0% found this document useful (0 votes)
362 views

Omron Date Code

Omron uses various date code methods to identify the date of manufacture for its products. Method A uses a combination of letters and numbers to indicate the month, day, and year of manufacture, along with the factory and line of production. Method B uses a combination of letters and numbers for dip switches to represent the date. Method C uses a similar system for sensors and some switches. Method D, E, F identify the date of manufacture for various connectors and automotive relays through different coding systems involving letters, numbers, and calendars.

Uploaded by

zerokull
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
362 views

Omron Date Code

Omron uses various date code methods to identify the date of manufacture for its products. Method A uses a combination of letters and numbers to indicate the month, day, and year of manufacture, along with the factory and line of production. Method B uses a combination of letters and numbers for dip switches to represent the date. Method C uses a similar system for sensors and some switches. Method D, E, F identify the date of manufacture for various connectors and automotive relays through different coding systems involving letters, numbers, and calendars.

Uploaded by

zerokull
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Omron Date Codes

1
Omron Date Codes
• The vast majority of Omron ECB products use the date code as shown in Method
A (next slide).
• Products use date codes that are outlined on the following pages.

Method Products
A Relay and Switches

B Dip Switches A6S/A6T/A6R/A6RV/A6E/A6ER/A6H


C Sensor and some switches EE-SX**/DC3

D Automotive relays: G8J /G8JR/ G8JE/ G8SN/ G8W


E Connector XC2/4
F Connector XM2
G Connector XS2

2
26X4H1
}
}

Day of The The Factory Line


the Months Year Code Code
Month 1:Jan Of C:OMZ
1-9
2:Feb D:Iida
01-31 3:Mar
The E:Takeo
4:April Decade H:OMI Digit
6&
5:May 0-9 K:Kusatsu
7 (if used)
6:June N:OMR Is for
7:July R:Krx Factory
8:Aug W:OMB Production
9:Sept Y:OER Line
X:Oct Z:Izumo Number
Y:Nov
Z:Dec

Method A Example: 26X4H1= October 26, 2004 3


BY57E02
}

}
Production Date: The The Line
Operator Year Months Code
Code Date Code Date Code Date Code
Of
1:Jan
1-9
1 1 11 C 21 N 2:Feb
2 2 12 D 22 P The 3:Mar
(Alphabetical)
3 3 13 E 23 Q Decade 4:April Digit
6&
5:May
4 4 14 F 24 R
0-9 7 (if used)
5 5 15 G 25 S 6:June Is for
6 6 16 H 26 T 7:July Factory
7 7 17 J 27 U 8:Aug Production
8 8 18 K 28 V 9:Sept Line
9 9 19 L 29 W X:Oct
10 A 20 M 30 X Y:Nov
31 Y Z:Dec

Method B Example: BY57E02 = July 31, 2005 4


GX5
Date: The The
Months Year
1:Jan
Of
Date Code Date Code Date Code

1 1 11 C 21 N
2:Feb
2 2 12 D 22 P
3:Mar The
3 3 13 E 23 Q
4:April Decade
4 4 14 F 24 R
5:May
0-9
5 5 15 G 25 S
6:June
6 6 16 H 26 T
7:July
7 7 17 J 27 U
8:Aug
8 8 18 K 28 V
9:Sept
9 9 19 L 29 W
X:Oct
10 A 20 M 30 X
Y:Nov
31 Y
Z:Dec

Method C Example: GX5= October 15, 2005 5


D5236

}
See attached
spreadsheet for full
Julian dates listing.
Shift The Julian
Working Julian Julian Julian Julian

Time:
Year Date Date Date Date Date Date Date Date Date
Of (see table)
1 1-Jan 11 11-Jan 21 21-Jan 41 10-Feb
D=Day The 2 2-Jan 12 12-Jan 22 22-Jan 42 11-Feb
A=After Decade 3 3-Jan 13 13-Jan 23 23-Jan 43 12-Feb
noon
N=Night 0-9 4 4-Jan 14 14-Jan 24 24-Jan 44 13-Feb
5 5-Jan 15 15-Jan 25 25-Jan 45 14-Feb
6 6-Jan 16 16-Jan 26 26-Jan 46 15-Feb
7 7-Jan 17 17-Jan 27 27-Jan 47 16-Feb
8 8-Jan 18 18-Jan 28 28-Jan 48 17-Feb
9 9-Jan 19 19-Jan 29 29-Jan 49 18-Feb
10 10-Jan 20 20-Jan 30 30-Jan 50 19-Feb

Method D Example: D5236= August 24, 2005, Day Shift 6


0525 See attached

}
}
spreadsheet for full
Julian weeks listing.

The Week:
Year (2005) Week DATE Week DATE

Of 1 2 8 11 13 20

The 2 9 15 12 20 26

Decade 3 16 22 13 27 2
4 23 29 14 3 9
0-9
5 1 5 15 10 15
6 6 12 16 17 23
7 13 19 17 24 30
8 20 26 18 1 7
9 27 5 19 8 14
10 6 12 20 15 21

Method E Example: 0525= June 13-17, 2005 7


5D01

}
The Sequential
The
Year Number
Months
Of A:Jan
The B:Feb
C:Mar
Decade
D:April
0-9 E:May
F:June
G:July
H:Aug
I:Sept
J:Oct
K:Nov
L:Dec

Method F Example: 05D01= April, 2005 8


E95
Days: The The
F: The first ten days Months Year
M: The middle ten days 1:Jan
2:Feb Of
E: The last ten days The
3:Mar
4:April Decade
5:May
0-9
6:June
7:July
8:Aug
9:Sept
X:Oct
Y:Nov
Z:Dec

Method G Example: E95= September 21-30, 2005 9

You might also like