Skid With Piles (Dyn Analysis) 30-09
Skid With Piles (Dyn Analysis) 30-09
2. Input the vendor data in sections 1 to 5. If seismic & wind loads in section 5 are
not provided by vendor, Input these loads from section 20.
3. Input the soil report data (soil & pile parameters) in sections 6 to 8.
4. Input the specifications data (material strength & unit weights) in section 9 to 11.
7. Design Conditions & Seismic Load Calculations are provided in the A & B sections
respectively of this sheet
A. DESIGN CONDITIONS
According to UBC 97
Seismic Load = Fp = ap ca lp / Rp (1 + 3 hx / hr ) Wp
Since hx = hr
So Fp = 4 ap ca lp Wp / Rp
Thus
Fp = 600.5 kN
Overturning Moment =
Mot = Fp * H / 2 = 375.3 kN-m
Unfactored Loading Combination
A B C D E F G H I
Empty Operation Test Imposed Live Wind Seismic Thermal Uplift
LCA 1
LCB 1
LCC 1
LCD 1
LCE 1 0.71
LCF 1 0.71
LCG 1 0.71
LCH 1 0.71
LCI 1
LCJ
J K
Dyn-x Dyn-z L/Cs
0.9 Empty 0.9
1.4 Operation 1.4
1.6 1.2 Operation + 1.6 Dynamic (x) 1.2
-1.6 1.2 Operation - -1.6 Dynamic (x) 1.2
1.6 1.2 Operation + 1.6 Dynamic (z) 1.2
-1.6 1.2 Operation - -1.6 Dynamic (z) 1.2
1.76 1.32 Operation + 1.1 Seismic + 1.76 Dynamic (x) 1.32
-1.76 1.32 Operation + 1.1 Seismic - -1.76 Dynamic (x) 1.32
1.76 1.32 Operation + 1.1 Seismic + 1.76 Dynamic (z) 1.32
-1.76 1.32 Operation + 1.1 Seismic - -1.76 Dynamic (z) 1.32
r t&s =
r tmaxs =
0.0020
0.0235
Doc. No. 1013-XX-XX-XX-XXX PAGE: 1 of 12
X X-XX-2005 XXXXXX XX XX XX
Initial Dated Initial Dated Initial Dated
Rev Date Description
Prepared by Checked by Approved By
EL WASTANI PETROLEUM COMPANY CLIENT
REFERENCE
(WASCO)
CLIENT P.O Box 52 El Maadi
El Safa Office Tower, Block 42, Sector No. 6 EW-T-13-2005
Zahraa El-Maadi, Cairo, Egypt
PRESSON ENERFLEX ENERFLEX
2103-8th STREET NISKU, ALBERTA, PROJECT NO.
XX XX XX 9/8/2023 1013-XX-XX-XX-XXX Ao
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 2 of 12
PROJECT: EL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao
CONTENTS
1. GENERAL 3
3. MATERIAL SPECIFICATIONS 3
4. SOIL CONDITION 3
5. FOUNDATION DETAIL 3
SOIL REPORT
6. Soil Condition
Soil Bearing Capacity 30 kpa
φ 30 deg
Coefficient of Elastic Resist Cp 500 t/m^3
7. Pile Bearing Capacity
V (long) 1100 KN
V (short) 1100 KN
H 80 KN
Uplift 200 KN
8. Pile Dimensions
Dimension of Pile Dp 600 mm
Length of Pile Lp 39 m
SPECIFICATIONS
9. Material Strength
fy 350 MPa
fc' 24 MPa
10. Unit Weights
RCC 24.0 kn/cu-m
Soil 16.3 kn/cu-m
Steel 78.4 kn/cu-m
Water 9.81 kn/cu-m
11. Modulus of Elasticity
Concrete 22 kN/mm²
RCC 207 kN/mmⁿ
DESIGN PARAMETERS
12. Document Info
Document No.: 1013-XX-XX-XX-XXX
Rev Ao
13. Foundation Detail
Foundation Shape Rectangle
Padestal Shape None
Foundation Type Pile
14. Foundation Dimensions
Footing Size in X-Dir Lx 11150 mm
Footing Size in Z-Dir Lz 2750 mm
Thickness of Foundation h1 1000 mm
Projection of Skid h2 150 mm
15. Piles
No. of Piles in X Dir n1 3
No. of Piles in Z Dir n2 2
16. Pile Spacings
Pile to Edge Distance in X-Dir 1.25 Dp
Pile to Edge Distance in Z-Dir 1.25 Dp
17. Footing Rebar Covers
Clear Cover at bottom 100 mm
Clear Cover at top 75 mm
Clear Cover at side 75 mm
18. Rebar Sizes & Spacings
Bottom Rebar Bar size 20 max s 200 mm
Top Rebar Bar size 20 max s 200 mm
Long Direction Bar size 20 max s 200 mm
19. Factors
Fatigue factor ε 3
20. Recommended Loads & Moments
Seismic Force 600.5 kN
Seismic Moment 375.3 kN-m
Wind Force N/A kN
Wind Moment N/A kN-m
CHECKS
21. Pile Stability Check
Max H/pile 71.1 < 80 OK !
Max +Rp 501.3 < 1100 OK !
Max -Rp -122.6 > -200 OK !
22. Pile Spacing Check
Pile to Pile Distance in X-Dir 8.04 Dp OK !
Pile to Pile Distance in Z-Dir 2.08 Dp OK !
23. Footing Reinforcement Design
Bottom Rebar 56 bars @ 200 mm OK !
Top Rebar 56 bars @ 200 mm OK !
Long Direction 14 bars @ 200 mm OK !
24. Shear Check
Around Pile perimeter OK !
25. Dynamic Amplitude Check
Vertical Amplitude (ay) OK !
Horizontal Amplitude (ax) OK !
Horizontal Amplitude (az) OK !
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 13+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao
1. GENERAL
Service PROPANE COMPRESSOR SKID (A)
Document No.: 1013-XX-XX-XX-XXX
3. MATERIAL SPECIFICATIONS
3.1 Strength
Reinforcement bar yield strength 350 MPa
Concrete compressive strength at 28 days (Cylinder) 24 MPa
Anchor bolts : fy(bolt) 280 MPa
4. SOIL CONDITION
5. FOUNDATION DETAIL
5.2 Elevation
Top of Skid 0.15 m
Unit 0.00 m
Ground water level (dw) -1.50 m
11150 mm
2750 mm
We
###
EL +0 m
1000 mm
Wf
hw
GWL
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 15+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao
8.1 Dimensions
Footing Size in X-dir Wx 11150 mm
Footing Size in Z-dir Wz 2750 mm
Thickness of Foundation h1 1000 mm
Dimension of Pile Dp 600 mm
Length of Pile Hp 39 m
Height of GWL hw -0.65 m
Projection of Skid h2 150 mm
Depth of center of elasticity of base support h' 19.5 m
8.2 Area
Area of Footing Af 30.66 m²
Area of Pile Ap 0.28 m²
Surface Area of Pile As 73.51 m²
8.3 Weight
Weight of Footing 735.9 KN
Weight of 1 Pile 264.6 KN
Footing Weight per 1 m² 24.0 KN/m²
8.4 Piles
Total Piles 6
Piles in X-dir 3
Piles in Z-dir 2
Pile to edge distance in X-Dir 1.25 Dp 750 mm
Pile to edge distance in Z-Dir 1.25 Dp 750 mm
Pile to Pile distance in X-dir 8.04 Dp 4825 mm
Pile to Pile distance in Z-dir 2.08 Dp 1250 mm
Correction factor for pile group α 1.00
Mass Moment of Inertia about axis passing through the centroid of base area
φx 71.8 kN-m-sec² φz 801.4 kN-m-sec²
Mass Moment of Inertia about the parallel axis through the base
φox = φx + mS² 44879 kN-m-sec² φoz = φz + mS² 45608 kN-m-sec²
9.5 Stiffness
9.5.1 Vertical Stiffness
Coefficient of Elastic Resistance Cp (Assumed) 500 t/m^3
Ky = n α Cp As α 1.00
Ky 2163495 kN/m
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 17+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao
9.8 AMPLITUDES
9.8.1 Vertical Amplitude
Vertical natural frequency wy = √ Ky / m 140.9 /sec
fn 1345 rpm > fm
ay = Py / m (w²y - w²m) 0.000 mm
< 0.04 OK !
9.8.2 Horizontal Amplitude
f(w²m) = mφz (w²n1 - w²m) (w²n2 - w²m) -3.31E+14 kN²
ax = [(Koz - W S + Kx S² - φz w²m) Px + (Kx S)Mz] / f(w²m) -0.00263 mm
X-Direction
Max Min Max Min Max Min
L/C Rp (KN) Rp (KN) R (x1) (KN) R (x1) (KN) R (x2) (KN) R (x2) (KN)
LCA 160.4 160.4 0.0 0.0 0.0 0.0
LCB 265.1 265.1 0.0 0.0 0.0 0.0
LCC1 227.6 226.9 0.0 0.0 0.0 0.0
LCC2 226.9 227.6 0.0 0.0 0.0 0.0
LCC3 235.2 219.3 0.0 0.0 0.0 0.0
LCC4 219.3 235.2 0.0 0.0 0.0 0.0
LCD1 262.3 237.6 0.0 0.0 0.0 0.0
LCD2 261.5 238.4 0.0 0.0 0.0 0.0
LCD3 734.3 -234.4 0.0 0.0 0.0 0.0
LCD4 716.9 -216.9 0.0 0.0 0.0 0.0
Z-Direction
Max Min Max Min Max Min
L/C Rp (KN) Rp (KN) R (z1) (KN) R (z1) (KN) R (z2) (KN) R (z2) (KN)
LCA 160.4 160.4 0.0 0.0 0.0 0.0
LCB 265.1 265.1 0.0 0.0 0.0 0.0
LCC1 227.6 226.9 0.0 0.0 0.0 0.0
LCC2 226.9 227.6 0.0 0.0 0.0 0.0
LCC3 235.2 219.3 0.0 0.0 0.0 0.0
LCC4 219.3 235.2 0.0 0.0 0.0 0.0
LCD1 262.3 237.6 0.0 0.0 0.0 0.0
LCD2 261.5 238.4 0.0 0.0 0.0 0.0
LCD3 734.3 -234.4 0.0 0.0 0.0 0.0
LCD4 716.9 -216.9 0.0 0.0 0.0 0.0
Rp R(z1) Rp
max max min
R(z1)
min
We should check the moment in shorter direction
Bottom Top
L/C Rd (KN/m²) Mf (KN-m) Mu (KN-m) Mu (KN-m)
LCA 21.6 27.2 -0.2 -0.2
LCB 33.6 42.4 2.2 2.2
LCC1 28.8 36.3 2.0 1.9
LCC2 28.8 36.3 1.9 2.0
LCC3 28.8 36.3 3.2 0.6
LCC4 28.8 36.3 0.6 3.2
LCD1 31.7 39.9 4.2 0.0
LCD2 31.7 39.9 4.1 0.2
CLIENT: EL WASTANI PETROLEUM COMPANY (WASCO) PAGE: 23+2 of 25+2
PROJECTEL WASTANI GAS FIELD DEVELOPMENT, PHASE-III DOC. NO: 1013-XX-XX-XX-XXX
TITLE: FOUNDATION DESIGN FOR PROPANE COMPRESSOR SKID (A) REV : Ao
number of re-bar 56
Bottom-bar pitch (S) 200 mm
Total area of Bottom-bar (As) 17593 mm² OK !
number of re-bar 56
Top-bar pitch 200 mm
Total area of Top-bar (As) 17593 mm² OK !
Required p = 0.0020
Required As 5500 mm²
Provide half on both top & bottom 2750 mm²
number of re-bar 14
Top-bar pitch 200 mm
Total area of Top-bar (As) 4398 mm² OK !
X-Direction
Bottom 56 bars T 20 @ 200 mm
Top 56 bars T 20 @ 200 mm
Z-Direction
Bottom 14 bars T 20 @ 200 mm
Top 14 bars T 20 @ 200 mm
bo 4681 mm
as (Column/Pedestal location coefficient) 20
b (Ratio of long side to short side of Column/Pedestal) 1.0
Vc = fc'0.5b0d/3 6803.2 KN
f Vc 5102.4 KN OK !