00 - Recommended Practices - List
00 - Recommended Practices - List
14R-90 Responsibility and Required Skills for a Project Planning and 2006/09/19
Scheduling Professional
[Look Inside]
15R-81 Profitability Methods 2008/07/16
[Look Inside]
16R-90 Conducting Technical and Economic Evaluations – As Applied for the 1991/04/01
Process and Utility Industries
[Look Inside]
https://www.aacei.org/resources/publications/recommended-practices 1/4
16/3/2020 Recommended Practices
37R-06 Schedule Levels of Detail—As Applied in Engineering, Procurement, 2010/03/20
and Construction
[Look Inside]
38R-06 Documenting the Schedule Basis 2009/06/18
[Look Inside]
39R-06 Project Planning – As Applied in Engineering and Construction for 2011/12/08
Capital Projects
[Look Inside]
40R-08 Contingency Estimating – General Principles 2008/06/25
[Look Inside]
44R-08 Risk Analysis and Contingency Determination Using Expected Value 2012/12/04
[Look Inside]
45R-08 Scheduling Claims Protection Methods 2009/06/01
[Look Inside]
46R-11 Required Skills and Knowledge of Project Cost Estimating 2013/01/16
[Look Inside]
57R-09 Integrated Cost and Schedule Risk Analysis Using Risk Drivers and 2019/07/09
Monte Carlo Simulation of a CPM Model
[Look Inside]
https://www.aacei.org/resources/publications/recommended-practices 2/4
16/3/2020 Recommended Practices
[Look Inside]
62R-11 Risk Assessment: Identification and Qualitative Analysis 2012/05/11
[Look Inside]
63R-11 Risk Treatment 2012/08/23
[Look Inside]
64R-11 CPM Schedule Risk Modeling and Analysis: Special Considerations 2012/05/02
[Look Inside]
65R-11 Integrated Cost and Schedule Risk Analysis and Contingency 2012/05/02
Determination Using Expected Value
[Look Inside]
66R-11 Selecting Probability Distribution Functions for use in Cost and 2012/08/24
Schedule Risk Simulation Models
[Look Inside]
67R-11 Contract Risk Allocation – As Applied in Engineering, Procurement, 2014/01/14
and Construction
[Look Inside]
68R-11 Escalation Estimating Using Indices and Monte Carlo Simulation 2012/05/02
[Look Inside]
71R-12 Required Skills and Knowledge of Decision and Risk Management 2013/06/17
[Look Inside]
72R-12 Developing a Project Risk Management Plan 2013/04/25
[Look Inside]
73R-13 Establishing Labor Productivity Norms 2014/01/14
[Look Inside]
74R-13 Basis of Estimate - As Applied for the Software Services Industries 2014/04/02
[Look Inside]
75R-13 Schedule and Cost Reserves within the Framework of ANSI EIA-748 2014/10/24
[Look Inside]
77R-15 Quality Control/Quality Assurance for Risk Management 2016/06/03
[Look Inside]
https://www.aacei.org/resources/publications/recommended-practices 3/4
16/3/2020 Recommended Practices
Applied in Construction
[Look Inside]
89R-16 Management Summary Schedule 2017/10/18
[Look Inside]
90R-17 Statusing the CPM Schedule – As Applied in Construction 2018/03/19
[Look Inside]
91R-16 Schedule Development 2018/03/20
[Look Inside]
92R-17 Analyzing Near-Critical Paths 2017/10/18
[Look Inside]
93R-17 Schedule Logs 2018/04/18
[Look Inside]
94R-18 Cost Control Software Requirements 2019/02/27
[Look Inside]
95R-18 Construction Photography to Document Project Status 2019/02/27
[Look Inside]
96R-18 Cost Estimate Classification System – As Applied in Engineering, 2019/07/31
Procurement, and Construction for the Power Transmission Line
Infrastructure Industries
[Look Inside]
97R-18 Cost Estimate Classification System – As Applied in Engineering, 2019/08/05
Procurement, and Construction for the Pipeline Transportation
Infrastructure Industries
[Look Inside]
98R-18 Cost Estimate Classification System – As Applied in Engineering, 2019/03/26
Procurement, and Construction for the Road and Rail Transportation
Infrastructure Industries
[Look Inside]
100R-19 Contract Change Management – As Applied in Engineering, 2020/02/27
Procurement, and Construction
[Look Inside]
103R-19 Project Code of Accounts – As Applied in the Mining and Mineral 2019/10/10
Processing Industries to Facilitate Benchmarking
[Look Inside]
105R-19 Estimate Requirements Document – As Applied in Engineering, 2019/10/11
Procurement, and Construction for the Process Industries
[Look Inside]