Software Engineering MCQs [set-4]
Chapter: Requirement Analysis
76. ----------- the degree to which the software assists in enabling new users to apply
the system.
A. Training
B. Traceability
C. Simplicity
D. Security
Answer: A
m
77. --------- The degree to which the source code provides meaningful
o
documentation.
. c
A. Self-documentation
te
B. Training
a
C. Traceability
q M
D. Simplicity
c
Answer: A
M
78. ---------- The damage that occurs when the program encounters an error.
A. Error tolerance
B. Training
C. Traceability
D. simplicity
Answer: A
79. -------------- The functional independence of program componets.
A. Error tolerance
B. Training
C. Modularity
D. Simplicity
Answer: C
80. ---------- The degree to which full implementation of required function has been
achieved.
A. Error tolerance
B. Training
C. Completeness
D. Simplicity
Answer: C
81. Pick up the odd one out of the following process m
A. Component assembly model
B. Prototyping Model
C. Spiral model
D. Waterfall Model
Answer: D
82. The Linear Sequential or Classic Life Cycle is also ca
A. Waterfall Model
B. Incremental Model
C. Spiral model
D. Prototyping Model
Answer: A
83. The waterfall model of the software process considers each process activity as a
_______ pha
A. separate
B. discrete
C. Both a and b options
D. None of the above
Answer: C
84. In Boehm’s spiral model, each loop in the spiral represents _____ of the softwa
A. phase
B. design
C. documentation
D. none of the above
Answer: A
View all MCQ's at McqMate.com
85. In incremental process model, some high end function are desig
A. Construction framework
B. Modeling framework
C. Planning framework
D. Deployment framework
Answer: B
86. RAD stands f
A. Relative Application Development
B. Rapid Application Development
C. Rapid Application Document
D. None of the mentioned
Answer: B
87. RAD Model ha
A. 2 phases
B. 3 phase
C. 5 phases
D. 6 phases
Answer: C
88. SDLC stands f
A. Software Development Life Cycle
B. System Development Life cycle
C. Software Design Life Cycle
D. System Design Life Cycle
Answer: A
89. Which one of the following is not an Evolutionary Process Model?
A. WINWIN Spiral Model
B. Incremental Model
C. Concurrent Development Model
D. All of the mentioned
Answer: D
90. The Incremental Model is a result of combination of elements of which two
models?
View all MCQ's at McqMate.com
A. Build & FIX Model & Waterfall Model
B. Linear Model & RAD Model
C. Linear Model & Prototyping Model
D. Waterfall Model & RAD Model
Answer: C
Chapter: Introduction to Software Engineering
91. What is the major advantage of using Incremental Model?
A. Customer can respond to each increment
B. Easier to test and debug
C. It is used when there is a need to get a product to the market early
D. Easier to test and debug & It is used when there is a need to get a product to the market early
Answer: A
92. The spiral model was originally proposed by
A. IBM
B. Barry Boehm
C. Pressman
D. Royce
Answer: B
93. The spiral model has two dimensions namely _____________ and ____________
A. diagonal, angular
B. radial, perpendicular
C. radial, angular
D. diagonal, perpendicular
Answer: C
94. How is WINWIN Spiral Model different from Spiral Model?
A. It defines tasks required to define resources, timelines, and other project related information
B. It defines a set of negotiation activities at the beginning of each pass around the spiral
C. It defines tasks required to assess both technical and management risks
D. It defines tasks required to construct, test, install, and provide user support
Answer: B
95. Identify the disadvantage of Spiral Model.
A. Doesn’t work well for smaller projects
View all MCQ's at McqMate.com
B. High amount of risk analysis
C. Strong approval and documentation control
D. Additional Functionality can be added at a later date
Answer: A
96. Spiral Model has user involvement in all its phases.
A. True
B. False
C. all
D. none
Answer: B
97. How is Incremental Model different from Spiral Model?
A. Progress can be measured for Incremental Model
B. Changing requirements can be accommodated in Incremental Model
C. Users can see the system early in Incremental Model
D. All of the mentioned
Answer: A
98. If you were to create client/server applications, which model would you go for?
A. WINWIN Spiral Model
B. Spiral Model
C. Concurrent Model
D. Incremental Model
Answer: C
99. A company is developing an advance version of their current software available
in the market, what model approach would they prefer ?
A. RAD
B. Iterative Enhancement
C. Both RAD & Iterative Enhancement
D. Spiral
Answer: C
100. One can choose Waterfall Model if the project development schedule is tight.
A. True
B. False
C. all
View all MCQ's at McqMate.com
D. none
Answer: B