the falsework should be checked for
adequacy and temporary piling may be used, if necessary.
Bridge Engineering
Formwork and Falsework
• In the case of bowstring girder bridges, the deck forms are built
first, supported on falsework.
•
E L
The arch members are formed as beams, using back forms near
the ends.
P T
• N
The arch centering is usually laid on ground and the forms are
built accurately in sections and numbered to save time during
erection.
Bridge Engineering
Formwork and Falsework
E L
interchangeability in use for formwork or falsework, ease of
P T
erection, resistance to fire, reliable strength and good salvage
•
value.
N
Disadvantages of tubular steel scaffolding include high initial
cost, costly replacement of damaged couplers and fittings,
difficulty in connecting with timber formwork, possible diverse
effects of human error in overlooking tightening of joints, need
for additional skilled trade at site and painting.
Bridge Engineering
Formwork and Falsework
L
• Screw jacks for use as sole plates under standards for formwork
are available.
T E
•
N P
For slab type bridges over river beds which are dry during
summer, movable staging of tubular scaffolds on platforms with
castors can be used.
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Construction Materials
Ø Construction Techniques
Bridge Engineering
Quality Assurance
Bridge Engineering
Quality Assurance
E L
with ease and reliability under the prevailing site conditions.
•
P T
In the case of reinforced concrete and prestressed concrete
N
bridges, specual attention should be devoted to the “4-Cs”, i.e. ,
Constituents, Compaction, Cover and Curing.
Bridge Engineering
Quality Assurance
•
quality.
N
Four classes of quality assurance are specified: (i) Q-1 Nominal
QA; (ii) Q-2 Normal QA; (iii) Q-3 High QA; and (iv) Q-4 Extra High
QA.
Bridge Engineering
Quality Assurance
• For bridge structures, only the three classes Q-2, Q-3 and Q-4
are acceptable.
•
E L
Class Q-3 may be adopted for reinforced concrete bridges and
P T
prestressed concrete bridges having length more than 60 m
N
with individual spans not exceeding 45 m.
Bridge Engineering
Quality Assurance
•
E L
The compliance of the guidelines in the above publication will
P T
be a step towards obtaining ISO: 9000 Quality Certification.
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Construction Materials
Ø Construction Techniques
Bridge Engineering
Economical Span and Configurations
•
E L
Materials like timber and iron have been replaced by new
P T
materials like high strength and high performance concrete,
N
reinforced concrete, prestressed concrete, high yield strength
deformed reinforcements, high tensile steel wires, bars, strands
cables and polymeric materials.
Bridge Engineering
Economical Span and Configurations
E L
contributed immensely through research and practice for the
P T
widespread use of prestressed concrete for medium and long
•
span bridges.
N
The structural forms of various types of bridges and their
respective economical span ranges are compiled in Table 1.
Bridge Engineering
Economical Span and Configurations
L
7 m - 12 m Prestressed Concrete Slab
15 m - 25 m
T E
Reinforced Concrete Tee beam and Slab, Reinforced Concrete Rigid Frame
25 m - 60 m
N P
Prestressed Concrete Beam and Slab Steel Plate Girder
75 m - 150 m Prestressed Concrete Box Girders Using Cantilevered Construction, Steel Truss
150 m - 500 m Cable stayed bridges with Reinforced or Prestressed Concrete decks
500 m - 1800 m Steel Suspension Bridges or Cable Stayed Bridges with Steel decks
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Construction Materials
Ø Construction Techniques
Bridge Engineering
Comparative Cost Analysis
•
E L
However, in general, the quantities of concrete and steel
P T
reinforcement used per unit area of bridge deck can be
N
considered as indicative of the degree of economic cost
although these figures are not the only factors which govern the
overall cost of the bridge.
Bridge Engineering
Comparative Cost Analysis
L
2. The length of individual spans and overall length of the
bridge.
T E
N P
3. The number of longitudinal and cross girders
Bridge Engineering
Comparative Cost Analysis
L
10. The time constraint for completion of the bridge project
E
•
P T
The quantities of concrete and steel reinforcement required per
N
unit area of different types of bridge decks with spans ranging
from 35 to 140 m were determined based on comprehensive
analysis and extensive practical experience.
Bridge Engineering
Comparative Cost Analysis
E L
P T
N
Bridge Engineering
Comparative Cost Analysis
•
E L
Continuous bridge decks with unequal spans are more
P T
economical than equal spans in the span range of 50 to 100 m.
• N
Rigid Portal Frame design also uses the same quantity of
materials as those of continuous girders with unequal spans.
Bridge Engineering
Comparative Cost Analysis
E L
strong in compression, and can easily resist the thrusts
developed an arch.
P T
• N
Bow string girders are economical, considering the material
quantities for spans up to 50 m.
• The dimensions of the Tee beam of the bow string girder bridge
can be considerably reduced by axial prestressing resulting in
overall economy.
Bridge Engineering
Comparative Cost Analysis
Bridge Engineering
Comparative Cost Analysis
E L
P T
N
Bridge Engineering
Comparative Cost Analysis
• Precast Tee, I and Box shaped girders with cast in-situ slab are
suitable for spans up to 50 m.
•
E L
The variation in the quantities of concrete and high tensile steel
P T
with average thickness of concrete deck as a function of span
N
for different types of structural configurations is graphically
presented in Figure.
Bridge Engineering
Comparative Cost Analysis
E L
P T
N
Bridge Engineering
Comparative Cost Analysis
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
T
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Inspection
E L
P T
N
Ø Inspection Instrumentation
Ø Introduction
Ø Inspection
Ø Inspection Instrumentation
Bridge Engineering
Introduction
•
E L
Effective maintenance will ensure that the bridge deck will
T
function satisfactorily at the various limit states of strength and
P
•
serviceability.
N
Good maintenance practice requires periodical surveillance,
identification of local damage, deterioration and loss of
durability of the deck due to environmental and other local
effects.
Bridge Engineering
Introduction
E L
maintenance with well programmed repairs and rehabilitation.
•
P T
It is a well-established fact that the total number of existing
N
bridges is much more in comparison with the new bridges
under construction.
Bridge Engineering
Introduction
E L
cases be several times than that required for periodical
maintenance and or rehabilitation.
P T
• N
Hence it is more prudent to inspect the bridge at regular
intervals for detection of any signs of deterioration and initiate
rehabilitation measures to restore the bridge structure to a
state of full serviceability.
Bridge Engineering
Introduction
E L
lines and methodologies to enable the local engineers to reach
T
rational cost effective measures and timely decisions
P
N
regarding maintenance and rehabilitation of distressed bridge
decks.
Bridge Engineering
Introduction
L
compounds and various other building materials along with
E
T
innovative methods of construction of bridges.
•
N P
Many of the existing concrete bridges have shown signs of
distress due to severe environmental conditions typically
prevailing in coastal regions.
Bridge Engineering
Introduction
• The existing bridges built during 1950s are more than 70 years
old and they have not been maintained due to the absence of
any systematic periodical surveillance and credible
maintenance organization.
•
E L
Rehabilitation of bridge structures may become essential due
T
to several reasons. Some common reasons are design and or
P
N
constructional deficiency, environmental effects, overloading
of the bridge deck either due to unanticipated loading or due to
accidents and user made changes in the structure during its
service life.
Bridge Engineering
Introduction
E L
compounds have been developed during the last decades
T
which are highly effective in protecting the basic structure
P
N
from the destructive effects of severe environmental exposure
conditions.
Bridge Engineering
Introduction
E L
resulted in various types of instruments which could monitor
T
the in-situ strength of concrete, micro cracking in concrete and
P
•
rusting in steel reinforcements.
N
Also methods have been codified to evaluate the in-situ
strength of slabs to sustain the designed loads by actual load
testing of the slab panel and monitoring the deflections
developed at the soffit of the slab.
Bridge Engineering
Introduction
E L
repaired by the process of guniting, pressure grouting and
shortcreting procedures.
P T
N
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Inspection
Ø Inspection Instrumentation
Bridge Engineering
Inspection
E L
measures including minor repairs and replacement of bridge
T
components should be planned periodical intervals without
P
•
N
disrupting the traffic on the bridge deck.
Bridge Engineering
Inspection
1. Routine Inspection:
E L
This type of inspection does not need any expertise in design,
detailing and constructional aspects.
P T
N
Routine inspection is necessary to identify minor deficiencies
which could lead to accidents or maintenance problems at a
future date.
Bridge Engineering
Inspection
2. Detailed Inspection:
Bridge Engineering
Inspection
E L
inspection platforms to examine the soffits of deck slab and
P T
girders, articulation locations and bearings at supports.
N
Depending on the importance of the structure, this type of
inspection is conducted at 2 to 3 year intervals for important
bridges specially exposed to aggressive environmental
conditions (e.g. Bridges located in coastal area, marine locations
and abnormal wind zones).
Bridge Engineering
Inspection
3. Special Inspection:
E L
These inspections are exhaustive comprising testing of structural
P T
elements (e.g. Non-destructive testing using ultrasonic pulse
N
velocity techniques to detect internal micro cracks and excessive
deflections using dial gauges etc.).
Bridge Engineering
Inspection
E L
Exposure to aggressive environment may result in cracking and
T
spalling of concrete in pretensioned girders with thin webs.
P
N
The inspection team should be led by a qualified and experienced
bridge engineer who is familiar with the design and constructional
aspects of the bridge structure to be inspected.
Bridge Engineering
Inspection
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Inspection
Ø Inspection Instrumentation
Bridge Engineering
Inspection Instrumentation
•
E L
Also, electronic gadgets have been developed to measure the
P T
thickness of concrete cover to reinforcements and strains
N
developed in concrete due to loading on the bridge deck.
Bridge Engineering
Inspection Instrumentation
Bridge Engineering
Inspection Instrumentation
L
10. Optical microscope with light source to measure the width of
cracks on the surface of concrete.
T E
N P
11. Mechanical extensometer or Demec Gauge with stainless steel
targets for measuring surface strains on concrete under loads.
Bridge Engineering
Inspection Instrumentation
E L
reinforcements embedded in concrete along with the cover to
an accuracy of ±3 mm.
P T
• N
For inspection of the soffits of bridge decks greater than 10.7 m
in height, a mechanical contraption widely referred to as Barin’s
Snooper vehicle is generally used.
Bridge Engineering
Inspection Instrumentation
Bridge Engineering
Inspection Instrumentation
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Inspection
Ø Inspection Instrumentation
Bridge Engineering
Repair and Rehabilitation
E L
rehabilitation which depends upon the degree of damage
suffered by the bridge structure.
P T
• N
Generally the degree of damage is classified under the following
three major groups:
Bridge Engineering
Repair and Rehabilitation
1. Minor Damage:
Bridge Engineering
Repair and Rehabilitation
2. Moderate Damage:
L
Extensive spalling and cracking of concrete due to multiple
E
reasons in a bridge deck can be grouped under moderate damage.
T
N P
In such cases, repair and rehabilitation is done by removing the
unsound or loose concrete by providing temporary supports to the
girder to relive dead load stresses.
Bridge Engineering
Repair and Rehabilitation
E L
P T
N
Expansion bolts or grout rebars are drilled into the sound concrete
from the soffit and wire mesh is placed to the sides and welded to
the existing bars.
Bridge Engineering
Repair and Rehabilitation
E L
compaction of concrete, holes are drilled diagonally and rebars are
P T
placed and grouted to arrest the shear cracks as shown in Figure.
Bridge Engineering
Repair and Rehabilitation
3. Severe Damage:
E L
A comprehensive review of design calculations and detailed
P T
examination of the damage will help in selecting a cost effective
N
and appropriate restoration technique for the damaged structural
elements of the bridge.
Bridge Engineering
Repair and Rehabilitation
E L
shortcreting or guniting is done providing a new concrete jacket
over the old girder.
P T
N
Bridge Engineering
Repair and Rehabilitation
In such cases, the unsound and loose concrete around the girder
E L
is removed and repairing against the loss of concrete section is
P T
done by jacketing the girder using a steel box fixed to the girder as
shown in figure.
N
The gap between the girder and the steel box is filled by epoxy
concrete grout ensuring the functional capacity of the girder.
Bridge Engineering
Repair and Rehabilitation
E L
P T
N
Bridge Engineering
Repair and Rehabilitation
E L
Due to improper detailing of reinforcements or due to severe
P T
exposure conditions, distress may develop at the articulation joint.
N
Repair and rehabilitation of articulation can be effectively done by
using post tensioning techniques.
In this method external anchor bars with plates and nuts are
employed to arrest the fracture distress at a poorly detailed and
overloaded articulation joint.
Bridge Engineering
Repair and Rehabilitation
L
If the damage is localized and not extensive, it can be repaired and
E
rehabilitated. The method of repairing the bottom flange of a
T
figure. N P
pretensioned beam partially damaged at the sides is shown in
Bridge Engineering
Repair and Rehabilitation
E L
P T
N
Bridge Engineering
Repair and Rehabilitation
E L
When unbounded tendons are used, the high tensile strands may
P T
get damaged due to rusting resulting in loss of prestress in the
girder. N
In such cases the effective cross sectional area of high tensile steel
gradually decreases due to rusting leading to sudden explosive
failure of the girder due to fracture of steel in tension.
Bridge Engineering
Repair and Rehabilitation
Method I:
L
The principle of post tensioning is used to restore the damaged
prestressed concrete I-girders.
T E
N P
In this method, post tensioning rods in conjunction with jacking
(concrete) corbels located outside the damaged areas are used for
restoration work.
Bridge Engineering
Repair and Rehabilitation
After the new concrete attains the desired strength, the preload is
removed.
E L
After the jacketing corbels are erected, the post tensioning of the
rods is done as per design computations.
P T
N
Suitable spiral and link reinforcements are used in the jacking
corbels to strengthen the concrete.
Bridge Engineering
Repair and Rehabilitation
E L
P T
N
Bridge Engineering
Repair and Rehabilitation
Method II:
L
The method of adding external reinforced concrete to restore the
strength of damaged beam is shown in figure.
T E
N P
16 mm diameter steel dowels are used to anchor the corbels to the
bottom flange.
Bridge Engineering
Repair and Rehabilitation
Method III:
L
This method does not restore the loss of prestress except that a
partial prestress may be gained by preloading.
T E
N P
The preload should be applied prior to the repair of the damaged
concrete and removed after completion of repairs.
Bridge Engineering
Repair and Rehabilitation
Finally the gap between the metal sleeve and the beam is filed with
epoxy grout by pressure injection as shown in Figure.
E L
P T
N
Bridge Engineering
Repair and Rehabilitation
E L
percent in the ultimate flexural strength in comparison with non-
plated beams.
P T
N
Two fundamental methods of strengthening/ rehabilitating of
flexural members with epoxy resin adhesives are:
Bridge Engineering
Repair and Rehabilitation
E L
Detailed experimental investigations have conclusively established
P T
the efficacy of strengthening concrete beams by externally bonded
steel plates.
N
In the case of bridge decks, it is not possible to add new concrete
on top of deck and hence the first method of bonding steel plates to
the soffit of slabs or girders is adopted.
Bridge Engineering
Repair and Rehabilitation
E L
Steel plates between 6-16 mm thickness are used in some
strengthening works.
P T
N
The adhesive joint is generally between 1-3 mm thick.
Bridge Engineering
Repair and Rehabilitation
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
T
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Replacement
E L
Rebuilding of Pier Top P T
Replacement of Girders
N
Rebuilding over Diversion
Topic of Discussion
Introduction
Replacement
Replacement of Girders
E L
Rebuilding over Diversion
P T
N
Bridge Engineering
Introduction
(a) Obsolescence
(b) Damage
E L
(c) Weathering or aging
P T
(d) Excessive maintenance cost
N
Bridge Engineering
Introduction
• Obsolescence
Bridge Engineering
Introduction
• Damage
Bridge Engineering
Introduction
• Weathering
E L
Even well maintained steel or concrete of the bridge can
P T
deteriorate over the years from the effects of weathering action of
N
saline atmosphere, fumes, abrasion, etc.
Bridge Engineering
Introduction
L
Actual fatigue service life has proven extremely difficult to predict
E
T
in practice, even though theoretical methods have been devised
P
to determine load cycles.
N
It is possible that some members or parts of the structure have
been subjected to more number of load cycles than anticipated.
Consequently, they may fail far in advance of the intended service
life of the structure as a whole.
Bridge Engineering
Introduction
• Maintenance cost
E L
found more economical to replace the structure with modern
P T
materials than spending money in maintaining the old one until
N
the ultimate theoretical service life of the structure is over.
It is also possible that though the bridge may not be due for
replacement either due to obsolescence or due to its high
maintenance costs including the cost of major repairs.
Bridge Engineering
Introduction
E L
P T
N
Bridge Engineering
Introduction
Bridge Engineering
Topic of Discussion
Introduction
Replacement
Replacement of Girders
E L
Rebuilding over Diversion
P T
N
Bridge Engineering
Replacement
E L
Full replacement of substructure can take the heavier loads with
P T
small overstressing or with minor strengthening like jacketing.
N
In case the replacement is required due to change in gradients of
the approaches, it may require only the raising or lowering of the
superstructure.
Bridge Engineering
Replacement
L
superstructure can take any heavier loading expected in the
E
T
foreseeable future. If not, it is preferable to change the entire
P
superstructure.
N
In most of the cases, along with the raising or replacement of the
superstructure, some modifications to the top part of the
pier/abutment, i.e. the bed block portion and some raising or
lowering of the pier/abutment may be called for. This type of
replacement is known as partial replacement.
Bridge Engineering
Replacement
E L
T
(c) when aging or weathering is considerable.
P
N
Bridge Engineering
Replacement
Bridge Engineering
Replacement
L
Over the passage of time, either the bed block portions have
E
T
deteriorated or the large stones have tended to become loose.
P
N
Partial reconstruction of the top part of the pier was found
necessary to get rid of the defect.
Bridge Engineering
Topic of Discussion
Introduction
Replacement
Replacement of Girders
E L
Rebuilding over Diversion
P T
N
Bridge Engineering
Rebuilding of Pier Top
N
side of the pier to support the ends of the girders temporarily.
Bridge Engineering
Rebuilding of Pier Top
E L
P T
N
Bridge Engineering
Rebuilding of Pier Top
This method is feasible where the depth from the bottom of the
girder to the bed is not considerable.
Also, the flow of the river in the off-season must be so shallow that
such cribs or stagings can be built up over a temporary base
formed on the bed.
E L
This method is quick for execution.
P T
N
A number of the girders can be supported at the same time with the
available temporary staging materials so that work on a number of
abutments/piers can be taken up simultaneously.
Bridge Engineering
Rebuilding of Pier Top
up.
N
purpose as the rail/deck level over the girders will temporarily go
Bridge Engineering
Rebuilding of Pier Top
E L
2. The crib/trestle is built and supporting cross joints are kept
ready for insertion.
P T
N
3. Traffic block/possession of line is taken, the girders lifted, the
support joists over the trestles inserted and the girders lowered (to
a predominant level).
Bridge Engineering
Rebuilding of Pier Top
Bridge Engineering
Rebuilding of Pier Top
Bridge Engineering
Rebuilding of Pier Top
E L
P T
N
Bridge Engineering
Rebuilding of Pier Top
E L
In such circumstances, the dismantling and rebuilding of the pier
top is done in stages.
P T
N
In this case, the pier is dismantled and rebuilt first in the nose
portions over which temporary steel tools can be fixed for taking
on temporary cross beams, which in turn, can support the girders.
The remaining portion of the pier coming directly below the girder
can be dismantled and rebuilt subsequently.
Bridge Engineering
Rebuilding of Pier Top
1. The existing bearings of the girders are removed and girders are
supported on timber packings.
2. The nose portion of the piers on either is dismantled and the part
E L
of the new bed block, which would cover this part, is built.
P T
N
3. Holes for temporary holding down bolts are left.
Bridge Engineering
Rebuilding of Pier Top
5. Two steel stools are fixed and held by holding down bolts over
the nose portion after the newly laid concrete attains sufficient
strength. Alternatively timber packings are laid and held.
Bridge Engineering
Rebuilding of Pier Top
Bridge Engineering
Rebuilding of Pier Top
11. The concrete for the main bed block is then laid.
12. In this stage of work, if it is felt that the supporting joists will
not be able to span the full width of the pier, the half-portion of the
pier under the joist is dismantled and rebuilt while the other
portion is supported in addition by timber packing.
E L
P T
13. After the concrete attains sufficient strength, the timber
N
packing can be laid over that part and the other half dismantled
and process repeated.
14. Another traffic block is taken when the main girders are jacked
up and the temporary cross-joist and packings (if any) and the
temporary stool over the ends also can be removed.
Bridge Engineering
Rebuilding of Pier Top
15. The bearings are set in position over new bed block after which
the girders are lowered to the final position.
16. Traffic can then be restored. After this process is done on all
the piers/abutments, the speed restrictions can be removed.
E L
The work sequence adopted using this method on a bridge where
P T
the pier tops have to be lowered to accommodate new deeper
N
girders (without altering the rail level) is indicated Figure.
Bridge Engineering
Rebuilding of Pier Top
E L
P T
N
Bridge Engineering
Topic of Discussion
Introduction
Replacement
Replacement of Girders
E L
Rebuilding over Diversion
P T
N
Bridge Engineering
Replacement of Girders
E L
1. Side slewing with temporary supports at suitable panel points;
2. Erection by cranes;
P T
3. End launching with temporary supports; N
4. Erection by floatation method;
5. Erection with the help of service span;
6. Regirdering by using existing spans.
Bridge Engineering
Replacement of Girders
1. Type of bridge
E L
P T
2. Site conditions
Bridge Engineering
Replacement of Girders
• The type of bridge includes the length, width, height and weight
of the girders, the number and type of spans, height and width
of piers and abutments, skew or square span, with deck or
without deck.
Bridge Engineering
Replacement of Girders
Bridge Engineering
Replacement of Girders
E L
• The bridge materials include those required for erecting various
P T
temporary supports and stagings, sleepers and packing pieces,
N
standard trestle material, beams, piles and pile driving
equipment are some of the items which come under this
category.
Bridge Engineering
Replacement of Girders
• The site conditions and facilities available may be such that they
can suit more than one method for replacement of the girder, in
which case the other aspects to be considered are the overall
time factor involved, the minimum block time required at a time
L
for stopping traffic for repairing one or more girders and also
E
overall cost.
P T
•
N
In estimating the overall cast, the actual cost involved in the
field work and assessed loss that may be involved in slowing
the traffic for a longer period will be taken into consideration.
Bridge Engineering
Replacement of Girders
• This method is the simplest and the safest that can be adopted
for changing complete spans one-by-one.
E L
supports, i.e. piers and abutments of either side, i.e. upstream
and downstream of the bridge.
P T
N
• The new girder is either assembled by the side over stagings or
assembled on the approaches.
Bridge Engineering
Replacement of Girders
• The girder is jacketed up and slewed over the trolleys from the
assembled position and the trolleys with the girder brought over
the span to be changed.
Bridge Engineering
Replacement of Girders
E L
P T
N
Bridge Engineering
Replacement of Girders
Bridge Engineering
Replacement of Girders
Bridge Engineering
Replacement of Girders
E L
P T
N
Bridge Engineering
Replacement of Girders
E L
the other, by temporary cover plates and are moved as a train
P T
over the bridge length till they completely occupy the gaps.
N
• The spans, in this case, are all assembled on the approaches.
• If the spans are not heavy and/or are of short length, they are
launched by fixing skid rails longitudinally from pier to pier (with
some intermediate supports if necessary) and using the same
as the skid path.
Bridge Engineering
Replacement of Girders
• The pulling is done by a 10 tonne crab winch kept at the far end
of the gap.
• The back/ballast wall is built after the erection of girders and the
approach bank made up to the correct level.
Bridge Engineering
Replacement of Girders
L
• After the girders reach the respective gaps, the intermediate
E
T
joists will be removed and each girder will be lowered over the
P
pier with the help of jacks.
N
Bridge Engineering
Replacement of Girders
E L
The sequence operation as actually adopted on a bridge, is
summarized below.
P T
N
1. The new span, assembled over the approaches, was brought
over the span to be changed, using low trolleys i.e. diplorries for
movement.
Bridge Engineering
Replacement of Girders
E L
P T
N
Bridge Engineering
Replacement of Girders
4. The new girder is lifted up by both the cranes and the end
L
brackets are lightly supported on timber jacks over ends of
E
adjacent spans.
P T
N
5. The diplorries on which the new span is brought, are removed
and lowered to bed or moved to the adjacent spans.
6. The track and the trough deck (if present) of the old span are
dismantled and removed.
Bridge Engineering
Replacement of Girders
7. The rivets of the deck would have been cut out and 40-50
percent holes replaced with bolts as part of preliminary
arrangements to facilitate quick work and to minimize time for the
block.
L
8. The cross bracings of the old span are disconnected and
E
T
removed. Rivets of cross bracings would have also been cut in
P
advance and substituted by bolts.
N
9. The old girders are slewed out over the skid rails or supporting
joists as slowly as possible, care being taken to guard against
toppling of the girder.
Bridge Engineering
Replacement of Girders
10. In this case, the supporting joist was in three pieces with bolted
splice connections and were resting at ends on stools on top of the
bed block over the nose of the pier.
11. The splice connections of the supporting joist are removed and
L
middle portion of the joist taken out to provide sufficient space for
E
T
lowering of the new span through the gap on to the bed block.
P
N
12. The temporary brackets at ends are removed and the new span
are lowered on the bearings over the piers.
13. The bed plate of bearing would have been positioned in the
meantime.
Bridge Engineering
Replacement of Girders
14. The new span having been assembled completes with sleepers
and track- the track on either side only has then to be connected to
the track on the new span.
15. The diplorries are now brought over the now span and the old
L
girders lifted one by one with the help of the cranes and placed on
E
the diplorries and properly stayed.
P T
N
16. The cranes are released and moved on to one approach at the
same time moving the diplorries with old girders in the same
direction.
17. Old girders are lifted and slewed out for stacking by the side of
the track, with the help of the cranes.
Bridge Engineering
Replacement of Girders
E L
P T
N
Bridge Engineering
Replacement of Girders
E L
joists supported on the noses of the existing abutments and
piers on either side.
P T
N
• Adequate space has to be left over piers between the gantry
track joists for housing individual girders slewed out after
dismantling.
• At the same time, sufficient space has to be left for lowering the
new girders in between.
Bridge Engineering
Replacement of Girders
Bridge Engineering
Replacement of Girders
E L
P T
N
Bridge Engineering
Replacement of Girders
Enveloping Method:
Bridge Engineering
Replacement of Girders
E L
• The new or temporary enveloping span is partly built up, i.e. the
P T
two side frames and the top bracings are built up together on
the approach. N
• A temporary trolley line or roller path is fixed over the top boom
of the existing girders.
Bridge Engineering
Replacement of Girders
E L
P T
N
Bridge Engineering
Replacement of Girders
• Then the front trolley is fixed over the existing girder and the
end of new girder brought to rest on the same and the trolley
below the bottom boom at the front end removed.
Bridge Engineering
Replacement of Girders
Floatation Method:
E L
• This is an ideal method for changing girders in navigable rivers
P T
where navigation facilities are normally available and can be
availed of without difficulty. N
• As the name suggests, the replacement of the girder is done by
floating out the old girder and floating in the new girder.
Bridge Engineering
Replacement of Girders
E L
• The pontoons are then towed near the gap where the girder is to
replaced, and temporarily anchored.
P T
N
• A pair of pontoons similarly provided with stagings are brought
on the either side of span and taken below the existing span.
• If the river is tidal, these pontoons will be taken when the tide is
rising so that, during the rising tide, the existing spans are
lifted.
Bridge Engineering
Replacement of Girders
• The top of the pier is cleared of any temporary supports and the
pontoons containing the new span are similarly towed over the
gap and taken on temporary supports.
E L
P T
• As the tide starts falling, the pontoon staging is free and can
quickly be towed out. N
• The span can then be lowered with the help of jacks over the
new bearings which would have been positioned in the
meantime removing any temporary supports.
Bridge Engineering
Replacement of Girders
• The pontoons containing the old spans can then be towed to the
dismantling yard built on the other side, where they will be
slewed out from the pontoons and taken up for dismantling.
E L
P T
N
Bridge Engineering
Topic of Discussion
Introduction
Replacement
Replacement of Girders
E L
Rebuilding over Diversion
P T
N
Bridge Engineering
Rebuilding over Diversion
Bridge Engineering
Rebuilding over Diversion
L
• This will avoid undue scour which may affect the existing bridge
E
T
being kept in service while the new bridge is under
P
•
construction.
N
Even in such case, it is preferable to keep a minimum distance
between the two and this minimum distance is dependent upon
the span arrangement and nature of the river, i.e. the flow
condition and the foundation strata condition.
Bridge Engineering
Rebuilding over Diversion
T
superstructure comprises steel/ timber decking.
P
N
• Hence, invariably, even for the replacement of the
superstructure, the existing traffic will have to be diverted on a
new alignment.
Bridge Engineering
Rebuilding over Diversion
Bridge Engineering
Rebuilding over Diversion
Temporary Diversion:
E L
alignment is straight or curvature suitably modified if the
alignment is on a curve.
P T
N
• It will be uneconomical and difficult to provide temporary piers
or even build up banks to the same level as that of existing
bridge.
Bridge Engineering
Rebuilding over Diversion
E L
P T
N
Bridge Engineering
Rebuilding over Diversion
Bridge Engineering
Rebuilding over Diversion
Bridge Engineering
Rebuilding over Diversion
E L
P T
N
Bridge Engineering
Rebuilding over Diversion
L
• For this purpose, a drive pit is made on the one side of the
E
T
embankment along the proposed alignment of the pipe, in which
P
N
a jacking wall is built at the rear end, against which jacking rig is
fixed.
• A similar pit is made up at the other end but without the need for
having any jacking wall.
Bridge Engineering
Rebuilding over Diversion
• Precast pipes in small lengths are inserted into the drive pit and
jacked through using a driving shield and removing soil in front
as adopted for tunnels.
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Numerical Examples
Codal Provisions
Topic of Discussion
Introduction
L
Practical Approach for Vibration Analysis
E
Numerical Examples
P T
Codal Provisions N
Bridge Engineering
Introduction
L
restore the bridge deck to its equilibrium position thus causing
E
T
a series of vibrations due to the motion of vehicles on the
P
bridge deck.
N
Bridge Engineering
Introduction
Bridge Engineering
Introduction
Bridge Engineering
Introduction
E L
P T
N
Bridge Engineering
Topic of Discussion
Introduction
L
Practical Approach for Vibration Analysis
E
Numerical Examples
P T
Codal Provisions N
Bridge Engineering
Factors Influencing Bridge Vibrations
E L
(3) Ratio of vehicle to bridge deck weight
P T
bridge deck
N
(4) Flexural rigidity and natural frequency of vibration of the
Bridge Engineering
Factors Influencing Bridge Vibrations
Bridge Engineering
Topic of Discussion
Introduction
L
Practical Approach for Vibration Analysis
E
Numerical Examples
P T
Codal Provisions N
Bridge Engineering
Dynamic Response of Bridge Decks
•
N
This may coincide with the range of frequencies of moving
vehicles resulting in the possibility of resonance leading to the
failure of the bridge deck.
Bridge Engineering
Topic of Discussion
Introduction
L
Practical Approach for Vibration Analysis
E
Numerical Examples
P T
Codal Provisions N
Bridge Engineering
Practical Approach for Vibration Analysis
Bridge Engineering
Practical Approach for Vibration Analysis
Bridge Engineering
Practical Approach for Vibration Analysis
𝟐𝟐 𝑬𝑬𝑬𝑬𝑬𝑬
𝑵𝑵𝒇𝒇 = cycles per second
𝑳𝑳𝟐𝟐 𝒘𝒘𝒅𝒅
Where
L = Span (m)
𝟐𝟐
g = Acceleration due to gravity = 9.81 m/𝒔𝒔𝒔𝒔𝒔𝒔
Bridge Engineering
Practical Approach for Vibration Analysis
E L
P T
(4) Estimate the maximum acceleration A from the equation
𝟐𝟐
A = 40 ∆ × 𝑵𝑵 mm/𝒔𝒔𝒔𝒔𝒔𝒔
𝒇𝒇
𝟐𝟐
N
(5) Ensure that product A∆ ≯ 3226 𝒎𝒎𝒎𝒎𝟐𝟐 /𝒔𝒔𝒔𝒔𝒔𝒔𝟐𝟐
Bridge Engineering
Practical Approach for Vibration Analysis
Lenzen’s
E L
Criteria
P T
N
Bridge Engineering
Topic of Discussion
Introduction
L
Practical Approach for Vibration Analysis
E
Numerical Examples
P T
Codal Provisions N
Bridge Engineering
Numerical Example 1: Problem Statement
L
Compute the natural frequency of the slab deck and check for the
E
T
safety of the deck against failure due to dynamic effects.
P
N
Bridge Engineering
Numerical Example 1: Solution
(1) Data:
L
E = 5700 𝒇𝒇𝒄𝒄𝒄𝒄 = 5700 𝟐𝟐𝟐𝟐 = 25491 N/𝐦𝐦𝐦𝐦𝟐𝟐 = 25.491 × 𝟏𝟏𝟏𝟏𝟔𝟔 kN/𝐦𝐦𝟐𝟐
E
I=
𝟗𝟗.𝟓𝟓 × 𝟎𝟎.𝟓𝟓𝟑𝟑
= 0.0989 𝐦𝐦𝟒𝟒 P T
𝟏𝟏𝟏𝟏
N
Flexural rigidity EI = (25.491 × 𝟏𝟏𝟏𝟏𝟔𝟔 ) × 0.0989 = 2.521 × 𝟏𝟏𝟏𝟏𝟔𝟔 kN.𝒎𝒎𝟐𝟐
Bridge Engineering
Numerical Example 1: Solution
E L
cycles per second
Bridge Engineering
Numerical Example 1: Solution
L
Since 𝑵𝑵𝒇𝒇 > 4 cycles per second
Bridge Engineering
Numerical Example 1: Solution
Lenzen’s
E L
Criteria
P T
N
Bridge Engineering
Numerical Example 2: Problem Statement
L
check for the safety of the deck against failure due to dynamic
E
effects.
P T
N
Bridge Engineering
Numerical Example 2: Solution
(a) Data:
Effective span = 16 m
L
E = 5700 𝒇𝒇𝒄𝒄𝒄𝒄 = 5700 𝟐𝟐𝟐𝟐 = 25491 N/𝐦𝐦𝐦𝐦𝟐𝟐 = 25.491 × 𝟏𝟏𝟏𝟏𝟔𝟔 kN/𝐦𝐦𝟐𝟐
E
(b) Sectional properties:
P T
The cross-section of Tee beam is shown in
Figure.
N
Location of Neutral Axis from base
= (300×1400×700 + 200×2500×1500)/
(300×1400 + 200×2500) = 1134.78 mm ≈ 1135 mm
Bridge Engineering
Numerical Example 2: Solution
Bridge Engineering
Numerical Example 2: Solution
L
Weight of 3 girders = [3 × (0.3 × 1.4 + 0.2 × 2.5) × 24) = 66.24 kN/m
E
P T
Weight of Kerb, parapet railing etc. = 12.68 kN/m (Approximately)
Bridge Engineering
Numerical Example 2: Solution
𝟐𝟐 𝑬𝑬𝑬𝑬𝑬𝑬
Fundamental natural frequency 𝑵𝑵𝒇𝒇 = cycles per second =
𝑳𝑳𝟐𝟐 𝒘𝒘𝒅𝒅
Bridge Engineering
Numerical Example 2: Solution
Lenzen’s
E L
Criteria
P T
N
Bridge Engineering
Topic of Discussion
Introduction
L
Practical Approach for Vibration Analysis
E
Numerical Examples
P T
Codal Provisions N
Bridge Engineering
Codal Provisions
E L
(3) Restriction in the span/depth ratios.
Bridge Engineering
Codal Provisions
I = A/ (B + L)
Where
E L
I = Impact Factor Fraction
L = Span in metres
Bridge Engineering
Codal Provisions
For deck span less than 3 m, impact factor is 0.5 for RC Bridges and
0.545 for Steel Bridges.
Bridge Engineering
Codal Provisions
E L
P T
N
Bridge Engineering
Codal Provisions
E L
P T
N
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
N
Seismic Design Provisions
Bridge Engineering
Seismic Effects on Bridges
Bridge Engineering
Seismic Effects on Bridges
Bridge Engineering
Seismic Effects on Bridges
• Bridges with large skew angle could rotate and unseat the
superstructure under seismic action.
Bridge Engineering
Seismic Effects on Bridges
L
longitudinal reinforcement or design not based on capacity
E
design methods.
P T
N
• Expansion joints are subjected to compression or tension
failure during earthquake.
Bridge Engineering
Seismic Effects on Bridges
Bridge Engineering
Seismic Effects on Bridges
L
• Design seismic force resultants (axial force, bending moments,
E
T
shear forces, and torsion) at any cross-section of a bridge
P
N
component resulting from the analyses in two orthogonal
horizontal directions (x,z) shall be combined as below.
Bridge Engineering
Seismic Effects on Bridges
b) ±0.3r1 ± r2 ± 0.3r3
E L
c) ±0.3r1 ± 0.3r2 ± r3 Where,P T
1 2
N
r and r = Force resultants due to full design seismic forces along
x direction and z direction respectively.
r3 is the force resultant due to full design seismic force along the
vertical direction.
Bridge Engineering
Topic of Discussion
N
Seismic Design Provisions
Bridge Engineering
Seismic Design Philosophy
L
ii. Under Maximum Considered Earthquake (MCE), a large
E
T
earthquake, which may occur once in the life of a structure; the
P
N
bridge may be subjected to significant structural damage but not
collapse. The damage should be readily accessible for inspection
and repair.
Bridge Engineering
Topic of Discussion
N
Seismic Design Provisions
Bridge Engineering
Structural Configuration for Earthquake
Bridge Engineering
Structural Configuration for Earthquake
Sl
Seismically preferred Seismically not preferred
No.
Superstructure
2. Right angled Bridges or
Bridges with mild curvature,
small skews (i.e. radius of
Curvature ≥ 100 m and Skew ≤
E L
30°). Right Bridges provides a
direct load path with predictable
P T
A.
N
response under seismic loads. 2. Superstructure with high
Bridges with sharp curvature seismic mass.
and large skew angles
experience larger and
unpredictable deformations,
which in turn, results in larger
ductility demands and also
imparts torsional effects);
Bridge Engineering
Structural Configuration for Earthquake
Sl
Seismically preferred Seismically not preferred
No.
Superstructure
3. Continuous Bridges (Helps to
avoid unseating of the
L
superstructure from support in
A.
longitudinal direction)
T E
2. Superstructure with high
N
substructure and foundation
design)
Bridge Engineering
Structural Configuration for Earthquake
Sl
Seismically preferred Seismically not preferred
No.
Substructure
1. Multiple column bent for
substructure are preferable 1. Plate Type Piers (Very
large difference in stiffness
L
because their redundancy and
E
ability to produce ductile in two orthogonal directions)
behaviour
P T
2. PCC and Masonry Piers in
B.
N
2. Adjacent Piers of near equal seismic zones IV and V
heights and near equal stiffness 3. Piers with such shapes,
(i,e. Variation in stiffness ≤ 25%). where plastic hinge is likely
(Stiffness irregularities cause to form at intermediate
concentration of seismic shear height. (Causes large shear
forces in the shorter columns, force in substructure for
which may cause brittle shear formation of plastic hinge)
failure)
Bridge Engineering
Structural Configuration for Earthquake
Sl
Seismically preferred Seismically not preferred
No.
Substructure
4. Piles extended up to pier
3. Piers of such shapes where cap without pile cap and
plastic hinge will form at the top without reduction in pile size
B. of foundation (Helps to restrict above ground
E L
the damage to inspectable
P T
portion above ground only, 5. Piers with flares near top
during a seismic event)
Nand bottom in case of portal
structure.
Bridge Engineering
Structural Configuration for Earthquake
Sl
Seismically preferred Seismically not preferred
No.
Bearings and Expansion Joints & Seismic Devices
1. Bearings with high damping
characteristics to dissipate
1. Metallic Rocker and
L
energy (i.e. High Damping
Rocker-cum-Roller bearings
C. Elastomeric Bearings and Lead
Rubber Bearings, friction
T E
in Seismic zones IV and V
pendulum bearings
reduces seismic demand in
which
N P
(Rigidity of bearings
increases seismic demand).
substructure and foundation).
Bridge Engineering
Structural Configuration for Earthquake
Sl
Seismically preferred Seismically not preferred
No.
Bearings and Expansion Joints & Seismic Devices
2. Bearings where vertical load
bearing mechanism is
L
segregated from lateral load
resisting mechanism (Ensures
T E
predictable response of the 1. Metallic Rocker and
C.
e.g. Pot cum PTFE bearings.
P
bearings under seismic event) Rocker-cum-Roller bearings
N in Seismic zones IV and V
(Rigidity of bearings
3. Detailing where adequate gap increases seismic demand).
at Expansion Joints are
provided to cater for seismic
movements. (To avoid pounding
of deck).
Bridge Engineering
Structural Configuration for Earthquake
Sl
Seismically preferred Seismically not preferred
No.
Bearings and Expansion Joints & Seismic Devices
4. Bearing Design to ensure
structural integrity and
L
avoidance of unseating of
structure under extreme seismic
T E
displacements, considering out 1. Metallic Rocker and
C. applicable. N P
of phase movements wherever Rocker-cum-Roller bearings
in Seismic zones IV and V
5. Use Seismic devices (like (Rigidity of bearings
Shock Transmission Units, increases seismic demand).
Viscous Dampers, Lead Rubber
Bearings to improve seismic
performance of Bridges (As it
reduces seismic demand)
Bridge Engineering
Structural Configuration for Earthquake
Sl
Seismically preferred Seismically not preferred
No.
Foundations
1. Foundation type preferred
D. which adds to flexibility to the
L
system and increases time
period.
T E
NP
Bridge Engineering
Topic of Discussion
N
Seismic Design Provisions
Bridge Engineering
Time Period of Bridge
L
• Various methods to enhance time periods of piers may be
E
T
explored such as using framed substructure, cantilever piers
P
N
with near equal stiffness in two principal directions and use of
seismic isolation bearings.
Bridge Engineering
Topic of Discussion
N
Seismic Design Provisions
Bridge Engineering
Strength, Ductility and Energy Dissipation
E L
• The location of plastic hinge should be predetermined and the
P T
required flexural strength of the plastic hinge shall be obtained
N
using capacity-based design approach.
Bridge Engineering
Strength, Ductility and Energy Dissipation
Bridge Engineering
Strength, Ductility and Energy Dissipation
L
• The seismic design of the bridge is achieved by providing
E
T
adequate strength and ductility in the members resisting seismic
P
N
action under design earthquake motion. The horizontal strength
and stiffness of substructure should not vary significantly along
the bridge length.
Bridge Engineering
Strength, Ductility and Energy Dissipation
L
• The ductility provisions in plastic hinge regions should therefore
E
be ensured as required by seismic codes.
P T
N
• The capacity protected regions of substructure/foundation can be
designed elastically without ductility provisions.
Bridge Engineering
Strength, Ductility and Energy Dissipation
Bridge Engineering
Strength, Ductility and Energy Dissipation
Bridge Engineering
Topic of Discussion
N
Seismic Design Provisions
Bridge Engineering
Seismic Design Provisions
Superstructure
Bridge Engineering
Seismic Design Provisions
iii. The superstructure should remain elastic even when the plastic
hinge location in columns/piers reach their plastic moment capacity.
E L
P T
N
Bridge Engineering
Seismic Design Provisions
Substructure
E L
selected so as to ensure their accessibility for inspection and
repair.
P T
N
iii. The shear failure in columns should be avoided by ductile design
and detailing practice.
Bridge Engineering
Seismic Design Provisions
vi. The number of piers and abutments that will resist seismic force
in longitudinal or transverse directions should be pre-selected.
E L
P T
N
Bridge Engineering
Seismic Design Provisions
ii.
E L
Wherever the fixed bearings are used, they shall be designed for
P T
the design seismic action determined through capacity design.
N
iii. Alternatively linkages shall be used to withstand seismic action.
Bridge Engineering
Seismic Design Provisions
iv. The out of phase motion between two piers due to various
causes such as different soil properties under pier foundations,
wave travel time effect in longer spans and different stiffness of
piers due to unequal heights or crosssectional dimensions shall
L
be considered in working out design seismic displacement in
E
bearings and expansion joints.
Bridge Engineering
Seismic Design Provisions
vii. Wherever the elastomeric bearings are used, these bearing shall
accommodate imposed deformations and normally resist only
non-seismic actions.
Bridge Engineering
Seismic Design Provisions
Bridge Engineering
Seismic Design Provisions
Foundations
ii.
E L
Foundation elements should be designed to remain essentially
P T
elastic. Pile foundations may experience limited inelastic
N
deformations; in such cases these should be designed and
detailed for ductile behaviour.
Bridge Engineering
Seismic Design Provisions
E L
• The number and location of intermediate joints should be decided
duly considering the above effects.
P T
N
• The different piers are subjected to different ground motions at
any one time, because seismic waves take time to travel from one
pier to another.
Bridge Engineering
Seismic Design Provisions
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Seismic Retrofitting
Topic of Discussion
Bridge Engineering
Seismic Design Principle
L
earthquake motions on each component of the bridge.
E
P T
• The design shall ensure that seismic resistance of the bridge
N
and its components are adequate to meet the specified design
requirement so that emergency communication after an
earthquake shall be maintained for the design basis
earthquake.
Bridge Engineering
Seismic Design Principle
• Masonry and plain concrete arch bridges with spans more than
10m shall not be built in the seismic zones IV and V.
E L
• Bridges of total length not more than 60 m and individual span
P T
not more than 15 m need not be designed for earthquake
forces other than in Zones IV and V.N
• Seismic forces on aqueducts and flyover bridges shall be
calculated as for any other bridge. The effect of inertia force of
flowing water mass and the hydrodynamic pressure on walls of
water trough in aqueduct shall be calculated accordingly.
Bridge Engineering
Seismic Design Principle
E L
•
P T
Where the two units may be out of phase, the clearance to be
Bridge Engineering
Seismic Design Principle
Bridge Engineering
Seismic Design Principle
E L
bridges located near a known fault (near - field) or the area is
known for complex seismotectonic geological setting, detailed
P T
investigations shall be carried out to obtain the site specific
spectrum. N
• Site specific spectrum is also required for bridges with spans
greater than 150 m. Such a spectrum shall be used for design
in place of code spectrum subject to minimum requirements.
Bridge Engineering
Seismic Design Principle
E L
P T
N
Bridge Engineering
Seismic Design Principle
L
foundations are used, detailed studies of soil structure
E
interaction are required.
P T
N
• The soil structure interaction may not be considered for open
foundations on rocky strata.
Bridge Engineering
Seismic Design Principle
E L
• In many cases one obtains a range of values of soil properties.
P T
In such cases, the highest values of soil stiffness shall be used
N
for calculating natural period and lowest value shall be used
for calculating deflection. For this purpose, dynamic soil
stiffness shall be considered.
Bridge Engineering
Seismic Design Principle
DL = dead load,
Bridge Engineering
Seismic Design Principle
PS = prestressing load,
HY = hydrodynamic load,
BO = buoyancy load,
E L
SH = shrinkage load,
P T
CR = creep load, N
TE = temperature load.
Bridge Engineering
Seismic Design Principle
E L
T
3) 0.9DL + 0.8DL(S) + 1.5EQ + 1.4 PS + 1.7 EP
P
(B) Serviceability Limit State
N
1) 1.0 DL+1.2 DL(S) +1.0 EQ + 1.0 EP + 1.0PS + 1.0HY+ 1.0BO
Bridge Engineering
Seismic Design Principle
E L
P T
N
Bridge Engineering
Seismic Design Principle
E L
design seismic forces acting along two orthogonal horizontal
directions.
P T
N
The design seismic force resultant (that is axial force, bending
moments, shear forces, and torsion) at any cross-section of a
bridge component resulting from the analyses in the two
orthogonal horizontal directions shall be combined as follows.
Bridge Engineering
Seismic Design Principle
a) ± ELx ± 0.3ELy
b) ± 0.3ELx ± ELy
Where ELx and ELy = force resultant due to full design seismic
force along x direction and y direction, respectively.
E L
P T
When vertical seismic forces are also considered, the design
seismic force resultants at any crosssection of a bridge
N
component shall be combined as below:
Bridge Engineering
Seismic Design Principle
Where ELx and Ely are force resultant due to full design seismic
force along x direction and y direction, respectively and EIz is the
force resultant due to full design seismic force along the vertical
direction.
L
As an alternative, the forces due to the combined effect of two or
E
T
three components can be obtained on the basic of square root of
P
sum of square (SRSS), that is
N
Bridge Engineering
Seismic Design Principle
L
important in the following components/situations and needs to be
E
investigated.
P T
a) Pre stressed concrete decks N
b) Bearing and lindages and
Bridge Engineering
Topic of Discussion
Bridge Engineering
Seismic Design Philosophy
E L
dissipation shall undergo minor damage without giving rise to
P T
need for reduction of traffic or immediate repair.
N
Bridge Engineering
Seismic Design Philosophy
Bridge Engineering
Seismic Design Philosophy
E L
P T
N
Bridge Engineering
Seismic Design Philosophy
Ductile Behavior:
E L
premature failure due to shear or bond does not occur.
P T
• Stresses induced in the superstructure due to earthquake
N
ground motion are usually quite nominal.
Bridge Engineering
Seismic Design Philosophy
E L
• Bridges shall be designed such that under severe seismic
P T
shaking plastic hinges form in the sub-structure, rather than in
the deck or foundation. N
• Ductile detailing is mandatory for piers/portals of bridges
located in seismic zones III, IV and V.
Bridge Engineering
Seismic Design Philosophy
L
structures shall be considered.
Bridge Engineering
Seismic Design Philosophy
Bridge Engineering
Topic of Discussion
Bridge Engineering
Seismic Design Assumptions
Bridge Engineering
Seismic Design Assumptions
L
walls of water carrying trough shall be considered as applicable
E
for liquid retaining structures.
P T
•
foundations should be reduced.
N
The earthquake accelerations on embedded portion of bridge
Bridge Engineering
Topic of Discussion
Bridge Engineering
Time Period of Bridge
Bridge Engineering
Time Period of Bridge
L
period. In case of RCC bridge piers, 75% of gross moment of
E
T
Inertia may be considered as cracked moment of inertia, in
P
absence of detailed calculation.
N
Bridge Engineering
Time Period of Bridge
L
superstructure, bearing, sub-structure, foundation and soil.
E
P T
N
Bridge Engineering
Topic of Discussion
Bridge Engineering
Seismic Design Provisions
Superstructure
E L
accelerations, the superstructure shall have a factor of safety of at
P T
least 1.5 against overturning under DBE condition.
N
• The superstructure shall be secured, when necessary to the sub-
structure in all zones through bearings possessing adequate
vertical holding down devices and/or unseating prevention system
for superstructure.
Bridge Engineering
Seismic Design Provisions
• These devices should be used for suspended spans also with the
restrained portion of the superstructure.
E L
P T
N
Bridge Engineering
Seismic Design Provisions
Bearings
E L
• In the case of movable bearings, the bearings shall be able to
P T
accommodate designed displacements. The displacements
N
beyond design values shall be restrained by stoppers.
Bridge Engineering
Seismic Design Provisions
E L
P T
N
Bridge Engineering
Seismic Design Provisions
Bridge Engineering
Seismic Design Provisions
L
10% of the downward dead load reaction that would be exerted if
E
the span were simply supported.
P T
N
Bridge Engineering
Seismic Design Provisions
Seating Width
The bearing seat width S in mm, between the end of girder and edge
of sub-structure, as shown in Figure and minimum SE between the
ends of girder at suspended joint should be not less that the
following values:
E L
SE = 203 + 1.67 L + 6.66 H for Seismic
P T
Zones II and III N
SE = 305 + 2.50 L + 10.0 H for Seismic
Zones IV and V
Bridge Engineering
Seismic Design Provisions
E L
H = average height of all columns or piers supporting the
P T
superstructure to the next expansion joint, for bearings at abutments,
N
in m. It is equal to zero for single span bridges.
Bridge Engineering
Seismic Design Provisions
E L
arrestors shall be designed for, at least twice the seismic force.
P T
N
The linkages, if provided, shall be designed for at least, elastic
seismic acceleration coefficient, Ah times the weight of the lighter of
the two adjoining spans or parts of the structure as in the case of
suspended spans.
Bridge Engineering
Seismic Design Provisions
adjacent span.
N or pier instead of to the
Bridge Engineering
Seismic Design Provisions
E L
special and irregular types of bridges in Zones III, IV and V.
P T
N
• The intended plastic hinges shall be provided with adequate
ductility measures to ensure the required overall structure
ductility.
Bridge Engineering
Seismic Design Provisions
The design value of the displacement dED under seismic condition for
providing clearances in critical components shall be determined as
follows:
dED = dE + dG ± dTS
E L
Where dE = design seismic displacement determined from linear
analysis considering R = 1;
P T
N
dG = displacement due to permanent and quasi-permanent action
measured in long term such as shrinkage, creep and post-tensioning;
Bridge Engineering
Topic of Discussion
Bridge Engineering
Seismic Retrofitting
Bridge Engineering
Seismic Retrofitting
• Retrofit Techniques
• Superstructure
E L
P T
N
Horizontal or vertical motion restrainers, interlinking of spans, pre-
stressing, using dampers.
• Sub-structure
Bridge Engineering
Seismic Retrofitting
• Bearings
• Foundation
E L
P T
N
Strengthening of existing foundation by enlargement of size,
increasing number of piles, jacketing.
Bridge Engineering
Seismic Retrofitting
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
E L
T
Brittle Fracture
Barge/ Ship Impact
False work Failures NP
Erection Errors
Design Deficiencies
Earthquake Effects
Failure due to Wind
Fatigue
Corrosion
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Introduction
L
precaution to avoid failures, as serious failures of bridges will
E
T
often result in loss of lives, interruption to vital traffic and
P
costly repairs.
Bridge Engineering
Introduction
L
careful layout and detailing of the various members by the
E
T
designers and correct compliance by the construction team.
P
N
• Lack of communication among the various key personnel
involved in the design and construction, and lapse in respect
for natural forces have often proved disastrous.
Bridge Engineering
Introduction
L
implementation of substantial repair and rehabilitation.
E
•
P T
Total failures generally attract attention. But partial failures
•
N
also merit careful study to avoid recurrence of the defects.
Bridge Engineering
Introduction
L
enhance the understanding of the behaviour of bridge systems
E
and the performance of new materials.
P T
N
• Bridge engineers should endeavour to apply the lessons learnt
from bridge disasters towards evolution safe, cost-effective
and durable bridges. The lessons learned from every major
bridge failure would normally result in revisions to the
standard specifications governing bridge design.
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Flood and Scour Failures
Bridge Engineering
Flood and Scour Failures
L
• The foundation should be taken to a depth well below the scour
E
T
level to ensure adequate anchorage. Scour protection
P
N
measures may include provision of riprap filling at piers and
abutments.
• The past failure incidents highlighted the need for taking the
foundation below the scour level, and the importance of
adequate erosion protection around piers and abutments
susceptible to scour.
Bridge Engineering
Flood and Scour Failures
L
• There have been cases of distress to approach embankments
E
T
when abutments were bought into the river portion in an
P
•
N
attempt to reduce the initial cost of the bridge.
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Brittle Fracture
E L
• With the availability of weldable notch ductile steels and better
P T
knowledge of welding techniques, this problem is now
overcome. N
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Barge/ Ship Impact
L
• When potential damage due to barge impact exists, it is prudent
E
T
not to use pile foundation with exposed piling above the river
P
N
bed. In such cases, sturdy well and heavy caisson foundation
with protective fendering will be desirable.
Bridge Engineering
Barge/ Ship Impact
L
in the initial design. The horizontal and vertical clearances of the
E
T
navigation span have to be determined based on the study of the
P
•
anticipated vessel movements.
N
There is scope for research study to improve our understanding
of the vessel collision mechanics and the development of cost
effective protection measures.
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
False work Failures
E L
• While flood, storm winds and earthquakes may contribute to
P T
failure, most falsework failures are attributable to human error.
N
• The problem of avoiding falsework failures is not easy to solve
because of many economic and administrative factors.
Bridge Engineering
False work Failures
L
• With increased spans of our bridges, falsework design has
E
become more complicated.
P T
N
• The bridge falsework design should be prepared and checked by a
competent engineer and its erection should be under proper
supervision.
Bridge Engineering
False work Failures
L
• By improved methods of construction and constant vigilance, we
E
can avoid falsework failures.
P T
N
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Erection Errors
Bridge Engineering
Erection Errors
T
resulting in buckling of the bottom flange.
P
N
• The lesson to be learnt is that design derived from sophisticated
analysis should be tempered with realistic allowances for
construction methods and erection tolerances.
Bridge Engineering
Erection Errors
E L
P T
N
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Design Deficiencies
• In the case of the steel box girder bridges, the primary mode of
failure is instability of the thin plates in compression due to minor
details such as geometric imperfections.
Bridge Engineering
Design Deficiencies
E L
P T
N
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Earthquake Effects
Bridge Engineering
Earthquake Effects
Bridge Engineering
Earthquake Effects
Bridge Engineering
Earthquake Effects
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Failure due to Wind
• Several bridge failures have occurred due to wind. The bridge may
faile due to aero-static instability, as the design of cross bracing
and its fastenings may be inadequate to sustain wind forces,
though the design may be otherwise in conformity with
contemporary practice.
E L
•
P T
While very little can be done to save a structure from the direct
N
attack of a severe tornado, the damage can be minimized by
providing proper anchorage of the deck with the substructure.
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Fatigue
Bridge Engineering
Topic of Discussion
Introduction
Flood and Scour Failures
Brittle Fracture
Barge/ Ship Impact
False work Failures
E L
Erection Errors
P T
Design Deficiencies
Earthquake Effects
N
Failure due to Wind
Fatigue
Corrosion
Bridge Engineering
Corrosion
Bridge Engineering
Corrosion
Bridge Engineering
Corrosion
L
corrosion resistant reinforcement, such as epoxy-coated bars and
E
exercise of good quality control.
P T
•
N
Grouting deficiencies have contributed to distress of several post-
tensioned bridges. Such failures have shown the importance of
durability design, besides the load and resistance based structural
design. Modern segmental construction, however, uses matchcast
joints sealed with epoxy.
Bridge Engineering
E L
P T
N
Bridge Engineering
N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
Pvt. Ltd.
P T
N
S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Fatigue
E L
P T
N
Ø Crack Growth and Fracture
Ø Introduction
Ø Fatigue
Bridge Engineering
Introduction
L
introduced in the manufacturing of the base metal or as a
E
T
consequence of fabrication.
•
N P
The process of fatigue crack extension is labeled as sub
critical crack growth since the process consists of incremental
crack extension with each cycle of loading. The meaning of
“sub critical” is that the crack can be tolerated in the member
without unstable propagation and fracture.
Bridge Engineering
Introduction
•
E L
Fracture is the rupture in tension or rapid extension of a
T
discontinuity (which could be a fatigue crack), leading to gross
P
N
deformation, loss of function or serviceability, or complete
separation of the component.
Bridge Engineering
Introduction
E L
P T
N
Bridge Engineering
Introduction
•
E L
All steel members possess discontinuities due to fabrication
T
and manufacturing, but these are benign as long as the
P
•
stresses are kept sufficiently low.
N
The structural engineering approach to fatigue presumes the
existence of some discontinuity that serves as a potential
initiation site for cracking.
Bridge Engineering
Introduction
E
identify and reject those that could cause harm.
L
•
P T
Fatigue details exhibit what is referred to as threshold fatigue
N
strength. This means that applied stress ranges below the
threshold stress range theoretically do not cause crack
extension.
Bridge Engineering
Introduction
E L
that the stress is below the threshold which provides a
T
structure which will confidently not exhibit fatigue crack
P
extension.
N
Bridge Engineering
Introduction
E L
cycles of fatigue loading each year. The number of trucks on
T
an interstate highway typically exceeds 1,000 trucks per day,
P
•
N
which produces over 27 million cycles in 75 years.
Bridge Engineering
Introduction
•
E L
Modern bridge designs utilize weld details which have known
T
and acceptable fatigue resistance. The designer must select
P
•
N
the proper details based upon the expected fatigue stress.
Bridge Engineering
Introduction
L
fracture, while cyclic stresses are important in the investigation
E
T
of both fatigue and fracture.
•
N P
The stresses applied to structural components due to dead
load and live load are shown in figure in the next slide.
Bridge Engineering
Introduction
E L
P T
N
Bridge Engineering
Introduction
E L
which will not exhibit fatigue damage or any fracture during the
service life of the structure.
P T
N
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Fatigue
Bridge Engineering
Fatigue
• The stress range for the fatigue limit state is the algebraic
E L
difference between a maximum and minimum live load stress
T
caused by the passage of a single fatigue design vehicle
P
•
occupying a single lane.
N
The most common cause of fatigue cracks in bridges is in-
service cyclical stress range due to trucks.
Bridge Engineering
Fatigue
E L
•
T
Two different sources of fatigue are identified: load-induced
P
•
and distortion-induced fatigue.
N
Both load-induced and distortion-induced fatigue must be
considered separately during design.
Bridge Engineering
Fatigue
•
E L
Examples of these in-plane stresses include the flexural stress
T
in a flange or web of a steel I-girder, stress ranges in a cross-
P
N
frame that result from a refined analysis, stress ranges at a
shear stud to girder flange connection when designing a
composite girder, stress ranges due to wind and other similar
instances where engineers have results from analysis.
Bridge Engineering
Fatigue
E L
these conditions due to applied stress-range cycles from the
passage of trucks.
P T
• N
Distortion-induced fatigue is the designation given to cracking
that arises from local out-of-plane secondary stresses not
typically calculated in analysis.
Bridge Engineering
Fatigue
•
E L
Distortion-induced cracking is prevented by providing a
T
positive load path to transmit unintentional and intended force
P
•
N
effects between transverse and longitudinal members.
Bridge Engineering
Fatigue
E L
•
T
The limit state is expressed mathematically as:
P
N
Load < Resistance
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Fatigue
Bridge Engineering
Crack Growth and Fracture
E L
crack growth, while sustained tensile stress or a single stress
P T
cycle with a tensile stress component can cause fracture.
• N
Cracking in steel structures can manifest as a slow, stable
process of growth from repeated applications of stress or
suddenly when the conditions are right.
Bridge Engineering
Crack Growth and Fracture
•
steel bridge members.
N
The fatigue process can take place at stress levels (calculated
on the initial section) that are substantially less than those
associated with yielding under static loading conditions.
Bridge Engineering
Crack Growth and Fracture
E L
that are susceptible to fatigue cracking include dynamically
P T
loaded structures such as bridges, highway sign and lighting
offshore structures.
N
structures, crane-support structures, stacks and masts, and
Bridge Engineering
Crack Growth and Fracture
•
E L
A relationship exists between load and resistance for both
P T
fatigue and fracture. However, the parameters in this
N
relationship vary for fatigue and fracture. For example, the load
parameter to initiate fatigue is stress range, while that for
fracture is total stress.
Bridge Engineering
Crack Growth and Fracture
E L
P T
N
Bridge Engineering
Crack Growth and Fracture
• Initiation
L
These discontinuities are byproducts of steel making, as well as
E
the various cutting, drilling, punching, and welding operations
T
elements. N P
associated with the fabrication of steel bridge and structural
Bridge Engineering
Crack Growth and Fracture
E L
discontinuities are sharpened into cracks is essentially non-
P T
existent for all fabricated steel structures and can conservatively
be ignored.
N
Thus, they are assumed to be present at the start. Crack growth in
bridges is delineated into only two regimes: stable fatigue cracking
and unstable fracture.
Bridge Engineering
Crack Growth and Fracture
• Propagation
E L
Fatigue is the propagation of microscopic cracks into macro
P T
cracks by the repeated application of tensile stress.
N
An existing crack grows a small amount in size each time a load is
applied.
Bridge Engineering
Crack Growth and Fracture
Continued slip results in a blunted crack tip, and the crack grows a
minute amount during this process.
E L
P T
Upon unloading, not necessarily to zero, the crack tip again
becomes sharp. N
The process is repeated during each load cycles.
Bridge Engineering
Crack Growth and Fracture
• Fracture
L
Fracture may be defined as rupture in tension or rapid extension of
E
a crack, leading to gross deformation, loss of load-carrying
T
P
capacity, or complete separation of the component.
N
Failure occurs in one of two ways. One possibility is that the steel
has sufficient toughness and the fatigue crack grows to such an
extent that the loss of section means the load simply can no longer
be resisted by the uncracked ligament (for example, overload).
Bridge Engineering
Crack Growth and Fracture
In the case of yielding and a ductile failure, the critical flaw size is
E L
proportional to the yield strength. If the steel does not have
P T
sufficient toughness, the section fails by brittle fracture.
N
In the case of a brittle failure, the critical size is proportional to the
fracture toughness of the material which varies with the rate of
application of the load and the temperature of the material.
Bridge Engineering
Crack Growth and Fracture
E L
limited magnitude of stress may allow the cracking to arrest,
P T
resulting in the need for either no repair or simple repair.
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Fatigue
Bridge Engineering
Fatigue and Fracture Control
E L
described, including both approximate analysis and refined
P T
analysis methods, the local-stress approach, and the fracture-
•
mechanics approach.
N
For the fatigue limit state, the design stress range must not
exceed the factored nominal resistance.
Bridge Engineering
Fatigue and Fracture Control
E L
commonly on older bridges), then a repair or retrofit strategy
P T
must be employed to rectify the problem and to help prevent
•
additional problems.
N
While the specifics of the repair strategy are dependent upon
the nature of the detail and problem, there are several general
repair and retrofit strategies that are common for virtually all
fatigue details.
Bridge Engineering
Fatigue and Fracture Control
E L
the unique fatigue characteristics of the bridge, each step is
P T
essential for any successful repair or retrofit strategy.
Bridge Engineering
Fatigue and Fracture Control
E L
increasing radii where stress flows are disrupted and stress
P T
concentrations drive down fatigue resistance,
N
(2) reducing the effect of tensile stress ranges by introducing
residual compressive stresses.
Bridge Engineering
E L
P T
N
Bridge Engineering
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co.
E
T
Pvt. Ltd.
N P
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI
Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor &
Francis Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Introduction
E L
P T
N
Bridge Engineering
Introduction
•
E L
Recent developments in performance-based seismic design
T
and assessment approaches have emphasized the importance
P
N
of properly assessing and limiting the residual (permanent)
deformations that are typically sustained by a structure after a
seismic event.
Bridge Engineering
Introduction
L
permanent deformation, this will substantially scale down the
E
T
repair and maintenance cost of structures and make them safer
against earthquakes.
N P
• Superelastic shape memory alloy (SMA) possesses the distinct
ability to experience large deformations and retrieve its original
shape upon load removal along with possessing a high
resistance to corrosion.
Bridge Engineering
Introduction
E L
•
T
Numerous experimental and numerical studies proved the
P
N
efficiency of SMA reinforced structures in seismic regions.
However, there exists no proper design guideline for utilizing
SMA in highway bridges.
Bridge Engineering
Introduction
•
E L
Most of the current researches on SMA-RC bridge piers are
T
focused on seismic performance assessment and comparison
P
•
with regular RC bridge piers.
N
Although a good number of studies exist on performance
based damage states for steel RC bridge piers, limited study
has focused on the performance based damage states for
SMA-RC piers.
Bridge Engineering
Introduction
E L
from their steel counterpart, using those damage states for
T
SMA-RC piers might lead to faulty design.
P
• N
Several compositions of SMAs are developed and used by
different researchers in civil engineering applications.
Bridge Engineering
Introduction
E L
reinforced concrete piers vary considerably from their steel
counterparts.
P T
• N
Hence, performance-based damage states were developed for
SMA-RC bridge piers considering five different SMAs with
three different earthquake hazard levels.
Bridge Engineering
Introduction
• The ultimate goal of the study by Billah and Alam (2016) was to
provide a technical basis for the development of performance-
based seismic design, and other evaluation methodologies, for
SMA-RC bridge piers.
•
E L
Using an incremental dynamic analysis (IDA)-based analytical
T
approach, performance-based damage states (based on drift
P
N
limits) were developed for five different SMA-RC bridge piers
and validated against experimental data.
Bridge Engineering
Introduction
•
E L
This study also developed residual drift-based damage states
T
for SMA-RC bridge piers and proposed an analytical
P
N
expression that can be used for predicting the residual drift in
SMA-reinforced concrete elements.
Bridge Engineering
Topic of Discussion
Ø Introduction
E L
P T
N
Bridge Engineering
Shape Memory Alloys
E L
Ni-Ti, Cu-Zn, Cu-Zn-Al, Cu-Al-Ni, Fe-Mn, Mn-Cu, Fe-Pd, and Ti-
Ni-Cu, etc.
P T
N
Bridge Engineering
Shape Memory Alloys
Bridge Engineering
Shape Memory Alloys
Bridge Engineering
Shape Memory Alloys
E L
weldability, and wide transformation hysteresis as compared to
Ni-Ti SMAs.
P T
• N
Although several compositions of Fe-based SMAs are
developed, large-scale applications are still limited due to the
poor shape recovery limit and associated costly training
treatment.
Bridge Engineering
Shape Memory Alloys
E L
than Fe-Ni-Co-Ti alloy and almost double that of conventional
Ni-Ti alloy.
P T
• N
This Fe-based SMA has extremely high ductility, greater
strength, and also energy dissipation capacity several times
higher than that of commercially available Ni-Ti SMA.
Bridge Engineering
Shape Memory Alloys
•
E L
This allows this SMA to operate in superelastic range even at a
very low temperature.
P T
N
Bridge Engineering
Shape Memory Alloys
Bridge Engineering
Shape Memory Alloys
E L
alloys are selected by Alam et al (2016) for use in bridge piers.
P T
N
Bridge Engineering
Shape Memory Alloys
L
to austenite finishing stress ( 𝒇𝑻𝟐 ); superelastic strain (εs);
E
T
residual strain (εr) are listed in Table 1.
N P
Bridge Engineering
Shape Memory Alloys
Table 1. Properties of Different Types of SMA
SMA Alloy ∈s ∈r E 𝐟𝐲 𝐟𝐩𝟏 𝐟𝐓𝟏 𝐟𝐓𝟐 𝐟𝐲/𝐄 Reference
Type (%) (%) (GPa) (MPa) (MPa) (MPa) (MPa)
SMA-1 𝐍𝐢𝐓𝐢𝟒𝟓 6 0.5 62.5 401.0 510 370 130 0.0065 Alam et al.
(2008)
SMA-2 𝐍𝐢𝐓𝐢𝟒𝟓 8 0.5 68 435.0 535.0 335 170 0.0063 Ghassemieh
E L et al. (2012)
T
SMA-3 FeNCATB 13.5 1.5 46.9 750 1200 300 200 0.0159 Tanaka et al.
(2010)
SMA-4
SMA-5
CuAlMn
FeMnAlNi
9
6.13
0.4
0.7
28
98.4
210.0
320.0 N
275.0
442.5
P 200
210.8
150
122
0.0075
0.0033
Shrestha et
al. (2013)
Omori et al.
(2011)
Bridge Engineering
Topic of Discussion
Ø Introduction
E L
P T
N
Bridge Engineering
Performance of SMA-RC Bridge Piers
E L
performance-based damage states for SMA-RC bridge piers.
•
P T
The bridge pier was seismically designed following the
Canadian highway bridge design code.N
• The considered bridge is a lifeline bridge as per (CSA 2010). In
an event of the design earthquake (return period of 475 years), a
lifeline bridge needs to remain open for immediate use to all
traffic.
Bridge Engineering
Performance of SMA-RC Bridge Piers
Bridge Engineering
Performance of SMA-RC Bridge Piers
E L
P T
N
Cross section and elevation of SMA reinforced concrete
bridge pier
Bridge Engineering
Performance of SMA-RC Bridge Piers
•
E L
A constant mass of 85t was applied at the top which represents
the weight of the superstructure.
P T
• N
The design moment and axial force were 11,265 kN-m and 9,500
kN, respectively.
Bridge Engineering
Performance of SMA-RC Bridge Piers
• The shear resistance of the pier was found to be 3,912 kN, which
E L
was much higher than the shear force demand of 1,230 kN.
•
P T
The moment-shear interaction and the axial load-moment
N
interaction of the bridge piers were investigated.
• It was found that the maximum moment and shear force as well
as the applied maximum axial load and moment are within the
safe boundary.
Bridge Engineering
Performance of SMA-RC Bridge Piers
• The shear capacity of the pier should be greater than 1.6 times
the base shear corresponding to the design moment which was
also satisfied.
E L
different SMAs have different elastic modulus and yield
strength.
P T
• N
Although SMA does not have a yielding process, the term yield
was used to refer to the initiation of phase transformation of
SMA.
Bridge Engineering
Performance of SMA-RC Bridge Piers
•
E L
SMA-RC-1 and SMA-RC-2 were reinforced with 48-28M SMA-1
and SMA-2 bars.
P T
• N
SMA-RC-3 was reinforced with 48-20M SMA-3 bars, SMA-RC-4
was reinforced with 48-35M SMA-4 bars, and SMA-RC-5 was
reinforced with 48-32M SMA-5 bars.
Bridge Engineering
Performance of SMA-RC Bridge Piers
• Rebar sizes were selected in such a way that the axial forces
developed in the rebar were almost similar.
• The bridge piers were designed in such a way that they have
comparable moment capacities.
E L
P T
N
Bridge Engineering
Performance of SMA-RC Bridge Piers
• Fig. 2(b) shows the pushover response curves for these five
different SMA-RC bridge piers.
E L
P T
N
Bridge Engineering
Performance of SMA-RC Bridge Piers
• From Fig. 2(a), it is evident that all the sections have similar
initial stiffness and comparable moment capacities.
E L
higher than that of SMA-RC-1, SMA-RC-2, SMA-RC-3, and SMA-
RC-4, respectively.
P T
• N
Moment-curvature response of all the sections revealed that this
design process led to comparable moment capacities for the
five different SMA reinforced bridge piers.
Bridge Engineering
Performance of SMA-RC Bridge Piers
•
E L
Fig. 2(b) shows the pushover response curves for these five
P T
different SMA-RC bridge piers. From this figure, it was observed
N
that all the bridge piers had similar stiffness and load-carrying
capacities.
Bridge Engineering
Performance of SMA-RC Bridge Piers
Steel
Elastic modulus (GPa)
Elastic modulus (GPa)
E L23.1
200
Bridge Engineering
Performance of SMA-RC Bridge Piers
Bridge Engineering
E L
P T
N
Bridge Engineering
v A. H. M. Muntasir Billah, and M. Shahria Alam. Performance-Based Seismic Design of
L
Shape Memory Alloy–Reinforced Concrete Bridge Piers. I: Development of
E
Performance-Based Damage States. ASCE J. Struct. Eng., 2016, 142(12): 04016140
T
P
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
N
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co. Pvt. Ltd.
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor & Francis
Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Introduction
E L
P T
N
Bridge Engineering
Introduction
E L
cause of this deficiency in reinforced-concrete (RC) bridges is
the corrosion of steel reinforcement.
P T
• N
The direct cost of corrosion-related repair of the bridge
infrastructure is quite high.
Bridge Engineering
Introduction
•
E L
However, this passive layer is lost in the presence of external
corroding agents such as chloride ions.
P T
• N
The chloride ions slowly diffuse through the porous concrete
cover and their concentration builds up around the steel rebar
over time, ultimately initiating the corrosion when a critical
concentration is reached.
Bridge Engineering
Introduction
E L
•
T
This provides an easier path for the corrosive agents to reach
P
N
the rebar, resulting in a self-feeding mechanism, which rapidly
increases the crack width and accelerates the deterioration of
the structure.
Bridge Engineering
Introduction
•
E L
Commonly used corrosion protection methods in the field to
T
prevent early deterioration of RC structures mainly focus on
P
N
delaying the initiation period because the propagation of
corrosion is difficult to control.
Bridge Engineering
Introduction
Bridge Engineering
Introduction
E L
•
T
Epoxy coated rebars (ECR) can be used for this purpose;
P
N
however, their effectiveness in the field for mitigating corrosion
is debatable.
Bridge Engineering
Introduction
E L
•
T
ECC absorbs damage through the formation of micro-cracks of
P
N
widths (or openings) less than 100 μm even at large imposed
deformations well beyond its elastic limit.
Bridge Engineering
Introduction
E L
•
T
The crack widths in ECC (typically under 100 μm) are much
P
N
lower than the service limit states for a variety of structural
applications.
Bridge Engineering
Introduction
•
E L
Thus, ECC presents a good potential for enhanced corrosion
T
resistance and service life of RC bridges subjected to
P
N
aggressive chloride-rich environments.
Bridge Engineering
Introduction
• However, ECC costs almost three times per unit volume and
E L
requires special processing in the field compared to normal
concrete.
P T
• N
Also, concrete adequately serves its function of resisting
compressive loads in the core of the bridge piers. The
performance limitation is caused mainly due to the
unreinforced concrete cover.
Bridge Engineering
Introduction
E L
•
T
The hypotheses are that the corrosion of rebars in an RC
P
N
bridge pier is significantly reduced by using ECC as the cover
material instead of concrete.
Bridge Engineering
Topic of Discussion
Ø Introduction
E L
P T
N
Bridge Engineering
Engineered Cementitious Composite
E L
P T
N
Bridge Engineering
Engineered Cementitious Composite
•
E L
The water/cementitious material (cement + fly ash) weight ratio
P T
is 0.29. Unreacted fly ash particles act as fillers in ECC
N
supplementing the primary aggregate, which is fine silica sand
with mean diameter of about 150 μm.
Bridge Engineering
Engineered Cementitious Composite
Bridge Engineering
Engineered Cementitious Composite
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø Introduction
E L
P T
N
Bridge Engineering
Performance of Bridge Piers with ECC Cover
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
P T
N
Bridge Engineering
Performance of Bridge Piers with ECC Cover
• In the first stage, only the ECC cover in the form of a thin tube
with average thickness of 12.7 mm was cast.
•
E L
High density polyethylene tubes of outer diameter 125 mm were
P T
placed inside the standard 150 mm x 300 mm cylinder moulds to
N
create an annular space, in which the ECC was poured from top.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
P T
N
• The ECC cover-tube was cured inside the moulds in moist
environment created by wet paper towels enclosed in an airtight
bag.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
Bridge Engineering
Performance of Bridge Piers with ECC Cover
•
E L
All the six cylinders were identically reinforced utilizing four 10
P T
mm Grade 60 black steel rebars without epoxy coating along the
•
N
longitudinal direction as shown in Figure 2.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
also used in these specimens, welded to the longitudinal rebars.
•
P T
Potentiostatic accelerated macrocell corrosion experiments
N
were performed on the cylinders to simulate several years of
corrosion (in an aggressive salt-rich environment) in a few days.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
P T
N
Experimental setup for accelerated macrocell corrosion
Bridge Engineering
Performance of Bridge Piers with ECC Cover
Bridge Engineering
Performance of Bridge Piers with ECC Cover
•
E L
The corrosion-current (icor) versus time (t) curves for all the six
P T
specimens (up to 465 hours) are given in Figure 5.
N
• As the same voltage was applied to all specimens, the
difference in observed corrosion currents was largely due to the
resistance of the concrete/ECC cover to the diffusion of ions.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
P T
N
Comparison of corrosion current-time histories of various specimens
Bridge Engineering
Performance of Bridge Piers with ECC Cover
•
E L
This was explained by the greater resistance offered by the
P T
denser microstructure (lower porosity) of ECC, which contains
•
N
no coarse aggregates, compared to normal concrete.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
Bridge Engineering
Performance of Bridge Piers with ECC Cover
Bridge Engineering
Performance of Bridge Piers with ECC Cover
L
• cleaning of the specimens and salt solution in the tank, or
Bridge Engineering
Performance of Bridge Piers with ECC Cover
• This was observed at 400 hr, when all specimens were removed
for observation and cleaning.
E L
•
P T
The laboratory temperature varied between 25 ± 2°C during this
experiment. N
• As ion diffusion was significantly influenced by temperature,
rise in temperature caused greater corrosion-currents, and vice
versa.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
•
P T
In this equation, A is the atomic mass of iron (56 g/mole), F is
N
the Faraday’s constant (96,500 Coulomb/gram-equivalent), Z is
the valence electrons of iron (equal to 2), t is time (s), and tu is
the total time of corrosion (465 hr). Δm represents m in terms of
percentage of the total initial mass of rebars in the specimen
(M), which is equal to about 730 g for the corroding
reinforcement in the study.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
• This figure shows that both the concrete specimens (Con-1 and
Con-2) suffered significant mass loss of rebars of about 68%
E L
and 52% by the end of the observation period of this study (465
hr).
P T
• N
In comparison, the mass loss in all specimens with ECC covers
ranged from 26% to 33%, which is less than half of the mass
loss observed in the specimens with the concrete cover.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
P T
N
Comparison of mass loss-time histories of various specimens
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
concrete cover which allowed easy ingress of corroding agents
to the rebar.
P T
• N
Thus, the damage due to the tensile strain imposed by the
expanding corrosion products was highly localized in the form
of large cracks in concrete near the longitudinal rebars, which
led to severe deterioration of structural behavior.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
P T
N
Comparison of damage patterns at the end of observation period in each
specimen, top figure shows the whole picture and bottom figure shows
the zoomed view of the dashed rectangular area in the top figure
Bridge Engineering
Performance of Bridge Piers with ECC Cover
•
E L
Unlike concrete cover, the ECC cover was able to spread the
P T
tensile strain demand due to expanding corrosion products over
•
N
a larger area via multiple fine micro-cracks.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
in time, kept the diffusion and permeability coefficients low in
P T
the corrosion propagation stage and can significantly prolong
•
the service life of infrastructure.
N
The specimens with ECC cover also provided greater
confinement of the core compared to the specimens with
concrete cover. This was supported by a close examination of
top cross-section of each type of specimen, shown in Figure 8.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
P T
N
Comparison of top cross-sections of various specimens
(a) Type 1 (b) Type 2 (c) Type 3
• Large cracks were visible in the cover as well as the core of the
all concrete specimens in Figure 8, whereas no cracks were
visible in the specimens with ECC cover.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
•
E L
Thus, the ECC cover not only improved the long-term durability
P T
but also improved the overall structural performance at all
N
stages of infrastructure’s service life.
Bridge Engineering
Performance of Bridge Piers with ECC Cover
E L
distribution of fibers in the thin precast ECC covers compared
P
to the cylinders made completely of ECC.
T
• N
The study revealed that using ECC only in the cover of lab-scale
steel-reinforced concrete cylinders to significantly mitigate
rebar corrosion is feasible.
Bridge Engineering
E L
P T
N
Bridge Engineering
v R Ranade, H Fakhri, KA Ragalwar. Feasibility of utilizing engineered cementitious
L
composite cover to mitigate rebar corrosion in reinforced-concrete bridge piers. 9th
E
RILEM International Symposium on Fiber Reinforced Concrete-BEFIB, pp. 521-530.
T
P
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
N
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co. Pvt. Ltd.
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor & Francis
Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Introduction
E L
P T
N
Bridge Engineering
Introduction
E L
with reasonable geometric accuracy, costs and build times.
•
P T
This technology was used to create the world's first metal 3D
N
printed bridge by Gardner et al. (2020).
Bridge Engineering
Introduction
• The bridge was printed in four main pieces, plus the four
corner swirls, which were then manually welded together.
•
E L
Printing was carried out using a 6-axis ABB industrial robot,
P T
fitted with a MIG welding machine, as shown in Fig. 3, and
controlled using MX3D's software.N
• The robot was mounted on the bridge for demonstration
purposes, though the majority of printing was performed with
the robot ground-mounted and a vertical build direction.
Bridge Engineering
Introduction
E L
P T
N
Overall view of MX3D metal 3D printed footbridge
Bridge Engineering
Introduction
E L
P T
N
Plan view of MX3D metal 3D printed footbridge
Bridge Engineering
Introduction
E L
P T
N
Bridge Engineering
Introduction
•
E L
The deposition rate was generally 0.5–2.0 kg/h. For the bridge
P T
elements of 3.5 mm nominal thickness, wire of 1.0 mm diameter
N
was deposited with a welding speed of 15–30mm/s and a wire
feed rate of 4–8m/min.
Bridge Engineering
Introduction
E L
the end beams, hot-rolled stainless steel (grade 316 L) plate,
T
forming the deck, both of which were manually welded to the
P
•
N
3D printed substructure and a non-slip deck coating.
Bridge Engineering
Topic of Discussion
Ø Introduction
E L
P T
N
Bridge Engineering
Material Testing and Load Testing
E L
•
T
Two types of tensile coupon were prepared – ‘undulating’
P
N
coupons with the as-built geometry and ‘smoothed’ coupons
with a machined uniform prismatic cross-section within the
reduced region; as-built and smoothed surfaces of a typical
WAAM plate.
Bridge Engineering
Material Testing and Load Testing
Bridge Engineering
Material Testing and Load Testing
E L
P T
N
Bridge Engineering
Material Testing and Load Testing
• The stub column test setup for the CHS specimens is shown in
Fig. 5. An Instron 3500kN-SPL testing machine was used.
E L
formed from PS adhesive) equally spaced around the
T
circumference of the specimens at mid-height, three equally
P
N
spaced linear variable displacement transducers (LVDT) to
measure the vertical movement of the top platen of the testing
machine and a load cell within the machine to measure the
applied load.
Bridge Engineering
Material Testing and Load Testing
E L
P T
N
Bridge Engineering
Material Testing and Load Testing
• A similar setup was employed for the SHS tests, but with four
strain gauges attached to the specimens at mid-height on
E L
opposite faces and four LVDTs used to measure the top plate
movement.
P T
• N
Non-contact digital image correlation (DIC) measurements were
also taken using a two camera LaVision DIC system, allowing
surface deformations to be recorded and strains computed.
Bridge Engineering
Material Testing and Load Testing
•
E L
The tests were continued beyond the ultimate load to observe
the initial unloading behaviour.
P T
• N
The DIC system acquired data at 0.1 Hz, while the datalogger
for the strain gauges, LVDTs and load cell was recording at 2
Hz.
Bridge Engineering
Topic of Discussion
Ø Introduction
E L
P T
N
Bridge Engineering
Finite element simulation and Initial Verification
Bridge Engineering
Finite element simulation and Initial Verification
E L
P T
N
Bridge Engineering
Finite element simulation and Initial Verification
E L
advanced nonlinear finite element modelling to verify the
structural performance of the bridge.
P T
• N
At the same time, by making suitable simplifications and
assumptions, a more traditional analysis and design approach
was also possible.
Bridge Engineering
Finite element simulation and Initial Verification
• The results from the component tests confirmed that the general
response of the 3D printed elements is similar to that exhibited
by conventional structural steelwork.
E L
that captured the key features of the structural behaviour,
P T
followed by structural design checks where the bridge was
•
considered as a U-frame.
N
The beam finite element model, developed by Arup,
corroborated the shell finite element results obtained by
Gardner et al. (2020).
Bridge Engineering
Finite element simulation and Initial Verification
• The physical testing to date has shown that the bridge can
sustain its full serviceability limit state design load.
Bridge Engineering
E L
P T
N
Bridge Engineering
v L. Gardner, P. Kyvelou, G. Herbert and C. Buchanan. Testing and initial verification of
L
the world's first metal 3D printed bridge. Journal of Constructional Steel Research,
Volume 172, September 2020, 106233.
T E
P
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
N
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co. Pvt. Ltd.
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor & Francis
Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
E L
T
BRIDGE ENGINEERING
P
N
Prof. Piyali Sengupta
Department of Civil Engineering,
Indian Institute of Technology (ISM) Dhanbad
Ø Literature Review
E L
P T
N
Ø Selection of Superstructure
Ø Introduction
Ø Literature Review
Ø Selection of Superstructure
Bridge Engineering
Introduction
•
E L
Entry of the train on the bridge creates a free vibration
P T
resulting from the inertia of the span that cannot instantly
N
accelerate to the deflection corresponding to the position of
the force.
Bridge Engineering
Introduction
E L
P T
N
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Literature Review
Ø Selection of Superstructure
Bridge Engineering
Literature Review
Author Major Findings
• Predicted the vulnerability of railway bridges subjected to high-speed trains of speeds above
Björklund 200 km/h loading by means of dynamic analysis.
(2004) • Discussed about dynamic amplification factors, damping coefficients, mass and stiffness of
railway bridges for case studies on high-speed rail in Sweden.
• Utilized capacity design methods for seismic resistant design of 185 m long 5 span bridge
across the Tuntzuchiao active faults under Taiwan High-Speed Rail Project.
Empelmann
• Considered amplified near fault shaking effects and fault rupture inclusive of 1.5 m horizontal
L
et al. (2004)
and 0.5 m vertical ground offsets for seismic design of the bridge at no catastrophic damage
E
or span failure.
P T
• Deduced that bearings of the high-speed railway bridges are required to experience minimum
deformation during load transfer to avoid buckling and misalignment of rails.
Marioni
(2005)
unless combined with rigid restraints.
N
• Concluded that elastomeric bearings can not be considered for high-speed railway bridges,
• Fixed and sliding guided pot bearings are commonly adopted in high-speed railway bridges
while spherical bearings were utilized in Italian high speed railway network to provide higher
rotation.
• Assessed the effectiveness of tuned mass dampers (TMD) in high-speed railway bridges in
Henriques reducing the train-induced vibrations by means of the auxiliary energy dissipation.
(2007) • Investigated the possibility of resonance between structure and the running train under
repeated passage of high-speed trains over the bridge.
Bridge Engineering
Literature Review
Author Major Findings
• Performed full span precast launching method (FPLM) analysis with dynamic simulation for
Taiwan High Speed Rail Project (THSR).
Pan et
• Adopted a dynamic simulation software SIMPROCESS for creating dynamic models of five
al.
different sections of THSR project for implementing FPLM as case studies.
(2008)
• Performed cross-tabulation and sensitivity analysis to identify the critical factors in the operating
process of FPLM for enhancing the performance of the project execution.
• Optimized the cross-sectional parameters of single and double track concrete and composite
L
Mellier
high-speed railway bridges under ten HSLM-A trains running at speeds between 150-350 km/h,
E
(2010)
based on first natural frequency and maximum vertical bridge deck acceleration criteria.
P T
• Investigated the high-speed train-track-bridge dynamic interactions through theoretical model
development, numerical simulation using the proposed train–track–bridge interaction simulation
N
software (TTBSIM) and experimental validations.
Zhai et • Coupled the vehicle subsystem with the track subsystem through a spatially interacted wheel-rail
al. model and the track subsystem with the bridge subsystem by a track–bridge dynamic interaction
(2015) model.
• Validated the numerical simulation results successfully with the on-site experimental results of
Yangcun Bridge of Beijing-Tianjin high-speed railway and Jinan Yellow River Bridge on the
Beijing–Shanghai high-speed railway.
Ding et • Performed a full-scale test, reduced scale test and numerical simulations to correlate
al. aerodynamic design principle, aerodynamic performance indexes and design variables for
(2016) aerodynamic design optimization of the streamlined head of high-speed trains.
Bridge Engineering
Literature Review
Author Major Findings
• Proposed dynamic load factors (DLF) for a high-speed railway truss arch bridge in China based
Youliang on dynamic strain responses measured by field monitoring systems and finite element
and simulations for the bridge and the train.
Gaoxin • Correlated of DLF with the train speed and location of the train lane from parametric study.
(2016) • Predicted probability characteristics of DLF using Generalized Extreme Value Distribution based
on which standard values of DLF for 50 years return period could be evaluated.
• Explored the design of the abutment pad foundations which are semi-integral with the viaduct
Ashworth
and expansion/contraction and traction and braking forces.
E L
superstructure. The pad foundation soil-structure interaction was expected to resist the viaduct
T
Young • Decided dimensions of the viaduct substructure to ensure minimum deck longitudinal
P
(2017) movements to allow rail expansion joints to be installed at each end of the bridge with 100 mm
N
allowable gap.
• Performed experimental investigation on a prestressed concrete (four box-girder) beam bridge
Brunetti Cave’s viaduct of the Italian high-speed network for evaluation of damping.
et al.
• Obtained 2.76% damping ratio from the experimental results, which was higher than the
(2017)
damping ratio prescribed by the Eurocode design guidelines.
• Highlighted the key technologies for China’s elevated high-speed railway (HSR) bridges with
small settlement requirement criterion.
He et al.
• Performed a comparative study between the Chinese technical standards and the Japanese and
(2017)
International Union of Railway (UIC) standards for HSR bridges on the dynamic coefficients,
limiting rotations at the beam ends for various train speeds, etc.
Bridge Engineering
Literature Review
Author Major Findings
• Conducted experimental dynamic analysis of Sesia viaduct under Turin-Milan high-speed rail
line for train passages with speed up to 374 km/h.
• Installed accelerometers at the steel box girder bridge and concrete deck to determine local
Somaschini
vibration modes for structural safety of the composite bridge as well as stability of the ballast
et al. (2017)
on the bridge deck.
• Assessed the influences of bridge vibration modes and adjacent span on the maximum
acceleration and the resonance train speed.
decades.
E L
• Presented a review of the high-speed railway bridges constructed in Germany in the past few
Kang et al.
(2018) T
• Simply supported box girder bridges were built on the first HSR lines, Hanover–Würzburg and
P
Mannheim–Stuttgart while continuous box girder bridges were preferred for subsequently built
N
HSR lines, Hanover–Berlin and Cologne–Rhine/Main.
• Latest HSR lines, Ebensfeld–Erfurt and Erfurt–Leipzig contained 3.05 km of simply supported
box girder bridges and more than 10 km of continuous box girder bridges.
• Developed a frequency domain vehicle-track-viaduct coupling model for China railways track
system-III type damping track system to mitigate the vibration and structure-borne noise of
Liu et al. the viaduct.
(2019)
• The high acoustic contribution rate for the top plate of the viaduct can be reduced by damping
track system up to 8.15 dB and 8.36 Db for near-field and far-field noise, respectively.
Bridge Engineering
Literature Review
Author Major Findings
• Evaluated the static and dynamic stiffnesses of the Itz valley railway viaduct by using a static
diagnostic load test and a braking test, respectively.
• Equivalent longitudinal stiffness of piers and abutments with fixed bearings, commonly
Wenner et
calculated using a pile group model, play a pivotal role in Track–bridge interaction of long
al. (2019)
railway bridges.
• Deduced from subsoil numerical simulation that the traditional pile group method
underestimates the measured stiffnesses up to 3-5 times.
E L
• Assessed the effects of substructure flexibility on the relative displacements of high-speed
Pugasap
(2020) T
• Developed 36 different numerical models of a 20-span viaduct supported by substructures
P
with natural frequencies of 0.566–3.706 Hz with column height, span length, bearing plan and
N
depth to span length ratio as four varying parameters.
• Found resonance phenomenon plausible for viaducts with flexible substructures contributing
to the response amplification.
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Literature Review
Ø Selection of Superstructure
Bridge Engineering
Selection of Superstructure
Bridge Engineering
Selection of Superstructure
E L
girder may be the possible options for the superstructure.
P T
N
Bridge Engineering
Selection of Superstructure
Bridge Engineering
Selection of Superstructure
• Composite Box Girder Bridge: Box girders are the least costly in
the applicable range of steel bridges. The applicable span is
about 85 m or less for simple girders and 100 m or less for
continuous girders.
•
E L
Truss Bridge: For spans longer than the applicable length of
P T
box girders, truss bridges are selected. Truss bridges are less
•
costly than arch bridges.
N
Arch Bridge: Arch bridges are also selected for longer spans.
The arch type is selected in urban areas where landscaping is
required.
Bridge Engineering
Selection of Superstructure
E L
P T
N
Steel Truss type HSR Bridge (Hirokawa Bridge, Japan)
Bridge Engineering
Selection of Superstructure
E L
P T
N
Steel Arch type HSR Bridge (Kitaoka Bridge, Japan)
Bridge Engineering
Selection of Superstructure
E L
take advantage of the best features of each material. This means
P T
combining the high compressive strength of concrete and the
good tensile performance of steel.
N
Bridge Engineering
Selection of Superstructure
Bridge Engineering
Selection of Superstructure
E L
P T
N
Bridge Engineering
Selection of Superstructure
•
E L
The lower concrete slab gives the required stability to the
bottom flange.
P T
N
Bridge Engineering
Topic of Discussion
Ø Introduction
Ø Literature Review
Ø Selection of Superstructure
Bridge Engineering
Dynamic Response Characterization
E L
dynamic effects on high-speed railway bridges can be
P T
determined by correlating it with the train speed and location of
•
the train lane.
N
Subsequently, calculation of deck acceleration, allowable
vertical, horizontal and rotational displacements of HSR
viaducts would be performed.
Bridge Engineering
Dynamic Response Characterization
E L
railway bridges, unless combined with rigid restraints.
•
P T
Fixed and sliding guided pot bearings may be adopted in high-
speed railway bridges. N
• Numerical simulation approach can be adopted to determine the
right type of bearing applicable for high speed railway bridges.
Bridge Engineering
Dynamic Response Characterization
•
E L
TMD consists in a simple device composed by a mass attached
P T
to the structure through spring and damper elements, tuned to a
•
N
particular structural frequency of the bridge.
Bridge Engineering
Dynamic Response Characterization
Bridge Engineering
Dynamic Response Characterization
E L
P T
N
A railway bridge with train without MTMD (left) and with MTMD (right)
Bridge Engineering
Dynamic Response Characterization
• Assumptions:
E L
P T
• The car bodies, bogie frames and wheelsets are all rigid bodies
with no elasticity. N
• The train moves at a constant speed along the track without
consideration of the stretching vibration of the vehicle and the
longitudinal dynamic interaction between neighbouring
vehicles.
Bridge Engineering
Dynamic Response Characterization
E L
P T
N
Bridge Engineering
Dynamic Response Characterization
E L
P T
N
High-speed railway double-block non-ballasted track
model: (a) side elevation; (b) end view
Bridge Engineering
Dynamic Response Characterization
E L
P T
N
Slab track–bridge dynamic interaction model
Bridge Engineering
E L
P T
N
Bridge Engineering
v Björklund, L. (2004) Dynamic Analysis of a Railway Bridge subjected to High Speed
L
Trains, MS Thesis, Royal Institute of Technology in Stockholm: 134 pp.
E
v Empelmann, M., Whittaker, D., Los, E., and Dorgarten, H-W. (2004) Taiwan High Speed
T
P
Rail Project-Seismic Design of Bridges across the TUNTZUCHIAO active fault, 13th
N
World Conference on Earthquake Engineering, Vancouver, B.C., Canada.
v Marioni, A. (2006) Bearing systems for high speed railway bridges, Sixth World
Congress on Joints, Bearings and Seismic Systems for Concrete Structures, Canada,
17-21 September 2006: 1-22.
v Henriques, J.F.C.S. (2007) Dynamic Behaviour and Vibration Control of High-Speed
Railway Bridges through Tuned Mass Dampers, MS Thesis, Instituto Superior
Técnico, Universidade de Lisboa: 226 pp.
v Mellier, C. (2010) Optimal Design of Bridges for High-Speed Trains: Single and Double
L
span bridges, MS thesis, Royal Institute of Technology (KTH), Sweden.
E
v Zhai, W., He Xia, Chengbiao Cai, Mangmang Gao , Xiaozhen Li , Xiangrong Guo, Nan
T
P
Zhang & Kaiyun Wang (2013) High-speed train–track–bridge dynamic interactions –
N
Part I: theoretical model and numerical simulation, International Journal of Rail
Transportation, 1:1-2, 3-24.
v Wanming Zhai , Shaolin Wang , Nan Zhang , Mangmang Gao , He Xia , Chengbiao Cai
& Chunfa Zhao (2013) High-speed train–track–bridge dynamic interactions – Part II:
experimental validation and engineering application, International Journal of Rail
Transportation, 1:1-2, 25-41.
v Ding, S.S., Li, Q., Tian, A.Q., Du, J. and Liu, J.L. (2016) Aerodynamic design on high-
speed trains, Acta Mechanica Sinica; 32 (2): 215-232.
v Youliang, D., and Gaoxin, W. (2016) Evaluation of Dynamic Load Factors for a High-
L
Speed Railway Truss Arch Bridge, Shock and Vibration, 1-15.
E
v Brunetti, M., Ciambella, J., Evangelista, L., Lofrano, E., Paolone, A., and Vittozzi, A.
T
P
(2017) Experimental results in damping evaluation of a high-speed railway bridge,
Procedia Engineering, 199, 3-15-3020.
N
v Somaschini, C., Matsuoka, K., Collina, A. (2017) Experimental analysis of a composite
bridge under high-speed train passages, Procedia Engineering, 199, 3071-3076.
v Ashworth, T. and Young, C. (2018) Design and construction of Loughor railway
viaduct with semi-integral abutments, Proceedings of the Institution of Civil
Engineers: Bridge Engineering; 171 (3): 191-200.
v Kang, C., Schneider, S., Wenner, M. and Marx, S. (2018) Development of design and
L
construction of high-speed railway bridges in Germany, Engineering Structures; 163:
184-196.
T E
P
v Liu, L., Song, R., Zhou, Y-L and Qin, J. (2019) Noise and Vibration Mitigation
N
Performance of Damping Pad under CRTS-III Ballastless Track in High-Speed Rail
Viaduct, KSCE Journal of Civil Engineering, 23(8), 3525-3534.
v Wenner M, Meier T, Wedel F, Schacht G and Marx S (2019) Experimental Determination
of the Longitudinal Pier Stiffness of a Long Railway Viaduct. Frontiers in Built
Environment 5 (45), 1-13.
v Pugasap, K. (2020) Dynamic responses of bridge substructures subjected to high-
speed trains, Proceedings of the Institution of Civil Engineers: Bridge Engineering;
173 (3): 143-157.
v N. Krishna Raju, Design of Bridges, Oxford & IBH Publishing Co. Pvt. Ltd.
L
v D.J. Victor, Essentials of Bridge Engineering, Oxford & IBH Publishing Co. Pvt. Ltd.
E
T
v S. Ponnuswamy, Bridge Engineering, McGraw Hill Education.
N P
v T.R. Jagadeesh and M.A. Jayaram, Design of Bridge Structures, PHI Learning Pvt. Ltd.
v W.F. Chen, and L. Duan, Bridge Engineering Handbook, CRC Press, Taylor & Francis
Group.
v G. Parke and N. Hewson, ICE manual of Bridge Engineering, Thomas Telford
Publishing.
12345689 5
56 7389934:;: <=>2? 56 7389934:;: <=>292@A5:B39CDEFG?
39H:B;:23:6H:6IJJKL< :B@= M
!"#$%"&'()*$+(+,'-.$/(0123+&/#('#&'((+&'#-$4+(1
0
NO*+(/
+(#&(+(/P-*&-Q
$-(-Q$4+
!('4
d55He8133<2 52e
133<2 522=39 5
I? \]^_àb
R=9635
=9B25
S$/$('
$'*&'(
-$4+(
$+Q,1 1
f
T((QU1 R
+-&-( g
T((QU h53i65:234563@=665@
[&#'!('U 8@=658I
(!(', 1@@57512345638
'!(0VXW1 j
T((QV1 c? \]^_àb
T((QW1
T((QX1
T((QY1
T((QZ1
0112456 +
,
0112756 -
.
0112856
/01234056170891:;880:3<
0112956 =:;80>?
+::0@30A+617081>
B
0112 56
!" #$%&'()
0112 56
0112 56
156
56
+
1 ,
11
156 -
.
/01234056170891:;880:3<
=:;80>?
+::0@30A+617081>
C
*" #$%&'()
+
,
-
.
/01234056170891:;880:3<
=:;80>?
+::0@30A+617081>
D
01 245678
!"
#
91 245678
!"
$
1 245678
!
01 245678
"
#
$
91 245678
"
#
!
1 245678
1
2
3
4
567896 7 6769
6
16961 7 67
!"#$%&$!'#(!)*+,-.
5767
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
!./
!0/
!1/
!2/
3 8 =
!
"#
01 2456789
$
%
&
!
"#
1 2456789
$
%
&
!
'#
1 2456789
12
32
42
52
6789 7 87872
7
1771 878
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
!
"
#$%&'($)*%+$,-%./,,$.'
0./,$12
..$3'$4*%+$,%1
76
!"#!
$%
01 2456789
!
&
!"#!
$%
1 2456789
!
&
!"#!
'%
1 2456789
12
32
42
52
6789 7 87872
7
1771 878
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
!"
#$
1 2456789
01 2456789
!
"#$%&
'
1 2456789
!
"#$%&
(
1 2456789
12
32
42
567896 7 67692
6
696 7 67
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
!"#$%
&
1 2456789
!"#$%
'
1 2456789
!"#!
$%
01 2456789
!
&
!"#!
$%
1 2456789
!
&
!"#!
$%
1 2456789
12
32
42
52
6789 7 87872
7
1771 878
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
!"
%$
1 2456789
!"#!
$%
01 2456789
!
&
!"#!
'%
1 2456789
!
&
!"#!
(%
1 2456789
12
32
42
52
6789 7 87872
7
1771 878
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
'(
)(
*(
+(
,-./01-23.4-56.7855-70(
9785-:;
'77-<0-='3.4-5.:
@?
& !"#$%
'(
)(
*(
+(
,-./01-23.4-56.7855-70(
9 ;
01 2456789
!
"#$%&
'
1 2456789
!
"#$%&
(
1 2456789
12
32
4567895 6 5 6 582
5
585 6 56
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
!
"#
$%
1 2456789
!
"#
$%
1 2456789
!"
#$
01 2456789
!"
%$
1 2456789
!
012 356789
"
#
$
%!
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
!"#$%&"'(#)"*+#,-**",%
.,-*"/0
,,"1%"2(#)"*#/
34
!"#$%&"'(#)"*+#,-**",%
.,-*"/0
,,"1%"2(#)"*#/
54
! & +
!
"#
01 2456789
$
%
&
!
'#
1 2456789
$
%
&
!
(#
1 2456789
12
32
42
52
6789 7 87872
7
1771 878
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
'(
)(
*(
+(
,-./01-23.4-56.7855-70(
9785-:;
'77-<0-='3.4-5.:
@?
& !"#$%
'(
)(
*(
+(
,-./01-23.4-56.7855-70(
9 ;
01 2456789
!
"#$%&
'
1 2456789
!
"#$%&
(
1 2456789
12
32
42
567896 7 67692
6
696 7 67
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
!
"#$%&'#()$*#+,$-.++#-&
/-.+#01
--#2)$*#+$0
45
!
"#$%&'#()$*#+,$-.++#-&
/-.+#01
--#2)$*#+$0
65
!
" ' ,
!
"#
01 2456789
$
%
&
!
'#
1 2456789
$
%
&
!
(#
1 2456789
$
12
32
4567895 6 5 6 582
5
585 6 56
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
EQ
ZQ
[Q
PQ
R&'ST&1'U&/'.(//&.Q
G.(/&V)
E..&W&@E'U&/'V
]Y
01 2456789
!
"#
$%
1 2456789
!
"#
&%
1 2456789
!
012 356789
"
#
$
!
1
#'())*+,--+./0/123452678# #'())*+,--+./0/12345267-79:;<)/6=+->?@AB8
+CD/=0/72+/ED/E2FGGHI31/6=2941#J
;G
HG
IG
JG
K7L0M".7N&/7#%&�G
=#%&O+
;##P0 ;.7N&7O
SR
9: ?@ABCDEF
;G
HG
IG
JG
K7L0M".7N&/7#%&�G
= +
01 2456789
!
"#$%&
'
1 2456789
!
"#$%&
(
1 2456789
12
32
4567895 6 5 6 582
5
585 6 56
NPTEL ONLINE CERTIFICATION COURSES
COURSE NAME: BRIDGE ENGINEERING
ASSIGNMENT - WEEK 1
A. 5m
B. 50 m
C. 90 m
D. 150 m
Right Answer: B. 50 m
Detailed Solution: Traffic projection in bridge sites is done through traffic survey considering
existing mode of transport, socio-economic conditions and upcoming developments in the
regions.
A. Tension
B. Compression
C. None of the above
D. All of the above
A. Tension
B. Compression
C. None of the above
D. All of the above
Detailed Solution: The cables of cable stayed bridges carry load in tension.
A. Contour Survey
B. Sub-soil Exploration
C. Catchment Area Map
D. All of the above
A. Dicken’s Formula
B. Ryve’s Formula
C. Unit Hydrograph Method
D. Pigeaud’s Coefficient Method
7. For 4 m3/s discharge per metre width, calculate the maximum scour depth below HFL near
abutments when the bed material is medium sand of particle size 0.50 mm.
A. 2.35 m
B. 3.15 m
C. 3.95 m
D. 4.75 m
Right Answer: C. 3.95 m
Detailed Solution: Silt factor Ksf = 1.76 × square root of the particle size in mm = 1.76 × √0.5
= 1.244
Mean depth of scour below HFL in metres dsm =1.34 × (Db2/ Ksf)0.33 = 1.34 × (42/ 1.244)0.33 =
3.113 m
Maximum Scour Depth below HFL near abutments, D = 1.27 × dsm = 1.27 × 3.113 m = 3.953
m
8. For the most economical span length of bridge, Cost of superstructure equals to
Detailed Solution: For the most economical span length, cost of superstructure equals cost of
substructure.
A. 3.5 m
B. 4.25 m
C. 7m
D. 7.5 m
Detailed Solution: The minimum carriageway width for 2 lane highway bridge is 7.5 m.
A. 1767 mm
B. 1676 mm
C. 767 mm
D. 672 mm
ASSIGNMENT - WEEK 2
A. 0.0015
B. 0.0025
C. 0.0031
D. 0.0035
Detailed Solution: The limiting value of yield strain in Fe250 grade steel is taken as 0.0031
regardless of the grade of concrete.
A. 0.138×fckbd2
B. 0.133×fckbd2
C. 0.128×fckbd2
D. 0.121×fckbd2
3. What is the maximum depth of neutral axis of a section with reinforcement made of Fe415
steel?
Detailed Solution: The maximum depth of neutral axis of a section with reinforcement made
of Fe415 steel is 0.48 times effective depth of section.
4. What is maximum permissible crack width in reinforced concrete members under severe
exposure condition?
A. 0.1 mm
B. 0.15 mm
C. 0.2 mm
D. 0.3 mm
Detailed Solution: Maximum permissible crack width in reinforced concrete members under
severe exposure condition is 0.3 mm.
5. The deflection limit in deck slab under vehicular and pedestrian live load is
A. Span/300
B. Span/500
C. Span/800`
D. Span/1000
Detailed Solution: The deflection limit in deck slab under vehicular and pedestrian live load
is Span/1000.
6. For a simply supported slab culvert of L = 6 m, B = 9.5 m, wearing coat thickness 80 mm, how
much is the effective width under a wheel load of 62.5 kN when it is placed at the centre of
span? Wheel contact dimension perpendicular to span = 200 mm
A. 2.67 m
B. 3.67 m
C. 4.67 m
D. 5.67 m
7. For a simply supported slab culvert of L = 6 m, B = 9.5 m, slab thickness 500 mm and wearing
coat thickness 80 mm, how much is the effective length under a wheel load of 62.5 kN when
it is placed at the centre of span? Wheel contact dimension along the span = 400 mm
A. 1.56 m
B. 1.86 m
C. 2.16 m
D. 2.46 m
8. Courbon’s Method is applicable for which of the following range of span (L) to Width (B)
ratio of deck?
Detailed Solution: Courbon’s method is applicable when Ratio of span (L) to width (B) of deck
is greater than 2 but less than 4.
9. For a T-beam bridge deck having wearing coat thickness 80 mm, what are wheel load
dispersions along short span and long span under a wheel load of 62.5 kN? Wheel contact
dimensions = 400 mm (along long span) × 200 mm (along short span)
Right Answer: D. 560 mm (along long span) × 360 mm (along short span)
Detailed Solution: Wheel Load Dispersion along the Short Span u = Wheel contact dimension
along short span + 2 × wearing coat thickness = 0.2 + 2 × 0.08 = 0.36 m
Wheel Load Dispersion along the Long Span v = Wheel contact dimension along long span +
2 × wearing coat thickness = 0.4 + 2 × 0.08 = 0.56 m
10. A T-beam bridge deck has short span length B = 2.5 m and long span length L = 5 m. Under a
wheel load of 100 kN, m1 = 0.2, m2 = 0.1 and μ = 0.15. Impact factor = 1.5. What are the live
load moments along short span and long span as per Pigeaud’s Coefficient method?
A. 32.25 kN-m (along short span) and 19.5 kN-m (along long span)
B. 22.25 kN-m (along short span) and 14.5 kN-m (along long span)
C. 12.25 kN-m (along short span) and 9.5 kN-m (along long span)
D. 2.25 kN-m (along short span) and 4.5 kN-m (along long span)
Right Answer: A. 32.25 kN-m (along short span) and 19.5 kN-m (along long span)
ASSIGNMENT - WEEK 3
1. A RC box culvert has a clear vent way of height h =3 m and length l = 3 m, slab thickness ts =
300 mm and wall thickness tw = 350 mm. What is the magnitude of K?
A. 0.98
B. 0.87
C. 0.75
D. 0.62
Detailed Solution: Clear Span of vent l = 3000 mm, Height of vent h = 3000 mm
Slab thickness ts = 300 mm, Wall thickness tw = 350 mm
Effective Span L = l + tw = 3350 mm,
Effective Height H = h + ts = 3300 mm
K = H/L × (ts/tw)3 = (3300/3350) × (300/350)3 = 0.62
2. A RC box culvert has effective span L = 3250 mm, effective height H = 3350 mm. If it is filled
with water, what is the maximum water pressure intensity?
A. 16.5 kN/m2
B. 23 kN/m2
C. 26.5 kN/m2
D. 33.5 kN/m2
3.
A RC box culvert has effective span L = 3250 mm, effective height H = 3350 mm. The density
of soil γsoil at bridge site = 18 kN/m3. Angle of repose φ = 30°. What is the soil pressure?
A. 29.7 kN/m2
B. 23.8 kN/m2
C. 20.1 kN/m2
D. 18.0 kN/m2
Detailed Solution: Soil pressure p = [γsoil × H × (1 – sin φ)/ (1 + sin φ)] = [18 × 3.35 × (1 – sin
30°)/ (1 + sin 30°)] = 20.1 kN/m2
4. A RC box culvert has effective span L = 3250 mm, effective height H = 3350 mm. slab
thickness ts = 300 mm and wall thickness tw = 350 mm. What is self-weight of each vertical
side wall per metre run? Unit weight of reinforced concrete γ = 24 kN/m3
A. 20.74 kN
B. 22.34 kN
C. 25.44 kN
D. 28.14 kN
Detailed Solution: Weight of each vertical side wall per metre run = (H × tw × γ) = (3.35 × 0.35
× 24) = 28.14 kN
5. A RC box culvert has effective span L = 3000 mm and K = 0.5. What are fixed end moments
in kN-m due to the equivalent concentrated wheel load W of 700 kN?
Detailed Solution: Fixed end moment MA in box culvert due to wheel load W = − (WL/12) ×
(2K + 4.5)/ [(K + 3) × (K + 1)] = − (700 × 3/12) × (2 × 0.5 + 4.5)/ [(0.5 + 3) × (0.5 + 1)] = −
183.33 kN-m
Fixed end moment MB in box culvert due to wheel load W = − (WL/24) × (K + 6)/ [(K + 3) ×
(K + 1)] = − (700 × 3/24) × (0.5 + 6)/ [(0.5 + 3) × (0.5 + 1)] = − 108.33 kN-m
6.
Which of the following is an unreinforced concrete non-pressure pipe?
A. NP-1
B. NP-2
C. NP-3
D. All of the above
7. Discharge through pipe culvert Q = 1.5 m3/s. Velocity of flow through pipe v = 2 m/s. What is
internal diameter d of the pipe?
A. 0.87 m
B. 0.92 m
C. 0.98 m
D. 1.15 m
Detailed Solution: Internal diameter of pipe d = √ (4Q/ πv) = √ [(4×1.5)/ (π×2)] = 0.98 m
8. What is the vertical external loading on a pipe of 1.1 m external diameter due to an embankment
of height 1 m above the pipe?
A. 24.2 kN/m
B. 28.3 kN/m
C. 29.6 kN/m
D. 33.4 kN/m
Detailed Solution: The vertical external loading on a pipe of 1.1 m external diameter due to an
embankment of height 1 m above the pipe = 28.3 kN/m
9. If IRC Class AA Tracked vehicle wheel load of 350 kN is placed directly above the pipe
culvert, what is the loading on pipe? The pipe has 1.1 m external diameter and the vertical
depth of top of pipe below the surface is 1 m. Impact factor is 1.5.
A. 187 kN/m
B. 141 kN/m
C. 93 kN/m
D. 47 kN/m
Right Answer: A. 187 kN/m
10. What is the weight of 8 mm spiral reinforcement per meter length of pipe? The average
diameter of spiral is 1.1 m. Spacing between spirals is 60 mm.
A. 14.7 kg/m
B. 17.1 kg/m
C. 20.4 kg/m
D. 23.2 kg/m
ASSIGNMENT – WEEK 4
1. Steel truss bridges are generally found economical in the span range of
A. 1-50 m
B. 50-100 m
C. 100-200 m
D. 200-300 m
Detailed Solution: Steel truss bridges are generally found economical in the span range of 100
to 200 m.
2. The depth of the truss for railway bridges generally ranges between
Detailed Solution: The depth of the truss for railway bridges generally ranges between 1/5 to
1/10 times span length.
A. Warren truss
B. Howe Truss
C. Fink Truss
D. None of the above
Detailed Solution: The most common type of steel truss used for bridges is the Warren truss.
5. If ISWB 450 is adopted for stringer beams of steel truss bridge, what is its shear area?
A. 2700 mm2
B. 3450 mm2
C. 4140 mm2
D. 4950 mm2
Detailed Solution: ISWB 450 has overall depth h = 450 mm and thickness of web tw = 9.2 mm
Shear Area for hot rolled sections Av = (h × tw) = (450 × 9.2) = 4140 mm2.
6. If ISWB 500 is adopted for stringer beams of steel truss bridge, what is its design shear
strength?
A. 443 kN
B. 649 kN
C. 882 kN
D. 1100 kN
Detailed Solution: ISWB 500 has overall depth h = 500 mm and thickness of web tw = 9.9
mm
Shear Area for hot rolled sections Av = (h × tw) = (500 × 9.9) = 4950 mm2.
Nominal Shear Resistance of Section Vn = Av fyw/√3 = 4950 × 250/√3 = 714470.958 N = 714.47
kN.
Design Shear Strength Vd = Vn/ γm0 = (714.47/1.1) = 649.518 kN ≈ 649 kN
7. If 4 angles of 100 × 100 × 10 is adopted for a tension member of a steel truss bridge, design
strength of the member under axial tension due to yielding of gross section is
A. 3164 kN
B. 2728 kN
C. 2293 kN
D. 1727 kN
Detailed Solution: 4 angles of 100 × 100 × 10 has a total cross sectional area Ag = 7600 mm2
Design strength of the member under axial tension due to yielding of gross section, Tdg = (Ag
× fy)/ γm0
γm0 = Partial safety factor for failure in tension by yielding = 1.1
Tdg = (Ag × fy)/ γm0 = (7600 × 250)/ 1.1 = 1727272.727 N = 1727.27 kN ≈ 1727 kN
A. Young’s Modulus E
B. Effective Length KL
C. Radius of Gyration r
D. All of the above
Detailed Solution: Imperfection factor α is dependent on buckling class and flange thickness.
10.
11.
What is the magnitude of φ of an axially loaded compression member of a steel truss bridge?
Effective slenderness ratio KL/r = 40 and imperfection factor α = 0.34.
A. 0.48
B. 0.64
C. 0.72
D. 0.85
ASSIGNMENT – WEEK 5
A. 10-15 m
B. 15-40 m
C. 40-100 m
D. 100-200 m
Detailed Solution: Plate girder bridges are economical for a span range of 15-40 m.
Right Answer: C. Yielding of the tension flange and buckling of the compression
flange
Detailed Solution: The modes of failure of a plate girder are by yielding of the tension flange
and by buckling of the compression flange.
A. Flanges carry a major portion of the flexural load while web carries most of the shear force
B. Flanges and web carry the flexural load only
C. Flanges and web carry the shear force only
D. None of the above
Right Answer: A. Flanges carry a major portion of the flexural load while web
carries most of the shear load
Detailed Solution: Based on the stress distribution diagrams, the flanges carry a major portion
of the flexural load while the web carries most of the shear load in the plate girder.
A. Prevent local buckling of the web and flanges due to concentrated loading
B. Prevent local crushing of the web and flanges due to concentrated loading
C. Provide torsional restraint to beams and girders at the supports
D. Prevent local buckling and local crushing of web respectively due to concentrated loading
Right Answer: D. Prevent local buckling and local crushing of web respectively
due to concentrated loading
Detailed Solution: The functions of load carrying and bearing stiffeners are to prevent local
buckling and local crushing of web respectively due to concentrated loading.
5. A plate girder of depth d, web thickness tw is sustaining a moment Mz. If d/tw = k, optimum
web thickness of plate girder is
A. ((Mz/fy k2)
B. (Mz/fy k)0.33
C. (Mz/fy k2)0.33
D. Mz/(fy k2)0.33
6. A plate girder of depth d, web thickness tw is sustaining a moment Mz. If d/tw = k, optimum
web depth of plate girder is
A. (Mz/fy k)0.33
B. (Mz/fy k2)0.33
C. (Mz k2/ fy)0.33
D. (Mzk/ fy)0.33
7.
For simply supported condition, critical elastic shear stress τcr,e of plate girder bridge is
Detailed Solution: For simply supported condition, critical elastic shear stress τcr,e of plate
girder bridge is Kvπ2E/ [12 × (1 − μ2) × (d/ tw)2].
8. For a web stiffener with thickness tq made of Fe 415 steel, outstand from the face of the web
can be up to
A. 16 tq
B. 20 tq
C. 24 tq
D. 28 tq
Right Answer: A. 16 tq
Detailed Solution: Outstand of web stiffener from the face of the web should not exceed 20 tqε
where tq is thickness of the stiffener and ε is yield stress ratio = √(250/fy). For Fe415 steel, ε =
0.78 and maximum outstand of web stiffener from the face of the web = 16 tq
9. The stiff bearing length of any element is determined considering load dispersion through solid
elements at an angle of
A. 90°
B. 60°
C. 45°
D. 30°
Detailed Solution: The stiff bearing length of any element is determined considering load
dispersion through solid elements at an angle of 45°.
10.
When only transverse stiffeners are provided in the plate girder at a spacing c = 0.5 times web
depth d, the maximum value of d/tw, as per serviceability criteria is
A. 300εw
B. 270εw
C. 250εw
D. 200εw
Detailed Solution: When only transverse stiffeners are provided in the plate girder at a spacing
c = 0.5 times web depth d, the maximum value of d/tw, as per serviceability criteria is 270 εw
NPTEL ONLINE CERTIFICATION COURSES
COURSE NAME: BRIDGE ENGINEERING
ASSIGNMENT – WEEK 6
1. A semi-circular masonry arch bridge has a span length S of 12 m. The rise and radius of the
arch are
A. 5 m and 7 m
B. 7 m and 5 m
C. 4 m and 8 m
D. 6 m and 6 m
2. A masonry arch bridge has a span length S of 12 m, rise r of 4 m, radius R of 6.5 m. Thickness
of arch ring is
A. 0.545 m
B. 0.565 m
C. 0.585 m
D. 0.625 m
Detailed Solution: Thickness of the Arch by Trautwyne’s formula t = [√(R + 0.5S)]/7 + 0.06 =
[√(6.5 + 0.5 × 12)]/7 + 0.06 = 0.565 m.
3.
Relationship between rise r, radius R and span L of circular arch is
A. L = 2r √(2R/r – 1)
B. L = 2r √(R/r – 1)
C. L = r √(2R/r – 1)
D. L = r √(R/r – 1)
Detailed Solution: Relationship between radius R, rise r and span L of circular arch is R = L2/8r
+ r/2. We can re-write it as L2/8r = R − r/2. Or, L2 = 8rR − 4r2. Or, L2 = 4r2(2R/r – 1).
Or, L = 2r √(2R/r – 1).
4. A two hinged parabolic arch has 16 m span length and 4 m rise. Equation of arch rib is
A. y = (x − x2/10)
B. y = (x − x2/12)
C. y = (x − x2/16)
D. y = (x − x2/20)
Detailed Solution: Equation of parabolic arch rib is y = 4rx/L2 (L ‒ x) = 4 × 4x/ 162 × (16 ‒ x)
= x/ 16 × (16 ‒ x) = (x ‒ x2/16).
5. A two hinged parabolic arch has 20 m span length and 5 m rise. It has 100 kN vertical load
applied at crown. ∫ (Mydx for the entire arch can be determined as
A. 2083 kNm2
B. 20833 kNm3
C. 2083 kNm3
D. 20833 kNm2
Detailed Solution: Equation of parabolic arch rib is y = 4rx/L2 (L ‒ x) = 4 × 5x/ 202 × (20
‒ x) = x/ 20 × (20 ‒ x) = (x ‒ x2/20).
Vertical support reaction VA = VB = 100/ 2 = 50 kN
For 0 < x < 10 m, Moment from A to C = 50x kN-m
For 0 < x < 20 m, Moment from C to B = 50x ‒ 100(x ‒ 10) = (‒ 50x + 1000) kN-m
∫010 (Mydx) = ∫01050x × (x ‒ x2/20) dx = ∫010(50x2 ‒ 5x3/2) dx = (50x3 /3‒ 5x4/8) 010 = 10416.67
kN-m3
∫1020 (Mydx) = ∫1020(‒ 50x + 1000) × (x ‒ x2/20) dx = ∫1020(‒50x2 + 5x3/2+1000x ‒50x2) dx=
∫1020(5x3/2+1000x ‒100x2) dx = (5x4 /8 +500x2‒ 100x3/3) 1020 = 10416.67 kN-m3
∫020 (Mydx) = 2 × 10416.67 = 20833.34 kN-m3
A. 0.17-0.50
B. 0.25-0.60
C. 0.35-0.70
D. 0.45-0.85
Detailed Solution: The ratio of side span to main span in suspension bridge generally varies
from 0.17 to 0.50.
7. Arrangements for passing the cables over the towers from the main span to the side span
Detailed Solution: There are two arrangements generally made for passing the cables over the
towers from the main span to the side span.
a) Guide Pulley Support b) Roller Support.
A. 40-80 degrees
B. 35-55 degrees
C. 30-60 degrees
D. 25-65 degrees
Detailed Solution: For reduced girder deflections, cable inclination may vary in the reasonable
limits of 25°-65°
9.
Central span of a balanced cantilever bridge can be up to
A. 30 m
B. 40 m
C. 50 m
D. 60 m
Right Answer: A. 30 m
Detailed Solution: Articulation is connection between suspended span and cantilever span.
NPTEL ONLINE CERTIFICATION COURSES
COURSE NAME: BRIDGE ENGINEERING
ASSIGNMENT – WEEK 7
A. 20-100 m
B. 20-200 m
C. 20-500 m
D. 20-1000 m
Detailed Solution: Prestressed concrete is applicable for bridges in the span range of 20-500
m.
Detailed Solution: Prestressed Concrete is a concrete which has Internal stresses introduced to
counteract external forces. It also has prestress introduced by tensons.
4. Pre-tensioning involves
A. Tensioning the tendons against hardened concrete and imparting prestress to concrete by
bearing
B. Tensioning the tendons before placing the concrete and imparting prestress to concrete by
bond between steel and concrete
C. Tensioning the tendons against hardened concrete and imparting prestress to concrete by
elongation
D. Tensioning the tendons against hardened concrete and imparting prestress to concrete by
separation
Right Answer: B. Tensioning the tendons before placing the concrete and
imparting prestress to concrete by bond between steel and concrete.
Detailed Solution: Pre-tensioning involves tensioning the tendons before placing the concrete
and imparting prestress to concrete by bond between steel and concrete.
5. Post-tensioning involves
A. Tensioning the tendons against hardened concrete and imparting prestress to concrete by
bearing
B. Tensioning the tendons before placing the concrete and imparting prestress to concrete by
bond between steel and concrete
C. Tensioning the tendons against hardened concrete and imparting prestress to concrete by
crushing
D. Tensioning the tendons against hardened concrete and imparting prestress to concrete by
separation
Right Answer: A. Tensioning the tendons against hardened concrete and imparting
prestress to concrete by bearing.
Detailed Solution: Post-tensioning involves tensioning the tendons against hardened concrete
and imparting prestress to concrete by bearing.
6. If 2500 kN is the minimum prestressing force, the spacing of Freyssinet cables containing 12
wires of 7 mm diameter stressed to 1200 N/mm2 is
A. 222 mm
B. 255 mm
C. 277 mm
D. 300 mm
7. Composite bridge decks comprising reinforced concrete decks supported by steel girders are
adapted in the span range of
A. 10-20 m
B. 30-40 m
C. 40-50 m
D. 50-60 m
Detailed Solution: Composite bridge decks are applicable in the span range of 10-20 m.
A. type of steel
B. cross-sectional dimensions of the connector
C. compressive strength of concrete in slab
D. All of the above
Detailed Solution: The shear strength of shear connectors depends upon the type of steel, the
cross-sectional dimensions of the connector and compressive strength of concrete in slab.
9.
Which of the following is not a type of shear connector?
Detailed Solution: Shear connectors are of three types, flexible type, rigid type and
anchorage type.
10.
A. 2-4
B. 5-6
C. 8-10
D. 12-15
Detailed Solution: The ratio of flexural stiffnesses of a composite beam and a steel beam is 2-
4.
NPTEL ONLINE CERTIFICATION COURSES
COURSE NAME: BRIDGE ENGINEERING
ASSIGNMENT – WEEK 8
1. Spacer beams or ribs are added in rigid frame bridge for span ranges
A. 5-10 m
B. 10-20 m
C. 20-30 m
D. 30-50 m
Detailed Solution: Beam and Slab type Rigid Frame Bridge is applicable for span ranges 20-
30 m.
A. Flange
B. Transom
C. Web
D. None of the above
A. Vertical columns of rigid frame serve as retaining walls and transfers load to ground
B. Cost of construction of abutments and associated foundations are too high
C. Transom serve the function of separate abutments
D. None of the above
Right Answer: A. Vertical columns of rigid frame serve as retaining walls and
transfers load to ground
Detailed Solution: Rigid frame bridges do not require separate abutments since the vertical
columns retain the earth and serve as retaining walls thus eliminating the construction of
abutments and their foundations.
A. Span Length/10
B. Span Length/15
C. Span Length/25
D. Span Length/35
Detailed Solution: Crown of a rigid frame bridge has a dimension of Span Length/35.
5. Junction of horizontal and vertical members of rigid frame bridge has a dimension of
A. Span Length/10
B. Span Length/15
C. Span Length/20
D. Span Length/30
Detailed Solution: Junction of horizontal and vertical members of a rigid frame bridge has a
dimension of Span Length/15.
6. Tee beam and slab type continuous bridge decks are applicable for span range of
A. 5-10 m
B. 10-20 m
C. 10-35 m
D. 20-50 m
Detailed Solution: Tee beam and slab type continuous solid slab bridge decks are applicable
for span range of 10-35 m.
7.
For spans exceeding 40 m, the configuration of continuous bridge is
8. The ratio of slab thicknesses of the support section to mid span section of a continuous slab
deck bridge is
A. 1-1.2
B. 1.2-1.4
C. 1.3-1.8
D. 1.4-2.0
Detailed Solution: The ratio of slab thicknesses of the support section to mid span section of a
continuous slab deck bridge is 1.3-1.8.
Detailed Solution: The length of haunches of a continuous slab deck bridge is 0.2-0.25 times
span length.
10. The ratio of the end span length to intermediate span length of a continuous bridge is
A. 0.30-0.50
B. 0.50-0.60
C. 0.60-0.80
D. 0.80-0.84
Right Answer: D. 0.80-0.84
Detailed Solution: The ratio of the end span length to intermediate span length of a continuous
bridge is 0.80-0.84. Generally, the end spans are made about 16 to 20 percent smaller than the
intermediate spans.
NPTEL ONLINE CERTIFICATION COURSES
COURSE NAME: BRIDGE ENGINEERING
ASSIGNMENT – WEEK 9
Detailed Solution: Substructures of a bridge typically comprises the piers and abutments which
are located below the level of the bearings and rest above the foundations.
Detailed Solution: Types of pier include solid type pier, trestle type pier, hammer-head type
pier, cellular type pier and framed type pier.
A. 1 in 5 to 1 in 10
B. 1 in 10 to 1 in 20
C. 1 in 12 to 1 in 24
D. 1 in 15 to 1 in 30
Right Answer: C. 1 in 12 to 1 in 24
Detailed Solution: The sides of pier are provided with a batter of 1 in 12 to 1 in 24.
A. M10 Concrete
B. M15 Concrete
C. M20 Concrete
D. M30 Concrete
Detailed Solution: The bed block is generally cast with M15 grade concrete.
A. Top wall
B. Wing wall
C. Back wall
D. Breast wall
Detailed Solution: Top level of pier and abutment is fixed at 1-1.5 m above HFL.
A. Deck Slab
B. Longitudinal Girder
C. Transverse Girder
D. Retaining Wall
A. 15 m
B. 20 m
C. 25 m
D. 30 m
Right Answer: A. 15 m
Detailed Solution: the approaches should have a minimum straight length of 15 m on either
side of the bridge.
A. Pile Foundations
B. Well Foundations
C. Framed Foundations
D. Pneumatic Caissons
A. Well Strains
B. Well Curb
C. Well Cap
D. Well Plugs
Detailed Solution: A typical well foundation comprises of Steining, Well Curb, Bottom and
Top Plugs, Well Cap, Sand filling and Cutting Edge.
NPTEL ONLINE CERTIFICATION COURSES
COURSE NAME: BRIDGE ENGINEERING
ASSIGNMENT – WEEK 10
Detailed Solution: Primary functions of bridge bearings are to transmit the end reaction to the
abutment and/or piers and to distribute it uniformly, to allow free movement in the longitudinal
direction (expansion and contraction) due to change in temperature and stresses and to allow
rotations at the ends when the bridge girders are loaded and deflections take place.
A. Expansion Bearings
B. Fixed Bearings
C. Contraction Bearings
D. None of the above
3. For major bridges, ratio of cost of bearings and the total cost of bridge construction is
A. 0.10-0.15
B. 0.15-0.20
C. 0.20-0.25
D. 0.25-0.30
Right Answer: A. 0.10-0.15.
Detailed Solution: For major bridges, cost of bearings are in the range of 10 to 15 percent of
the total cost of the bridge.
A. 20 to 50 mm
B. 50 to 80 mm
C. 80 to 100 mm
D. 100 to 150 mm
Detailed Solution: Preferable roller diameter for steel roller cum rocker bearing is 100 to
150 mm.
A. 20 m
B. 30 m
C. 40 m
D. 50 m
Right Answer: A. 20 m
Detailed Solution: Sliding Plate Bearing is used for girder bridges of spans up to 20 m.
6. Steel rocker fixed bearings are generally used for longer spans exceeding
A. 10 m
B. 15 m
C. 20 m
D. 30 m
Right Answer: B. 15 m
Detailed Solution: Steel rocker fixed bearings are generally used for longer spans
exceeding 15 m.
7.
Elastomeric bearings are preferable over Metallic Bearings as
A. Metallic bearings are expensive in terms of initial cost as well as maintenance cost
B. Elastomeric bearings occupy a smaller space
C. Elastomeric bearings are easy to maintain and to replace when damaged
D. All of the above
Detailed Solution: Elastomeric bearings are preferable over Metallic Bearings as metallic
bearings are expensive in terms of initial cost as well as maintenance cost, elastomeric bearings
occupy a smaller space, elastomeric bearings are easy to maintain and to replace when
damaged.
A. 1m
B. 1.5 m
C. 2m
D. 2.5 m
Detailed Solution: Joints in bridges are generally classified as Construction Joints and
Expansion and Contraction Joints.
Detailed Solution: Expansion and Contraction Joints are provided due to differential shrinkage
of concrete, thermal expansion and contraction, creep and elastic shortening of concrete due to
prestress.
NPTEL ONLINE CERTIFICATION COURSES
COURSE NAME: BRIDGE ENGINEERING
ASSIGNMENT – WEEK 11
A. Cantilever Method
B. Progressive Placement Method
C. Staging Method
D. All of the Above
Detailed Solution: Construction methods for bridges are Cantilever Method, Progressive
Placement Method, Incremental Launching Method and Staging Method.
2. “4-Cs” associated with quality assurance of reinforced concrete and prestressed concrete
bridges are
Detailed Solution: “4-Cs” associated with quality assurance of reinforced concrete and
prestressed concrete bridges are Constituents, Compaction, Cover and Curing.
3. Falsework is
A. the temporary structural system required to support concrete construction for the permanent
structure
B. required until the structure becomes self-supporting
C. the total temporary structural system including formwork
D. All of the above
Right Answer: D. All of the above.
Detailed Solution: Falsework is the total temporary structural system including formwork
required to support concrete construction for the permanent structure until the structure
becomes self-supporting.
A. 100 years
B. 150 years
C. 200 years
D. 250 years
Detailed Solution: Bridge structures are generally designed for a service life of 100 years.
5. Formwork is
Detailed Solution: Formwork is mould required to cast concrete to a desired shape, used to
retain plastic concrete until the concrete has hardened and designed to resist the fluid pressure
of plastic concrete and additional pressure caused by vibrators.
6. Pachometer is used to measure the diameter of steel bars embedded in concrete along with
the cover at an accuracy of
A. ±1 mm
B. ±2 mm
C. ±3 mm
D. ±5 mm
Right Answer: C. ±3 mm
Detailed Solution: Instruments for inspection in structures under distress are Electronic
strain gauges, Ultrasonic pulse velocity apparatus, Rebound hammer, etc.
A. pre tensioning
B. post tensioning
C. epoxy mortaring
D. metal jacketing
Detailed Solution: Repair and rehabilitation of articulation joints can be effectively done
by using post tensioning techniques.
A. grade separation
B. change in the pattern of traffic
C. Both A and B
D. None of the above
Detailed Solution: The functional obsolescence of the structure is frequently encountered due
to grade separation or change in the pattern of traffic passing over the railway or highway using
the bridge.
10.
To study vibration characteristics of bridges, natural frequency and vibration amplitude can be
related using
A. Pigeaud’s Criteria
B. Lehman’s Criteria
C. Lenzen’s Criteria
D. Rowe’s Criteria
Detailed Solution: To study vibration characteristics of bridges, natural frequency and vibration
amplitude can be related using Lenzen’s Criteria.
NPTEL ONLINE CERTIFICATION COURSES
COURSE NAME: BRIDGE ENGINEERING
ASSIGNMENT – WEEK 12
Detailed Solution: Two different sources of fatigue are identified: load-induced and distortion-
induced fatigue.
A. Initiation of crack
B. steady-state propagation of crack
C. unstable fracture
D. All of the above
Detailed Solution: Crack growth can be delineated into three distinct regimes: initiation,
steady-state propagation, and unstable fracture.
A. existing discontinuities
B. tensile stresses normal to the discontinuities
C. Both A and B
D. None of the above
Right Answer: D. ability to recover plastic strain upon heating and upon load
removal
Detailed Solution: Although Ni-Ti SMAs show large recoverable strains, good
superelasticity, and exceptional resistance to corrosion, the high cost of Ni-Ti SMAs and their
machinability restrict their large-scale applications.
Detailed Solution: Sound (uncracked) concrete provides a highly alkaline environment, which
facilitates the formation of a protective passive oxide layer around the steel rebars, preventing
further oxidation of iron leading to corrosion.
7.
Which of the following is not a feature of Engineered Cementitious Composite (ECC)
A. Corrosion resistance
B. Low tensile ductility
C. Self-healing of micro cracks
D. High tensile ductility
Detailed Solution: Wire and arc additive manufacturing (WAAM) is a method of metal 3D
printing that enables large components to be built with reasonable geometric accuracy, costs
and build times.
A. longer
B. faster
C. Both A and B
D. None of the above
Detailed Solution: With an increasing demand in transportation, trains are made longer and
faster.
10. Which of the bearing cannot be adopted for high-speed railway bridge?
A. Fixed bearings
B. Elastomeric bearing without rigid restraint
C. Pot bearing
D. Elastomeric bearing with rigid restraint
Right Answer: B. Elastomeric bearing without rigid restraint
Detailed Solution: Elastomeric bearings cannot be considered for high-speed railway bridges,
unless combined with rigid restraints.