100% found this document useful (2 votes)
490 views

Ch-4 Furrow Excercise

This document provides an example calculation to determine: (1) the desired time to cut-off irrigation (Tco = 1143 minutes), (2) the equivalent depths of surface runoff (dro = 120mm) and deep percolation (ddp = 5mm), and (3) the distribution pattern efficiency (ed = 37.5%) for a maize field with given intake family, furrow length, slope, roughness, net irrigation depth, inflow rate, and crop spacing. A series of equations are used to calculate the advance time, net infiltration time, average infiltration, and other variables needed to solve for the requested parameters.

Uploaded by

Kuba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
490 views

Ch-4 Furrow Excercise

This document provides an example calculation to determine: (1) the desired time to cut-off irrigation (Tco = 1143 minutes), (2) the equivalent depths of surface runoff (dro = 120mm) and deep percolation (ddp = 5mm), and (3) the distribution pattern efficiency (ed = 37.5%) for a maize field with given intake family, furrow length, slope, roughness, net irrigation depth, inflow rate, and crop spacing. A series of equations are used to calculate the advance time, net infiltration time, average infiltration, and other variables needed to solve for the requested parameters.

Uploaded by

Kuba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PLANNING AND DESIGN OF SURFACE IRRIGATION SYSTEMS

Example: Given the following information,


Intake family, IF = 0.3
Furrow length, L = 275m
Furrow slope, s = 0.004 m/m
Roughness coefficient, n = 0.04
Net irrigation depth, in = 75mm
Inflow rate, Q = 0.6 l/s
Crop : Maize
Spacing, W : 0.75m
Compute
A. the desired time to cut–off, Tco ,
B. the equivalent depths of surface run off and deep percolation, dro, ddp,
C. the distribution pattern efficiency.
Soln:

For IF = 0.3 , a = 0.9246 , b= 0.720 , c= 7.0 , f = 7.61 g =1.904*10-4

i. Advance time Tt

x  gx  275m  (1.904 *10  4 ) * 275 


Tt = exp  0.5  = exp    144 min
f  QS  7.61  0. 60. 004 0.5

= 36.1367*exp(0.05236/0.03795) = 36.1367*3.9737=143.6=144min

ii. Adjusted wetted perimeter , P


0.425
 Qn 
0.425
 0.6 * 0.04 
P = 0.265  0.5   0.227 = 0.265 
0.5 
 0.227  0.40m
S   0. 004  

iii. Net Infiltration time , Tn


1 1
  w  b
  0.75m   0.720
 i n    C   75mm 0.4m   7.0 
 p  
Tn =   =    999 min
 a   0 .925 
   
   
= (133.625/0.925)^(1/0.2) = 144.459^(1/0.72)= 999.19=999min

A. Design cut-off time , Tco


Tco = Tt + Tn = 144 + 999 = 1143 min. (19.05hr)
A. Gross application depth , Ig

Ig =
60Q Tco 
=

60 0.6 l
s

1143 min 
 199.51mm  200mm
WL 0.75m * 275m

B. Average infiltration Time , TO-L


0.0929 gx
To-L = Tco - 2
  1exp( )  1 where  
 0.305  QS 0.5
f ( x) 
 x 
gx 0.0001904 * 275
 0.5
  0.05236 / 0.03795  1.37971
QS = 0.6 * 0.004 0.5

0.0929 0.0929
 2
  1exp( )  1  2
* 1.38  1 exp(1.38)  1
 0.305   0.305 *1.38 
f ( x)  7.61 * 275
 x   275 
0.0929
 * 0.38 * 3.9749  1  18.959 * 2.5105  47.597  47.6 min
0.0049

Substituting for all the variables

 The average infiltration opportunity time over distance x down the furrow

To-L = 1143 – 47.6 = 1095.4 app = 1095min.

C. - Average infiltration , iavg


b
iavg = ( aTO  L  c)
p
W

= 0.92461095  7.0
0.72 0.40
0.75

 79.82  80mm

 Hence the average infiltration depth along the furrow is 80mm

D. Surface runoff depth , dro


dro = ig – iavg = 200mm – 80mm = 120mm
 Hence the amount of water lost from the furrow is 120mm

E. Deep percolation depth , ddp


ddp = iavg – in = 80mm-75mm = 5mm of water drained below crop root zone

F. Distribution pattern efficiency , ed,


i 75mm
ed = n * 100 = * 100%  37.5%
ig 200mm