D CR202 Os JV CWD ZZ S TMP-DR Sec 2509 09.06.2023

This document is an endorsement from SP PowerGrid for a new substation with an approved load of 8471kVA at 22kV. It provides the topological survey boundary details including coordinates and distances between demarcation points. The endorsement states that the electric substation site layout and miscellaneous details are acceptable subject to the approval of the building authority.

Uploaded by

Bolsen cp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1 page

D CR202 Os JV CWD ZZ S TMP-DR Sec 2509 09.06.2023

This document is an endorsement from SP PowerGrid for a new substation with an approved load of 8471kVA at 22kV. It provides the topological survey boundary details including coordinates and distances between demarcation points. The endorsement states that the electric substation site layout and miscellaneous details are acceptable subject to the approval of the building authority.

Uploaded by

Bolsen cp
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SP PowerGrid Endorsement

MWP No : 1210 054 114

F
NEW SP
O
TOPOGRAPHICAL SURVEY BOUNDARY
SPPG No :

R S
AVENUE
APPROVED LOAD: 8471kVA @22kV

U BSTATIO
PG LINE
N
SP PowerGrid Ltd
O

DP1 DP2 N=35448.5102 N=35461.2452


ENG NE

E=24126.3915 DP3
Distribution Planning Section

DP
E=24081.8895

4
Electric Substation Site/ Layout/ Misc Details is /are acceptable
N=35474.8823
subject to approval of building Authority
D=22.12m D=46.29m D=49.82m
N=35441.9574 D=28.82m E=24033.9717 Type of Substation:22kV(Temp S/S)
E=24149.2888

100
50
00 CR202 ACCESS ROAD

Date:_______________________ _____________________________
Goh Li Qing
Subject to revision 18 months f. Dy Director (DPL)

15
after this date SP PowerGrid Ltd
As agent for and on behalf of

0
SP PowerAssets Ltd
TOPOGRAPHICAL SURVEY BOUNDARY

D=
49.
85m
Y
DAR

Y
N

AR
OU

D
B

N
E

U
XI

VE

BO
S

UR

Y
T

VE
S
IN

R
G

PH

CA

U S
CO

HI

L
AS

CA
N

A
N=35520.5556

I
E

H
OG
EA

AP
E=24014.0059

1B

P
L

R
TO
10

ED

OG
25

P
/

AC

TO
C

JP
PH
/ SE

5
R

A
/D

SS
P

SE
/S /TM

1A
ZZ
W D/
JV/C
S
/O
02
LEAD-IN PIPE ROUTE LAYOUT PLAN
C R2
SCALE 1:300 D/

ENG NEO FAIRWAY


AVENUE DRIVE SURFACE DRAW PIT C/W REINFORCED
22120 CONCRETE COVER
(SEE DETAIL-STD 2210-211)
15796 28820
SURFACE DRAW PIT C/W REINFORCED
15982
CONCRETE COVER
+20.162m SHD +20.148m SHD +20.116m SHD PROPOSED ROAD
+19.961m SHD (SEE DETAIL-STD 2210-211)
DP 1 +19.668m SHD

MATCH 1-1
PROP 1.6m (w) EXISTING 0.3m (w)
1500

BOX CULVERT OPEN-DRAIN +18.861m SHD


+18.574m SHD +18.518m SHD
IL : 18.912 IL : 18.912 DP 2
1000

1350

+17.418m SHD Rev. Description Date


13°

2 ROWS OF 4 NOS Ø150MM UPVC CABLE


PIPE BEND SUBJECTED TO LEAD-IN PIPES ENCASED IN CONCRETE


+17.562m SHD
PASSING OF MANDREL TEST EXISTING ROAD FOR ACCEPTANCE
Qualified Person Endorsement :

LTA Endorsement :
46290

SURFACE DRAW PIT C/W REINFORCED


CONCRETE COVER
+17.387m SHD (SEE DETAIL-STD 2210-211)
MATCH 1-1

MATCH 2-2
PROPOSED ROAD
49820

+16.201m SHD
+15.773m SHD
DP 3 Owner :

+15.014m SHD
+14.673m SHD
+14.091m SHD
2 ROWS OF 4 NOS Ø150MM UPVC CABLE
EXISTING ROAD Main Contractor :
LEAD-IN PIPES ENCASED IN CONCRETE
OBAYASHI - STECS CR202


JOINT - VENTURE
PIPE BEND SUBJECTED TO OBAYASHI
PASSING OF MANDREL TEST
Consultant :

AECOM Singapore Pte. Ltd.

Project Title :
49850
CONTRACT CR202
SURFACE DRAW PIT C/W REINFORCED DESIGN AND CONSTRUCTION OF BORED
CONCRETE COVER SURFACE DRAW PIT C/W REINFORCED
EXISTING ROAD CONCRETE COVER TUNNEL BETWEEN FAIRWAYS DRIVE AND SIN
MATCH 2-2

MATCH 3-3
(SEE DETAIL-STD 2210-211)
PROPOSED ROAD (SEE DETAIL-STD 2210-211) MING WALK AND ASSOCIATED WORKS.

+13.953m SHD +13.934m SHD Drawing Title :


DP 4 +13.825m SHD +13.716m SHD +13.683m SHD
JP 5 22kV TEMPORARY SUBSTATION
+12.853m SHD LEAD-IN PIPE ROUTE LAYOUT PLAN
+12.583m SHD
AND ELEVATION (SHEET 1 OF 5)
2 ROWS OF 4 NOS Ø150MM UPVC CABLE Designed Checked Approved
LEAD-IN PIPES ENCASED IN CONCRETE MZH RY MK

Scale Drawn Date


As shown TTA 09/06/2023

Drawing No : Rev

D/CR202/OSJV/CWD/ZZ/S/TMP/DR/SEC/2509
LEAD-IN PIPE ROUTE ELEVATION
SCALE 1:100 CAD File Name : D_CR202_OS_JV_CWD_ZZ_S_TMP-DR_SEC_2509~2513_09.06.2023.dwg Sheet 1 of 1 A1

You might also like