memoranoum cimcurar no, 2023-010
Series of
2023,
UPDATING THE OPERATIONS MANUAL OF THE PAMBANSANG PABAHAY PARA
‘SA PILIPINO (4PH) PROGRAM
4. Background
1.
12.
2. Pur
Department Circular (OC) No, 2022-004 dated December 15, 2022,
declared the Fambansang Pabshay para sa Plipino (4PH) Program as a
priorty program of the Department of Hurian Setiements and Urban
Development (DHSUD);
Memorandum Circular (MC) Nos. 2023-002 and 2023-002-A were issued
to prescribe the guidelines for the implementation of the Pambansang
Pabahay Para sa Pilpino (4PH) Program.
pose
‘After due consutatiors with stakeholders of the 4PH Program, this Memorandum
Circular is issued to update certain provisions of the 4PH Operations Manual
covered by Memorantum Circulars 2023-002 and 2023-000-A.
3. Updating of Selected Sections
“The fllowing are hereby amended, as follows:
A. Section B, Option BS (Privately-owned propery), second paragraph
For this purpose, the recommended landflat area fora typical building foor
Plate of 740 sqm (24 sqm at 26 units floor) is between 1,100 to 1,200 sqm
{or a1 to 2 tower-proect, subject to possible adjustments, as required for
imeguiar lot configurations. The maximum recommended number of
towers per hectare is 5, with 40% provision for open space that can be
used for parksplayground, common facies, and parking. Deviation inthe typical balling floor plate is allowed, subject to the review and
approval by the project proponent and DHSUD.
B. Section C. Proposed Housing Design and Price Celing Parameters. The
project proponents shall be responsible for preparing the parameters of
their
Proposed housing projects, in accord
lance with exsting
overnmentprescribed laws and standards, and the following DHSUD