Experiment 3 Report
Experiment 3 Report
Engineering
Department of Civil Engineering
2. Objectives:
There are many objectives but the main
one of this project is
1-To obtain a horizontal plan of a building by
chain surveying.
2- Drawing the horizontal plan on A3 paper
with scale 1:100
3. Apparatus:
4. Procedure:
1- First we draw a line "traverse line" down the length of the
basin 20 meters so that it emerges from the basin about a
meter from each side and puts us 2 Range rod on each side .
and divided this line into several sections, so that the length of
each section is 4 m .
2- We have identified the corner and features ( d1 & d2 & d3 &
d4 & d5 & d6 & d7 & d8 & d9 ) that we want to drop on the
base line for drawing on the paper, using "the pair of ties
method" & " The offset method " .
8. Appendix
|2.5−2.42
2.42 |
×100=3.305 %
|16.1−16.17
16.17 |
×100=0.432 %
|6−6.02
6.02 |
×100=0.332 %