0% found this document useful (0 votes)
52 views

Final Price List 29-09-2022

Uploaded by

Anshu Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
52 views

Final Price List 29-09-2022

Uploaded by

Anshu Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
PEG GAME ON! Pee 1M AI ee T NO. C-4, Dre Wiss Maer eer PRICE LIST 1X - GAMING UNLIMITED - FOURTH FLOOR Sale 2X - GAMING UNLIMITED - SIXTH FLOOR Bae Pen au tea ee PEP a encore Cease nec sen Pewee men eas eau eect deci ep toan SC Rend hoe ea Rae ess Toni Ree Se amen heres Teco eC hn fics 1. GST/Cess/Registry Charges/Other Taxes/Levies / VAT / Fees / Charges shall borne by the Allottee. Fire Fighting Charges (FQ) & External Electrification Charges (EEC) @ £200/- per square feet on saleable area will be charged extra One Time Lease Rent @ £200/- per square feet on saleable area will be charged extra. eco eke Ok a eee cee Ec? SR Rate ore eC CU eee Peo ee eee et ees Price/Charges are subject to change without any prior notice. Pete rae ete ee Ca ce Ree ‘The company reserve al rights to accept or reject any form without giving any reason whatsoever. All specifications, designs, layouts, conditions are only indicative and some of these can be changed at offerings. RTGS Details PHASE 1: ICICI Bank A/C NO: 777705226201 (Block A & B), IFSC: ICICO0008 16, Branch Sector 63, Noida. CON eM tC aed ‘The terms & conditions mentioned here are subject to detailed terms & conditions mentioned in Application Form & Allotment feces Hafeez Contractor Cees gr

You might also like