Skid With Piles (Dyn Analysis) 30-09

This document provides design details for the foundation of a propane compressor skid. It includes sections on relevant codes and standards, material specifications, soil conditions, foundation details, loading data, foundation dimensions and inputs, calculation of dynamic forces, stability check, reinforcement design, and a check for shear strength. Input data is provided for the equipment, anchor bolts, elevations, and loading. Soil report data includes bearing capacity, friction angle, and coefficient of subgrade reaction.

Uploaded by

LeeCH LeeCH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
200 views25 pages

Skid With Piles (Dyn Analysis) 30-09

This document provides design details for the foundation of a propane compressor skid. It includes sections on relevant codes and standards, material specifications, soil conditions, foundation details, loading data, foundation dimensions and inputs, calculation of dynamic forces, stability check, reinforcement design, and a check for shear strength. Input data is provided for the equipment, anchor bolts, elevations, and loading. Soil report data includes bearing capacity, friction angle, and coefficient of subgrade reaction.

Uploaded by

LeeCH LeeCH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 25

Operating Manual for Skid Pile Foundation

1. Enter Input data in Input sheet cells enclosed with

2. Input the vendor data in sections 1 to 5. If seismic & wind loads in section 5 are
not provided by vendor, Input these loads from section 20.

3. Input the soil report data (soil & pile parameters) in sections 6 to 8.

4. Input the specifications data (material strength & unit weights) in section 9 to 11.

5. Input the design parameters in sections 12 to 19.

6. Check if all the checks are passed in sections 21 to 25.

7. Design Conditions & Seismic Load Calculations are provided in the A & B sections
respectively of this sheet

A. DESIGN CONDITIONS

A.1 Thickness of Pile Cap (h1)


Minimum Thickness of pile cap for compressors
1. Weight of Cap should be 3 to 5 times the operation load
h1 = 5 x Operation Load / ( Lx.Lz. Conc density)
h1 = 2720 mm
2. Thickness should not be less than (0.6 + Lx/30)
h1 = 0.6 + Lx / 30
h1 = 972 mm
Selected Thickness (h1) = 1000 mm

A.2 Pile Spacings


Minimum Pile to Edge Spacing ( 1.25 Dp
Minimum Pile to Edge Spacing ( 1.25 Dp
Minimum Pile to Pile Spacing (X 3.00 Dp
Minimum Pile to Pile Spacing (Z 2.00 Dp
B. SEISMIC LOAD (Fp)

According to UBC 97
Seismic Load = Fp = ap ca lp / Rp (1 + 3 hx / hr ) Wp

Since hx = hr
So Fp = 4 ap ca lp Wp / Rp

Where ap = 2.5 (Ref: Table 16-O)


ca = 0.3 (Ref: Table 16-Q)
lp = 1.5 (Ref: Table 16-K)
Rp = 3 (Ref: Table 16-O)
Wp = 400.3 kN

Thus
Fp = 600.5 kN

Height of CG of Equipment H= 1.25 m

Overturning Moment =
Mot = Fp * H / 2 = 375.3 kN-m
Unfactored Loading Combination
A B C D E F G H I
Empty Operation Test Imposed Live Wind Seismic Thermal Uplift
LCA 1
LCB 1
LCC 1
LCD 1
LCE 1 0.71
LCF 1 0.71
LCG 1 0.71
LCH 1 0.71
LCI 1
LCJ

Factored Loading Combination


A B C D E F G H I
Empty Operation Test Imposed Live Wind Seismic Thermal Uplift
LCA 0.9
LCB 1.4
LCC 1.2
LCD 1.2
LCE 1.2
LCF 1.2
LCG 1.32 1.1
LCH 1.32 1.1
LCI 1.32 1.1
LCJ 1.32 1.1
J K
Dyn-x Dyn-z L/Cs
1 Operation + Dynamic (x)
-1 Operation - Dynamic (x)
1 Operation + Dynamic (z)
-1 Operation - Dynamic (z)
1 Operation + 0.71 Seismic + Dynamic (x)
-1 Operation + 0.71 Seismic - Dynamic (x)
1 Operation + 0.71 Seismic + Dynamic (z)
-1 Operation + 0.71 Seismic - Dynamic (z)
Empty

J K
Dyn-x Dyn-z L/Cs
0.9 Empty 0.9
1.4 Operation 1.4
1.6 1.2 Operation + 1.6 Dynamic (x) 1.2
-1.6 1.2 Operation - -1.6 Dynamic (x) 1.2
1.6 1.2 Operation + 1.6 Dynamic (z) 1.2
-1.6 1.2 Operation - -1.6 Dynamic (z) 1.2
1.76 1.32 Operation + 1.1 Seismic + 1.76 Dynamic (x) 1.32
-1.76 1.32 Operation + 1.1 Seismic - -1.76 Dynamic (x) 1.32
1.76 1.32 Operation + 1.1 Seismic + 1.76 Dynamic (z) 1.32
-1.76 1.32 Operation + 1.1 Seismic - -1.76 Dynamic (z) 1.32
r t&s =
r tmaxs =
0.0020
0.0235
Doc. No. 1013-XX-XX-XX-XXX PAGE: 1 of 12

X X-XX-2005 XXXXXX XX XX XX
Initial Dated Initial Dated Initial Dated
Rev Date Description
Prepared by Checked by Approved By
EL WASTANI PETROLEUM COMPANY CLIENT
REFERENCE
(WASCO)
CLIENT P.O Box 52 El Maadi
El Safa Office Tower, Block 42, Sector No. 6 EW-T-13-2005
Zahraa El-Maadi, Cairo, Egypt
PRESSON ENERFLEX ENERFLEX
2103-8th STREET NISKU, ALBERTA, PROJECT NO.

CANADA, T9E 7Z1

Telephone: 1-780-955-2447 1013

PROJECT ELWASTANI GAS FIELD DEVELOPMENT PHASE- III

TITLE FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A)

PREPARED CHECKED APPROVED DATE DOCUMENT NO. REV

XX XX XX 9/8/2023 1013-XX-XX-XX-XXX Ao
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 2 of 12
PROJECT: EL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

CONTENTS

1. GENERAL 3

2. RELEVANT CODES AND STANDARDS 3

3. MATERIAL SPECIFICATIONS 3

4. SOIL CONDITION 3

5. FOUNDATION DETAIL 3

6. FOUNDATION LOADING DATA 4

7. SHAPE AND DIMENSIONS OF FOUNDATION 4

8. FOUNDATION DIMENSIONS & INPUT 5

9. CALCULATION OF DYNAMIC FORCES 6

10. STABILITY CHECK 8

11. DESIGN OF REINFORCEMENT 9

12. CHECK FOR SHEAR STRENGTH 12


VENDOR INFO
1. General
Item A
Service PROPANE COMPRESSOR SKID
2. Equipment Detail
Height of Equipment 2450 mm
Operating Speed fm 1200 rpm
Vertical Exciting Force Py 0.0 kN
From Footing Edge (x) 0.00 m
From Footing Edge (z) 0.00 m
Horizontal Exciting Force in XPx 4.5 kN
Horizontal Exciting Force in ZPz 3.0 kN
From Footing Top 0.60 m
Equipment Data W (kN) x (m) y (m) z (m)
1. 333.6 5.525 1.250 1.375
2.
3. Anchor Bolts
No of Anchor Bolts 12
Anchor Bolt Size 72 mm
fy (bolt) 280 MPa
4. Elevations
GWL Elevation -1.50 m
FGL Elevation (Unit) 0.00 m
5. Loading Data Vertical Horizontal Moment
(kN) (kN) (kN-m)
Empty/Dry 333.6 0.0 0.0
Imposed 0.0 0.0 0.0
Live 0.0 0.0 0.0
Operating 400.3 0.0 0.0
Full of Water 0.0 0.0 0.0
Earthquake 0.0 600.5 412.9
Wind 0.0 0.0 0.0
Thermal 0.0 0.0 0.0
Uplift 0.0 0.0 0.0

SOIL REPORT
6. Soil Condition
Soil Bearing Capacity 30 kpa
φ 30 deg
Coefficient of Elastic Resist Cp 500 t/m^3
7. Pile Bearing Capacity
V (long) 1100 KN
V (short) 1100 KN
H 80 KN
Uplift 200 KN
8. Pile Dimensions
Dimension of Pile Dp 600 mm
Length of Pile Lp 39 m

SPECIFICATIONS
9. Material Strength
fy 350 MPa
fc' 24 MPa
10. Unit Weights
RCC 24.0 kn/cu-m
Soil 16.3 kn/cu-m
Steel 78.4 kn/cu-m
Water 9.81 kn/cu-m
11. Modulus of Elasticity
Concrete 22 kN/mm²
RCC 207 kN/mmⁿ
DESIGN PARAMETERS
12. Document Info
Document No.: 1013-XX-XX-XX-XXX
Rev Ao
13. Foundation Detail
Foundation Shape Rectangle
Padestal Shape None
Foundation Type Pile
14. Foundation Dimensions
Footing Size in X-Dir Lx 11150 mm
Footing Size in Z-Dir Lz 2750 mm
Thickness of Foundation h1 1000 mm
Projection of Skid h2 150 mm
15. Piles
No. of Piles in X Dir n1 3
No. of Piles in Z Dir n2 2
16. Pile Spacings
Pile to Edge Distance in X-Dir 1.25 Dp
Pile to Edge Distance in Z-Dir 1.25 Dp
17. Footing Rebar Covers
Clear Cover at bottom 100 mm
Clear Cover at top 75 mm
Clear Cover at side 75 mm
18. Rebar Sizes & Spacings
Bottom Rebar Bar size 20 max s 200 mm
Top Rebar Bar size 20 max s 200 mm
Long Direction Bar size 20 max s 200 mm
19. Factors
Fatigue factor ε 3
20. Recommended Loads & Moments
Seismic Force 600.5 kN
Seismic Moment 375.3 kN-m
Wind Force N/A kN
Wind Moment N/A kN-m

CHECKS
21. Pile Stability Check
Max H/pile 71.1 < 80 OK !
Max +Rp 501.3 < 1100 OK !
Max -Rp -122.6 > -200 OK !
22. Pile Spacing Check
Pile to Pile Distance in X-Dir 8.04 Dp OK !
Pile to Pile Distance in Z-Dir 2.08 Dp OK !
23. Footing Reinforcement Design
Bottom Rebar 56 bars @ 200 mm OK !
Top Rebar 56 bars @ 200 mm OK !
Long Direction 14 bars @ 200 mm OK !
24. Shear Check
Around Pile perimeter OK !
25. Dynamic Amplitude Check
Vertical Amplitude (ay) OK !
Horizontal Amplitude (ax) OK !
Horizontal Amplitude (az) OK !
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 13+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

1. GENERAL
Service PROPANE COMPRESSOR SKID (A)
Document No.: 1013-XX-XX-XX-XXX

2. RELEVANT CODES AND STANDARDS


ACI 318-02 Building Code Requirements for Structural Concrete
UBC 97 Uniform Building Code

3. MATERIAL SPECIFICATIONS

3.1 Strength
Reinforcement bar yield strength 350 MPa
Concrete compressive strength at 28 days (Cylinder) 24 MPa
Anchor bolts : fy(bolt) 280 MPa

3.2 Unit Weight


Reinforced Concrete 24 KN/cu-m
Soil 16.3 KN/cu-m
Steel 78.4 KN/cu-m
Water 9.81 KN/cu-m

4. SOIL CONDITION

4.1 Net Soil Bearing Capacity of Area


In normal operations (Assumed) 30.0 KPa
Normal operation + Lateral forces 40.0 KPa

4.2 Coefficient of Lateral Soil Pressure


φ (As per geotechnical study) (Assumed) 30
Active soil pressure coefficient Ka = tan² (45 - f/2) 0.33
At rest soil pressure coefficient Ko = 1 - sinf 0.50
Passive soil pressure coefficient Kp = tan² (45 + f/2) 3.00

5. FOUNDATION DETAIL

5.1 Foundation Outline


Footing shape Rectangle
Pedestal shape None
Foundation type Pile

5.2 Elevation
Top of Skid 0.15 m
Unit 0.00 m
Ground water level (dw) -1.50 m

5.3 Pile Bearing Capacity


V (long term) (Assumed) 1100 KN
(short term) (Assumed) 1100 KN
H (Assumed) 80 KN
Uplift (Assumed) -200 KN
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 14+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

6. FOUNDATION LOADING DATA

Loading Type Vertical Load Horizontal Load Moment Load


kN kN kN-m
Empty/Dry 333.6 0.0 0.0
Imposed 0.0 0.0 0.0
Live 0.0 0.0 0.0
Operating 400.3 0.0 0.0
Full of Water 0.0 0.0 0.0
Earthquake 0.0 600.5 412.9
Wind 0.0 0.0 0.0
Thermal 0.0 0.0 0.0
Uplift 0.0 0.0 0.0

7. SHAPE AND DIMENSIONS OF FOUNDATION

11150 mm

2750 mm

We
###
EL +0 m
1000 mm
Wf

hw
GWL
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 15+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

8. FOUNDATION DIMENSIONS & INPUT

8.1 Dimensions
Footing Size in X-dir Wx 11150 mm
Footing Size in Z-dir Wz 2750 mm
Thickness of Foundation h1 1000 mm
Dimension of Pile Dp 600 mm
Length of Pile Hp 39 m
Height of GWL hw -0.65 m
Projection of Skid h2 150 mm
Depth of center of elasticity of base support h' 19.5 m

8.2 Area
Area of Footing Af 30.66 m²
Area of Pile Ap 0.28 m²
Surface Area of Pile As 73.51 m²

8.3 Weight
Weight of Footing 735.9 KN
Weight of 1 Pile 264.6 KN
Footing Weight per 1 m² 24.0 KN/m²

8.4 Piles
Total Piles 6
Piles in X-dir 3
Piles in Z-dir 2
Pile to edge distance in X-Dir 1.25 Dp 750 mm
Pile to edge distance in Z-Dir 1.25 Dp 750 mm
Pile to Pile distance in X-dir 8.04 Dp 4825 mm
Pile to Pile distance in Z-dir 2.08 Dp 1250 mm
Correction factor for pile group α 1.00

8.5 Moment of Inertia & Polar Section Modulus


Distance of Piles from Centroid axis
x1 4.83 m z1 0.63 m
x2 0.00 m z2 0.00 m
x3 0.00 m z3 0.00 m
x4 0.00 m z4 0.00 m
x5 0.00 m z5 0.00 m

x' = min (x1,x2,..xn) 4.83 m z' = min (z1,z2,..zn) 0.63 m


Σ Ixx = 93.12 m² Σ Izz = 2.34 m²
Zpx (max) = Σ Ixx / x' 19.30 m Zpz (max) = Σ Izz / z' 3.75 m
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 16+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

9. CALCULATION OF DYNAMIC FORCES


9.1 Center of Gravity
W mi xi yi zi W xi W yi W zi
kN kN-sec²/m m m m kN - m kN - m kN - m
Eq-1 333.6 34.01 5.525 1.375 1.250 1843.1 458.7 417.0
Eq-2
Fnd 735.9 75.02 5.575 0.500 1.375 4102.6 368.0 1011.9

Sum 1069.5 109.02 5945.8 826.7 1428.9


x' 5.559 m
y' 0.773 m
z' 1.336 m

9.2 Design Parameters

Total Weight of Foundation (inc equipment) W 1069.5 kN


Mass of the foundation m 109.0 kN-sec²/m
Operating Speed fm (Assumed) 1200 rpm
Circular frequency wm 125.7 /sec

Vertical Excitaion Force Py 0.0 kN


Moment arm in x-dir 0.00 m Moment arm in z-dir 0.00 m

Horizontal Excitaion Forces Px 4.50 kN


Moment arm in y-dir 0.60 m Pz 3.00 kN

Moment due to exciting forces Mz 3.72 kN-m


Moment due to exciting forces Mx 2.48 kN-m
S = y' + h' 20.27 m
Fatigue Factor ε (Assumed) 3

9.3 Mass Moment of Inertia


xoi yoi zoi φx φox φz φoz
m m m kN-m-sec² kN-m-sec² kN-m-sec² kN-m-sec²
Eq-1 0.034 0.602 0.086 12.6 13989 12.4 13989
Eq-2
Fnd 0.016 0.273 0.039 59.2 30890 789.0 31620

Sum 71.8 44879 801.4 45608

Mass Moment of Inertia about axis passing through the centroid of base area
φx 71.8 kN-m-sec² φz 801.4 kN-m-sec²

Mass Moment of Inertia about the parallel axis through the base
φox = φx + mS² 44879 kN-m-sec² φoz = φz + mS² 45608 kN-m-sec²

9.4 Mass Ratio


αx = φx / φox 0.002 αz = φz / φoz 0.018

9.5 Stiffness
9.5.1 Vertical Stiffness
Coefficient of Elastic Resistance Cp (Assumed) 500 t/m^3
Ky = n α Cp As α 1.00
Ky 2163495 kN/m
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 17+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

9.5.2 Horizontal Stiffness


E 22000000 kN/m²
Kx = n x 12 E Ix / h^3
h = Hp/4 (Assumed) 9.75 m Ix (pile) 0.006 m^4
Kx = Kz 10872 kN/m
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 18+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

9.5.3 Rotational Stiffness


Izz 2.34 m² Ixx 93.12 m²
Kox = Izz Ky 5070693 kN-m Koz = Ixx Ky ### kN-m

9.6 Limiting Frequencies


w²ox = (Kox - W S) / φ 112.5 /sec² w²oz = (Koz - W S) / φo 4416.9 /sec²
w²z = Kz / m 99.7 /sec² w²x = Kx / m 99.7 /sec²

9.7 Coupled Natural Frequencies


Z-Dir X-Dir
-(w²ox + w²z) / αx -132641 /sec^4 -(w²oz + w²x) / αz -257047 /sec^4
(w²ox w²z) / αx 7.0.E+06 /sec^4 (w²oz w²x) / αz 2.5.E+07 /sec^4

w²n1 132588 /sec² w²n1 256949 /sec²


w²n2 53 /sec² w²n2 98 /sec²
wn1 364.1 /sec wn1 506.9 /sec
wn2 7.3 /sec wn2 9.9 /sec
f1 57.95 cps f1 80.68 cps
f2 1.16 cps f2 1.57 cps

9.8 AMPLITUDES
9.8.1 Vertical Amplitude
Vertical natural frequency wy = √ Ky / m 140.9 /sec
fn 1345 rpm > fm
ay = Py / m (w²y - w²m) 0.000 mm
< 0.04 OK !
9.8.2 Horizontal Amplitude
f(w²m) = mφz (w²n1 - w²m) (w²n2 - w²m) -3.31E+14 kN²
ax = [(Koz - W S + Kx S² - φz w²m) Px + (Kx S)Mz] / f(w²m) -0.00263 mm

f(w²m) = mφx (w²n1 - w²m) (w²n2 - w²m) -1.44E+13 kN²


az = [(Kox - W S + Kz S² - φx w²m) Pz + (Kz S)Mx] / f(w²m) -0.00179 mm

9.8.3 Rotational Amplitude


aoz = [Kx S Px + (Kx - m w²m) Mz] / f(w²m) 0.0000 mm

aox = [Kz S Pz + (Kz - m w²m) Mx] / f(w²m) 0.0002 mm

9.8.4 Net Amplitude at base level


a base = az - S aox -0.0068 mm a base = ax - S aoz -0.0030 mm

9.8.5 Net Amplitude on top of foundation


a top = az + (ht - S)aox -0.0066 mm a top = ax + (ht - S)aoz -0.0029 mm
< 0.2 OK ! < 0.2 OK !
9.9 CALCULATION OF FORCES
9.9.1 Dynamic Forces
Vd = ± ε Ky ay 0.00 kN
Hd = ± ε Kz (az - S aox -0.22 kN Hd = ± ε Kx (ax - S aoz) -0.10 kN
Md = ± ε Kox aox 3.79 kN-m Md = ± ε Koz aoz 9.82 kN-m

9.9.2 Inertial Forces

(Fm)y = ε m ay w²m 0.00 kN


CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 19+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

(Fm)z = ε m az w²m -9.22 kN (Fm)x = ε m ax w²m -13.60 kN


(Mm)x = ε φx aox w²m 0.85 kN-m (Mm)z = ε φz aoz w²m 0.62 kN-m
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 20+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

9.9.3 Induced Forces


Fy = ± ε Py 0.0 kN
Fz = ± ε Pz 9.0 kN Fx = ± ε Px 13.5 kN
Mx = ± ε Mx 7.4 kN-m Mz = ± ε Mz 11.2 kN-m

9.9.4 Net Dynamic Forces


Vertical Force 0.0 kN
Horizontal Force -0.4 kN Horizontal Force -0.2 kN
Moment 12.1 kN-m Moment 21.6 kN-m

10. STABILITY CHECK

10.1 Unfactored Loading Combinations


LCA1 Operation + Dynamic (x) Long term
LCA2 Operation - Dynamic (x) Long term
LCA3 Operation + Dynamic (z) Long term
LCA4 Operation - Dynamic (z) Long term
LCB1 Operation + 0.71 Seismic + Dynamic (x) Short term
LCB2 Operation + 0.71 Seismic - Dynamic (x) Short term
LCB3 Operation + 0.71 Seismic + Dynamic (z) Short term
LCB4 Operation + 0.71 Seismic - Dynamic (z) Short term
LCC Empty Short term

10.2 Unfactored Load at Bottom of Footing


N H M H x Hf Mo Zp
kN kN kN-m kN-m kN-m m
LCA1 1136.2 -0.2 21.6 -0.2 21.4 93.1
LCA2 1136.2 0.2 -21.6 0.2 -21.4 93.1
LCA3 1136.2 -0.4 12.1 -0.4 11.6 2.34
LCA4 1136.2 0.4 -12.1 0.4 -11.6 2.34
LCB1 1136.2 426.2 314.8 426.2 740.9 93.1
LCB2 1136.2 426.5 271.6 426.5 698.1 93.1
LCB3 1136.2 425.9 305.2 425.9 731.1 2.34
LCB4 1136.2 426.8 281.1 426.8 707.9 2.34
LCC 1069.5 0.0 0.0 0.0 0.0 93.1

10.3 Check Shear Force on Each Pile


H / Pile Shear Capacity of
kN Pile (kN)
LCA1 0.0 < 80 OK !
LCA2 0.0 < 80 OK !
LCA3 -0.1 < 80 OK !
LCA4 0.1 < 80 OK !
LCB1 71.0 < 80 OK !
LCB2 71.1 < 80 OK !
LCB3 71.0 < 80 OK !
LCB4 71.1 < 80 OK !
LCC 0.0 < 80 OK !
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 21+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

10.4 Check Compression Force on Each Pile


Max Load on Pile Pile Capacity in
+Rp (kN) = N/n + Mo/Zpx Compression (kN)
LCA1 189.6 < 1100 OK !
LCA2 189.1 < 1100 OK !
LCA3 194.3 < 1100 OK !
LCA4 184.4 < 1100 OK !
LCB1 197.3 < 1100 OK !
LCB2 196.9 < 1100 OK !
LCB3 501.3 < 1100 OK !
LCB4 491.4 < 1100 OK !
LCC 178.3 < 1100 OK !

10.5 Check Tension Force on Each Pile


Min Load on Pile Pile Capacity in
-Rp (kN) = N/n - Mo/Zpx Tension (kN)
LCA1 189.1 > -200 OK !
LCA2 189.6 > -200 OK !
LCA3 184.4 > -200 OK !
LCA4 194.3 > -200 OK !
LCB1 181.4 > -200 OK !
LCB2 181.9 > -200 OK !
LCB3 -122.6 > -200 OK !
LCB4 -112.7 > -200 OK !
LCC 178.3 > -200 OK !

11. DESIGN OF REINFORCEMENT

11.1 Factored Loading Combinations

LCA 0.9 Empty


LCB 1.4 Operation
LCC1 1.2 Operation + 1.6 Dynamic (x)
LCC2 1.2 Operation - -1.6 Dynamic (x)
LCC3 1.2 Operation + 1.6 Dynamic (z)
LCC4 1.2 Operation - -1.6 Dynamic (z)
LCD1 1.32 Operation + 1.1 Seismic + 1.76 Dynamic (x)
LCD2 1.32 Operation + 1.1 Seismic - -1.76 Dynamic (x)
LCD3 1.32 Operation + 1.1 Seismic + 1.76 Dynamic (z)
LCD4 1.32 Operation + 1.1 Seismic - -1.76 Dynamic (z)

11.2 Factored Load at Bottom of Footing

L/C N (KN) H (KN) M (KN-m) Hxh1(kN-m) Mo (KN-m) Zp (m)


LCA 962.6 0.0 0.0 0.0 0.0 93.1
LCB 1590.7 0.0 0.0 0.0 0.0 93.1
LCC1 1363.5 -0.3 34.6 -0.3 34.3 93.1
LCC2 1363.5 0.3 -34.6 0.3 -34.3 93.1
LCC3 1363.5 -0.7 19.3 -0.7 18.6 2.34
LCC4 1363.5 0.7 -19.3 0.7 -18.6 2.34
LCD1 1499.8 660.2 492.2 660.2 1152.4 93.1
LCD2 1499.8 660.9 416.2 660.9 1077.1 93.1
LCD3 1499.8 659.8 475.4 659.8 1135.2 2.34
LCD4 1499.8 661.3 432.9 661.3 1094.3 2.34
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 22+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

X-Direction
Max Min Max Min Max Min
L/C Rp (KN) Rp (KN) R (x1) (KN) R (x1) (KN) R (x2) (KN) R (x2) (KN)
LCA 160.4 160.4 0.0 0.0 0.0 0.0
LCB 265.1 265.1 0.0 0.0 0.0 0.0
LCC1 227.6 226.9 0.0 0.0 0.0 0.0
LCC2 226.9 227.6 0.0 0.0 0.0 0.0
LCC3 235.2 219.3 0.0 0.0 0.0 0.0
LCC4 219.3 235.2 0.0 0.0 0.0 0.0
LCD1 262.3 237.6 0.0 0.0 0.0 0.0
LCD2 261.5 238.4 0.0 0.0 0.0 0.0
LCD3 734.3 -234.4 0.0 0.0 0.0 0.0
LCD4 716.9 -216.9 0.0 0.0 0.0 0.0

Z-Direction
Max Min Max Min Max Min
L/C Rp (KN) Rp (KN) R (z1) (KN) R (z1) (KN) R (z2) (KN) R (z2) (KN)
LCA 160.4 160.4 0.0 0.0 0.0 0.0
LCB 265.1 265.1 0.0 0.0 0.0 0.0
LCC1 227.6 226.9 0.0 0.0 0.0 0.0
LCC2 226.9 227.6 0.0 0.0 0.0 0.0
LCC3 235.2 219.3 0.0 0.0 0.0 0.0
LCC4 219.3 235.2 0.0 0.0 0.0 0.0
LCD1 262.3 237.6 0.0 0.0 0.0 0.0
LCD2 261.5 238.4 0.0 0.0 0.0 0.0
LCD3 734.3 -234.4 0.0 0.0 0.0 0.0
LCD4 716.9 -216.9 0.0 0.0 0.0 0.0

11.3 Bending Moment for Rebar Design

Rp R(z1) Rp
max max min

R(z1)
min
We should check the moment in shorter direction
Bottom Top
L/C Rd (KN/m²) Mf (KN-m) Mu (KN-m) Mu (KN-m)
LCA 21.6 27.2 -0.2 -0.2
LCB 33.6 42.4 2.2 2.2
LCC1 28.8 36.3 2.0 1.9
LCC2 28.8 36.3 1.9 2.0
LCC3 28.8 36.3 3.2 0.6
LCC4 28.8 36.3 0.6 3.2
LCD1 31.7 39.9 4.2 0.0
LCD2 31.7 39.9 4.1 0.2
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 23+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

LCD3 31.7 39.9 83.6 -79.3


LCD4 31.7 39.9 80.6 -76.4
Max/Min 83.6 -79.3
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 24+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

11.4 Footing Design

11.4.1 Clearance of Footing Re-bar


Clearance for the re-bar of footing bottom (cfb) 0.100 m
Clearance for the re-bar of footing top (cft) 0.075 m
Clearance for the re-bar of footing side 0.075 m

11.4.2 Minimum and Maximum Ratio of Reinforcement


pa = √(fc') / 4 fy 0.0035
pb = 1.4 / fy 0.0040
p1 = Max ( pa, pb ) 0.0040
p t & s = for temperature & shrinkage reinforcement 0.0020
used with gross area of footing
p max = 0.75 x 0.85 ß1 fc'/fy 600 / (600+ fy) 0.0235

Shorter Direction (Z-Direction)


11.4.3 Design of Bottom-bar
Max Mu (bottom) 83.6 kN-m
Effective Depth of Footing (d) 0.890 m
b 11.150 m
Bottom-bar size (db) 20 mm
Sectional area 314 mm²
Rn = Mu / (φ b d²) 0.117 N/mm²
Required p = 0.85 fc' / fy * (1 - √(1 - 2 Rn / 0.85 fc')) 0.0003
Calculated As 3333 mm²
Min As 4433 mm²
Max As 232881 mm²

number of re-bar 56
Bottom-bar pitch (S) 200 mm
Total area of Bottom-bar (As) 17593 mm² OK !

11.4.4 Design of Top-bar


Max Mu(top) 79.3 kN-m
Effective depth of Footing (d) 0.915 m
b 11.150 m
Top-bar 20 mm
Sectional area 314 mm²
Rn = Mu / (φ b d²) 0.105 N/mm²
Required p = 0.85 fc' / fy * (1 - √(1 - 2 Rn / 0.85 fc')) 0.0003
Calculated As 3077 mm²
Min As 4093 mm²
Max As 239423 mm²

number of re-bar 56
Top-bar pitch 200 mm
Total area of Top-bar (As) 17593 mm² OK !

Min As (by shrinkage and temperature reinforcement) 22300 mm² OK !


CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 25+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao

11.4.5 Longer Direction (X-Direction)


In longer direction just provide minimum steel for temperature & shrinkage

Effective depth of Footing (d) 0.895 m


b 2.750 m
Top-bar 20 mm
Sectional area 314 mm²

Required p = 0.0020
Required As 5500 mm²
Provide half on both top & bottom 2750 mm²

number of re-bar 14
Top-bar pitch 200 mm
Total area of Top-bar (As) 4398 mm² OK !

11.4.6 Rebar Arrangement for Footing Slab

X-Direction
Bottom 56 bars T 20 @ 200 mm
Top 56 bars T 20 @ 200 mm
Z-Direction
Bottom 14 bars T 20 @ 200 mm
Top 14 bars T 20 @ 200 mm

12. CHECK FOR SHEAR STRENGTH

12.1 Punching Shear (Two-way action)


Around Pile Perimeter
Vu Vertical Load due to Pile Reaction
Vu Pile Reaction Force - Soil weight and Footing selfweight over the pile
Nu 206.5 KN

bo 4681 mm
as (Column/Pedestal location coefficient) 20
b (Ratio of long side to short side of Column/Pedestal) 1.0

Vc = fc'0.5b0d/3 6803.2 KN
f Vc 5102.4 KN OK !