IPCR Performance Standards For 2023
IPCR Performance Standards For 2023
CITIZEN’S CHARTER
2023 (1ST Edition)
SPMS PERFORMANCE STANDARDS AND MEASURES
UNIQUE AND COMMON
Initial Interview Form 5 - IIF/PIF/Intake 5 – 100% of target clients has Complex: Initial Interview Form (for FR) – 4 pages
(IIF)/ Sheet/Admission Form filled out IIF/PIF/Intake Sheet/Admission 5 -. form filled out within the day
form containing information of client’s
with very sufficient data Form in their individual folder urgent needs as a requirement for
Profiling Interview with very sufficient data 3– form not filled out completely Comprehensive Local Integration
Form (PIF)/ 3 - IIF/PIF/Intake within the day Program (CLIP) enrollment and
Sheet/Admission Form with 3 – 100% of target client has IIF/ immediate assistance
Intake Sheet/ lacking 1-2 data PIF/Intake Sheet/Admission 1 – fail to fill up the form
Form in their individual folder Profiling Interview Form – 5 pages form
Admission Form 1 – IIF/PIF/Intake with insufficient data. Simple used to determine the medium and long
Sheet/Admission Form with no 5 - form filled up 30 minutes term needs of clients for reintegration.
data 1 – 100% of clients has no after interview
IIF/PIF/Intake Sheet/Admission 3 – form filled up 45 minutes Intake Sheet (for AICS)– 1 to 3 pages
Form in their folder after interview form containing basic information of the
1 – form filled up 1 hour after client including presented problem,
interview initial assessment and other information
for the initial treatment.
Provision of Appropriate 5-with excellent feedback 5- 100% clients’ needs acted 5-within 2 hours upon admission
Intervention 4-with very satisfactory upon/intervention provided Admission Form (for Centers) – 1-page
feedback 3- more than 2 hours to 4 hours form containing basic information of the
3-with satisfactory feedback 3-100% clients needs acted after admission client and reasons of admission and the
2-with fair feedback upon/intervention provided referring party.
1-wit poor feedback with delay 1-more than 4 hours and beyond
Appropriate Interventions - are services
1-failed to provide /client provided to center residents upon
needs/intervention admission e.g counseling, orientation of
Center rules, room/bed assignment,
2
provision of beddings, personal care
items and others.
Social Case Study Report 5 – Documents prepared with 5 – 100% Social Case Study 5 - document prepared 1 month Social Case Study Report (Complex)– 2-8
(SCSR) no revision Report acted upon. after the interview/ assessment pages comprehensive narrative report
and admission of client. containing the identifying information,
A. Complex 4 - Documents prepared with 3- 100% Social Case Study Report 4 – prepared within 1 month and family composition, presented problem,
1 revision Acted upon with delay 2 weeks socio-economic background,
3 - prepared within 2 months circumstances on the presented
3 – Documents prepared with 1 – Failed to prepare SCSR after the interview of the client. problem, worker’s assessment,
2 revisions 1 - prepared within 2 treatment plan & evaluation and
months & 2 weeks recommendation.
2 – Documents prepared with
3 revisions 1 - Prepared more than 2 months Note:
and 2 weeks Complex SCSR requires series of
1 - Documents prepared with interviews with client, his/her family
more than 3 revisions members, significant others, home
visitation; gathering of
reports/documents from his/her area of
origin (e.g school/health records, SCSR
B. Updated Social 5 –updated with no revision 5 – 100% SCSR updated 5- the document updated within from MSWDO, etc) which will help the
Case Study Report 4 - updated with 1 with 1 3 social worker prepare a comprehensive
(Complex) revision 3 – 100% SCSR updated with weeks after 6 months of Social Case Study Report
3 - Updated with 2 revisions dalay admission
2 – updated with 3 revisions 4 – document updated within 4
1 – updated with 4 or more 1 – Failed to update SCSR weeks Updated SCSR - A Report containing the
revisions 3- updated within 5 weeks progress of residents/clients after the
2 – within 6 weeks after assessment/ evaluation on the
evaluation interventions provided after six months.
1-Updated after 7 weeks and
beyond
5 – Documents prepared with 5 – 100% task acted upon
no revision
3
4 - Documents prepared with 3 – 100% task acted upon with 5 - A document prepared 1 hour
C. Updated Social 1 revision delay and less after the interview of the Social Case Study Report (Simple) – 1
Case Study Report 3 – Documents prepared with client. page report containing basic information
(Simple) 2 revisions 1 – failed to act on task 4 – prepared 1 hour and 30 of the client’s identifying data, presented
2 – Documents prepared with minutes after the interview problem and recommendation. Usually
3 revisions 3 - prepared 1 hour and 45 used as an attachment to avail financial
1 - Documents prepared with minutes after the interview. assistance or for referral to other
more than 3 revisions agencies
4
Case Conference 5 – with clear & complete 5 – 100% of task Case Conference Proceedings –
Proceedings information completed/acted upon 5 – task completed within a week proceedings containing the agenda and
results of the round table discussion with
4 – with 1-2 information 3 – 100% of task acted upon with 4 – task completed 2 days after 1 the stakeholders upon admission of the
missing missing information /late week client to and discharge from the center,
which includes the required documents
3 – with 2-3 information 1 – Failed to act on the task 3 – task completed 3 days after 1 and the responsibilities of both parties in
missing week terms of case management while the
2 – with 3-4 information client is in the center and upon
missing 2 – task completed after 2 weeks discharge.
1 – with more than 4
information missing 1 – task completed beyond 2
weeks
Progress 5 – no corrections/error 5 – 100% reports prepared and 5 – Performed task within 3 Progress Notes/Report/Anecdotal – A
Reports/Progress 4 - with 1-2 error filed in case folders. weeks after 6-month period of report that contains the result/output of
Notes/Anecdotal 3 – with 3-4 error admission the following activities conducted:
2 - with 5-6 error 3 – 100% of reports prepared and 4 – Performed task within 1 counseling, individual activities and
1 –7 and more error filed in case folders with incorrect month after 6-month period of group dynamics, skills enhancement
data/ late admission activities, spiritual enhancement
3 - within 1 month and 1 week activities, tutorial session and other
1 – Failed to prepare report after the 6-month period of observations regarding the improvement
admission of the client’s psycho-social functioning.
2– within 1 month 2 weeks after
the 6-month period
1 – failed to prepare progress
report
Counseling Report 5 - report completed with no 5—100% of task acted upon 5 - task completed 30-45 minutes Counseling Report – A document
errors after contact with the client containing the result of the one on one
3 – 100% of task acted upon with 4 - task completed 46 mins.-1 conversation to individual client
4- 1-2 data missing/errors errors and delay hour manifesting emotional and psychological
2 - task completed 1 hour stress/in crisis situation and action taken
3 – 3-4 errors/data missing to 15 mins. providing options to the client for the
5
2- 5-6 errors/data missing 1— Failed to act on task solution of their presented problem.
2 - task completed 1 hour to 30
1 – more than 6 errors/data mins.
missing 1 - task completed beyond 1
hour and 30 minutes
Closing 5 – no revision 5 – 100% of task completed 5 – Task completed 1 week after Closing/Transfer Summary Report – A
Summary/Transfer 4 – 1 revision receipt of Court Order for release report containing a brief narrative report
Summary Report 3 – 2 revisions 3 – 100% of task completed with 4 - task completed within 2 stating the reason for closing or
2 – 3 revision delay weeks transferring the case to the concern
1 – with 4 and more revisions After receipt of court order for stakeholder including the after care
1 – Failed to act on task release services.
3 – Task completed 3 weeks after
Receipt of court order for release
2 - complete after 1 month
1 – Task completed more than 1
month
Recreational Activities 5 – activity conducted with 5 – 100% of task completed 5 – activity conducted at least 7 Recreational Activity- is an outdoor
for CEDC/CICL excellent feedback. hours within the day activity provided to Children in Especially
3 – 100% of task completed with 3 – conducted at least 4 hours Difficult Circumstances (CEDC) and
4- Very Satisfactory feedback delay within the day Children in Conflict with the Law (CICLs)
3 – Satisfactory feedback 1- Conducted at least 3 as a form of therapeutic activity such as
2 – Unsatisfactory feedback 1 – Failed to act on task hours within the day educational trips /field exposure, team
1 – Poor feedback building and the like.
Vocational Technology 5 –with excellent feedback. 5 - task acted upon 5 - the CICL enrolled 10 days
Course/Training before the start of the training Vocational Technology Course/Training
4- Very Satisfactory feedback 3 - task acted with delay course – refers to a short term courses/trainings
in coordination with TESDA availed to
3 – Satisfactory feedback 1 - not acted 4 – the client enrolled 5 days CICL residents of BPYC. This aimed to
before develop or enhance their knowledge and
2 – Unsatisfactory feedback the start of the training course skills on technologies such as welding,
automotive mechanic, vulcanizing and
1 – Poor feedback others, so as to prepare them in their
6
3 - the client enrolled during the reintegration to the community during
start their discharge at Bahay Pag-asa Youth
Of the training course Center (BPYC) which they can can use as
their means of livelihood.
2 - the client enrolled 1 day after
the
Start of the training course
1-Cash Assistance/Guarantee
Letter/other interventions
provided more than more than 2
1/2 hours after assessment and
submission of complete
requirements
8
5 – 100% of qualified clients 5 – task completed in 5 minutes Food Assistance – Provision of food
Food Assistance 5 –complete food packs received food assistance packs (good for 5 days consumption) to
3 – incomplete food packs 3 - 100% qualified clients 3 – task completed in 10 minutes clients with confined patients to
received food packs with delay different hospitals, stranded individuals
1 – no food packs received 1 - qualified clients unable to 1 – task completed after 15 and other emergency cases certified by
receive family food packs. minutes PSWDO Social Worker.
Summary of Daily 5 – no error/correction 5- 100% cash disbursement 5- recorded/posted within 5-10 Summary/List of Daily Disbursement is a
Disbursement 4 – with 1-2 errors/1-2 entries recorded/posted without delay minutes per client upon receipt of document that contains list of clients provided
lacking complete supporting documents with Financial Assistance daily, their address,
3 – with 3-5 errors/ 3-5 entries 3 – cash disbursement recorded/ type and amount of assistance signed by the
lacking Posted with delay 3- recorded/posted within 11-15 clients opposite their name as proof of receipt
2- with 6-10 errors / 6-10 entries minutes per client upon receipt of of financial assistance.
lacking 1 – cash disbursement not recorded/ complete suppporting docuements
1 – with more than 10 errors posted 1 – recorded/posted 16 minutes and
more per client
Reintegration Plan/ 5 – with no error 5 – 100% of client’s reintegration/ 5 - Document completed within 2 Reintegration Plan – 11 pages of
Intervention Plan intervention acted upon days document containing the identified
4 – with 1 errors needs, responsible agency to respond to
3 – acted upon with delay 4 – within 3 days that needs and time frame. With the
3 – with 2 errors supervision of a Social Worker each FR
1 – not acted upon 3 – within 1 week shall be able to formulate own plan thus,
2 – with 3 errors his/her cooperation
2 – within 2 weeks
1 - 4 and more errors
1 –within 6 months and beyond
10
DISASTER RELIEF 5 – administered 3 weeks before Inventory of Relief Goods is the conduct
OPERATION: 5- with no errors 5 - 100% task acted upon the end of every semester of actual physical count of relief goods
4 - administered 2 weeks before available at the stock room taking into
Inventory of Relief 3- with 5-6 errors 3 - task acted upon with error w/ the end of semester consideration the quantity and
Goods delay 3 –administered 1 week before expiration dates, and other pertinent
1-with 7 or more errors the end of the semester observations as to the present quality of
1 -Failed to act on task 2 –administered 1 day before the goods and the conduciveness of the
end of semester stock room. It is conducted every 6
1 – administered during or after months.
the end of every semester
Inventory Report 5- with no error 5 - 100% task acted upon 5- prepared within 3 days upon
completion Inventory Report is a report that
3- with 5-6 errors 3 - task acted upon with error 4- prepared 4 days contains detailed actual list of relief
and w/ 3- Prepared within 5 days or goods and other disaster relief goods on
1- with 7 or more errors delay more upon completion hand with corresponding quantity,
2 - within six days and more expiration dates and other pertinent
1 -Failed to act on task 1 - Failed to prepare report data being prepared every 6 months
Prepositioning of 5 – request for goods period
Welfare Goods preposition- 5 – 100% request acted upon 5- Goods released within the day
ing releases with complete with of arrival of the vehicle/haulers of
items complete items requesting municipality Prepositioning of Welfare Goods – is the
3- 100% request acted upon with stockpiling of food items to the
3– released with lacking items 4 – Goods released 1 day after municipalities through
1 – not released 1 – Failed to act arrival of the vehicle/haulers of MSWDO/MDRRMO prior to the
requesting municipality occurrence of any disaster/hazard. It is
intended for the immediate assistance
3– Goods released 2-3 days after for the families affected by natural/man-
arrival of vehicle/haulers of made disaster
requesting municipality
5 – with excellent feedback from 5- 100% request for relief assistance 5- Relief distribution conducted within
victims acted the given schedule set by the Relief Distribution – is an activity conducted
Relief Distribution 4 – with very satisfactory feedback Upon Supervisor after the onset of any disaster or calamity to
from the victims 3-Relief distribution conducted 3-5 provide food augmentation to victims through
3 – with satisfactory feedback from 3-request for relief assistance acted days after the set schedule by the family food packs and other form of relief
the victims upon with delay Supervisor goods to reduce their sufferings.
2- with fair feedback from the 1 – Relief distribution conducted 6
victims 1-failed to act on request days and beyond after the set
1 – with poor feedback from the schedule by the supervisor
victims
Child Development 5 - no revisions 5 – 100% of accreditation result 5- Accreditation Result submitted Accreditation Result – is a 31-page
Center/Worker 4- with 1-2 revisions acted upon to DSWD Regional Office within 2 document containing information
Accreditation 3 - with 3 revisions weeks after the accomplishment regarding the Day Care Center/Day Care
Result 2 - with 4 revisions 3 – 100% of accreditation result of 31-page accreditation tool Worker accredited with assessment/
1 - with 5 or more revisions acted accreditation results and rating based on
Upon with delay 4 - submitted within 3 weeks tallied scores from the different areas
1 - Failed to act accreditation after the (e.g Advancement of Children’s Growth
12
results. accomplishment of 31-page and Development; Partnership with
accreditation tool Families, Communities & Local
Government Unit; Human Resource &
3 - submitted 1 month after the Development; Supervision; Physical
accomplishment of 31-page Environment & Safety; and relevant
accreditation tool others)
3 – Clients PMRF filled out 3 – walk-in/ referred clients/Point 1 –enrolled within 4 days or - Regular Enrollment
with 2 errors/missing data of Care enrolled to PhilHealth more - Point of Care
13
with errors/ late
1 – Client’s PMRF filled up
with more than 3 errors/ 1 –not enrolled
missing data
Draft Ordinance/ 5 – no revision 5 - 100% tasks acted upon 5 – completed within 5 working Draft Ordinance/Resolution – a
Resolution/ 4 – 1 revision days prepared ordinance/resolution for a
Executive Order/ 3 – 2 revisions 3 – task acted upon with missing certain project recommended to the
2 – 3 revisions data /delay 3 -completed within 7 working legislators for its finalization and
Project Proposal for 1 – 4 or more revisions 1 – task not acted upon days adoption /approval.
Livelihood
1 - completed beyond 5 days Executive Order – a documents prepared
to support the legal existence
Project Proposals for: 5 – no revision 5 - 100% tasks acted upon 5 – submitted 2 months before the /reconstitution of social structures.
scheduled activity
Scholarship 4 – 1 revision
Children’s 3 – 2 revisions 3 – task acted upon with missing 4 – submitted 1/2 months before the Project Proposals – a 2-4 pages of
Contest 2 – 3 revisions data /delay scheduled activity documents containing information of
Service Award 1 – 4 or more revisions identified/proposed livelihood or
1 – task not acted upon 3 – submitted 1 months before the activity, the needed raw materials,
Training
scheduled activity
projected expenses including the labor
2 – submitted less than a month before cost, the target market and the
the scheduled activity projected income out of the project.
Livelihood Assistance 5- report prepared with no 5-100% beneficiaries visited for 5- conducted 1 1/2 month after Livelihood Assistance Grant Utilization
Grant Utilization Check revision LAGUC the release of livelihood grant Check – (LAGUC) is an activity conducted
(LAGUC) after 1 month grace period upon release
3 - report prepared with 2 3 – beneficiaries visited for 3-conducted more than 1 ½ to 2 of Livelihood Assistance Grant to
revisions LAGUC with delay. months after months after the beneficiaries through actual project visit
release of livelihood grant to check the proper utilization of
1- report prepared with 3 1 – LAGUK not conducted government assistance to ensure that it
or more revisions 1-conducted more than 2 really serve its purpose. An Official
months Receipts or any proof of purchase of raw
materials for the his/her income
generating project shall be required from
the beneficiaries
Contract of Services and 5 – no revision w/ complete 5 – 100% of tasks acted upon 5 – prepared within the day Contract of Service and Job Order – is
Job Order Contracts (for requirements a document signed by the contracting
PSWDO Contractual and 4 – with 1 revisions and with 3 – 100% of tasks acted upon 4– prepared 1-2 days after parties ( the Prov’l/Gov’t and the
Cash For Work) complete requirements with corrections and delay. contractee) before a person/employee
3 – with 2 revisions & 3 – prepared 3-4 days reports for work/duty , indicated
17
complete requirements 1 – Failed to act on task therein is his work of assignment ,
2 – with 3 revisions & 2 – prepared 5 days and after duties and functions, salary and period
incomplete requirements covered. This also includes verification
1 – with 4 or more revisions & 1 – prepared more than 1 week of information indicated on its
incomplete requirements after supporting documents (PDS & etc.)
Application for Cash 5-with complete entries/no 5-100% required documents prepared 5-required documents pre- Application for Cash Advance – is a
Advance (As Special revisions and submitted for approval pared and submitted for document that consist of Gen. Form No. 57
Disbursing Officer) approval within 5 days also known as Request for
3-with 1-2 revisions 3 – Application for Cash Advance Bonding/Cancellation of Bonds by
prepared with lacking documents/ late 3-prepared and submitted accountable officials/employees;
1- With 3 or more revisions for approval within 6-7 days Confirmation letter for the approved bond by
1-Failed to prepare and submit the Bureau of Treasury and Designation
1 –prepared and submitted for approval Order as Special Disbursing Officer by the
within 8 days and beyond Governor being processed for petty cash in
payment of financial assistance for AICS;
C/A for incentives of Day Care Workers and
Local Social Pension of Senior Citizens.
Liquidation of Cash 5- correct attachments/no revision 5-100% cash advance liquidated 5-prepared and submitted: Liquidation of Cash Advance – is a
Advance *1 month after disbursement document that consist evidences of
*Disbursement Report 3-With 1-2 revisions 3 - 100% cash advance liquidated for Local Social Pension/Day disbursements such as special payrolls that
with revisions and late submission. Care Workers’ Incentives corresponds to the amount of cash advance
*15-19 days after the end of calendar approved to the Special Disbursing Officer.
1-with more than 3 revisions 1-Failed to liquidate cash advance year (for PWP Financial It should be submitted to the accounting
Assistance, Bahay Pag-asa office one month after the total disbursement
& LWCP) and/or during the cut-off date of the
3-prepared and submitted Provincial Treasurer’s Office.
*1 ½ months after disbursement for
Local Social Pension & Day Care
Workers Incentives
*20-24 days after the end of calendar
year (for PWP, Bahay Pag-asa &
18
LWCP)
1-Prepared & submitted
*2 months after disbursement for
Local Social Pension/Day Care
Worker’s Incentives
* 25 days after the calendar
( for PWP Financial Assistance ,
Bahay Pag-asa and LWCP )
19
Late submission) 31 to PPDO/PMT (specific, measurable, attainable,
1 – more than 15 corrections/ 0 - submitted after Dec. 31 of the realistic, time-bound). Two forms used
Erasures/revisions 1 – complied until Dec. 31 with covered period to PPDO/PMT for setting the targets, the Office
more than 15 errors Performance Contract and Review
IPCR (OPCR) for the following year’s
5 – submitted on Dec. 15 – 23 to performance targets is submitted 1st
Office Head/PHRMO week of October to PPDO/PMT and the
4 –submitted on Dec. 24- Jan.4 Individual Performance Commitment
to Office Head/ PHRMO and Review (IPCR) is prepared based
3 – submitted on Jan. 5 -13 to on the approved OPCR targets to be
Office Head/ PHRMO submitted to PHRMO the 1st week of
2 – submitted on Jan 14-22 January
Office Head/PHRMO
1 - submitted on Jan 23 – Dec. 31
to Office Head/PHRMO
0 - submitted after Dec. 31 of
covered year
B. PERFORMANCE 5 – monitoring/coaching with 5 – submitted 1 to 5 of April, Performance Monitoring– the stage
MONITORING AND excellent feedback 5- 100% coaching/monitoring July, Oct and January after where supervisors enhance the
COACHING 4 – monitoring/coaching acted upon the end of the quarter potentials of every employee under
with very satisfactory month. them, periodically checking on the
Coaching and feedback 3 – 100% coaching/monitoring 4 - submitted on 6 to 10 of progress and quality of work output of
Monitoring 3 - monitoring/coaching with acted upon late April, July, Oct and the office, division and individual. Rater
satisfactory feedback 1 – failed to comply January after the end of address factors that either help or
2 - monitoring/coaching the quarter month hinder effective work performance and
With unsatisfactory 3 - submitted on 11 to 15 of design tracking tools/monitoring
feedback January, April, July, and Oct. strategies as needed. May be
1 - monitoring/coaching done after the end of the quarter conducted through meetings, one- on-
With poor feedback month one discussion, memorandum and
2 - submitted 16 to 20 of review of pertinent documents such as
April, July, Oct. and Jan. reports, communications and tracking
after the end of the forms to ensure timely completion and
quarter month quality execution of deliverables.
20
1 - submitted on 21-31 Monitoring is also done to avert any
of April, July, Oct and Jan. untoward incident or address
after the end of the constraints/ challenges.
quarter month Coaching – a critical function of the
0 – submitted after the end of supervisor to empower and help
January, April, July, Oct and individual employees in their work
a year or more after the assignments. Team coaching in the
covered year management of work focused on
shared goals to accomplish a task may
be done by the supervisor
C. PERFORMANCE OPCR/IPCR OPCR Performance Review and Evaluation –
REVIEW AND 5 – no corrections/erasures 5 – 100% documents prepared 5 – submitted on Jan. 5-13 for the the phase where both office and
EVALUATION corresponding targets and submitted 2nd sem. and on July 5-13 for individual employee’s performance
4 –1 to 2 corrections/erasures 3 – 100% documents prepared the 1st sem. to PPDO/PMT targets and measures as approved in
corresponding targets with delayed submission 4 - submitted on Jan.14-22 for the office and individual performance
3 – 3-5 corrections/erasures 1 – failed to submit for the 2nd sem. & on July 14- contracts) are objectively assessed by
OPCR AND IPCR corresponding targets 22 for the 1st sem. to the rater and gaps between the actual
ACCOMPLISHMENT/ 2– 6-10 corrections/erasures PPDO/PMT and desired performance are
RATING corresponding targets 3 – submitted on Jan. 23-31 for determined.
1 – 11 and above corrections/ the 2nd sem.& on July 23-31
revisions for the 1st sem. to PPDO/PMT
2 – submitted on Feb.1-9 for
the 2nd sem. & Aug. 1-9 for
the 1st sem. to PPDO/PMT
1– submitted on Feb.10 - Dec 31.
for the 2nd sem. & August 10 –
Dec. 31 for the 1st sem. to
PPDO/PMT
0- submitted after Dec. 31 of the
next covered period/year
IPCR
5 – submitted on Feb. 15-23 for
the 2nd sem. & on Aug. 15-23
21
for the 1st sem. to Office Head/
PHRMO.
4 – submitted on Feb. 23-March
2 for the 2nd sem.& on Aug.
. 24-Sept. 1 for the 1st sem. to
Office Head/PHRMO
3 – submitted on March 3-11 for
2nd sem.& on Sept.2-10 for
1stsem. to Office Head/PHRMO
2 – submitted on March 12-20 for
2nd sem. & on Sept. 11-19 for
1st sem. to Office Head/PHRMO
1 - submitted on March 21-Dec.
31 for the 2nd sem. & Sept. 20
Dec. 31 for the 1 st sem. to
Office
Head/PHRMO
0 – submitted after Dec.31 a year
after or more of the covered
period/year
Individual Development Plan/
D. PERFORMANCE 5 – no corrections/revisions 5 – 100% documents prepared 5 – Individual Development Plan Consolidated Individual Development
REWARD AND Interventions matching and submitted submitted by Supervisors/ Plan - Head of Office and Supervisors
DEVELOPMENT competency gaps 3 – 100% documents prepared Head of Office on February shall discuss with individual employees
PLANNING 4 –1 to 2 (with revisions/delayed 15-19 to assess their strengths, competency
corrections/revisions Submission) 4 - submitted on Feb. 20-24 related performance gaps and the
3 – 3-5 corrections/revisions 1 – failed to submit 3 – submitted on Feb.25-28/29 opportunities to address these gaps,
CONSOLIDATED/ 2 – 6-10 corrections/revisions 2 - submitted 1st week of March career paths and alternatives. The
INDIVIDUAL 1 – 11 and above corrections/ 1- submitted after the 1st wk result of the performance evaluation/
DEVELOPMENT PLAN /revisions of March and the covered assessment shall serve as inputs to
year identifying and providing interventions
0 – submitted after March and needed based on the developmental
beyond the covered year needs identified. Offices are to submit
22
the consolidated individual
development to the Human Resource
Management Office the during the 1st
quarter for incorporation to the Human
Resource/Career Plan and the basis for
rewards and incentives.
E. TRAINING 5 - excellent TOW Demand/Customer Driven: Training – a short program designed to
ORIENTATION evaluation feedback 5 – TOW facilitated/conducted develop knowledge, skills and attitudes
WORKSHOP (TOW) 4 – very satisfactory TOW 5 – 100% of TOW activity on given schedule of employees
evaluation feedback completed responsive to Orientation - is the process of helping
3 – satisfactory evaluation participant’s need 3- TOW postponed/re-scheduled new employees settle into a new job or
feedback new assigned task or re-orientation of
2 – unsatisfactory evaluation 3- 100% TOW completed at a 1- failed to conduct/facilitate new updates
feedback later date TOW Workshop – is a seminar, group
1 – poor evaluation discussion or the like that emphasizes
feedback 1 – failed to act on request exchange of ideas/information and the
demonstration and application of
techniques, and skills
TOW proposal - a
suggestion/recommendation to
conduct a training, orientation or
workshop approval/acceptance. It
includes training objectives, estimates
of budgetary requirements, schedule
and other relevant information.
CUSTOMER ASSISTANCE
Walk-in/phone calls 5 - excellent customer 5 - walk-in/phone calls/ Walk-in/phone calls – assistance
feedback technical assistance provided to individuals/groups
Technical Assistance 4 – very satisfactory 5 – 100% requests acted upon responded within 1-5 involving procedural queries and
Customer feedback seconds clarification of policies and other
3 - satisfactory customer 3 – 100% request acted upon 4 - walk-ins/phone calls/ assistance/information needed. A
feedback With Delay technical assistance logbook/journal contains the details of
2- unsatisfactory customer responded after 6-10 the service extended.
23
feedback 1 – request not acted upon seconds
1 – poor customer feedback 3 - walk-ins/phone calls/ Technical Assistance - involves more
technical assistance specialized knowledge and skill in a
responded within 11-15 specific field or area of expertise.
seconds Requires competency and time
2 – walk-ins/phone calls/ compared to an ordinary query/
technical assistance assistance extended.
responded 16-20 seconds Ex. Radio guesting/resource
1 – walk-ins/phone calls/ person/consultation on a particular
Technical assistance topic/subject
responded within 21
seconds and more
NETWORKING/ 5 –networking/linkaging 5 – task done within the day Networking/Liaison Work- involves
LINKAGING/MEETINGS accomplished excellently 5 –100% networking/liaising connecting, linking, coordinating with
4 – networking/linkaging requests acted 4 – task done within 2-3 days individuals, other offices/agencies to
very satisfactorily accomplish assigned tasks and or
accomplished 3 –100% networking/liaising 3 – task done within 4-7 days activities. May include meetings (one-
3- networking/linkaging requests acted upon with on-one, or in groups), follow-up by
accomplished delay 2 – task done within 8-12 phone or in writing.
satisfactorily Days
2 – networking/linkaging 1- failed act upon networking/
unsatisfactorily Liaising requests 1 – task done 13 days and
accomplished More
1 – poorly accomplished
SECRETARIAT WORK 5 – task completed within 5 Secretariat work – includes the sending
- Attendance 5– No corrections/revision 5 – 100% task acted upon working days before the out of notice of meeting either by
- Agenda 4 – 1-2 corrections/revisions meeting phone or written form to the members;
- Notice of Meeting 3 – 3-5 corrections/revisions 3- 100% task acted upon with 4 – task completed 4 working the preparation of the agenda before
2 – 6-10 revisions/late submisson days before the meeting the meeting; and the taking of the
corrections/revisions 3 – task completed 3 working attendance and minutes of the
1 – more than 10 1 –failed to act/comply days before the meeting meeting on the scheduled date as well
corrections/revisions 2 – task completed 2 working as the formulation of resolutions taken
days before the meeting from the minutes of the meeting.
24
1 – completed 1 day before the
meeting
- Minutes of the Meeting
- Resolutions 5 – task completed within 1- 2
working days after the
meeting
4 – task completed 3-4 working
days after the meeting
3 – task completed 5-6 working
days after the meeting
2 – completed 7-8 working
days after the meeting
1 - completed more than 9-15
days after the meeting
0 – beyond 15 days after the
Meeting
ADMINISTRATIVE SERVICES
I . A. ADMIN. ISSUANCES 5 – no correction/ revision 5 – task completed Admin. Issuances – includes
4 – 1–2 corrections/ 5 – 100% task acted upon Complex – within the day preparation of complex issuances such
revisions Simple (Pro-forma)- 30 min. as executive orders, memorandum of
3- 100% task acted upon with 4 – task completed within agreement and simple issuances such
3– 3–4 corrections errors and late Complex - 2 days as office orders, special orders, travel
/revisions 0 –failed to act/comply Simple - within the day orders issued by the Governor,
3 – task completed within Provincial Administrator and the
2 – 5 – 7 corrections/ Complex - 3 days department/unit heads.
revisions Simple - 2 days
2 – task completed
1 - more than 7 Complex - 4-5 days
corrections/ Simple - 3 days
revisions 1 – task completed
Complex – 6 days or more
Simple – 4 days or more
B. COMMUNICATIONS 5 – no correction/ revision 5 – task completed within 1-2 hrs Communications – comprises all letters
25
5 – 100% task acted upon for complex; 10 min. simple (simple - max. 10 minutes)– pro-forma
4 – 1–2 corrections/ 4 – task completed within 3-4 hrs e.g transmittals, endorsement, etc.),
revisions 3- 100% task acted upon with complex; 11-15 min. simple and complex – letters with
errors and late 3 – task completed w/in the day information/data needed), written in
3– 3–4 complex;16-30 min. simple response to communications
corrections/revisions 1 –failed to act/comply 2 – task completed after 1-2 days forwarded to the different offices and
complex; 31-45 min. simple those written to seek information or
2 – 5 – 7 corrections/ 1 – task completed after 3 or clarification to other offices/agencies.
revisions more days complex; 31 min.
and more for simple
1 - more than 7
corrections/
Revisions
C. REVIEW/INITIAL/SIGN 5 – complete review 5 – 100% documents 5 – simple – 5-10 minutes Review/Sign Documents – involves
DOCUMENTS reviewed/signed Complex – 10-15 minutes the checking/examining of
4 – 1-2 missed items 4 – simple – 11-15 minutes documents/papers by
3 – 100% documents reviewed/ Complex – 16-20 minutes Heads/Supervisors /designated staff
Signed with delay and 3 – simple 16-20 minutes before affixing initials/signature by the
3 - 3-4 missed items corrections Complex – 21-25 minutes concerned before release.
1 – failed to act 2 – simple – 21-25 minutes
2 – 5-6 missed items Complex – 26-30 minutes
1 – simple – more than 26 min.
1 – more than 6 missed Complex – more than 30
iitems minutes
C. MANDATORY 5 – submitted a week ahead Mandatory Requirements – are
REQUIREMENTS 5 – no corrections / 5 – 100% task acted upon before cut-off date documents prepared by the different
revision 4 – submitted 2-4 days offices required by the Civil Service for
4– 1–2 corrections / 3 - 100% task acted upon with ahead of schedule submission, e.g. SALN, PDS, LEAVE, DTR
revisions errors and late 3 – submitted on schedule with supporting documents attached
3– 3–4 corrections 2 – submitted 1-3 days after
/revisions 1 – failed to act/comply cut-off date
2–5 – 7 corrections/ 1 – submitted more than 3
revisions days after cut-off date
26
1 - more than 7
corrections/
revisions
D. ATTENDANCE TO 5 – complete uniform/ 5 – 100% mandatory activities Official activities – include
MANDATORY appropriate dress code attended 5- 30 min. early functions/events accompanied by a
FUNCTIONS/ with ID, finished 4 - 90-99% attendance 4 – 29 - 01 minutes early memorandum requiring all
ACTIVITIES activity 3 - 80-88% attendance 3 - on schedule officials/employees to attend/
3 – incomplete uniform, 2 - 70-79% attendance 2 – 01 to 30 minutes late participate e.g. flag ceremony, parades,
did 1 - 69% a and below attendance 1 – more than 30 minutes late etc
not finish activity 0 – failed to attend mandatory
1– not in uniform, had only activities
attendance
checked/left
E. MANDATORY REPORTS 5 – no 5 – submitted 5 days(a week Mandatory Reports – obligatory
corrections/complete 5 – 100% task acted upon ahead) before cut-off date documents such as monthly, quarterly,
entries 4 – submitted 2-4 days annual and other reports as a
4 – 1-2 revisions/missing 3- 100% task acted upon with ahead of schedule requirement in the performance of
entries errors/late 3 – submitted on schedule assigned task/function for submission
3 – 3-5 revisions/missing 2 – submitted 1-3 days after to the supervisor or other
entries 1 –failed to act/comply cut-off date offices/agencies requiring such reports
2 – 6-10 revisions/missing 1 – submitted more than 3
entries days after cut-off date
1 – more than 10
revisions/missing
entries
II. FINANCIAL MANAGEMENT
Programmed Appropriation and
A. Budget Execution 5 – no corrections 5 – 100% budget preparation 5 – submitted 4 working days Obligation by Object of Expenditures
forms (AIP, LBP5, /correction forms ahead of schedule (LBP2) – a document that presents the
LBE3, LBE3A) prepared and submitted 4 – submitted 2-3 working days Object of Expenditures, Account Code
4 – 1 minor ahead of schedule using the Revised Chart of Accounts for
correction/erasures 3 – 100% budget preparation 3 – submitted on July 15/ as LGU’s as prescribes under Audit
forms scheduled Circular No. 2015-009 dated Dec. 1,
27
3 – 2 minor prepared with errors/late 2 - submitted 1-7 working days 2015, actual expenditures incurred in
corrections/erasures submission after the schedule the past year, current year’s
1 – submitted 8 working days or expenditures for the 1st sem. – actual
2 - 3 minor corrections 1 - Failed to comply more after the schedule expenditures as certified by the Local
Accountant and 2nd sem. – estimated
1 – 4 or more minor expenditures prepared by the
corrections Department Head and the proposed
expenditures for the budget year.
Submitted to the Budget Office.
Mandate, Vision/Mission, Major Final
Output, Performance Indicators and
Targets (LBP4) – a document that
presents the provision of the LGC on
the mandate of the department/office,
the vision or the future role of the
department/office in attaining the
vision, and the Organizational Outcome
of the specific short-term benefits to
clients and the community as a result of
the LGU’s delivery of major Final
Outputs. Submitted to the PPDO.
REGULAR FUND Summary of Financial and Physical
5 – no correction/erasures 5 – 100% budget 5 – submitted 2 working days Performance Targets (LBE3) - a
B. Budget Execution execution/other ahead of schedule document that serves as basis in
Documents (LBE3, 4 - 1 corrections/erasures financial documents with no comparing actual level of
LBE3a) errors/submitted early 4 – submitted 1 day ahead of accomplishment for the preceding year
3 – 2 corrections/erasures schedule and knowing the available resources for
C. Other Budget 3 – 100% budget execution/other the budget year. Submitted to PPDO.
Execution 2 – 3 corrections/erasures financial documents with 3 – submitted on schedule (5
Documents/Financial errors/late submission working days upon approval Detailed Financial and Physical
Documents 1 – 4 or more corrections/ of the Local Expenditure Performance Targets (LBE3a) – a
(FP, PPMP, Request erasures 1 – failed to comply Program (LEP) document that presents the quarterly
for Hiring and breakdown of the financial allocation
28
Personnel Schedule) 2 – submitted 2 working days that is needed to accomplish a specific
after the schedule level of target. Submitted to PPDO.
LOCALLY FUNDED
PROGRAMS AND 1 – submitted 3 or more working Work and Financial Plan – is a
PROJECTS/20% days after the schedule prescribed budgetary form showing the
DEVELOPMENT total Authorized Appropriation and
FUND their net program of a particular office
for a specific fiscal year indicating the
Budget Preparation Monthly Allocation of Appropriations
Forms (LBP2,LBP4) based on the Object of Expenditure
classified as to Personal Services,
Budget Execution Maintenance and Other Operating
Documents Expenses and Capital Outlay. Submitted
(LBE3, LBE3a) to the Budget Office.
1 – more than 10
corrections
/erasures
III. RECORDS MANAGEMENT
30
A. Incoming/Outgoing 5 – no revision/complete 5– incoming/outgoing documents Incoming – documents coming in are
entries 5 – 100% complied/acted upon received, recorded, released, received, recorded and routed to
within the day concerned individuals
4 – 1-2 revisions/missing 3 – 100% acted upon/complied 4- incoming/outgoing documents Outgoing – documents released/
entries with corrections/late received, recorded, released transmitted to different offices, in hard
the following day or soft copy or packaged documents
3 – 3-5 revisions/missing 1 – failed to comply 3- incoming/outgoing documents are also recorded
Entries received, recorded, released
after 2 days
2 – 6-10 revisions/missing 2- incoming/outgoing documents
Entries received, recorded, released
after 3 days
1 – more than 10 1- incoming/outgoing documents
revisions/missing received, recorded, released
entries after more than 4 days
B. Filing and Retrieval 5 – complete, systematic 5 - 100% documents filed/ 5 – documents filed/retrieved Filing – documents are alphabetically
of Records files retrieved within the day within 1 minute or numerically filed in boxes/ filing
4 – 1-2 misplaced files 4 – documents filed/retrieved cabinets for easy access and retrieval
3– 3-5 misplaced files 3 - 100% unsystematic files with within 2-3 minutes
2 – 6-10/misplaced delayed retrieval/errors 3 – documents filed/retrieved Retrieval – documents systematically
files within 4-5 minutes filed are easily accessed/retrieved.
1 – more than 10 1 – failed to locate file/retrieve 2– documents filed/retrieved
misplaced files Documents within 6 – 8 minutes
1 –documents filed/retrieved.
within 8 min. and more
C. Disposition of 5 – no correction in 5 – disposition of records done Disposition of Records– the systematic
Records sorting, 5 –100% disposition of records within the 1st week of January transfer of Non-current records from
labeling and packing acted upon during the year office to storage area, identification
- Periodic examination valueless records, 4 – disposition of records done and preservation of archival records
of agency files once 4– 1-2 corrections in 3 – 100% records disposed with within the 2nd week of January and the destruction of valueless
a sorting, errors/late records
year to identify labeling and packing 3 – disposition of records done
31
valueless records to valueless records 1 – Failed to dispose of records within the 3rd week of January Valueless records–all records that have
be 3 – 3-5 corrections in during the year reached the prescribed retention
requested for
sorting, 2 – disposition of records done period and outlived the usefulness to
disposal labeling and packing within the 4th week of January the agency/government as a whole are
- Separate records for valueless records 1 – disposition of records done sorted, segregated and removed from
disposal from those 2 – 6-10 corrections in w/in the 1st week of February files. A request to GSO is made with the
for further retention sorting, labeling and list of documents/ records for
based on NAP packing storage/disposal.
General valueless records
storage Records 1 – more than corrections
Disposition Schedule sorting, labeling and
packing valueless
records
D. Reproduction/ 5 – clear copies 5 – 100% of requests for 5 – print-outs/photocopies Reproduction/Photocopy – are print-
Photocopy reproduction/photocopy within the day outs/photocopies validated from
4 – 1-2 unclear lines acted upon/no waste 4 – print-outs/photocopies original documents either for TOW
3 - 100% documents within 2 days distribution, or attachments as
3 – 3-5 unclear lines printed/reproduced with 3 – print-outs/photocopies supporting documents
errors/waste within 3 days
2 – 6-10 undlear lines 1 – failed to act on requests to 2 - print-outs/photocopies
print/photocopy within 4-5 days
1 – more than 10 unclear 1- print-outs/photocopies
lines within 6 days or more
E. Certification of 5 – no corrections 5 – 100% of requests for 5 – done within the day Original documents are photocopied
Machine/True Copies 4 – 1-2 corrections certification acted upon and certified as machine/photocopies
3 - 3-5 corrections 3 – done a day after by the originating office as supporting
2 – 6-10 corrections 3 - 100% documents documents/attachments. Documents
1 – more than 10 Certified with 1 – done 2 or more days after photocopied/ reproduced that are
corrections corrections/delay certified include: contracts/job orders,
payrolls, and other personnel related
1 - failed to act on requests papers.
32
F. Upload/Download 5 – complete download 5 – uploaded/downloaded Upload- documents /information /data
documents 5 – 100% uploaded/ downloaded within 3 minutes/ page are entered in the computer data base
4 –1-2 incomplete documents requested done 4 – uploaded/downloaded or website / internet.
download/corrections within 4-5minutes/page Download is getting/transferring
3 - 100% uploaded/downloaded 3 – uploaded/downloaded documents – circulars, researched
3 – 3-5 incomplete with errors/late within 6-8 minutes/page materials, reports, communications
download/corrections 2 - uploaded/downloaded from the internet for printing.
2 – 6-10 ncomplete 1 – failed to upload/download as within 9-10 minutes/page
download/correctons Requested 1 - uploaded/downloaded
w/in 11-15 minutes/page
1 – more than 10
incomplete/corrections
Citizens Charter/Updated 5 - updated no error 5- 100% acted upon 5 – submitted by end of March of Citizens Charter – is Manual of Operation of
Citizens Charter 3 - updated with 2 errors 3– acted upon with errors and Every year the office that contains the Vision, Mission;
1 – updated with 3 or Delay 3– submitted between April 1-15 Objects; Programs and Services; clientele
more 1 – not acted upon Of every year groups; Organizational Set-Up; Service
errors 1 – submitted on April 16 and Pledge; Work Flow Charts of every
Beyond Division’s/Unit’s major functions or frontline
services. Also includes required documents
for services to be availed by the clients
IV. TRANSPORT & MAINTENANCE
A. Transport Service 5 – no traffic violation, 5 – 100% driving/transport 5 – official driving/ transport Transport Service – is the conveyance
driver in services requested Services responded within 15 of passengers to and from the place of
proper attire 3- 100% driving services acted min.– 30 min origin and to its destination in
4- 1-2 traffic violations/ upon 4 – official driving/ transport government vehicles accompanied by
proper with delay/traffic violations service acted upon within trip tickets
attire lacking 1 – failed to respond/act upon 31 min. to 1 hr.
3 – 3-4 traffic Request 3 – official driving/ transport
violations/lacking Service acted upon 2-4
in proper attire hours
2 –5- 8 traffic violations, 2 - official driving/ transport
inappropriate attire of Service acted upon within
driver 5-6 hrs.
33
1 – more than 8 traffic 1 - official driving/ transport
violations service attended to more
and inappropriate than 7 hours,
driving
attire
B. Trip tickets/gasoline Trip ticket Trip Ticket – is a document required for
consumption Report 5 – no correction in trip 5 – 100% trip tickets/gasoline 5 – trip ticket accomplished the use of government vehicle with the
tickets/gasoline consumption report before 4 hrs. before the trip; driver’s name, plate number,
consumption and after the trip with less 4 – trip ticket made within 3- 2 authorized passengers, destination/s,
report wastage of fuel and hours purpose/s authorized by the Head of
4 – 1-2 correction in trip lubricants before the trip; Office with information of the
ticket/gasoline 3 – 100% reports complied with 3 – trip ticket made within departure time/place and time of
consumption wastage and late submission 1 hr. before the trip; arrival/place with total distance
report 2 – trip ticket made 1-2 hrs. traveled and liters of gasoline/diesel
3 – 3-5 corrections 2 – 99-50% reports complied trip after the trip; used to be accomplished by the driver.
2 – 6- 8 correctiosn 1 – trip ticket made 3 – 4 hrs.
1 - more than 8 1 – failed prepare/submit report after the trip
corrections
Gasoline Consumption Report Gasoline Consumption Report –
5 - Prepared report one hour includes the balance in tank of the
after vehicle whether it was issued from the
after the trip stock or purchased outside.
4 – 2-3 hours after the trip Accomplished by the driver every trip
3 – 4-5 hours after the trip and consolidated into monthly
2 – 6-8 hours after the trip. consumption report.
1 - a day or more after the trip
C. Vehicle Maintenance 5 – all systems thoroughly 5 – vehicle maintenance checked Vehicle maintenance – a scheduled
cleaned/checked of 5 – 100% tasks completed/acted last week of the month regular comprehensive vehicle check
motor vehicle/; in upon 4 – vehicle maintenance check and cleaning undertaken to keep the
good running condition, 3- 100% task completed/acted last week of every 2 months vehicle in good running condition.
able to travel long distance upon with delay 3 – vehicle maintenance 4 x a Performing BLOW BAG before every
3 - vehicle in running 1 – failed to complete/act upon Year, every last week of trips made: B- brakes, L- lights, O – oil,
34
condition but unable Tasks April, June, Sept. and Dec. W- water, B – battery, A- air, G-
to 2 - vehicle maintenance done gasoline is a must for every driver and
travel long distance semi-annually, last week of performing minor trouble
1 – failed to clean/check June and December shooting/repair.
Vehicle before driving 1 – once a year vehicle
and not running maintenance
condition
35