Satip P 104 10
Satip P 104 10
00 31-Mar-18
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Cable Splicer Certification and Job Clearance Cards (JCC's) to be issued prior to
1.2
Project Job Clearance Cards
SAIC-P-3215 SAIC-P-3215 RH RH commencement of HV cable termination work.
Vendor Installation Manual- To be reviewed and approved prior to electrical work at job
1.3
Cable Laying Method
See Remarks See Remarks RH RH site
RECEIVING
2.0
INSPECTION
Cable Storage, Handling, and
2.1 Preservation SAIC-P-3201 SAIC-P-3201 H W Weekly Inspection by Contractor QC
Visual Inspection
3.0 INSTALLATION
Direct Buried
Cable Trench See SATIP-P-104-07 Below Grade Conduit and Duct
3.1
Visual Inspection
SAIC-P-3333 SAIC-P-3333 H H Bank.
(Before Cable Laying)
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Below Grade
3.4 Warning Device Installation SAIC-P-3333 SAIC-P-3333 H W
Visual Inspection
4.0 PRE-COMMISSIONING
Cable Continuity
Continuity (Volt-Ohm Meter) and
4.1 and Insulation Testing SATR-P-3212 SATR-P-3212 H W Insulation (Megger) Test.
(Installed Cable)
Cable Termination
4.3
Torque Testing
SATR-P-3213 SATR-P-3213 H W Hydraulic and mechanical crimping / bolting
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
1
of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative
3
is not present.
4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
###
###