Lighting
Lighting
PB
S2
S1
S1 S1
S2
S2
3000
3000
7000
4000
6000
LIVING AREA
BEDROOM 1
DINING AREA
KITCHEN
BEDROOM 2
SYMBOLS: ELECTRICAL GENERAL NO
T&B
3000.00
BEDROOM 1 BEDROOM 2
DINING AREA
3000.00 a
LIVING AREA
PORCH
KITCHEN AREA
FLOOR PLAN
PRC NO._____________
SIMPLENG INHINYERO VALIDITY:____________ PROPOSED 1 STOREY BUILDING JUAN DELA CRUZ
PTR NO.______________ 1
Civil Engineer/Architect
Issued on/at:___________
ADDRESS: XXXXXXXXXXXXX TIN:__________________ LOCATION: XXXXXXXXXXXXX ADDRESS: XXXXXXXXXXXXX
REAR VIEW ELEV. PLAN
SCALE: 1:75
PRC NO._____________
SIMPLENG INHINYERO VALIDITY:____________ PROPOSED 1 STOREY BUILDING JUAN DELA CRUZ
PTR NO.______________ 2
Civil Engineer/Architect
Issued on/at:___________
ADDRESS: XXXXXXXXXXXXX TIN:__________________ LOCATION: XXXXXXXXXXXXX ADDRESS: XXXXXXXXXXXXX
e
f g
Sf Sg
Sde
d
Sc
Sab b c
a
C1
PB PB C2
FLOOR PLAN
POWER LAY-OUT
SCALE: 1:75 SCALE: 1:75
BRANCH CKT. NO. LOAD DESCRIPTION NO. OF LOADS VA VOLTS AMPERES CB RATING / AT SIZE OF WIRE & CONDUIT
1 LIGHTING OUTLET 7 700 230 3.04 15 2.0 MM² THHN WIRE IN 13MM ø UPVC PIPE
2 CONVE. OUTLET 7 2520 230 10.96 20 3.5 MM² THHN WIRE IN 13MM ø UPVC PIPE
TOTAL 3220 230 14.00 30 2-8.0 MM² THHN WIRE IN 20MM ø UPVC PIPE
COMPUTATIONS:
TOTAL CONNECTED LOADS IL = 3220/230 = 14 AMPS
80% ACTUAL LOAD: DEMAND FACTOR = 14 x 80% = 11.02 AMPS
SIZE OF MAIN WIRE & CONDUIT:
THEREFORE USE 2 - 8.0 mm2 TW WIRE FOR THE MAIN-FEEDER AND
30 A FOR THE MAIN BREAKER ON 20MM ø UPVC PIPE.
PRC NO._____________
SIMPLENG INHINYERO VALIDITY:____________ PROPOSED 1 STOREY BUILDING JUAN DELA CRUZ
PTR NO.______________ 2
Civil Engineer/Architect
Issued on/at:___________
ADDRESS: XXXXXXXXXXXXX TIN:__________________ LOCATION: XXXXXXXXXXXXX ADDRESS: XXXXXXXXXXXXX
MAIN & NEUTRAL FEEDER
2 - 8 mm2 TW WIRE
ON 20MM ø UPVC PIPE SYMBOLS: ELECTRICAL GENERAL NOTES:
CEILING LIGHT 1. ALL ELECTRICAL INSTALLATIONS HEREIN AND OTHER RELATED WORKS TO BE DONE IN
THIS BUILDING SHALL BE IN ACCORDANCE WITH THE PROVISIONS AND STANDARDS OF
CONVENIENCE OUTLET THE FOLLOWING:
1.1 THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE.
OUTLET FOR A.C.U 1.2 REPUBLIC ACT 7926 OTHERWISE KNOWN AS THE NEW ELECTRICAL
MCB ENGINEERING LAW
SERVICE ENTRANCE 30 AMP 15 AMP M WATT HOUR-METER 1.3 THE NATIONAL BUILDING CODE OF THE PHILIPPINES.
1 MPB
1.4 FIRE CODE OF THE PHILIPPINES.
MAIN PANEL BOARD - MPB 1.5 EXISTING RULES AND REGULATION OF THE LOCAL POWER UTILITY COMPANY.
PRIVATE PB
PANEL BOARD - PB 1.6 THE EXISTING CITY/MUNICIPAL ORDINANCES AND,
20 AMP 1.7 THE BUREAU OF LABOR STANDARDS.
CONC. POLE FLUSH WALL SWITCH 2. ALL ELECTRICAL INSTALLATIONS HEREIN SHALL BE DONE UNDER THE DIRECT
2 3 SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER. HE SHALL BE RESPONSIBLE
20MM ø UPVC PIPE CIRCUIT BRANCH
IN THE INTERPRETATION OF THE PLANS AND SPECIFICATION AND THE REQUIRED
CIRCUIT STANDARDS OF THE ELECTRICAL CODE.
HOMERUN 3. MATERIALS AND EQUIPMENT TO BE USED SHALL HAVE INSPECTED COMMODITY
KILOWATTHOUR CLEARANCE (ICC) LABEL FOR FOREIGN MADE PRODUCTS AND P.S. MARK FOR LOCAL IN
METER NATURE OF THE BUREAU OF PRODUCT STANDARD (BPS).
GROUND 4. PROVIDE GROUNDING WIRE TO ALL OUTLETS AND LIGHTING CIRCUITS, ALL NON CURRENT
LUGS CARRYING METAL PARTS SHALL BE GROUNDED AND BOBDED INCLUDING FENCE AND
LIGHTING CIRCUIT LINE GATE.
5. ALL PANEL BOARDS, MAIN DISTRIBUTION PANELS, ETC., SHALL HAVE GROUNDING BUS FOR
POWER CIRCUIT LINE BRANCH CIRCUITS AND SUB FEEDER GROUNDING SYSTEM SHALL BE BONDED TO THE
Sa 1 Gang Switch NEAREST METAL WATER PIPE.
WATT-HOUT METER Sab 2 Gang Switch
6. MOUNTING HEIGHT FOR ALL WIRING DEVICES AND PANEL BOARDS SHALL BE.
6.1 LIGHTING OUTLETS 1.40M ABOVE FLOOR FINISH.
Sabc 3 Gang Switch 6.2 CONVENIENCE OUTLETS 0.30M ABOVE FLOOR FINISH.
6.3 TELEPHONE OUTLETS 0.30M ABOVE FLOOR FINISH.
6.4 PANEL BOARDS & CABINETS 1.40M ABOVE FLOOR FINISH.
7. WIRING METHODS SHALL BE AS FOLLOWS:
7.1 SERVICE ENTRANCE RESISTS INTERMEDIATE METALLIC
CONDUIT (IMC).
7.2 LIGHTING AND POWER SYSTEM POLYVINYL CHLORIDE (PVC).
7.3 TELEPHONE OUTLETS POLYVINYL CHLORIDE (PVC).
7.4 ALL VIBRATING EQUIPMENTS LIQUID TIGHT FLEXIBLE METAL
CONDUIT.
8. NO CHANGES OR MODIFICATION SHALL BE MADE WITHOUT THE DESIGNERS WRITTEN
CONSENT.
9. ALL WORKS SHALL BE EXECUTED IN A WORKMANSHIP MANNER AND SHALL PREVENT A
SINGLE LINE DIAGRAM NEAT AND ORDERLY ACCEPTANCE. ALL WIRING SHALL BE CONCEALED IN THE LEAST
POSSIBLE WAY.
SCALE: NTS
PRC NO._____________
SIMPLENG INHINYERO VALIDITY:____________ PROPOSED 1 STOREY BUILDING JUAN DELA CRUZ
PTR NO.______________ 2
Civil Engineer/Architect
Issued on/at:___________
ADDRESS: XXXXXXXXXXXXX TIN:__________________ LOCATION: XXXXXXXXXXXXX ADDRESS: XXXXXXXXXXXXX