1) The quality control plan outlines five control points for inspection of incoming materials, blending, product testing, packing, and final inspection. Acceptance criteria and inspection methods are defined for each control point.
2) Inspections will be conducted on a regular basis according to the defined frequency and sampling plans. Responsibilities are assigned to operators, lab assistants, and receiving personnel.
3) Records like production inspection records, certificates of analysis, and stamped delivery orders document the results of quality checks and ensure traceability. Standards and procedures provide guidelines for inspection methods.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
588 views1 page
Quality Control Plan
1) The quality control plan outlines five control points for inspection of incoming materials, blending, product testing, packing, and final inspection. Acceptance criteria and inspection methods are defined for each control point.
2) Inspections will be conducted on a regular basis according to the defined frequency and sampling plans. Responsibilities are assigned to operators, lab assistants, and receiving personnel.
3) Records like production inspection records, certificates of analysis, and stamped delivery orders document the results of quality checks and ensure traceability. Standards and procedures provide guidelines for inspection methods.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1
Doc No Prepared By
QUALITY CONTROL PLAN
Revision 00 Approved By Equipment/ Frequency/ Process Acceptance No. Control Item Method/Tools Sampling Responsibility Record Reference Name Criteria Used Plan 1. Incoming Description of the Tally with Visual Every As per supplier’s Material item and quantity DO/Invoice Receiving DO Receiving Stamping on Packing Condition No Damage Visual Every person DO Receiving 2. Blending of Blending Correct Visual Start / Daily Operator Production Standard Operating Material Component/ material & Inspection Procedure (SOP) Material amount Record 3 Product As per product Lab Test Lab Assistant Certificate of Standard Operating Inspection & specification 100ml per lot Analysis (COA) Procedure (SOP) Testing / Start 4 Packing Weight Correct weight Weighing 100% Operator -- -- machine 5. Final Correct quantity, As per Delivery Visual 100% Operator D/O -- inspection Product Code, Order. Lot Number