0% found this document useful (0 votes)
49 views4 pages

Catalog of Pool Concepts

This document contains a quotation for the construction of a 4x5 meter swimming pool. It includes 20 line items for various components of the project like excavation, concrete work, plumbing, electrical, drainage systems and landscaping. The total cost before taxes is $148,139.89. With a 23.7% value added tax, the total project cost is $171,842.27.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views4 pages

Catalog of Pool Concepts

This document contains a quotation for the construction of a 4x5 meter swimming pool. It includes 20 line items for various components of the project like excavation, concrete work, plumbing, electrical, drainage systems and landscaping. The total cost before taxes is $148,139.89. With a 23.7% value added tax, the total project cost is $171,842.27.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

4X5 KANAN SECTION SWIMMING POOL QUOTATION

KEY CONCEPT UNIT QUANTITY P.U.


MASONRY
001 EXCAVATION OF NATURAL GROUND WITH M3 25.00 $ 1,014.00
MECHANICAL EQUIPMENT (BACKHOE) UP TO 1.8 M
DEEP, INCLUDING LIGHT EQUIPMENT, TOOLS,
LABOR AND HAULING UP TO A DISTANCE OF 20 M.

002 CONCRETE TEMPLATE FOR THE DISPLACEMENT OF ML 17.00 $ 119.46


A 40 CM THICK MASONRY WALL, INCLUDING
LABOR, MATERIAL AND TOOLS.

003 MASONRY WALL WITH EXCAVATED MATERIAL 40 M2 15.00 $ 565.50


CM THICK, INCLUDING MATERIAL AND LABOR.

004 REINFORCED CONCRETE CASTLE BASED ON45X45 ML 19.00 $ 385.00


SECTION ARMEX, INCLUDING MATERIAL AND
LABOR.

005 45X45 REINFORCED CONCRETE DOUBLE ARMEX ML 36.00 $ 452.51


CHAIN LINK ENCLOSURE, INCLUDING MATERIAL
AND LABOR.

006 MASONRY WALL FLATTENING WITH MORTAR, M2 25.00 $ 239.33


THICKNESS UP TO 3CM, INCLUDES MATERIAL AND
LABOR.

007 POURING OF CONCRETE FLOOR, 5 CM THICK, M2 10.00 $ 359.00


BRUSHED FINISH TO RECEIVE CHUKUM, INCLUDES
MATERIAL AND LABOR.

008 POURING OF A 10 CM THICK CONCRETE FLOOR IN A M2 15.00 $ 393.19


SWIMMING POOL REINFORCED WITH
ELECTROWELDED MESH. 6X6-
10X10, FINISH
BRUSHING, INCLUDING MATERIAL AND LABOR.

FACILITIES
009 LIGHTING OUTLET, INCLUDING DUCT, GROOVING, SAL 5.00 $ 450.00
CHALUPAS AND 15 ML OF 12 GAUGE CABLE.

010 SUPPLY AND INSTALLATION OF PIPING ML 25.00 $ 180.00


3" HYDRAULICS FOR SWIMMING POOL FILLING
SUPPLY AND INSTALLATION OF PIPING ML 25.00 $ 130.00
3" SANITARY FOR POOL DRAINING
011 SUPPLY AND INSTALLATION OF POWER CABLE, LOT 1.00 $ 4,500.00
DIFFERENT GAUGES, INCLUDING CABLE, PIPING,
INSTALLATION AND LABOR.

012 SUPPLY, INSTALLATION, CONNECTION AND LOT 1.00 $10,000.00


COMMISSIONING OF PUMPING EQUIPMENT FOR
FILLING AND EMPTYING OF POOL, INCLUDING
PUMP, CONNECTIONS, INSTALLATION, TESTING
AND LABOR.

013 SUPPLY AND INSTALLATION OF STREET LIGHTING, PZA 5.00 $ 1,500.00


INCLUDING LAMP, DAMPER, CONNECTION AND
LABOR.

014 SUPPLY AND INSTALLATION OF CHUKUM-BASED M2 60.00 $ 120.00


COATING ON INTERIOR AND EXTERIOR POOL
WALLS , INCLUDING MATERIAL AND LABOR.

ADDITIONAL WORK
015 RE-LEVELING OF NATURAL TERRAIN WITH BENCH M2 25.00 $ 50.00
MATERIAL.
016 LAYING OF GRASS IN GREEN AREA M2 25.00 $ 60.00
017 GENERAL CLEANING OF EXTERIOR WORK. 50.00 $ 25.00
018 VILIC PAINT FOR EXTERIOR WALLS, INCLUDES M2 100.00
MATERIAL AND LABOR.

$ 60.00
019 DEEP WELL DEVELOPMENT FOR PZA 1.00
SUPPLY $14,000.00
020 ELABORATION OF ABSORPTION WELL FOR PZA 1.00
DRAINAGE
$10,000.00

SUBTOTAL
VAT
TOTAL
TOTAL
$ 25,350.00

$ 2,030.89

$ 8,482.50

$ 7,315.00

$ 16,290.53

$ 5,983.25

$ 3,589.95

$ 5,897.78

$ 2,250.00

$ 4,500.00

$ 3,250.00
$ 4,500.00

$ 10,000.00

$ 7,500.00

$ 7,200.00

$ 1,250.00

$ 1,500.00
$ 1,250.00
$ 6,000.00

$ 14,000.00

$ 10,000.00

$ 148,139.89
$ 23,702.38
$ 171,842.27