15 July Index
15 July Index
LIST OF FIGURES ii
LIST OF ABBREVIATIONS iv
TIMELINE OF PROJECT vi
1 INTRODUCTION 01
2 LITERATURE REVIEW 05
4 METHODOLOGY 10
8 RESULT 42
CONCLUSION 43
FUTURE SCOPE 44
REFERENCES 45
ANNEXURE 46
GROUP MEMBERS 51
LIST OF FIGURES
5.4.5 RESISTOR 24
5.4.7 DIODE 26
5.4.10 CAPACITOR 28
5.4.11 LED 29
5.4.12 SWITCH 29
7.2 ON CONDITION 42
LIST OF TABLES
TABLE
TABLE NAME PAGE NO.
NO.
5.1 LIST OF COMPONENTS 15
8.1 RESULT 42
LIST OF ABBREVIATIONS
SR.
ABBREVIATIONS FULL FORM
NO.
1 IOT INTERNET OF THINGS
3 RF RADIO FREQUENCY
21 CT CURRENT TRANSFORMER
32 TV TELEVISION
2 Topic Selection
3 Literature Review
5 Project
Presentation
(phase-1) &
Report
Phase 2:
1 Designing of
Circuit
2 Collecting
hardware
Components
3 Hardware
Implementation
4 Hardware Testing
and problem
solving
5 Project
Presentation
(phase-2) & Report